Early successes of the BSI Kitemark and Energy Reduction Verification Bill Wilkinson – Managing Director CAMFIL FARR

Early successes of the BSI Kitemark and Energy Reduction Verification

Embed Size (px)

DESCRIPTION

BSI Kitemark and Energy Reduction Verification.

Citation preview

Page 1: Early successes of the BSI Kitemark and Energy Reduction Verification

Early successes of the BSI Kitemark and Energy Reduction Verification

Bill Wilkinson – Managing Director CAMFIL FARR

Page 2: Early successes of the BSI Kitemark and Energy Reduction Verification

The Standards Solution – EN 16001

• Developed by the European Commission

• Builds upon and harmonises existing national standards and initiatives within Europe

• Adopted as the UK National standard – BS EN 16001:2009

Page 3: Early successes of the BSI Kitemark and Energy Reduction Verification

BS EN 16001 Energy Management System Model

Source: EN 16001:2009Source: EN 16001:2009

Page 4: Early successes of the BSI Kitemark and Energy Reduction Verification

The development of ISO 50001

Publication due 2011

Publication due 2011

Page 5: Early successes of the BSI Kitemark and Energy Reduction Verification

Kitemark Energy Reduction Verification

• Scheme enabling organisations to prove energy reductions

• Based on BS EN 16001

• Applicable to all organisations of any size

• Developed specifically with CRC Energy Efficiency Scheme (CRC) in mind

• Approved as an Early Action Metric under the CRC

Page 6: Early successes of the BSI Kitemark and Energy Reduction Verification

Key benefits of the Kitemark

• Easier for those already familiar with management systems

• Ensures identification and management of ongoing opportunities for improvement

• Excludes emissions not required by the CRC

• Wins the trust of stakeholders

Page 7: Early successes of the BSI Kitemark and Energy Reduction Verification

Don’t take my word for it…

• Camfil Farr is a global manufacturer of air filtration systems and associated services

• BS EN 16001 and BSI ERV Kitemark

• Mr Bill Wilkinson, Managing Director

“This has truly been a master strokefor our organisation.”

“This has truly been a master strokefor our organisation.”

Page 8: Early successes of the BSI Kitemark and Energy Reduction Verification

C L E A N A I R S O L U T I O N S

EARLY SUCCESS OF BSI KITEMARK AND ENERGY REDUCTION VERIFICATION

Page 9: Early successes of the BSI Kitemark and Energy Reduction Verification

C L E A N A I R S O L U T I O N S

9

2011 United Kingdom Sales £22 million

160,000 ft² Production Plant

210 employees £500,000 energy usage

Page 10: Early successes of the BSI Kitemark and Energy Reduction Verification

C L E A N A I R S O L U T I O N S

10www.lowenergyairfilter.co.uk

Manufacture Air Filters

Page 11: Early successes of the BSI Kitemark and Energy Reduction Verification

C L E A N A I R S O L U T I O N S

11

© CAM

FIL

FARR

23-

04-1

3

Air Filters impact on Energy Consumption

Air Handling Unit

Pre-filter Secondary-filter

Air intake

Inlet duct Distribution duct

Room distribution grille

Damper

Cooling coil Heating coil

FAN

MOTOR

Air supply

Molecular-filter

Noise attenuation

OUTSIDE INSIDE

Page 12: Early successes of the BSI Kitemark and Energy Reduction Verification

C L E A N A I R S O L U T I O N S

12

WHY?

Low Energy Air Filters

Page 13: Early successes of the BSI Kitemark and Energy Reduction Verification

C L E A N A I R S O L U T I O N S

13www.lowenergyairfilter.co.uk

CHALLENGES ALONG THE WAY

Page 14: Early successes of the BSI Kitemark and Energy Reduction Verification

C L E A N A I R S O L U T I O N S

14www.lowenergyairfilter.co.uk

CHALLENGES ALONG THE WAY

Page 15: Early successes of the BSI Kitemark and Energy Reduction Verification

C L E A N A I R S O L U T I O N S

15www.lowenergyairfilter.co.uk

CHALLENGES ALONG THE WAY

Page 16: Early successes of the BSI Kitemark and Energy Reduction Verification

C L E A N A I R S O L U T I O N S

16www.lowenergyairfilter.co.uk

CHALLENGES ALONG THE WAY

Page 17: Early successes of the BSI Kitemark and Energy Reduction Verification

C L E A N A I R S O L U T I O N S

FINANCIAL SAVINGS

2008 22%2009 14%2010 12%2011 8%

Page 18: Early successes of the BSI Kitemark and Energy Reduction Verification

C L E A N A I R S O L U T I O N S

18www.lowenergyairfilter.co.uk

IMPACT ON STAKEHOLDERS

Lancashire Business Environmental Awards 2010

Camfil Farr

Carbon management for SMEs

Page 19: Early successes of the BSI Kitemark and Energy Reduction Verification

C L E A N A I R S O L U T I O N S

19www.lowenergyairfilter.co.uk

IMPACT ON STAKEHOLDERS

MITIE Supplier Awards March 2011

Overall Winner of Carbon Management

Camfil Farr

Page 20: Early successes of the BSI Kitemark and Energy Reduction Verification

C L E A N A I R S O L U T I O N S

20www.lowenergyairfilter.co.uk

IMPACT ON STAKEHOLDERS

HVN AWARDS 2011Heating and Ventilating Industry Awards

Air Conditioning Product of the Year

Camfil FarrLow Energy Air Filters

Page 21: Early successes of the BSI Kitemark and Energy Reduction Verification

C L E A N A I R S O L U T I O N S

21www.lowenergyairfilter.co.uk

IMPACT ON STAKEHOLDERS

Shortlisted for Best Factory Awards 2011

Cranfield University

Camfil Farr

Page 22: Early successes of the BSI Kitemark and Energy Reduction Verification

C L E A N A I R S O L U T I O N S

22www.lowenergyairfilter.co.uk

IMPACT ON STAKEHOLDERS

Sustainability Live 2011

The SME Award for Energy Efficiency

Camfil Farr

Page 23: Early successes of the BSI Kitemark and Energy Reduction Verification

C L E A N A I R S O L U T I O N S

23www.lowenergyairfilter.co.uk

IMPACT ON STAKEHOLDERS

Page 24: Early successes of the BSI Kitemark and Energy Reduction Verification

C L E A N A I R S O L U T I O N S

Visit our award winning blogwww.lowenergyairfilter.co.uk

Page 25: Early successes of the BSI Kitemark and Energy Reduction Verification

C L E A N A I R S O L U T I O N S

Page 26: Early successes of the BSI Kitemark and Energy Reduction Verification

Working in partnership

www.lowenergyairfilter.co.uk