Upload
bob-squirrell
View
217
Download
4
Tags:
Embed Size (px)
DESCRIPTION
Here's very official proof from Mongolia that F2-21 has the ability to significantly reduce fuel emissions and pollution across cities, while cutting fuel consumption by a substantial amount. The Honorable N. Altankhuyag, the Prime Minister of Mongolia and the Chairman of National Committee on Reducing Air Pollution issued an Official Order, effective in October, 2014, that H2OIL’s F2-21 eeFuel be used throughout the nation in order to encourage fuel efficiency and combat air pollution. The official order was issued after extensive tests and examination, which proved F2-21 eeFuel fuel savings and benefits to the environment. This is the first time the head of state has issued such an order. This presentation shows the methods and results of the extensive and extended tests conducted on cars, buses, lorries and trains - both petrol and diesel - in order to reach this decision. PS: eeFuel has recently received a “Lean and Green Certificate” from Intertraffic of Amsterdam and recognized as one of the best green products in Benelux Countries.
Citation preview
Testing Result of Fuel Saving (2012.04.09 – 2014.08.01(
Project Manager: “J.WELL Mongolia International” LLC Exclusive Distributor of H2OIL Corporation, U.S.A
“J.WELL Mongolia International” LLC 2012.04.20
Participating Organizations № Organizations Executives Participation
1 Concern of the Electronic Technology & Machinery Research (CETMR)
D.Yondon Suren (Mongolian State Honored Transport Worker, Doctor Ph.D, Professior,
Consulting Engineer of Mongolia)
Head of Testing operation
2 Center Laboratory of Customhouse in Mongolia N.Tsolmon (Chief) Examined the sample of F2-21
3 Institute of Chemistry and Chemical Technology Mongolian Academy of Sciences
D.Batsuren (Director, Academician)
Examined the sample of F2-21
4 Metropolitan Air Pollution Department Ch.Batsaikhan (Vice Chief)
Tested F2-21 for smoke reduction
5 Functional Inspection Department of Mongolia Gan-Uul (State Inspector)
Tested F2-21 for smoke reduction
6 International Confidential Laboratory of Mongolian University of Science and Technology
J.Tseveenjav (Doctor Ph.D), Professor Examined the sample of F2-21
7 International and Confidential Laboratory of Petrovis Group
V.Alimaa (Doctor Ph.d) of Mongolian University of Science and Technology
Examined the sample of F2-21
8 International and Confidential Laboratory of Shunkhlai Group
D.Chuluunchimeg (Laboratory manager)
Examined the sample of F2-21
9 “AMBER” International and Confidential Laboratory
B.Adiya (Laboratory manager) Examined the sample of F2-21
10 Department of Transportation and Transport Diagnostics Center
Nyamsan (Expert) Analyze and Tested Vehicles
11 Autobus-3 Company T.Battsetseg (Expert of Concern of the Electronic Technology & Machinery Research)
Second Leader of Testing Operation
TECHNICAL SPECIFICATION OF THE TEST VEHICLES
“J.WELL Mongolia International” LLC 2012.04.20
Specification Vehicles state numbers 16-67 UNG 46-31 UBE 66-78 UBO 22-75 UNO 75-26 UBE 79-04 UNZ 29-77 UNC
1 Manufacturer country Japan Japan Korea Japan Korea Korea China
2 Brand and Model Toyota Corolla
Toyota Platz
Hyundai Accent
Toyota L a n d - Cruiser
Sang Yong Istana
Kia Bongo Dong Feng
3 Application Automobile Automobile Automobile Automobile Small-sized Microbus
Small-sized Truck
40 ton Truck
4 Manufactured date 1998 1999 1994 1992 1998 2005 2011
5 Imported date in Mongolia
2007 2008 2005 2011 2008 2011 2011
6 Total Run (odometer)
145862 177581 99209 130239 313800 100870 101915
7 Engine Petrol Petrol Petrol Diesel Diesel Diesel Diesel
8 Engine capacity 1330cc 1000cc 1500cc 2800cc 2000cc 2700cc 20080cc
9 Fuel type AI – 92 AI – 92 AI – 92 Diesel Diesel Diesel Diesel
10 Gearbox Mechanical Automatic Mechanical Automatic Mechanical Mechanical Mechanical
Participating Vehicles for the Tes>ng Opera>on
ULAANBAATAR – BAGANUUR (ROUTE 121KM)
“J.WELL Mongolia International” LLC 2012.04.21
ULAANBAATAR – DARKHAN (ROUTE 230KM)
ULAANBAATAR – DARKHAN (ROUTE 45KM)
Participating Drivers For The Testing Operation
ULAANBAATAR – BAGANUUR DRIVERS: LHAGVADORJ AND TUYA
ULAANBAATAR – DARKHAN DRIVERS: ALTANSUKH AND BAYARJARGAL
ULAANBAATAR – ZUUNMOD DRIVERS: BATTUMUR AND OTGONTUMUR
ULAANBAATAR – BULGAN DRIVER: GANSUKH
“J.WELL Mongolia International” LLC 2012.04.21
Mixing F2-21 eeFuel Additive with Regular Fuel
F2-‐21 PRODUCT USED FOR 2 DAYS TESTING
“J.WELL Mongolia International” LLC 2012.04.22
Fuel Consumption Figures
FUEL CONSUMPTION FOR 2 DAYS TEST
“J.WELL Mongolia International” LLC 2012.04.22
Vehicle state
number
Brand and Model
Fuel Used (Liters)
Fuel consumption after using F2-21 eeFuel, (Liter)
2 days testing change average (%)
Fuel (Liters)
Change (%)
Fuel (Liters)
Change (%)
First day Second day 22.75 UNO Toyota
Landcruiser 46.35L 40.9L 11.7% 42.59L 8.1% 9.9%
75-26 UBE Sang Yong Istana
36.39L 33.29L 8.5% 33.78L 7.2% 7.85%
79-04 UNZ Kia Bongo
22.91L 22.80L 0.5% 22.1L 3.5% 2.0%
29-77 UNS Dong Fång
90.0L 75.0L 16.7% 65.0L 27.8% 22.25%
46-31 UBE Òîyota Platz
6.43L 7.06L 9.8% 5.74L 10.7% 10.25%
66-78 UBO Hyundai Accent
4.83L 3.92L 18.8% 3.87L 19.8% 19.3%
16-67 UNG Òîyota Corolla
23.72L 22.29L 6.0% 22.23L 6.3% 6.15%
Total - - - 10.28% - 11.9% 11.09%
TESTING, OPERATION AND MEASURING FUELS
“J.WELL Mongolia International” LLC 2012.04.22
The Report of Concern of the Electronic Technology & Machinery Research
“J.WELL Mongolia International” LLC 2012.04.23
Test -‐ 3 Summary of F2-21 eeFuel additive Evaluation Report
“J.WELL Mongolia International” LLC 2012.05.24
“J.WELL Mongolia International” LLC 2012.05.24
№ Organization name Executives Participation
1 Concern of the Electronic Technology & Machinery Research
D.YondonSuren (Mongolian State Honored Transport
Worker, Doctor Ph.D, Professior, Consulting Engineer of Mongolia)
Leader of Testing operation
2 Functional Inspection Department of Mongolia
State Inspector Surveillance and Investigation
3 Department of Transportation and Transport Diagnostics Center
Expert Analyze and Tested Vehicles
4 Autobus-3 Company Director of Autobus-3 Company Support the testing operation
Cooperating Organizations for Bus Testing
Buses involved in the experiment
“J.WELL Mongolia International” LLC 2012.05.24
Garage # State Number Start End Drivers Name
A 51st Route (Misheel Expo– DariEkh) Final Destination Selkh Misheel Selkh Misheel
1 31 0370 UBCH + Altangadas
2 48 0387 UBCH + + Oyuntsetseg
3 30 0369 UBCH + + Svkhbaatar
4 46 0355 UBCH + + Turbat
5 36 0375 UBCH + + Sainbayar
B 51st Route (Misheel Expo– DariEkh)
Final Destination Khoroolol Khaldvart Khoroolol Khaldvart 1 18 0346 UBCH + Byambasuren
2 10 0345 UBCH + Munkhtubshin
3 2 0351 UBCH + Baasansuren
4 17 UBCH
5 24 0363 UBCH + Davaa
Participating Buses
5 BUSES FROM KHOROOLOL – KHALDVART ROUTE 5 BUSES FROM SELKH – MISHEEL EXPO ROUTE
THERE WERE TWO DIFFERENT ROUTES AND 10 OF THE 85 BUSES FROM AUTOBUS-3 COMPANY WERE INVOLVED IN THE TESTING OPERATION
“J.WELL Mongolia International” LLC 2012.05.25
Participating Bus Drivers
“J.WELL Mongolia International” LLC 2012.05.25
Enriching Regular Diesel by F2-21 eeFuel
“J.WELL Mongolia International” LLC 2012.05.30
F2-21 eeFuel was used for 6 days of testing
Report from Advising Engineers and Head of Testing Operation
“J.WELL Mongolia International” LLC 2012.06.05
Testing Operation at 2nd Division of Ulaanbaatar Railways Company
“J.WELL Mongolia International” LLC 2012.11.16
Testing Result from 2nd Division of Ulaanbaatar Railway Company
“J.WELL Mongolia International” LLC 2012.11.17
Joint Testing Report of Shunkhlai LLC and J.WELL Mongolia International LLC for testing
“F2-21 eeFuel and F2-21 eeLube”
J. WELL Mongolia International LLC
“J.WELL Mongolia International” LLC 2013.05.16
Brief Introduction
The joint report from Shunkhlai LLC and J. WELL Mongolia International LLC for testing F2-21 eeFuel and eeLube liquid nano- technology in the field, has shown significant results. Saving fuel an average of 14% over 3 days of testing operation. This involved 3 diesel vehicles of Shunkhlai LLC in the testing operation and covered a total of 728.4km on the Ulaanbaatar to Lvn to Ulaanbaatar route. Two representative from J. WELL Mongolia International LLC and five representatives from Shunkhlai LLC (total of 7 persons) participated in the testing operation.
“J.WELL Mongolia International” LLC 2013.05.16
Participating Vehicles
Three diesel vehicles from Shunkhlai LLC: Toyota – Mitsubishi FUSO - Nissan
“J.WELL Mongolia International” LLC 2013.05.16
Participating Drivers and Workgroup
“J.WELL Mongolia International” LLC 2013.05.16
Using F2-21 eeLube Oil Additive
“J.WELL Mongolia International” LLC 2013.05.16
Using F2-21 eeFuel Additive
“J.WELL Mongolia International” LLC 2013.05.17
Dose Ratio
“J.WELL Mongolia International” LLC 2013.05.17
Working group decided to test 3 vehicles using regular fuel on the Ulaanbaatar to Lvn route, and dose F2-21 eeFuel on the return Lvn to Ulaanbaatar route. Shunkhlai LLC decided to use F2-21 eeLube and F2-21 eeFuel together on vehicle10-84 UBG. Dose ratio for eeFuel was of 1:10,000 (26ML F2-21 eeFuel for 260L fuel) and dose ratio for eeLube was 1:500 (42ML F2-21 eeLube for 20L of engine oil).
№ State Number Mark,
Model
Fuel F2-21®
eeFuel®
Engine-Oil F2-21®
eeLube®
1. 10 – 84 UBG 100L 10ML 22L 44ML
2. 26 – 29 UBCH 60L 6ML = =
3. 58 – 52 UBV 100L 10ML = =
TOTAL 260L 26ML 22L 44ML
Vehicles showed a significant result and saved fuel by an average of 7.8% - 24.9% in the joint testing operation.
“J.WELL Mongolia International” LLC 2013.05.17
Testing Report of F2-21 products and working conditions
Test result in cooperation with Government Organizations
Project proponent : “J.WELL Mongolia International” LLC Exclusive Distributor of H2OIL corporation, U.S.A
“J.WELL Mongolia International” LLC 2014.06.09
PROJECT MANAGEMENT:
NCRAP order
Purpose
1. To test and confirm that F2-21 eeFuel has an economic impact. 2. To draw conclusions on the possibility of introducing F2-21
eeFuel into the market.
Related works:
• To test and draw conclusions for the possibility of introducing F2-21 eeFuel into the market.
• To generate the methodology of testing and ensure the protocol is followed during the test.
• To check the legal right to sell F2-21 eeFuel in Mongolian territory. • To research the monitoring arrangement for dosing F2-21
eeFuel • To confirm the co-operation of petroleum companies who sell
Nano- Fuel in the Mongolian market. • To make a presentation and raise an issue at the next meeting
of NCRAP about the possibility of sales and marketing F2-21 eeFuel in the future.
“J.WELL Mongolia International” LLC 2014.06.09
GOVERNMENTAL ORGANIZATIONS: Governmental Organizations who participates and observed the test:
NATIONAL COMMITTEE ON REDUCING AIR POLLUTION
MINISTRY OF MINING
MINISTRY OF ROAD AND TRANSPORTATION
PETROLEUM AUTHORITY OF MONGOLIA
AIR QUALITY AGENCY NATIONAL TRANSPORT AUTHORITY
SPECIALIZED INSPECTION AGENCY OF ULAANBAATAR
TRANSPORT DEPARTMENT OF ULAANBAATAR CITY
“J.WELL Mongolia International” LLC 2014.06.09
NCRAP WORKING GROUP:
“J.WELL Mongolia International” LLC 2014.06.10
№ Name Organization Position 1 Radnaasuren.L
(Leader of Working Group) Ministry of Mining Head (Division of Fuel Policy)
2 Munkh-Khand.B (Secretary of Working Group)
National Committee on Reducing Air Pollution
Expert
3 Enkhjargal.B (Member)
National Committee on Reducing Air Pollution
Chief Expert
4 Munkhbat.P (Member)
Ministry of Road and Transportation
Expert (Specialization of Technics and Technology Department)
5 Erdenemunkh.B (Member)
National Transport Authority Chief Expert (Division of Technics and Monitoring)
6 Munkhbat.T (Member)
Specialized Inspection Agency of Ulaanbaatar city
State Inspector (Monitoring of Gas and Fuel)
7 Dagvasuren.D (Member)
Petroleum Authority of Mongolia Expert (Division of Industry, technics and technology)
8 Altangerel.O (Member)
Air Quality Agency Chief Expert
9 Enkhmaa.S (Member)
National Agency Meteorology and Environmental Monitoring
Chief Expert
10 Badamkhand.Ch (Member)
Transport Department of Ulaanbaatar City
Expert (Division of Technics and Technology)
“J.WELL Mongolia International” LLC 2014.06.10
1. Continue the testing operation for up to 10 days. 2. Select a total of 5 vehicles for testing (3 petrol engine and 2
diesel engine). 3. Age of vehicles must all be different. 4. Test the vehicles in 2 different routes (such as country and city). 5. Use regular fuel for the first day of testing. 6. Use both F2-21 eeFuel and eeLube for the last 2 days of test. 7. Measure the fuel saving 1 time and reduction of exhaust
emission 2 times per day. 8. Measure the reduction of exhaust emission using portable
diagnostic equipment. 9. Measurement of fuel savings will use a standard method for
filling the fuel tank.
Testing Instructions:
PARTICIPATING VEHICLES:
PETROL ENGINE
“J.WELL Mongolia International” LLC 2014.06.10
Driver: Badamsukh.J State Number: 61-‐59 UNTS Register Number:KhK59031819 Mark: Toyota Carina, automobile Driver ID:599352 Engine Capacity: 1490 cm³ Category: B Year: 2001
Driver: Dagvasambuu.B State Number: 45-‐80 SEV Register Number:MYu92081214 Mark: Toyota Crown, automobile Driver ID:662575 Engine Capacity: 2490 cm³ Category: B Year: 2008
Driver: Lhagvadorj.E State Number: 27-‐94 UNTS Register Number: ZZ90051113 Mark: Honda Civic (hybrid) Driver ID:902250 Engine Capacity: 1330 cm³ Category: B Year: 2001
DIESEL ENGINE
“J.WELL Mongolia International” LLC 2014.06.10
Driver: Enkh-‐Amgalan.N State Number: 16-‐68 UNKH Register Number: HK75120817 Mark: H. Galloper, (Mid-‐Size SUV) Driver ID:399284 Engine Capacity: 2972 cm³ Category: B Year: 1999
Driver: Batbazar.G State Number: 50-‐79 UNM Register Number: UH62062574 Mark: Mitsubishi Delica, truck Driver ID: 045098 Engine Capacity: 2470 cm³ Category: B,C Year: 1989
PARTICIPATING VEHICLES:
PARTICIPATING DRIVERS:
City Group
Driver Lhagvadorj.E
Driver Davaasambuu.B City Group covered 834km.
Driver Enkh-Amgalan.E
“J.WELL Mongolia International” LLC 2014.06.10
Country Group
Driver Batbazar.B Driver Badamsukh.J
Country Group covered 1,506km. City and Country Groups covered a total of 2,340km.
“J.WELL Mongolia International” LLC 2014.06.10
PARTICIPATING DRIVERS:
“J.WELL Mongolia International” LLC 2014.06.10
TEST ROUTE:
Country-Side Route: Ulaanbaatar – Baganuur – Ulaanbaatar (254km)
“J.WELL Mongolia International” LLC 2014.06.11
TEST ROUTE:
1:500 The 5 vehicles used a total of 183L of fuel during the test and used 18,3ml of eeFuel and 58ml of eeLube.
“J.WELL Mongolia International” LLC 2014.06.11
1:10,000
DOSE RATIO:
Work pictures
“J.WELL Mongolia International” LLC 2014.06.12
TEST PROCESS:
“J.WELL Mongolia International” LLC 2014.06.14
Changes in Fuel Consumption
After using F2-21 eeFuel, average fuel savings for 5 vehicles was up to 12,9%. In other words, all vehicles showed significant fuel savings results (from 5.3% to 34.4%).
Name June 10, 2014 June 11, 2014 Total (average of 2 days)
№ GROUP L % L % L % 1 CITY 1,26 12,57 1,36 10,67 1,31 11,62 2 COUNTRY 1,73 23,31 0,26 5 1 14,16
3 Total 1,16 12,89
TEST RESULT:
TEST REPORT OF F2-‐21 eeFuel USED IN THE HEAVY MACHINE EQUIPMENT OF “BAYAN-‐GOL” PROJECT
FROM “MINING NATIONAL OPERATOR” LLC
“J.WELL Mongolia International” LLC “Mining National Operator” LLC
Testing Groups:
Parties have negotiated and decided to execute the testing operation for 3 days
PURPOSE: To dose regular diesel with F2-21 eeFuel in the heavy machine equipment to confirm and document reduced fuel consumption. Then to discuss the possibility of introducing and selling the product to “Mining National Operator, LLC" (MNO).
“J.WELL Mongolia International” LLC 2014.07.17
TESTING APPROVAL:
Bolorchimeg.D (JWMI)
Gerelt-Od.G (MNO), Gantugs.B (JWMI)
“J.WELL Mongolia International” LLC 2014.07.17
TEST WORK GROUPS:
Heavy equipment participating in the test.
CAT 773E №5 CAT D9R №2 CAT 390D № 1
“J.WELL Mongolia International” LLC 2014.07.18
TEST EQUIPMENT:
4 operators from the day shift participated in the testing.
MNO’s operators: Jargal.T, Naranbayar.D, Gerel-Chuluun.N, Batzorig.B
“J.WELL Mongolia International” LLC 2014.07.18
Equipment Operators:
The test was located at “Burhant” open cut gold mining of “Bayan-Gol” project from “Mining National Operator” LLC in the “Zaamar” town of Tuv aimag province.
“J.WELL Mongolia International” LLC 2014.07.18
Test Location
A total of 8,704L fuel was used for the testing operation (regular fuel 3,360L and treated fuel 5,344L). A total of 540ml of F2-21 eeFuel was used for dosing.
F2-21 eeFuel dose ratio was 10,000:1 as per the manufacturer’s instruction.
“J.WELL Mongolia International” LLC 2014.07.19
Test Operation
“J.WELL Mongolia International” LLC 2014.07.20
Test Results:
Fuel savings calculated using separate results for both efficiency and work/hour.
After dosing regular fuel with F2-21 eeFuel and testing on the heavy equipment, the “efficiency” of fuel consumption was improved by an average of 9.94%. The “work/hour” fuel consumption was also improved by an average of 9.29%. Average fuel saving was 9.62%.
“J.WELL Mongolia International” LLC 2014.07.20
Both parties have acknowledged the following results by officially confirming the test report: 1. After dosing fuel with F2-21 eeFuel and testing on heavy mining equipment at the
Bayan-Gol mining project , the “efficiency” of fuel consumption was improved by an average of 9.94%.
2. The “work/hour” fuel consumption was also improved by an average of 9.29%.
3. Average fuel savings was 9.62%.
4. It is confirmed that using regular fuel dosed with F2-21 eeFuel significantly improved the economic performance and reduced fuel consumption of heavy mining equipment.
Test Report:
Fuel Savings in Mongolia: 5.5% - 24.9%
Test 3
Representation of all Vehicles
Autobus – 3 LLC 2nd Division of Ulaanbaatar
Railway Company
Average 8.1-‐ 22.25%
Average 5.5 -‐ 16.8%
Work/hour – 11.95% Running -‐ 13.5%
7 Vehicles 10 Buses 1 Locomogve
Exclusive Distributor Company of H2OIL Corporation, U.S.A
Test 2 Test 1
Test Results (1):
As ordered by NCRAP
Average savings 11.62 – 14.16%
5 automobiles
Shunkhlai LLC
Average savings 7.8 – 24.9%
3 trucks
Test 6
National Mining Operator LLC
Average savings 9,29 – 9,94%
3 machines
Exclusive Distributor Company of H2OIL Corporation, U.S.A
Test Results (2):
Test 5 Test 4