1
MONPOLYMET GROUP
• Founded by Mrs.Garamjav
Tseden in 1992
• One of “MONGOLIAN TOP 100
INDUSTRY”, “BEST
REHABILITATING COMPANY”
from 2003 - 2015
• 23 years of successful
production and business
operations
• Has 4 subsidiaries
MONCEMENT PROJECT MANAGEMENT
MONPOLYMET GROUP IMPLEMENTER OF THE MONCEMENT PROJECT
MONPOLYMET ONE OF THE LEADING MINING
COMPANIES IN MONGOLIA
MONPOLYMET
“BEST REHABILITATING COMPANY” (2003 to 2015)
Recognized nationally
for leading the
industry’s standards for
land rehabilitation by
taking seriously the
environmental
responsibility of its
mining activities.
475 hectare (60%) area
was restored at the
780 hectare mined
area utilizing own
investments and in-
house professional
expertise. Technical
rehabilitation was done
on 705 ha (90%).
Ensures
environmentally
friendly work ethics by
training its staff and
building experience
each year with the help
of the latest technology
and qualified
professionals.
MONCEMENT PROJECT
MAIN OUTCOME
MONCEMENT PROJECT
DEVELOPING A CONSTRUCTION MATERIALS COMPANY
Integrated plant of Orgun Soum – Dornogobi
province
• Clinker 1750 tpd corresponding to 550 ktpy of
clinker, and up to 800 ktpy of cement
• Cement capacity 250 ktpy
Grinding station of
Ulaanbaatar
• Cement only
• Capacity 650 ktpy
520 km of Ulaanbaatar
180 km from the
Chinese border
Clinker &
cement plant
Cement plant
Head office in
Ulaanbaatar
1
1
1
MONCEMENT PROJECT
MARKET STUDY
57% 59%
65%
77%
85%
79%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
0.0
0.5
1.0
1.5
2.0
2.5
2009 2010 2011 2012 2013 2014
Mill
ion
to
ns
of
cem
en
t
Local cement
Imported
Import ratio
ORGUN SOUM
INTEGRATED PLANT PROJECT
Quality specification for cement
OPC 10% 42.5 MNS 974:2008
Advantages of Moncement plant
with dry-method technology
Water consumption is 4-5 times less than
wet-method technology
Power consumption is 30% less than that of
wet-method technology
Dust level is 30mg/Hm3 NOx, Sox –
negligible amount
WHR system produces 5MW of
power by using waste heat
Fuel consumption is 2 times less than that of
wet-method technology
90% of living and industrial used water is
recycled and re-used
Mineral additive – 10% zeolite
Grinding rate – R008% < 3
Blaine S cm2/g > 3200
Uneven fluctuation in volume – No
Compressive strength after 28 days – 47.5 mPa
Creeping rate after 28 days – 7.8 kg/cm2
MONCEMENT PLANT TECHNOLOGY
URGON SOUM INTEGRATED PLANT
The site in July 2013
URGON SOUM INTEGRATED PLANT
The site in September 2015
ENGINEERING OF THE PLANT
• Implementation of the BAT for all process (dust and gas emissions)
• Continuous monitoring of the emissions
• No solid wastes
• Waste water rejects are treated and meet the Mongolian standards
• Energy saving (Plant performance and WHGG)
• Water saving and recycling
ENVIRONMENTAL & SOCIAL ACTION PLAN
ENVIRONMENTAL STEWARDSHIP
OTHER IMPORTANT ACTIONS
• Hydrogeology study and monitoring
• Biodiversity study and monitoring
ENVIRONMENTAL & SOCIAL ACTION PLAN
SUPPORT TO THE LOCAL COMMUNITY
JUNE 26TH, FIRST DELIVERIES OF
MATERIALS FOR CEMENT LINE TESTING
17
ULAANBAATAR GRINDING STATION
PROJECT ESSENTIALS
A grinding station in Ulaanbaatar
corresponds to our commercial
strategy
• Cement terminal for direct
sales
• The biggest cement storage
in UB: customers request
• Optimization of logistics &
investment
Technical data
• Connected to the railroad
• 650 ktpy
• EPC contract awarded to
CEIEC
Schedule & progress
• Civil works in progress
• Commissioning Q3 2016
19