DESCRIPTION

Presentation to launch the London Residential Research report Student Accommodation 2013. The report itself is available to download and has a range of interactive graphs and tables.

Citation preview

Nigel Evans - team leader Rates

These are the various rates at which

applications submitted

permissions granted

construction started

each year up to and including H1 2013

DOWNLOAD REPORT HERE

...this is how that pipeline

looked like pre 2007 pre-Lehmannot particularly impressive

not particularly active2004 2005 2006 2007 2008 2009 2010 2011 2012 End

2013*

0

2000

4000

6000

8000

10000

12000

14000Application Permission Starts

DOWNLOAD REPORT HERE

But, in the dark days that were to follow,

student housing saved the day...

This is what saving the day looks like...

2004 2005 2006 2007 2008 2009 2010 2011 2012 End 2013*

0

2000

4000

6000

8000

10000

12000

14000Application Permission Starts

DOWNLOAD REPORT HERE

2004 2005 2006 2007 2008 2009 2010 2011 2012 End 2013*

0

2000

4000

6000

8000

10000

12000

14000Application Permission Starts

An almost

instant response

DOWNLOAD REPORT HERE

more

applications...

2004 2005 2006 2007 2008 2009 2010 2011 2012 End 2013*

0

2000

4000

6000

8000

10000

12000

14000 ApplicationApplication

DOWNLOAD REPORT HERE

2004 2005 2006 2007 2008 2009 2010 2011 2012 End 2013*

0

2000

4000

6000

8000

10000

12000

14000Application Permission

More

permissions

granted

DOWNLOAD REPORT HERE

2004 2005 2006 2007 2008 2009 2010 2011 2012 End 2013*

0

2000

4000

6000

8000

10000

12000

14000Application Starts

More

starts

DOWNLOAD REPORT HERE

2004 2005 2006 2007 2008 2009 2010 2011 2012 End 2013*

0

2000

4000

6000

8000

10000

12000

14000Application Permission Starts

and from 2009 to

2012 an almost exact correlation between

permission rates and construction

starts

DOWNLOAD REPORT HERE

2004 2005 2006 2007 2008 2009 2010 2011 2012 End 2013*

0

2000

4000

6000

8000

10000

12000

14000Application Permission Starts

With permissions being almost

immediately converted to construction starts. A dynamic state of affairs but...

DOWNLOAD REPORT HERE

far more activity in the inner boroughs,

more applications

more permissions

more starts

with near flat-line

conditions in the outer

boroughs.

2004 2005 2006 2007 2008 2009 2010 2011 2012 End 2013*

0

1000

2000

3000

4000

5000

6000

7000

8000

Application Permission Starts

2004 2005 2006 2007 2008 2009 2010 2011 2012 End 2013*

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

Application Permission Starts

INNER BOROUGHS

OUTER BOROUGHS

DOWNLOAD REPORT HERE

requires closer inspection –

when data lines cross

as in the inner boroughs

(application and permission rates down but a surge in construction starts)

2004 2005 2006 2007 2008 2009 2010 2011 2012 End 2013*

0

1000

2000

3000

4000

5000

6000

7000

8000

Application Permission Starts

2004 2005 2006 2007 2008 2009 2010 2011 2012 End 2013*

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

Application Permission Starts

INNER BOROUGHS

OUTER BOROUGHS

DOWNLOAD REPORT HERE

or they spike as in the outer boroughs

(going from 323 units in 2010 to 7,810 units submitted in 2012)

2004 2005 2006 2007 2008 2009 2010 2011 2012 End 2013*

0

1000

2000

3000

4000

5000

6000

7000

8000

Application Permission Starts

2004 2005 2006 2007 2008 2009 2010 2011 2012 End 2013*

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

Application Permission Starts

INNER BOROUGHS

OUTER BOROUGHS

DOWNLOAD REPORT HERE

something of

significance is almost always behind it

(Let’s take a detailed look starting with the inner boroughs)

2004 2005 2006 2007 2008 2009 2010 2011 2012 End 2013*

0

1000

2000

3000

4000

5000

6000

7000

8000

Application Permission Starts

2004 2005 2006 2007 2008 2009 2010 2011 2012 End 2013*

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

Application Permission Starts

INNER BOROUGHS

OUTER BOROUGHS

DOWNLOAD REPORT HERE

The recent spurt in construction

starts, we estimate it could top

the 6,900 unit mark in the

inner boroughs by year end (estimated by doubling H1 2013 figures), points not only to

confidence

in the sector but also of

demand.

2004 2005 2006 2007 2008 2009 2010 2011 2012 End 2013*

0

1000

2000

3000

4000

5000

6000

7000

8000 Starts

DOWNLOAD REPORT HERE

However, in such a scenario we would expect the

application pipeline to show a

corresponding increase as well

2004 2005 2006 2007 2008 2009 2010 2011 2012 End 2013*

0

1000

2000

3000

4000

5000

6000

7000

8000 Starts

DOWNLOAD REPORT HERE

Inner pipeline Outer pipeline0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

App PPG

Spot the inner borough application pipeline

INNER BOROUGHS OUTER BOROUGHS

DOWNLOAD REPORT HERE

Inner pipeline Outer pipeline0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

App PPG

Spot the inner borough application pipeline

INNER BOROUGHS OUTER BOROUGHS

Application pipeline

DOWNLOAD REPORT HERE

530 unitsabout the size of a medium sized student block

and that’s all that’s left...

DOWNLOAD REPORT HERE

This is a

pipeline

whose

foundations are being

eroded

but

not replaced DOWNLOAD REPORT HERE

If construction rates continue at the

same level as they have done post-Lehman then

the entire stock of

potential student housing in the inner boroughs could be

exhausted by the end of

2014

DOWNLOAD REPORT HERE

ironically

very forces

driving the student housing since 2007 now

risk slowing it down, albeit inadvertently.

Let’s take a closer look at those forces...

DOWNLOAD REPORT HERE

2004 2005 2006 2007 2008 2009 2010 2011 2012

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

2004 2005 2006 2007 2008 2009 2010 2011 2012

0

2,000

4,000

6,000

8,000

10,000

12,000 Outer London construction starts 2004-2011 private units

Inner London construction starts 2004-2011 private units End 2011:

starts: Inner borough up 7%.

starts:

Outer up

53%

*Private residential

DOWNLOAD REPORT HERE

2004 2005 2006 2007 2008 2009 2010 2011 2012

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

2004 2005 2006 2007 2008 2009 2010 2011 2012

0

2,000

4,000

6,000

8,000

10,000

12,000Outer London construction starts 2004-2012 private units

Inner London construction starts 2004-2012 private units

End 2012

Starts:

Inner up

42%

Outer down

21%

*Private residential

DOWNLOAD REPORT HERE

2004 2005 2006 2007 2008 2009 2010 2011 2012

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

2004 2005 2006 2007 2008 2009 2010 2011 2012

0

2,000

4,000

6,000

8,000

10,000

12,000 Outer London construction starts 2004-2011 private units

Inner London construction starts 2004-2011 private units End 2011:

Starts: Inner borough up 7%.

Starts:

Outer up

53%

*Private residential

DOWNLOAD REPORT HERE

2004 2005 2006 2007 2008 2009 2010 2011 2012

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

2004 2005 2006 2007 2008 2009 2010 2011 2012

0

2,000

4,000

6,000

8,000

10,000

12,000Outer London construction starts 2004-2012 private units

Inner London construction starts 2004-2012 private units

End 2012

Starts:

Inner up

42%

Outer down

21%

*Private residential

DOWNLOAD REPORT HERE

The reversal of fortune due to

• scarcity of mortgage availability

• abundance of foreign equity

During 2011 equity was chasing super-prime existing stock.

It seems now that that stock is slowly being exhausted

and to cater for the continuing demand developers are

building again and they are building prime.

We could just have carried on here and said...

*Private residential

DOWNLOAD REPORT HERE

The reversal of fortune due to

• scarcity of mortgage availability

• abundance of foreign equity

During 2011 equity was chasing super-prime existing stock.

It seems now that that stock is slowly being exhausted

and to cater for the continuing demand developers are

building again and they are building prime.

(instead ofstudentHousing...) student

*Private residential

DOWNLOAD REPORT HERE

100 Middlesex Street Denning Point

Middlesex Street

Commercial Street

DOWNLOAD REPORT HERE

100 Middlesex Street Denning Point

Nido

Cityscape

1,204 student units

2008 DOWNLOAD REPORT HERE

100 Middlesex Street Denning Point

Nido

Cityscape

1,204 student units

128 private units

2008

2012

100 Middlesex Street

Student housing NOW?

But could it be that the

very factors discouraging the

development of student accommodation in the

inner boroughs could

fuel it in the

outer boroughs?

Let’s take a look at those factors

Inner pipeline Outer pipeline0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

App PPG

INNER BOROUGHS OUTER BOROUGHS

Inner and Outer borough pipeline

Inner pipeline Outer pipeline0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

App PPG

INNER BOROUGHS OUTER BOROUGHS

9,100 units in the inner planning pipeline – applications & permission combined

Inner pipeline Outer pipeline0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

App PPG

INNER BOROUGHS OUTER BOROUGHS

10,224 units in the outerplanning pipeline – applications & permission combined

Both sectors have a

similar potential

what differentiates them is

how close that

potential is to delivery

Inner pipeline Outer pipeline0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

App PPG

INNER BOROUGHS OUTER BOROUGHS

The pipeline seems to suggest two things.

Firstly, that supply in the

inner boroughs is becoming exhausted

Inner pipeline Outer pipeline0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

App PPG

INNER BOROUGHS OUTER BOROUGHS

Secondly

that developers are gearing up to tap in to a

secondary market in the outer boroughs

But why so much

latent potential in the

outer boroughs?

emergence of a

3 tier system

of provision

1. Offering International students a more affordable choice

2. Providing off-site accommodation

for inner London universities

e.g....

Kodak

Land Sec220 student housing units

spec buildWestminster University and UCL

have shown early interest in the units for their students.

3. Satellite campuses

complete with teaching facilities

and accommodation

Imperial College’s Imperial West BBC site Wood Lane

“lock, stock and barrel”

600+ student units (already)

plans for a research & commercial facilities to comea complete purpose built self-contained entity

SYNERGY

But there could be an extra level

A 4th level fuelled by

the very factors inhibiting growth in the

inner boroughs

Let’s have...

Nigel Evans - team leader Another

LOREMA Recap

£psf values across the capital

 investor activity

expanding from the

super-prime core to the

prime fringe

£psf values across the capital

If demand increases to such an extent that

investors venture in numbers beyond that

boundary into

traditional owner-occupier territory ...

£psf values across the capital

 could lead to increased demand for rented stock which

in turn could push prices upwards in the private rented sector.

in the outer boroughs

bespoke student housing could become

an increasingly attractive option

for the domestic student.

Why live in a shared house when you can have free

wifigym facilities

conciergelaundry service

Securityfor the same price?

Recap:

Inner boroughs:

Supply being exhausted but not replaced due to a shift in

focus by developers to super-prime

Recap:

Outer boroughs:

Will cater for an increasingly diverse group of students both

international and domestic

Recap:

Outer boroughs:

emergence of

super satellite universities complete with

accommodation and

teaching facilities

And finally:

It seems that the future of student housing is all

about the outer boroughs, but...

Let’s just take another look at the inner borough pipeline graph again.

Inner pipeline Outer pipeline0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

App PPG

INNER BOROUGHS OUTER BOROUGHS

The number of applications may be diminished

Inner pipeline Outer pipeline0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

App PPG

INNER BOROUGHS OUTER BOROUGHS

The number of applications may be diminished

Inner pipeline Outer pipeline0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

App PPG

INNER BOROUGHS OUTER BOROUGHS

but the permission pipeline remains strong

7,000 unit strong

but as long as

the influx of cash from overseas persists

student housing will continue to take a

back seat to

super-prime residential

As long as the

influx of

cash from

overseas

persists

Nigel Evans - team leader

When that bubble bursts Will it be student housing

that saves the day.Again?

Nigel Evans - team leader

The Digital edition

The start of this presentation same each year

180,000 applications, 6,000 site visits, 20,000 schemes on the database etc... Of those 20,000 schemes some

3,000 are either lapsed, withdrawn or refused,

But, if this digital edition is about anything it’s about

visualisation

Let’s not say how vast the database is

let’s visualise it

This is what 3,000 schemes looks like

Policy 3.8 of the London Plan seeks to ensure that strategic local requirements for student housing are addressed, without  compromising capacity to meet the need for conventional dwellings, especially affordable family homes.

A lucky dip

All these sites have at one point been

in the planning system,

each site was once thought to have

development potential, each one

could have again

The LOREMA Student Housing Update

In-box Tomorrow

LOREMA Main Report

Nigel Evans – Head of London Residential Research

LOREMA UPDATE:

STUDENT ACCOMMODATION 2013

DOWNLOAD REPORT HERE

Recommended