Your Maximo Build How Much is Enough? Michael Zacharia, City of Roseville October 6, 2016 NorcalMUG
Your MAXIMO Journey …..
Reach for the Stars?
….. or not reach at all?
What Does Your Road Map Look Like?
First Look at What Asset Management and Maximo Are
Each step has a Value Consideration
Level 1 Business Processes
Level 2 Tools & Technology
Level 3 Organizational Effectiveness
Level 4 Asset Management
Level 5 Optimized Operations
Superiority
RCM Ops
Excellence
Criticality Life Cycle FMEA
Empower Staff
Geo-Spatial Integration
Optimized Hand Held Tech
Planning Work Mgmt Mtls Mgmt KPI
Work Order Prioritization
Process
Resource Management
Communication Specialty Software
Asset Monitoring
Condition Monitoring
Craft Flexibility
Business Alignment
Invest in Staff
First Look at What Asset Management and Maximo Are
§ Your Goals and Needs
§ Staff and Competency Levels
§ Time Required to Implement
§ Emerging Software and Software Stability
§ Timing of Needs Now vs Future
How Much is Enough?
EPA Asset Mgmt Questions • Do We Have an Asset Management Strategy/Plan?
o Have we documented our AM strategies and program? o Have we identified owners of the AM program components? o Is our organizational structure set-up to support our AM program? o Have we educated our staff about our AM program and how it affects them?
• Current State of Our Assets? o What do we have? o Where is it located? o What is the asset condition? o What is the assets useful remaining life? o What is the assets remaining economic value? o What is the assets criticality based on the whole system?
• Required Level of Service (LOS) o What is our customer demand for services? o Are there regulations driving LOS? o What is our actual performance against expected LOS? o Have we identified Key Performance Indicators to monitor our LOS and AMP?
EPA Asset Mgmt Questions • Which are Our Critical Assets to Keep us Meeting our LOS?
o Have we identified our critical assets? o How are our assets failing? o What is the likelihood of asset failure? o What are our repair/replacement cost? o What are the consequences of asset failure? o Are the assets in our Maximo updated to show their criticality? o Have we used the asset criticality to ensure emergency work is high priority?
• Best Alternative Funding Investments? o Alternative funding options that exist (Rates/Government Funds)? o Most feasible funding options for our utility? o How to best invest budget funding? o Where best to invest our long term CIP funds?
• What is our IT Plan to Support our AM Strategies o Do we have an updated asset register in our Maximo? o How do we ensure new assets are in our Maximo? o How do we store our condition assessment, testing and inspection findings? o How do we use our condition assessment and inspection findings? o Do we have a data collection strategy? o Does our IT integration support our AM program?
Asset Management Elements
• Prolong asset life and aid in rehab/repair/replace decisions through efficient and focused operations and maintenance
• Meeting customer demands with a focus on system sustainability
• Setting rates based on sound operational and financial planning
• Budgeting focused on activities critical to sustained performance
• Meeting service expectations and regulatory requirements
• Improving response to emergencies
AM as a Business Model • What do we do?
• Why do we do it?
• How do we accomplish our objectives?
• What is the cost of doing business?
• Where should we spend our money?
• What is our best return on our investment?
Asset Register - Used to create and store asset characteristics and corresponding information, such as parent, location, vendor, up/down status. Asset Hierarchy - Building an asset hierarchy serves the following functions: Ø Costs get "rolled up" the hierarchy to the asset
responsible for assuming the maintenance cost. Ø Better visualization of all of the assets
Location
Asset
Child Asset
Child Asset
Asset
Asset Management Components
Preventative Maintenance – Programmed Work. Optimize as required based on work history, manufacturer recommendations and local knowledge. Asset Criticality
• How important is the asset? • What are the consequences if the asset does fail? • Redundancy? • Cost • Impacts to other processes?
• Asset Classifications - Allows you to group assets into organized categories. Allows standardization and use of characterizing attributes
Asset Management Components
Failure Analysis - is the process by which you examine asset or location failure history, reported over a significant period of time. Use failure reports to look for breakdown trends, average time between failures, and so on. By correlating this failure information with other data available to you, for instance, preventive maintenance schedules, you can develop ways to reduce or limit equipment failures in the future.
Asset Management Components
Job Plan - templates include a detailed description of work to be performed, and labor, material, service, and tool requirements. Job plans can be created for assets, items, and locations, and can be used in the Work Order Tracking applications.
Maximo supports RCM requirements through: • Failure codes and analysis • Condition monitoring • Downtime reporting • User defined KPIs • Asset Inspections – oil analysis, vibration analysis, meter readings
Reliability Centered Maintenance - often known as RCM, is a process to ensure that assets continue to do what their users require in their present operating context: • Oil Analysis • Vibration Analysis • Meter Readings
Asset Management Components
Asset Management Components
Condition Monitoring - tracks measured point data for an asset or location and using that data to predict when preventive maintenance needs to be performed. The type of data, for example, vibration, pressure, oil analysis or temperature, depends on the asset or location. A measurement point record defines the acceptable high and low limits for condition and optimal performance measurements for a point or place on an asset or location. You can generate preventive maintenance (PM) work orders for measurements outside of the acceptable limits.
Maintenance Management
Planning –what you are going to do Scheduling –when it will be done and who will do it Reporting –what you did Work Control –what it costs time, people and inventory
Work Management Work Order
Follow-Up Process Work Order
Performance Process Work Order
Assignment Process Work Order
Scheduling Process Work Order
Planning Process Work Order
Approval Process Work Request
Initiation Process
Integrations
§ Visualize Horizontal Assets
§ Inspection Software § Reduced Data Entry
§ Timekeeping, etc § Replacement Planning § Leverage Business
Systems
Finance
HR
Mapping
Maximo
SCADA
Mobile
Tying it all Together
Best Practices Forecasting and Planning
Work Management Efficiencies
Advancing Your Program
Budgeting Accountability Supply Chain Scheduling
Design GIS Funding Condition
Failure Reporting Analysis Asset Registry Predictive
Maintenance
Collaboration Succession Success Renewal Shared
Knowledge
What Could Your Road Map Look Like?
Level 1 – Get Started
Modelled Assets • Hierarchy • Asset Profile • Preventative Maintenance • Work Planning
Staff Readiness • Learn Maximo • Learn Work Management • Break Down and Rebuild
Goal Planning and Implementation
Level 2 – What Can I Do With It?
Improved Work Mgmt • Work Prioritization • Scheduling • Crew Management • Safety Planning • KPI
Advanced Maintenance • Failure Profiling • PdM • Data Collection and Condition
Monitoring
Level 2 – What Can I Do With It?
Supply Chain • Warehousing • Purchasing
Condition Assessment • Inspection and Testing • Scoring
Level 2 – What Can I Do With It?
Applications • Maximo For Utilities • Maximo Linear • Health and Safety
Configuration • Enhanced Dashboards • Workflow
Level 3 – Other Business Systems
Integrations • Timekeeping • Finance • GIS • SCADA • Other Systems?
Broader Application • Other/Diverse Asset Groups • Increased Functionality
Level 4 – Added Applications
Bolt-On Software • Asset Rehab and
Replacement Planning • Design Integration
Specialties • Inspection Devices • Tools
The Road Map Spectrum
Get Started
Get into Maximo and Learn Get Staff Adjusted
My Options
What Can I Do With It? Other Maximo Apps Enhancements
Peripheral Integrations
Connect Existing Outside Business Systems
Bolt-On Applications
Include New Software Solutions
Planned and Phased Implementation
Asset Hierarchy Workflow Spatial Scheduler Condition
Assessment
Many Dimensions to Consider
Asset Group 1
Asset Group 2
Asset Group 3
Asset Group 4
Asset Group 5
Integrations Time Keeping
Specialty Inspection Systems
Finance Special
Business Systems
Envision Develop Train Change Mgmt Monitor
§ Where are you in your Road Map? § What Asset Group(s)? § What Applications do you utilize? § What Business Systems do you integrate with? § What Other Solutions do you utilize? § What more could you be doing? § Do you have a Roadmap?
Discussion
Your Maximo Build How Much is Enough? Thank You!