TcpET – Surveying and Setting out using Total Station

TcpET

Surveying and Setting out using Total StationVersion 3.0.0

TcpET – Surveying and Setting out using Total Station

INDEX

• Main Features

• Program Structure

• Surveying

• Setting Out

• Tools and Utilities

• Customization

TcpET – Surveying and Setting out using Total StationMain Features

Supported Platforms• Total Stations

• Topcon • Sokkia• Trimble• Leica• Nikon• Geodimeter

• Mobile Devices• Pocket PC with ARM Processor. • Handheld PC with ARM, MIPS or SH processor.

• Operating Systems• Windows CE 2.11 / 3.0• Windows Mobile 2003 / 2003 SE / 5.0• Windows CE .NET 4.0 / 4.1 / 4.2/ 5.0

TcpET – Surveying and Setting out using Total StationMain Features

Connection via Cable or Bluetooth

TcpET – Surveying and Setting out using Total StationMain Features

Main Menu

•Clear Structure

•Data organised in projects

•ASCII files

•Windows environment

•Easy to use

TcpET – Surveying and Setting out using Total StationMain Features

Projects

TcpET – Surveying and Setting out using Total Station

Points

Point Management Editing Points Drawing Points

TcpET – Surveying and Setting out using Total Station

Other supported files (1)

Horizontal Alignments Vertical Alignments Cross Sections

TcpET – Surveying and Setting out using Total Station

Other supported files (2)

DXF Cartography Surfaces

TcpET – Surveying and Setting out using Total Station

Surveying

Point MeasurementsStation MeasurementsSurvey Management

TcpET – Surveying and Setting out using Total Station

Instrument Set-Ups

TcpET – Surveying and Setting out using Total Station

Surveying

Inverse Intersection

TcpET – Surveying and Setting out using Total StationSurveying

TcpET – Surveying and Setting out using Total Station

Surveying

Point Measurements

Point Measurement Graphic ModeDisplaced Points

TcpET – Surveying and Setting out using Total Station

Surveying

Station Measurements

Graphic ModeStation Measurements Measurement Settings

TcpET – Surveying and Setting out using Total Station

Surveying

Point and Station Calculation

Double MeasurementStations Calculation Simple Measurement

TcpET – Surveying and Setting out using Total StationSETTING OUT

TcpET – Surveying and Setting out using Total StationSetting Out Points

TcpET – Surveying and Setting out using Total StationSetting Out Station and Offset

TcpET – Surveying and Setting out using Total StationSetting Out Station and Code

TcpET – Surveying and Setting out using Total StationPoints over Line

TcpET – Surveying and Setting out using Total StationLines Intersection

TcpET – Surveying and Setting out using Total StationCrowns and Feet

TcpET – Surveying and Setting out using Total StationSlope Control

TcpET – Surveying and Setting out using Total StationSimple Cross-Section

TcpET – Surveying and Setting out using Total StationPoints over Cross-Section

TcpET – Surveying and Setting out using Total StationTOOLS

TcpET – Surveying and Setting out using Total StationPoints over Alignment

TcpET – Surveying and Setting out using Total StationDistance and Area among Points

Distance between Points Area among Points

TcpET – Surveying and Setting out using Total StationGeometric Constructions

TcpET – Surveying and Setting out using Total StationUTILITIES

TcpET – Surveying and Setting out using Total StationUtilities

Manual Measurement System Information

TcpET – Surveying and Setting out using Total StationSet-Up

TcpET – Surveying and Setting out using Total StationSurveying

TcpET – Surveying and Setting out using Total StationEquipment & Prism height

TcpET – Surveying and Setting out using Total StationCode Database & Comunication