KEY PARAMETER FOR EFFECTIVE SOURCING
• Experienced Team – Should have experienced professionals. The management team is constituted by a highly experienced leadership team.
• Engineering Excellence – Focus on value based engineering, design and planning. • Quality Focus - Well-defined and stringent quality standards for supplier selection. Existing relationship with the tier 1 supplier
helps in ensuring the quality and timely execution of the projects.• Engineering – Re-engineering of complex processes in the most economical manner
– Resulting in increase in output and reduction in losses– Resulting in minimal cost over-run– Resulting in cost savings during execution
• Effective procurement – Procurement strategy driven by a deep understanding of vendors / contractors network in India and abroad.
– Ordering with established vendors to facilitate cost effectiveness & standardization– Explore & develop vendors for contingency– Efficient time management in finalizing, ordering & tracking of supplies
• Demonstrated capability in systems integration: An in-depth knowledge of PV plant design and optimization techniques for a wide spectrum of PV technologies.
•
STRATEGY OF PROCUREMENT
PROCUREMENT
New supplieridentification
Optimally ratedequipment chosen
Quality and Certifiedproducts
Tie-ups & SLA withreputed vendors
Experienced procurementteam
Strategicpaymentterms for
critical itemsfor long
termview
Pre-Bid tie up
and SLA
Vendor base and
Geographiclocation ofprojects ismapped
RequirementConsolidation
GLOBAL SOURCING TIE UP
STRATEGY FOR SOURCING
Tie-ups with Major OEM’s,Vendors
Strong Focus on Quality andCertification of products
Strong SLAs with majorvendors for dedicated O&Mpractice
Procuring ElectricalEquipment for more than 8decades
Pre Quality audit ofmanufacturing facility ofvendors
EHS process validation
Modules Inverters Cables Transformers
CENTRALIZED PROCUREMENT
Leverage Buying Power and Optimize System CostDeploy best practiced procurement teams to establish broad connections with world famous solar suppliers and are professional in both quality control and cost optimization.
Advantages Ensuring the Success of Project- Robust, agile supply chain with a global network, strong purchasing power, and timely delivery- Integrated planning, scheduling, and execution system- Significant improvements in cost reduction and installationspeed- Ideal partner with leadership, experience, and technicalexpertise- Globally centralized supply chain management- Selection of the best components and equipment withrespect to quality, price-performance ratio, and harmonization- Key components of the highest quality from premiumbankable suppliers- Cost control and security through strict cooperationagreements- Leverage buying power and optimize project cost- Significant cost-reduction improvements
EFFICIENT LOGISTICS & LOGISTIC DIFFERENTIATOR
Single window for all
Centralized CHAand freightforwarder
Finalization
B.O.E,Advance
reconciliations
LC Remittance
CentralizedLC, TT &Advancereleases
Advantages:
verticalsSingle window for allbank liasonningPost export documentstraceability
• Deploying of freight forwarders for material movement at vendors premises
• Tracking of shipments on daily basis to ensure timely deliveries at sites
• Planning and co-ordination for Road permits and MNRE documents for excise exemption – Teams formed to ensure smooth movement of material to site
• HSS, B/L retrieval from bank ,clearing of containers at port and local freight seamlessly completed within 4 days of shipment docking
• Planning and distribution of resources allocated to this ensure vital element and monitored by Head SCM
• Co-ordination with site team to ensure minimum turnover time of containers evacuation.
S
O
LONG TERM RELATIONSHIP WITH SUPPLIERS
•••••
Identifying and developing new vendors with auditPeriodic vendor evaluationsGetting differential rates in the marketEstablishing Rate contracts both annual and monthlyStrategic Purchase decision involving Top personnel of suppliers
ANNUAL RATECONTRACTS WITHVENDORS WHICH
HELPS INCOMPETITIVE
RATESAND STOCKS
DISPOSAL ONCEPROJECT SITES ARE
OVER.
VENDOR FINANCINGSCHEME : VENDORS
GET THEIR PAYMENTWITHIN 30-45 DAYS
THROUGH RTGSIMPROVING THEIRWORKING CAPITAL
REQUIREMENTS
WORKING WITHVENDORS FROM PRE
TENDER STAGE ANDGETTING THEMENLISTED FOR
PROJECTS PROVIDESDIFFERTIAL PRICES T
SECURE ORDERS
PROVIDING LASTCHANCE OF REFUSAL
TO VENDORS WHOHAVE SUPPORTED IN
TENDER STAGE
ty and HS pliance
ost
BASIS FOR SELECTING OF VENDORS
Time
C
Quali Supplier pastE performance
Com and reliability
• There should be a proccess for audit and to have strong and long term strategic tie up
• Involve in process improvement of vendors andsuppliers
• Standardization of engineering design toprocure material/ equipment's from regularvendors in time
• Bulk buying to get the benefit of economies• Selection of Freight forwarded for carrying the
material at competitive prices• Supplier past performance and reliability
ensures delivering the right quality st theproject
``````` ``` QUALITY CONTROLQUALITY IS OUR MOTTO
Activity
ITP (Inspection Test Plan)
For Procured Materials atFactory
Activity Owner Documentation
Incoming Material Inspection ReportIn-Process Inspection ReportsFinal Inspection ReportsPerformance Witness
Performed by: Vendors
Checked by: SWL QMC Team, Third Party & Project Owner
Installation Inspection
Method StatementInstallation ChecklistInspection Records
FQP (Field Quality Plan)
For Physical Installation ofSystem
Performed by: SWL
Checked by: SWL QMC Team,Project Owner
•••
Integrated Testing Plan
Pre-Commissioning Checklist Individual Test Records System Test RecordsData Inputs/ Outputs
Certificate of Conformance
ATP (Acceptance Test Plan)
Integrated PerformanceTest
Performed by: SWL
Checked by: Project Owner•••••
SELECTION OF PV MODULES
KEY PARAMETERS FOR SELCTION OF PV MODULES:
1. Module shall be 320 Wp or higher with linear degradation.2. It should be PID resistant3. It should have 4 sq. mm cable with atleast 1200 mm length4. Current sorting shall be available for +_5% per pallet.5. Serial defect should not be present in the modules6. Have good reference in INDIA 7. It should have backing from Insurance co. such as Munich, RE8. It should have anti reflecting coating glass of 3.2 mm thickness.9. Power coefficient shall be low.10. Junction box shall have at least 3 bypass diodes and output cable shall be compatible with MC4 or MC4
compatible connectors.11. It should have 4 BB
SELECTION OF PV MODULES
KEY PARAMETERS FOR SELCTION OF PV MODULES:Validity of the documents including Certificates.- Compliance of the product (including Bill of Materials) with the required certifications designated by the manufacturer.- Compliance of the product with other related certificates required by the client, including but not limited to IEC62804 (PID). -IV test and curve analysis, including:Equipment validation | Annual calibration | Maintenance records | First and Second Reference Module validationTesting Procedure | Standard Operating Procedure validation | Frequency of calibration and recordsTest Results | Pmax (to be within the tolerance) | All electrical parameters including fill factor | IV curve- Electro-luminescence inspection- Visual InspectionWorkmanship defectsVerification of components visually and from manufacturer’s internal systemPackaging--BOM Verification as per agreed and certified specifications.
CURRENT PRICE OF ROOFTOP MARKET
ROOFTOP MARKET:
• Prices vary from 52 RS/ Wp to 60 Rs. / Wp • Prices depends on the following:
size of the roof. Evacuation Voltage Type of roof ( Trapezoidal/ high seam/ RCC) Inverter selection Module configuration Misc. requirement
In the range of 42-44 USD Cents/ Wp
Modules
String Inverter approx. 6 Rs/ Wp without tax.
Inverter
RCC ROOF: Approx 3-4 Rs/ Wp, metallic roof approx. 2 Rs/ Wp
Structures
REASONS OF LOWERING OF SOLAR PV PRICING
1. Drop in Module Price.2. Optimization of Engineering i.e. DC: AC ratio3. Entry of New manufacturers in the market4. Customized solutions5. Increase in Size of the project6. Reduction in BOS price due to higher
efficiency of Modules7. Reduction in structure weight due to better
material like ZAM/ Galvalume
TYPICAL SOLAR PLANT