Page 1: 2 Day Rail

“Delivering Tomorrow’s Solutions 2-Day”

Page 2: 2 Day Rail

Projects

East London Line Project Metronet Track Renewals Project

Waterloo & City Line Project Piccadilly Line Wet Beds

LUL Sub-Surface Upgrade ProjectT002/3 Safety Critical Licensing

Page 3: 2 Day Rail

East LondonLine Project

Project managed the delivery of architectural, civils and station infrastructure; to meet main works project milestones on the NEC contract.

Developed strategy, scope definition, interface management and design delivery for £70m variation works to residual civils assets station non compliance works

Page 4: 2 Day Rail

Metronet TrackRenewals Project

• Established design, survey and assurance teams and project planning processes to manage multi-million pound track replacement programme.

• Established team to successfully tender and plan multi-million pound track renewals on NEC contracts.

• Project managed and delivered track renewals work against stringent safety, quality, engineering standards and specifications.

Page 5: 2 Day Rail

Waterloo & CityLine Project

• Provided leadership of engineering management and assurance team for £23m multi-discipline (track, DC electrification, signals, control systems) NEC contract.

Page 6: 2 Day Rail

Piccadilly LineWet Beds

• Project managed delivery of £1m of track heavy maintenance work including, specifications, tender review, method statements, access planning, cost control and handback.

Page 7: 2 Day Rail

T002/3 SafetyCritical Licensing

• Spearheaded the permanent way discipline on the steering committee to design, develop and implement safety critical licensing throughout London Underground. • Developed, implemented and maintained T002/3 Safety Critical Licensing process for all sub-contracted labour and permanent staff.

Page 8: 2 Day Rail

LUL Sub-SurfaceUpgrade Project

• Provision of technical expertise to enable installation of Correct Side Door Communications Equipment.

Page 9: 2 Day Rail

“Delivering Tomorrow’s Solutions 2-Day”

GARY DAY BEng. (Hons), MBA

Telephone: 07768-917567E-Mail: [email protected]: http://uk.linkedin.com/in/garyday

http://rail-champions.com/our-valued-partners/