Page 1: Construction project to extend a lorry parking facility for Nightowl Truckstop

O’Brien Contractors Limited – Case Study

www. obriencontractors.co.uk | Tel: 01926 423 918

Page 2: Construction project to extend a lorry parking facility for Nightowl Truckstop

www. obriencontractors.co.uk | Tel: 01926 423 918

O'Brien Contractors LtdManor Cottage, Church LaneLeamington SpaCV32 7JT www. obriencontractors.co.uk |[email protected]| Tel: 01926 423 918

Project Profile:

Nightowl Truckstop Rugby Case Study

O’Brien is confident to say, using its wealth of knowledge it is able to target each and every new contract with a smart approach, offering clients the best in quality and construction knowledge.

Client: Hobden CromwellLocation: Lilbourne, Rugby

Date: May 2012 – Sept 2012Sector: Design and Build

Page 3: Construction project to extend a lorry parking facility for Nightowl Truckstop

www. obriencontractors.co.uk | Tel: 01926 423 918

O'Brien Contractors LtdManor Cottage, Church LaneLeamington SpaCV32 7JT www. obriencontractors.co.uk |[email protected]| Tel: 01926 423 918

About the Project:

As Principal Contractor, O’Brien Contractors recently completed a Design and Build project to extend an existing lorry park facility for NightowlTruckstop along the A5 Watling Street, near Rugby. The extension consisted of the construction of an additional 82 lorry parking bays.

The project comprised of a 10,000sqm concrete hard standing with associated storm outfall drainage including a 500mq attenuation tank and pumping station. The perimeter which is monitored by CCTV cameras installed by O’Brien has been secured by a 2.4m fence with electrical topping.

The managed entrance and exit to the new parking bays is controlled from a central hub by ticket machines and lorry blockers that are activated by a prepaid system. A security kiosk has been installed at this location for manual operations if required.

An upgrade to the entrance and exit roads from the A5 to existing fuel areas was also undertaken.

The design was required to meet the “Secured by Design” standards and as the new facility met the desired requirements it has been awarded a “Park Mark” certification, a police driven initiative to ensure a safe and secure area for both lorry and driver. It also enables control and monitoring of truck and trailer movements.

Page 4: Construction project to extend a lorry parking facility for Nightowl Truckstop

Project Challenges:

www. obriencontractors.co.uk | Tel: 01926 423 918

O'Brien Contractors LtdManor Cottage, Church LaneLeamington SpaCV32 7JT www. obriencontractors.co.uk |[email protected]| Tel: 01926 423 918

The truckstop had to meet the standards required by the police initiative Park Mark, there are only 7 other lorry parks in the UK that meetthe standard set by the Police and the parks must pass a full risk assessment before the Park Mark stamp can be awarded.

By choosing a Park Mark® Safer Parking facility you are visiting a car park that has been vetted by the Police and has measures in place in order to create a safer environment for both you and your vehicle.

Page 5: Construction project to extend a lorry parking facility for Nightowl Truckstop

www. obriencontractors.co.uk | Tel: 01926 423 918

O'Brien Contractors LtdManor Cottage, Church LaneLeamington SpaCV32 7JT www. obriencontractors.co.uk |[email protected]| Tel: 01926 423 918

Core Operations:

“O’Brien – Delivering a Smart Approach to Construction”

O’Brien Group offers expert teams across a diverse range of services. All five construction led services, Design and Build, Construction, Sports Pitches, Earthworks, Laser Levelling and Plant Hire operate highly skilled teams who aim to provide the best in construction knowledge and a smart approach to every aspect of our works.

• Bulk earthworks and site clearance• Ground stabilization• Reinforced concrete works including foundations, floors, retaining walls and external service yards• Roads and sewers• Drainage, pipework and associated works• External works including block paving and slabbing• Parking areas• Earthworks’ design and ground modelling facilities• Fine tolerance Laser Levelling and 3D machine control system

Page 6: Construction project to extend a lorry parking facility for Nightowl Truckstop

List of products or services:

Service 1 - Concrete ✓Service 2 - Drainage ✓Service 3 – Fencing ✓Service 4 – Installation of Services ✓Service 5 – 278 Works ✓Service 6 – Design & Build ✓Service 7 – Earthworks ✓Service 8 – Laser Levelling ✓

O'Brien Contractors LtdManor Cottage, Church LaneLeamington SpaCV32 7JT www. obriencontractors.co.uk |[email protected]| Tel: 01926 423 918

List of services provided for the project:

Page 7: Construction project to extend a lorry parking facility for Nightowl Truckstop

www. obriencontractors.co.uk | Tel: 01926 423 918

O'Brien Contractors LtdManor Cottage, Church LaneLeamington SpaCV32 7JT www. obriencontractors.co.uk |[email protected]| Tel: 01926 423 918

Contact Details:

O'Brien Contractors LtdManor CottageChurch LaneLeamington SpaCV32 7JT

Website: www. obriencontractors.co.uk

Email: [email protected]

Tel: 01926 423 918

Connect with us via our social media channels:

Twitter

Google+

Facebook

Linkedin