BUILD-TO-ORDER

By:

Lorenzo Cislaghi

Maurizio Melzi

BUS002 – Operations Management 21/10/2013

Queen Mary University of London A.Y. 2013-2014

Page 2: Build to order

0. Build-to-Forecast

BTF is a production approach where products are built on forecast demand rather than actual.

• Mass process and economies of scale

• Overproduction and “push” system

It is the most appropriate approach for high volume and low variety of products

Its non-flexible layout implies long lead times and costs for customized orders.

BTF does not permit to build the car the customer wants, when the customer wants it

Page 3: Build to order

BTO is a production approach where products are not built until a confirmed order forproducts is received.

Customers highly customized requests can be satisfied.

Reconnect the value chain to the customer

0. Build-to-Order

Page 4: Build to order

Batch

• High-customized products need a correctprocess type based on correct objectives.

• It is necessary to give up an high volumeof production for developing theflexibility needed for meeting actualcustomers requests.

• Mass process is not designed forsatisfying customers specificationswithout high costs and long lead times.

Continuous

Variety

Volume

Mass

Jobbing

Project

Productcharacteristics

Pro

cess

char

acte

rist

ics

Transit from a mass processto a batch process

BTO

BTF

1. BtO – Product-Process matrix

Page 5: Build to order

FLEXIBILITYCustomer satisfaction meeting Volume/Mix actual demand

QUALITY

•Quality assurance because each defect isan high cost with small batches and no-inventory

COST

•Avoiding waste for dealing with noeconomies of scale (less volume)

DEPENDABILITY

•Delivering on-time to the next processbecause inventory safety is absent

SPEED

•Satisfying quickly customized requests(loss of sales) and takt between processes.

1. BtO – Performance objectives

Page 6: Build to order

OPERATIONS OBJECTIVES DESIGN PROCESS OBJECTIVES PROCESS CHARACTERISTICS

FLEXIBILITY - Changeover ability- Skilful people- Meeting variable demand

- Cell layout- Architectural knowledge- Flow/Pull System

COST - Reducing holding cost and inventory- Avoiding quality costs- Eliminating waste activities

- Just-in-time- Total Quality Management- Waste reduction

DEPENDABILITY - Delivering items on time for dealing with no inventory

- Assuring replenishment according to actual demand

- Just in Time- Pull system - Flow

SPEED - Reducing lead times- Synchronization between processes

- Flow- Takt

QUALITY - Total control - Suppliers control- Stop and fix

- Flow- Total Quality Management

1. BtO – Design Process objectives

Page 7: Build to order

Focusing on keeping production flexibleand shortening lead times by eliminatingwaste leads to best quality and lowestcost, while improving safety and morale.

TPS House is an example of correctobjectives set and process design forimplementing a BTO system.

1. Today, Tomorrow and

Page 8: Build to order

“I plan to cut down on the slack time within work processes and in the shipping of parts and materials as much as possible. As the basicprinciple in realizing this plan, I will upload the ‘just in time’ approach. The guiding rule is not to have goods shipped too early or too late.”

Kiichiro Toyoda

JIT is a production strategy based on producing and delivering the right items at the right time in theright amounts at the right place.

It is like going to a supermarket:

- Required quantity at the required time

- Stock only what it expects to sell

- Replenishment when items run low on the shelf

- Take only what you need, resupply is assured.

Each process is a customer of preceding processes, and the preceding processes are a kind of store

This pull system reduces in-process inventory and lead times.

2. Just in Time

Page 9: Build to order

PULL SYSTEM is a material-flow control based on the replenishment of only those quantities thathave already been consumed by the next process. The “pull” comes directly from customer actualdemand.

In the supply chain, each process is a “customer” that withdraws from the previous process.

Replenishment of what is needed, when is needed, in the needed quantity at short intervals.

It aligns costly inventory levelswith actual consumption andimplement the flow.

A signal (Kanban) is sent to produce and deliver anew shipment as material is consumed

2. Pull System

Page 10: Build to order

• Eliminating all waste that adds cost withoutadding to value.

• Map the activities that added value to theproduct and getting rid of non value addingactivity

• Do what internal and external customerswant from the process

No waste means reducing costsand lead times

3. Waste Reduction

Page 11: Build to order

Total: everyone in the supply chain is involved in (including suppliers)

Quality: quality built in the process and continuos improvement

Management: enhancing quality with data and profound knowledge

No inventory means a line can not operate from in-process inventory while a production problem isfixed. Lowering the water level of inventory exposes problem.

Each part has to fit perfectly because inadequate quality means costs in JIT.

Build a culture of stopping to fix problems when they occur, to get quality right in the first time.

Focusing on quality reduces costs more than focusing only on cost

4. Total Quality Management

Page 12: Build to order

“Row, row, row”

• Takt (rhythm) comes from the rate customersare buying the product and determines the“pull” for the system.

• It is the maximum time available forproducing a product in order to correctlysatisfy the demand.

• Make one department extra efficient can buryother departments in excess inventory.Processes speed must be synchronized.

Takt is necessary for implementing a flow that does not create inventory

5. Takt

Page 13: Build to order

• BtO process optimal features are summarized in the concept of Lean Manufacturing.

• The core idea is to maximize customer value with fewer resources minimizing waste.

Lean manufacturing

Page 14: Build to order

Test and rework

AssemblyPainted

body storePaint shop

Body-in-white

Body shop

6. Product (line) layoutComponent-related Knowledge

Page 15: Build to order

Cell 1 – Welding Cell 3 - Assembly

Cell 2 - Paint shop

6. Cell LayoutArchitectural-related Knowledge

Page 16: Build to order

• Meet the actual demand (volume and mix)• Changeover

The process ismore flexible, but more expensive

• No economies of scale• Flexible labour is required(architectural knowledge)

The material flow is significantly improved

6. Cell Layout

Page 17: Build to order

7. Financial Data

0

10

20

30

40

50

60

70

80

0.00

2000.00

4000.00

6000.00

8000.00

10000.00

12000.00

14000.00

16000.00

18000.00

19

93

19

94

19

94

19

95

19

95

19

96

19

96

19

97

19

97

19

98

19

98

19

99

19

99

20

00

20

00

20

01

20

01

20

02

20

02

20

03

20

03

20

04

20

04

20

05

20

05

20

06

20

06

20

07

20

07

20

08

20

08

20

09

20

09

20

10

20

10

20

11

20

11

20

12

20

12

20

13

20

13

DJIAFord Motor Corp. & General Motor Corp.

Page 18: Build to order

0

20

40

60

80

100

120

140

160

0

5000

10000

15000

20000

25000

19

93

19

94

19

94

19

95

19

95

19

96

19

96

19

97

19

97

19

98

19

98

19

99

19

99

20

00

20

00

20

01

20

01

20

02

20

02

20

03

20

03

20

04

20

04

20

05

20

05

20

06

20

06

20

07

20

07

20

08

20

08

20

09

20

09

20

10

20

10

20

11

20

11

20

12

20

12

20

13

20

13

NIKKEI 225Toyota Motor Corp. & Honda Motor Corp.

source: Yahoo Finance - Historical Data

7. Financial Data

Page 19: Build to order

0

50

100

150

200

250

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

01

-20

00

05

-20

00

09

-20

00

01

-20

01

05

-20

01

09

-20

01

01

-20

02

05

-20

02

09

-20

02

01

-20

03

05

-20

03

09

-20

03

01

-20

04

05

-20

04

09

-20

04

01

-20

05

05

-20

05

09

-20

05

01

-20

06

05

-20

06

09

-20

06

01

-20

07

05

-20

07

09

-20

07

01

-20

08

05

-20

08

09

-20

08

01

-20

09

05

-20

09

09

-20

09

01

-20

10

05

-20

10

09

-20

10

01

-20

11

05

-20

11

09

-20

11

01

-20

12

05

-20

12

09

-20

12

01

-20

13

05

-20

13

09

-20

13

DAX 30Volkswagen AG & Daimler AG

7. Financial Data

Page 20: Build to order

• RoCE = Return of Capital Employed

RoCEpre-tax = EBIT _

Long-term capital invested

-

+ Measure of efficiency

+ Values profitability

+ No biases because of taxes

- No clear benchmark

- Over-production is awarded

8. Performance Evaluation

Page 21: Build to order

-10.00

-5.00

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.001

98

9

19

90

19

91

19

92

19

93

19

94

19

95

19

96

19

97

19

98

19

99

20

00

Chrysler Ford GM

Best performer: Build to Forecast

USA 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 Sparkline

Chrysler 2.20 0.70 -3.80 4.50 28.00 31.80 16.60 32.50 22.40 #N/D #N/D #N/D

Ford 9.80 2.30 -3.40 -0.10 5.70 6.20 4.40 4.40 6.40 10.90 10.50 7.10

GM 8.70 -3.10 -8.50 -4.00 3.30 9.20 9.60 6.40 7.60 4.30 8.20 5.80

8. Performance Evaluation

Page 22: Build to order

-25.00

-15.00

-5.00

5.00

15.00

25.001

98

9

19

90

19

91

19

92

19

93

19

94

19

95

19

96

19

97

19

98

19

99

20

00

Honda Nissan Toyota

Best performer: Build to Forecast

JAPAN 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 Sparkline

Honda 14.80 10.70 9.30 7.70 5.60 3.60 5.70 7.20 19.30 20.20 21.90 17.30

Nissan 8.50 8.50 4.00 4.60 -1.30 -2.20 -4.50 -2.30 3.30 -0.60 -0.10 -26.10

Toyota 13.10 15.80 12.20 7.20 5.30 3.90 4.30 6.20 10.00 9.60 9.30 9.20

8. Performance Evaluation

Page 23: Build to order

-10.00

-5.00

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

40.001

98

9

19

90

19

91

19

92

19

93

19

94

19

95

19

96

19

97

19

98

19

99

20

00

BMW Daimler VW Group

Best performer: Build to Order

DE 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 Sparkline

BMW 16.00 16.70 15.00 10.90 5.60 7.70 7.20 8.00 10.60 8.60 8.50 11.70

Daimler 47.90 14.30 14.80 8.60 -3.50 6.50 -2.70 3.70 8.00 14.50 15.10 4.80

VW Group 10.60 7.40 8.20 1.80 -6.60 1.90 4.70 8.30 15.10 19.50 14.00 19.70

8. Performance Evaluation

Page 24: Build to order

9. Market Segmentation

BtF

Chrysler

12.8%

Large family cars, SUV, MUV

Ford

5.5%

Fleet, Small and Large cars

GM

4.3%

Fleet, Small and Large cars

Page 25: Build to order

9. Market Segmentation

BtO

Toyota

8.8%

Small, Large car,

MUV, SUV

Nissan

-0.5%

Small, Large, Family cars

BtF

Honda

12.8%

Small, Large car,

MUV, SUV

Page 26: Build to order

9. Market Segmentation

BtO

Daimler

10.1%

Executive, sport cars

BMW

10.1%

Executive, sports cars

BtF

VW Group

9.2%

Small, Large, Family cars, executive

Page 27: Build to order

9. Market Segmentation

•Target the correct market segmentation

• Design the process to achieve perf. objectives

OperationsMarketing

STRATEGY Mass market

Small and fragmented

Medium-high market

Page 28: Build to order

Customise your own car !

COST: 9,795 £DELIVERY: NowCOMFROT: Power steering, electric mirrors and electric front window

COST:DELIVERY:

COMFROT:

10. Choose your car

Page 29: Build to order

Can they work together?

“How do you pronounce DaimlerChrysler?…

‘Daimler’—the ‘Chrysler’ is silent.”

11.

Page 30: Build to order

• Matthias Holweg and Frits K. Pil, The Second Century: ReconnectingCustomer and Value Chain through Build-to-Order, The MITPress, 2005 (Chapter 1,2 and 3)

• Jeffrey K. Liker, The Toyota Way, McGraw-Hill, 2004 (Part One and TwoSection I and II)

• Froud, Haslam, Johal, Williams, Cars after financialisation: a casestudy in financial under-performance, constraints andconsequences, Competition and change, 2002

• “Build-to-order, Lean manufacturing, Just-in-Time, TQM and Cellularmanufacturing”, Wikipedia

References