14
Allomax Subsea is part of the Allomax Associates group of company’s Allomax Subsea Overview "ROV support on "IRM Projects "Construction Projects "Survey projects "Drill support projects "Diver support and inspection work scopes

Allomax Subsea Ppt

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Allomax Subsea Ppt

Allomax Subsea is part of the Allomax Associates group of company’s

Allomax Subsea Overview

• ROV support on• IRM Projects • Construction Projects• Survey projects• Drill support projects• Diver support and inspection work scopes

Page 2: Allomax Subsea Ppt

Why Allomax?

• Proven 18 year track record consisting of

– Conceptual field designs for BP west of Shetland fields, Claire, Foinaven and Schiehallion.

– Talisman 85 field evaluations. Taking production from 45 – 150 mbpd. From 1995 to 2005

– Supply project management to Respsol Egypt for the design, planning, and drilling for a jackup, a semi-sub and drilling ship.

– Re-engineered drilling platform from 2 to 1 for Apache China saving $40M Capex.

Page 3: Allomax Subsea Ppt

Our Client base

Page 4: Allomax Subsea Ppt

Our Client base

Page 5: Allomax Subsea Ppt

Company overview

Allomax Limited Formed 1992 Project Management internationally

Allomax Limited 1996Global provider of personnel

Allomax Subsea formed 2010Global provider or ROV services

Offices Aberdeen & London

Page 6: Allomax Subsea Ppt

Allomax Subsea

• Client awareness

• specific points of contact for larger clients

• Future long term relationships

• Strategy focused on the next 3-5 years

• New ROV’s for long term projects

• Experienced within the ROV industry

• Dynamic ROV supply company

• Innovative, fast & efficient

• Focussed market awareness

• Solution orientated

• Originality, objectivity, enthusiasm & trust

• Premium service delivering ‘value for money’

• No prior market challenges

• No excess baggage!

Page 7: Allomax Subsea Ppt

ROV Solutions

• Allomax Subsea intends to use Triton

based ROV systems, XLX and XLR.

• All construction/survey work will be

completed by XLX ROV

• All medium construction and drill support

will be completed by XLR.

• All medium/smaller construction and

inspection will be performed by Seaeye

systems either Panther/Cougar variations

• We intend to integrate Micro ROV’s to

our medium systems where inspection

work is required.

• We have the ability to bring in vessels for

longer term charter work where required.

Page 8: Allomax Subsea Ppt

Triton XLX

Heavy Duty Work Class ROV

System

Perry Slingsby (PSS) Work Class

ROV - Triton XLX with construction

capabilities

Depth Rating: 3,000/4,000 MSW

Power: 150 – 200 HP

Through Lift Frame: 3,000kg

Control System: ICE™ Real Time

Control System with GHz Telemetry

and Graphical Diagnostics

Control Modes: Heading, Depth,

Altitude and Auto Position

Payload capacity: 250 – 550 kg

Page 9: Allomax Subsea Ppt

Triton XLR

Medium Duty Work Class ROV

System

Perry Slingsby (PSS) Work Class

ROV - Triton XLR with construction

capabilities

Depth Rating: 3,000/4,000 MSW

Power: 100-125

Through Lift Frame: 2,000kg

Control System: ICE™ Real Time

Control System with GHz Telemetry

and Graphical Diagnostics

Control Modes: Heading, Depth,

Altitude and Auto Position

Payload capacity: 150-300kg

Page 10: Allomax Subsea Ppt

Seaeye Cougar (XT)/ Panther XT (Plus)

Specifications Seaeye Cougar

Seaeye Cougar-XT

Depth Rating 2000 msw 2000 msw

Length 1506 mm 1515 mm

Height 745 mm 790 mm

Width 1000 mm 1000 mm

Launch Weight 335 kg 344 kgForward Speed 3 knots > 3.2 knots

Thrust Fwd 100 kgf 170 kgf

Thrust Lateral 72 kgf 120 kgf

Thrust Vertical 76 kgf 110 kgf

Payload 80 kg 80 kg

Specifications Seaeye Panther XT

Depth rating 1500 mswLength 1750 mmHeight 1217 mmWidth 1060 mm

Launch weight 500 kgForward speed > 3 knotsThrust forward 195 kgfThrust lateral 140 kgfThrust vertical 118 kgf

Payload 110 kg

Page 11: Allomax Subsea Ppt

Proposed Personnel • Allomax Subsea intends to have the best personnel

available to run their projects

•Allomax Subsea has spent over £1M developing a

competency scheme which can be used over the

internet.

• Allomax Subsea will use this competency scheme in

conjunction with IMCA’s guideline as a base to ensure

the its effectiveness

• Allomax Subsea’s will also ensure a full training matrix

is adhered to.

• Our training matrix will also ensure our personnel will be

fully qualified.

• Training such as High Voltage will be competed by a

competent subcontractor such as MTCS

• Allomax Associates is an agency and we will only use

personnel via this agency, this keeps costs low and

ensures top calibre personnel

Page 12: Allomax Subsea Ppt

Proposed Project Personnel for Client

Managing DirectorAllomax Subsea

Operations Manager

IRM PM

Senior PM client Only

Survey PM

• Not enough attention paid to clients• Regular meetings either at client or Allomax • Daily communication with client (no matter what) • Trust developed between client and Allomax

Page 13: Allomax Subsea Ppt

Additional Information

• Allomax Subsea in talks with survey

contractors

• Allomax will have an alliance with someone

shortly

• All survey sensors and tooling will be either

provided by Allomax or survey contractor under

instruction of project manager

• All ROV tooling will be handled by Allomax

project manager

• All ROV/survey/tooling specific cabling will

handled by Allomax project managers

• All project procedures will be completed by

Allomax project managers and HSEQ manager

Page 14: Allomax Subsea Ppt

Thank you for your attention, any questions?