The GIS for the Solar Projects Development

Preview:

DESCRIPTION

Presentation by Alejandro Mamiam from Veolia on Esri European User Conference 2011.

Citation preview

Alejandro MAMIAN Jefe de proyectos SIG

The Geographical Information System for the

Solar Projects Development

Alejandro MAMIAN GIS Project Manager

SummarySummary

1. Eolfi Profile

2. Solar Energy

3. Solar GIS

4. Solar GIS Model 4.1 Concepts

4.2 Tools

5. Raster Elevation 5.1 Slope Analysis

5.2 Aspect Map

5.3 Environmental studies and land occupation

5.4 Grid connection and infrastructure

5.5 Results

6. Conclusions

2

1. Eolfi Profile1. Eolfi Profile

3

Wind and solar subsidiary of Veolia Environnement

Developer and operator in renewable energy

Producer of wind and solar electricity

Assets Managements

4

Photovoltaic power plants produce electricity according to sustainable development policy

Evolution of PV technology

Decentralized production without CO2 emission

Green Energy: clean and renewable

Response to environmental commitment initiated by the Kyoto Protocol

2. Solar Energy2. Solar Energy

5

3. Solar GIS3. Solar GIS

Solar GIS is a tool aiming at talking decision, capable of incorporating the information, experience, and know-how in the solar energy field.

The integration of different skills

reliable results.

4. GIS Solar Model4. GIS Solar Model

6

Creation of spatial connections between variables • Grid Network - Capacity • Distance to the grid

Understanding the needs of development while respecting the environment and each of its aspects.

Construction of the Solar GIS model with the help of a GIS software

Goal

To make an orography map from raster and vector data Project Managers an able to build the layout of the PV power plant

Means

Arc GIS tools and Spatial Analyst extension

Expected Result

Implementation area, that takes into account: • Slope (Determines the feasibility and the pitch)

• Shadows (Forbidden areas)

• Obstacles (Trees, buildings, antennas …)

• Orientation (Irradiation losses)

• Environmental constraints (Natura 2000, RAMSAR…)

• Grid connection (Costs) 7

4.1. Concepts 4.1. Concepts

8

4.2. Tools4.2. Tools

DTM / DSM very high

resolution that allow us to

define the slopes, shadows,

aspects and visibility studies

Software for integration and

processing of graphics and

alphanumeric data

BD ORTHO ® Ortho photograph color and 50 cm resolution

25 SCAN ® Map at 1:25 000 standard

Cartographic Data

Tool for the measurement

of solar radiation

9

With this tool you can transform the vector-raster-vector

Spatial Analyst is a performing tool that help to realize important studies for PV, contours, slopes, aspect and hill shade.

5. Raster Elevation5. Raster Elevation

10

The slope map shows the sectors relevant to receive a solar implantation and allows us to exclude the unsuitable land.

Depending on the shape of the terrain and the slope, the PM will be able to identify the most appropriate solar technology for the project.

5.1. Slope analysis5.1. Slope analysis

11

5.2. Aspect Map5.2. Aspect Map

The aspect map shows the relevant sectors which orientation are important for us (All south).

This tool checks once again the relevance of the areas.

12

5.3. Environmental studies and land occupation5.3. Environmental studies and land occupation

Recover of data and analysis of environmental layers that limit the study areas, for example Natura 2000. This information allows us to identify the impact zones next to our project.

13

5.4. Grid connection and infrastructure5.4. Grid connection and infrastructure

Identify the distance of the electrical connection points which are next to the power plant and the road infrastructure of the region.

14

5.5. Results 5.5. Results

A solar implantation according to regulation A solar implantation integrated into the landscape Clean and safe electricity solution

15

6. Conclusions6. Conclusions

Immediate, practical and reliable response due to the performance of the GIS tool.

Construction mapping that takes into account the territorial and environmental restrictions.

Geo referenced database that facilitates the information transfer.

Take decisions more efficiently thanks to a more efficient mapping.

Reduced time and costs of environmental studies, scoping and territorial analysis.

16

Contact

Alejandro MAMIAN GIS Project Manager Engineering & Innovation Department alejandro.mamian@eolfi.com

Wind Farm of Monts Bergeron 22 MW

Solar Parking PSA Peugeot 1.4 MW

Thank youThank you