BMH Conference, Perth | June 2015 | 1
Optimising returnsat the end of mine life
MMG Case Study
B I L L S U G D E N I J U N E 2 0 1 5
BMH Conference, Perth | June 2015 | 2
O U R G O L D E N R U L E S O F S A F E T Y
How can we demonstrate
living ‘Safety in all we do’,
‘Respect the environment’ and
following the Golden Rules
of Safety as individuals in
our everyday life?
HSEC moment
BMH Conference, Perth | June 2015 | 3
1
2
3
5
6
7
4 8
Ausenco
MMG Century Mine
Motivation
Our Process
Results
Questions
Close
Agenda
Introduction
BMH Conference, Perth | June 2015 | 4
A U S E N C O I S A G L O B A L , D I V E R S I F I E D
E N G I N E E R I N G A N D P R O G R A M M A N A G E M E N T
C O M PA N Y P R O V I D I N G S E RV I C E S A C R O S S T H E
E N E R G Y A N D R E S O U R C E S S E C TO R S .
BMH Conference, Perth | June 2015 | 5
31 offices, 19 countriesAsia
Beijing, China
Jakarta, Indonesia
Mumbai, India
Kuala Lumpur, Malaysia
Australia/
South Pacific
Apia, Samoa
Brisbane, Australia
Honiara, Solomon Islands
Nuku’alofa, Tonga
Perth, Australia
Port Moresby, PNG
Port Vila, Vanuatu
Sunshine Coast, Australia
Suva, Fiji
Middle East
Jeddah, Saudi Arabia
North America
Burlington, Canada
Calgary, Canada
Halifax, Canada
Concord, USA
Denver, USA
Houston, USA
Montréal, Canada
Reno, USA
Toronto, Canada
Vancouver, Canada
South America
Belo Horizonte, Brazil
Lima, Peru
Mendoza, Argentina
Salta, Argentina
San Juan, Argentina
Santiago, Chile
Africa
Johannesburg,
South Africa
BMH Conference, Perth | June 2015 | 6
Highlights
O U R C L A I M S T O F A M E
Track record offit-for-purposeProcess plantsthat exceed nameplate
One of the largest in-house team of experts
in minerals processing in
the world
Delivered the largest
greenfield copper
concentrator in Africa lump sum
PHU KHAM Set the
benchmark for low-cost plants
that perform
P O R T S A N D
T E R M I N A L S
Involved in the design of over
400 ports globally
Exceptional capability in
bulk materials handling
S L U R R Y P I P E L I N E S
Involved in more than 75% of the world’s long distance slurry pipelines
S E P O N M I N E
First acid milling hard rock
grinding circuit in world
C O N S T A N C I A
Delivering the first large-scale
copper concentrate at high altitude in
Peru
O P E R A T I O N S &
M A I N T E N A N C E
Leaders in
physical asset
management
and reliability
BMH Conference, Perth | June 2015 | 7
• Australia’s largest, and the World's
3rd largest, open cut zinc mine
• Located at Lawn Hill, 250km from
Mount Isa in north-west Queensland
• Conventional open cut mining,
grinding and flotation methods to
produce zinc and lead concentrate
• Product slurry is transferred 304km by
underground pipeline to Karumba
Port on the lower Gulf of Carpentaria
• Shipped to smelters in Australia,
Europe and Asia
• Began operations in 1999 and the
last production from the open cut
is expected to occur in Q3 of 2015
MMG Century MineI N T R O D U C T I O N
BMH Conference, Perth | June 2015 | 8
• Closure was planned 2 years ago
with requirement for minimisation
of operating costs without risking
asset reliability – must deliver plan
• Century engaged Ausenco Rylson for
Cost-Reliability Optimisation in 2013
• Performance based contract – must
deliver at least 10% savings in site
maintenance costs, or no fee
MMG Century MineM O T I V A T I O N
BMH Conference, Perth | June 2015 | 9
Industry driversM O T I V A T I O N
Aberdeen Group Research 2012
Two Research Papers delivered in 2012 by Aberdeen Group:
1. Asset Management, Building the Business Case
2. Operation Risk Management.
BMH Conference, Perth | June 2015 | 10
• Initiatives forecast a reduction in the
Life Cycle Plan Costs of $38 million
over the period
• Equivalent to a reduction of 17%
• This was a full ‘At Risk’ contract;
payment on outcome only.
MMG Century Mine – Forecast ResultsO U R P R O C E S S
LCP costs (AM&MM) OCT 13 – DEC 15
Optimised LCP Costs (AM&MM) OCT 13 – DEC 15
Cost reduction initiatives
BMH Conference, Perth | June 2015 | 11
• Project Initiation – set key targets for
costs, reliability and trade productivity
• Capability Mapping – baseline the
‘current state’ cost performance and
maintenance strategy
• Gap Analysis – identify cost reduction
initiatives with detailed processes and
methodologies to achieve
• Optimisation – analytics and
modelling of changes to deliver
savings against added business risk
• Implementation – rolling out and
bedding in the changes, coupled with
mentoring, training and guidance
Key PhasesO U R P R O C E S S
BMH Conference, Perth | June 2015 | 12
People Process Tactics Systems
Where do we focus?O U R P R O C E S S
Understanding Process Definition Definition Suitability
Competencies Understanding Validation Configuration
Structure Training Optimisation Competency
Training Communication Innovation Training
Communication Measurement Implementation Communication
Measurement Measurement Measurement
BMH Conference, Perth | June 2015 | 13
• Internally developed Enterprise Asset
Management (EAM) solution designed to
deliver a holistic view of the asset over the
asset lifecycle
• Ensures the organisation can deliver the
business requirement at optimum cost and risk.
• Developed based on accepted industry
standards including PAS 55 and ISO55000
Asset Management standards; as well as the
SAE JA-1011 RCM standard'
• Focuses at the activity level to ensure that
optimisations will provide a sustainable benefit
to the business
IP: Rylson8O U R P R O C E S S
BMH Conference, Perth | June 2015 | 14
RoadmapO U R P R O C E S S
Operating
Strategy
CAPEX Forecasts
BMH Conference, Perth | June 2015 | 15
Criticality analysisO U R P R O C E S S
• Understand the criticality of
an asset to the business
• Given business context and
operating strategy
BMH Conference, Perth | June 2015 | 16
Plant hierarchyO U R P R O C E S S
• Captures to
maintainable item
level
• Last replace dates
are captured from
the CMMS
• Forecast forward
costs from last
replace date
BMH Conference, Perth | June 2015 | 17
Maintenance strategy developmentO U R P R O C E S S
• Wizards assist with applying structured
Reliability Centred Maintenance
(RCM) approach to maintenance
strategy development.
• Risk based tools allow the user to
optimise task frequencies
BMH Conference, Perth | June 2015 | 18
Risk based task analysisO U R P R O C E S S
• Condition based tasks utilise a criticality
based optimisation wizard
• Fixed Time replacement tasks utilise
Glasser’s Graphs (optimal replacement age)
• Fault Finding Tasks utilise a consequence
based analysis of multiple failures
BMH Conference, Perth | June 2015 | 19
Task resourcesO U R P R O C E S S
• Full integration
with the materials
catalog and labour
tables to ensure
material costs are
always current
• Ability to specify
labour productivity
to ensure labour
forecasts are
always accurate
BMH Conference, Perth | June 2015 | 20
Work packagesO U R P R O C E S S
• Package tasks
by route, labour,
constraints or
frequency
• Output is fully
customisable
with routing and
grouping ability
as standard
BMH Conference, Perth | June 2015 | 21
Life cycle performance modellingO U R P R O C E S S
• Full RAM
modelling
capability
• Breakdown to the
Maintainable Item
BMH Conference, Perth | June 2015 | 22
OpexO U R P R O C E S S
• Full suite of
reports and
charts available
to analyse
Opex budgets
over the life of
the Asset or
Business
BMH Conference, Perth | June 2015 | 23
Spare analysisO U R P R O C E S S
• Optimise Critical
Spares holding
based on risk
based analysis
• Utilises the
inputs from the
maintenance
strategy to
determine the
probability of
failure
• Recommends
optimum holding
and time to hold
BMH Conference, Perth | June 2015 | 24
Total cost of ownershipO U R P R O C E S S
• Determine the Total Cost of Ownership of the Asset over the Asset Lifecycle
• Optimise the Economic Life of the Asset from the EAC curve
• Determine the replacement drivers
BMH Conference, Perth | June 2015 | 25
Dynamic shutdown schedulerO U R P R O C E S S
BMH Conference, Perth | June 2015 | 26
Labour modellingO U R P R O C E S S
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
1 2 3 4 5 6 7 8 9 10 11
FTE
-Fu
ll Ti
me
Eq
uiv
ale
nt
Years
FTE - Life of Asset
Contractor
Lube Tech
Auto Electrician
Tyre Fitter
Boilermaker
Fitter
BMH Conference, Perth | June 2015 | 27
Materials modellingO U R P R O C E S S
$0
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
$700,000
$800,000
1 2 3 4 5 6 7 8 9 10 11
Co
st A
U$
Years
Material Costs Per Expense Element
2431 - Maint Materials - Mechanical
2404 - Hydraulic Components
0000 - Non Selected
2010 - Pipes Valves & Accessories
2422 - Lubricants
2408 - Transmissions & Drivelines
2461 - Maintenance Materials - Other, inc Consumables
2451 - Maintenance Materials - Electrical
2421 - Maintenance Materials - Preventative
BMH Conference, Perth | June 2015 | 28
Full life cycle cost modellingO U R P R O C E S S
$0
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
1 2 3 4 5 6 7 8 9 10 11
Co
st A
U$
Years
OPEX - Life of Asset
Secondary Maintenance
Tyre Allowance ($/hr)
Diesel
Primary Maintenance
Cumulative Cost Average
BMH Conference, Perth | June 2015 | 29
Risk modellingO U R P R O C E S S
Increased Risk Cost Reduction
0-10% $ 3,231,58010%-20% $ 1,429,326
20%-30% $ 1,244,324
30%-40% $ 129,015
50%+ $ 24,648
Grand Total $ 6,058,895
BMH Conference, Perth | June 2015 | 30
OffsetO U R P R O C E S S
• Offset condition
based tasks
where data
support it
• Optimise Opex
budgets based
on Risk
BMH Conference, Perth | June 2015 | 31
• Increasing Labour productivity
will yield cost savings with
labour reductions
• Recommendation is a staged
labour reduction against the
mine plan
Labour profileO U R P R O C E S S
BMH Conference, Perth | June 2015 | 32
ImplementO U R P R O C E S S
• Rolling out and
bedding in changes
• Mentoring
• Training
• Guidance
BMH Conference, Perth | June 2015 | 33
Cost profileR E S U L T S
Original
Optimised
BMH Conference, Perth | June 2015 | 34
• Lifecycle Optimisation of all Process Plant and Mining Assets
• Introduction of innovation around the use of already available data
• Initiatives represent a reduction in Life Cycle Plan Costs that is approaching $40 million ‘banked’ over the period
• Equivalent to a reduction of 17%
• This was a full ‘At Risk’ contract; payment on outcome only.
MMG Century Mine – Benefit SummaryR E S U L T S
LCP costs (AM&MM) OCT 13 – DEC 15
Optimised LCP Costs (AM&MM) OCT 13 – DEC 15
Cost reduction initiatives
BMH Conference, Perth | June 2015 | 35
Questions?
BMH Conference, Perth | June 2015 | 36
Thank-you
Bill Sugden
Regional Manager
M: +61 458 432 008