Sta. Barbara Heights - The Shophouse District

Preview:

Citation preview

STA. BARBARA HEIGHTS

COMMERCIAL

STA. BARBARA HEIGHTS

SHOPHOUSE

STA. BARBARA HEIGHTSKEY PLAN

Shophouse District

SITE DEVELOPMENT PLAN

SHOPHOUSE DISTRICT: a variety of building heights which is composed of 3 story

developments

Regular lot frontage: 14 meters

Regular lot depth: 20 meters

Ground floor setback

Front: 2.00 metersRear: 2.00 meters

***Note: Details are still subject to change

Total no. of lots: 85 lots

Lot sizes: 272 sqm. to 685sqm.

Price per sqm: Php 24,500 to 25,500 **Note: There will be price increase in every 20

lots sold

Basic guidelines for Shophouse Lots

No building shall be more that three (3) stories high and shall not exceed 14.00 meters in height reckoned from the sidewalk elevation of the main road or service road, to the roof of the apex wall.

The arcade elevation shall be .10m higher than the sidewalk elevation

The ground floor up to the second floor shall have a maximum height of 5.00 meters and shall be .10m higher in elevation than the arcade level.

***Note: Details are still subject to change

Basic guidelines for Shophouse Lots

Provision of roofs, decks and attic shall be in compliance with the designated architectural character in the particular zone by the Declarants

An attic may be allowed at the 3rd floor provided that the floor plate of attic shall not exceed 50% of the building footprint of the immediately preceding floor and must part of the roof.

Building footprints shall not exceed 70% of the lot area, but should not less than 50% of the lot area.

***Note: Details are still subject to change

TERMS OF PAYMENT

Option 1Cash in 30 days (less 10% discount on contract

price)

Option 230% downpayment (less 10% discount on downpayment)30% in 36 months40% upon turnover

Option 35% downpayment60,000/mo. : months 1 – 1280,000/mo. : months 13 – 24100,000/mo. : months 25 – 365% on the 12th month5% on the 24th month5% on the 36th monthBalance upon turnover

TERMS OF PAYMENT

Option 420% in 12 months80% in 24 months

Option 4100% in 36 months

TURNOVER DATE:

FEBRUARY 2017 + 6 months grace period

THANK YOU!

Recommended