A systematic approach
January 2011
Kickoff Fast Forward
Regional Transit
System Plan
Mobile Outreach Bus
119 locations
2000 citizens
July 2011
Draft Plan presented
for public review
October 2011
Regional Transit
System Plan adopted
January 2012
Kickoff Peoria
Alternatives Analysis
April 2012
Data collection for
Peoria Route 105 and
8 other routes
July 2012
Public Meetings along
corridor (Round 1)
January 2013
Public meetings and
targeted outreach
(Round 2)
February 2013
Peoria BRT adopted
as locally preferred
alternative
Adopted Regional Transit System
Plan
10/21/2013 4
Peoria/Riverside
Corridor
Residents: 69,000
Jobs: 37,000
5,700 daily trips to
downtown
36 stations
15 min peak frequency
Real-time arrival info
Off-board fare payment
Easy boarding
Signature branding
$37 M in economic impact
CONNECTS TO…
5 grocery stores
Cherry Street
Brookside
Downtown
10 other bus routes
ORU/ Mabee Center
Cityplex Towers
Shoppes on
Peoria
Tulsa Tech – Peoria Campus
St. John/Hillcrest
Utica Square
Gathering Place
Station Concept Examples
•32 ft Concrete platform
•Station canopy and structural framing support
•LED lighting beneath station canopy
•Benches and / or leaning rails, bicycle racks, trash cans
•Branded, BRT signage and passenger information
•Allowance for public art incorporated into amenities
James Wagner, AICP
Transportation Projects Coordinator
INCOG
(918) 584-7526
Questions?