I‐595 Express Corridor Improvements Project
Kelley Hall, PE | FDOTMay 10, 2013
TYPICAL SECTIONS
PROJECT COMPONENTS
• Reversible Express Lanes• Direct Connect to
Florida’s Turnpike• Open Road Tolling
• SR 84 Continuous Connection• Florida’s Turnpike Interchange
• Broward County Greenway• Ramp Improvements
• Auxiliary Lanes• Braided Ramps• Bypass Bridges
• Sound Barrier Walls
Concessionaire
Counsel
Concession Agreement
DB Contract
Technical and
Legal Advice
Financing Agreements
Technical Advisor
Design‐Build Contractor
Design Subcontractor
CEI O&M
LendersLenders
Design‐Build Contractor
Design ManagementConstruction/Operations
Management
I‐595 TEAM ORGANIZATION
Bank Syndicate/TIFIA
INNOVATIONS
• 1st DBFOM P3 in Florida• 1st Availability Payment P3 in the US• Reversible Toll Lanes (six lanes for the price of three)• Congestion Pricing• State of the Art Emergency Access and Infrastructure
Fire suppression system Emergency access gates
• 35‐year Operations and Maintenance (O&M)• Direct Connections to Florida’s Turnpike• Oversight CEI• Shared‐use Drainage
INNOVATIONS ‐ CONTRACTING
Why a Public Private Partnership (P3) was considered for the I‐595 Corridor:• Accelerated the schedule
Advanced noise wall construction Provided capacity improvements a minimum of 15 years sooner than the
Initial (conventional) plan• Provided financial mechanism for funding shortfall• Potential to deliver long‐term cost savings and higher levels of service• Industry Innovation
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Projects 1 thru 6 & 8 UNFUNDED Projects 7, 9, 10, & 10A
Projects 1 thru 10A
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Projects 1 thru 6 & 8 UNFUNDED Projects 7, 9, 10, & 10A
CONSTRUCTION YEARS
PROJECTS 1 THRU 10ACURRENT ANTICIPATED PLAN
Projects 1 thru 10APROJECTS 1 THRU 10APUBLIC – PRIVATEPARTNERSHIP (P3)
INNOVATIONS ‐ CONTRACTING
$0
$50
$100
$150
$200
$250
$300
2014 2015 2016 2017 2018 2019 2020 2044
20
6650
124
7195
123
217
4
Paym
ents (M
illions)
Year
I‐595 Express Payment Structure
Final
Maximum Milestones Payment
Availability
ScheduledConstructionCompletionJuly 2014
Design & Construction March 2009
2009
INNOVATIONS – EXPRESS LANES
Morning Movement ‐ Eastbound Access Open
N
INNOVATIONS – EXPRESS LANES
Afternoon Movement – Westbound Access Open
N
INNOVATIONS ‐ SAFETY
Emergency Access Gates
Warning GatesLONGITUDINAL SLIDING GATE BY ENERGY ABSORPTION
• 42 FT WIDE OPENING• REMOTE CONTROL OPENING
Fire Suppression System
INNOVATIONS – PROJECT COST
Summer 2009 Summer 2010
• Right of Way Acquisition• Shared‐Use Drainage
ToNaples
University
Driv
e
Pine
Island
Roa
d
Nob
Hill Roa
d
Hiatus R
oad
Flam
ingo
Roa
d
Davie Roa
d
Broward Boulevard
Sunrise Boulevard
Peters Road
Griffin Road
To Miami
To West Palm Beach
To Miami
SW 136
Avenu
e
Port Everglades
FLLAirport
Segment CBegan February 2010
82% Complete
Segment EBegan April 201170% Complete
Project Limits
I‐595 from I‐75/Sawgrass Expressway Interchange to west of the I‐95 Interchangeand Florida’s Turnpike from Griffin Road to Peters Road
Segment DBegan June 201078% Complete
Segment A/BBegan November 2010
78% Complete
CONSTRUCTION PROGRESS
I‐595 PROJECT HIGHLIGHTS
• Total Construction Completed: $633.4M‒ Construction Completed in March 2013: $21.1M‒ 1 remaining Milestone is on schedule ‒ 100% of customer requests in March were responded to by
FDOT/OCEI team within 24hrs • Road Ranger Services: 100% customer satisfaction rating for Q4 of 2012• Severe Incident Response Vehicle (SIRV) and Rapid Incident Scene
Clearance (RISC) Operations• Traffic Management Center Operations: 24/7 – 365• Scheduled Completion Date: Spring 2014
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
I‐595 Express Corridor Improvements Project
THANK YOU!
For additional project information, please visit:
www.i‐595.com