Coyote Complex

Preview:

DESCRIPTION

 

Citation preview

COYOTE COMPLEX

HOME OF THE COYOTES

MEN AND WOMEN’S BASKETBALL AND VOLLEYBALL

QuickTime™ and aTIFF (Uncompressed) decompressorare needed to see this picture.

Over view map

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

Overview Map & Parking

QuickTime™ and aTIFF (Uncompressed) decompressorare needed to see this picture.

Exterior View

A Cross BetweenQuickTime™ and a

TIFF (Uncompressed) decompressorare needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressorare needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

Coyote Arena

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressorare needed to see this picture.

INTERIOR VIEW

A Cross Between

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

Seats 7,000

QuickTime™ and aTIFF (Uncompressed) decompressorare needed to see this picture.

Stadium Seating

Features and Benefits ・Raid Mounted Design offering flexible seating spacing

Easy to clean with tough textured surfaceQuick to install with low maintainence requirement

High Impact Seat Numbering

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressorare needed to see this picture.

This attractive locker has a rich finish with sculpted sides and a comfortable cushioned seat, which lifts to reveal a spacious yet hidden storage nook.

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressorare needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

OFFICES

QuickTime™ and aTIFF (Uncompressed) decompressorare needed to see this picture.QuickTime™ and a

TIFF (Uncompressed) decompressorare needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

Suites Suites

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

The LuxuryThe View

Restrooms

• Sleek and Functional

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

Phases– Phase I - Foundation Stage

• Site Survey - Excavation & pad leveling - Foundation pinned, and framed - Underground utilities installed• Sewer or septic lines installed - Vapor barrier installed - Municipal Inspection - Foundation Poured

– Phase II - Framing Stage• Frame all walls and trusses - Install roof sheathing - Municipal framing inspection

– Phase III - Roofing Stage• Install exterior sheathing - Install shingles / roofing system - Install all windows - Install exterior doors

• Phase IV - Pre-Sheetrock Stage• Begin installation of exterior finish (masonry, wood, etc) - Rough-in plumbing; water & waste vent piping

• Rough-in mechanical systems; venting and furnace installation - Rough-in wiring & electrical• Install HVAC & plumbing system - Install water heater - Municipal inspections for mechanical, plumbing,

electrical, & frame

– Phase V - Sheetrock Stage• Install wall insulation - Install sheetrock - Install tape & texture; apply wall & ceiling textures

• Sheetrock nail/screw inspection (if applicable)

Phases Con’t– Phase VI - Interior Trim Stage

• Install all interior doors and moldings - Install staircase balusters & railings (if applicable)

– Phase VII - Painting, Cabinets, & Countertops Stage• Paint installation (interior) - All cabinetry installed - All countertops installed - All wall tile installed

• Install all mirrors and shower enclosures

– Phase VIII - Flooring Stage• Install finish electrical - Install finish plumbing - Install finish mechanical - HVAC installed and tested

• Install all flooring - Appliances installed - Install Flat Work - driveways, sidewalks• Final mechanical, plumbing, electrical municipal inspections - Municipal "Certificate of Occupancy" issued

– Phase IX - Quality Assurance Stage• Final Municipal inspection - Ceiling insulation installed - Builder's Quality Assurance Inspection

• Punch List Development - Exterior landscaping completed - Final Cleaning - Final Buyer's Walk-Through

– Phase X - Buyer Acceptance Stage• Home Buyers Inspection - Completion of Punch List items - Final Buyer's Walk-Through

• Contract items installation review - New Home Orientation

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

Recommended