Page 2: Construction of a Car Park - Jaguar Landrover

O'Brien Contractors LtdManor Cottage, Church LaneLeamington SpaCV32 7JT www. obriencontractors.co.uk |[email protected]| Tel: 01926 423 918

Project Profile:

Jaguar Land Rover – Case Study

O’Brien is confident to say, using its wealth of knowledge it is able to target each and every new contract with a smart approach, offering clients the best in quality and construction knowledge.

Client: Jaguar Land Rover Project: Car Park B and Modular Accommodation Location: Gaydon Engineering Plant, Warwick Value: £1.25m Contract Duration: 18 weeks

Page 3: Construction of a Car Park - Jaguar Landrover

O'Brien Contractors LtdManor Cottage, Church LaneLeamington SpaCV32 7JT www. obriencontractors.co.uk |[email protected]| Tel: 01926 423 918

About the Project:

Work carried out by O’Brien

O’Brien were acting principal contractor for the construction of a new 520 space car park with all site clearances and the removal of spoil to form a new “hill” for testing vehicles. Associated paths, lighting, CCTV and planting and the installation of an underground drainage system and storm attenuation to drain in to the existing drainage outfall were included.

The design was modified during the construction period to reduce future maintenance costs to the client by removing the gravel parking bays and replacing them with porous tarmac The 5200m2 car park was completed in 18 weeks and handed back to the client on time and budget.

Running concurrently with the car park, O’Brien Contractors were also responsible as principal contractor for the sub-structure element of the construction of a new 3 storey modular building for 750 persons and included all foundations, bridging of the existing data ducts, drainage and connection to existing storm system and the completion of a new 6m deep pumping chamber to allow the foul to be discharged to the foul drainage system, the installation of new services and sub-station and all finishes to the perimeter of the building.

Page 4: Construction of a Car Park - Jaguar Landrover

Core Operations:

“O’Brien – Delivering a Smart Approach to Construction”

O’Brien Group offers expert teams across a diverse range of services. All five construction led services, Design and Build, Construction, Sports Pitches, Earthworks, Laser Levelling and Plant Hire operate highly skilled teams who aim to provide the best in construction knowledge and a smart approach to every aspect of our works.

• Bulk earthworks and site clearance• Ground stabilization• Reinforced concrete works including foundations, floors, retaining walls and external service yards• Roads and sewers• Drainage, pipework and associated works• External works including block paving and slabbing• Parking areas• Earthworks’ design and ground modelling facilities• Fine tolerance Laser Levelling and 3D machine control system

O'Brien Contractors LtdManor Cottage, Church LaneLeamington SpaCV32 7JT www. obriencontractors.co.uk |[email protected]| Tel: 01926 423 918

Page 5: Construction of a Car Park - Jaguar Landrover

O'Brien Contractors LtdManor CottageChurch LaneLeamington SpaCV32 7JT

Website: www. obriencontractors.co.uk

Email: [email protected]

Tel: 01926 423 918

Contact Details:

Connect with us via our social media channels:

Twitter

Google+

Facebook

Linkedin