• What is Prestressing?

Prestressing is a method of reinforcing concrete,

counteracting applied loads.

• Pre-Tensioning Steel tendons are stressed prior to concrete placement,

usually at a precast plant remote from the construction

site. • Post-Tensioning

Steel tendons are stressed after the concrete has been placed and gained sufficient strength at the construction

Prestressed Concrete

In post-tensioning systems

the ducts for the tendons (or strands) are placed along with the

reinforcement before the casting of concrete. The tendons are placed in the ducts

after the casting of concrete. The duct prevents contact between concrete and the

tendons during the tensioning operation.

Unlike pre-tensioning the tendons are pulled with the reaction acting against the hardened

concrete.

if the ducts are filled with grout

then it is known as bonded post-tensioning. The grout is a neat cement paste or a sand-cement mortar containing suitable admixture. The

grouting operation isdiscussed later in the section.

In unbonded post-tensioning,

as the name suggests, the ducts are never grouted and the tendon is held in tension solely by the end anchorages.

3

The various stages of the post-tensioning operation are summarised as follows.

1) Casting of concrete.

2) Placement of the tendons.

3) Placement of the anchorage block and jack.

4) Applying tension to the tendons.

5) Seating of the wedges.

6) Cutting of the tendon

The relative advantages of post-tensioning as compared to pre-tensioning are as

follows.

• Post-tensioning is suitable for heavy cast-in-place members.

• The waiting period in the casting bed is less.

• The transfer of prestress is independent of transmission length.

Grouting Grouting can be defined as the filling of duct, with a material

that provides an anti corrosive alkaline environment to the prestressing steel and alsoa strong bond between

the tendon and the surrounding grout.

The major part of grout comprises of water and cement, with a water-to -cement ratio of about 0.5, together with some water-reducing admixtures, expansion agent and

Pozzolans

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

Loss of Prestressفقدان االجهاد

المسلط على حديد التسليح مسبقة االجهاد يقل بشكل مؤثر مع مرور الوقت ان االجهاد -

-:االجهاداتوفيما يلي اهم العوامل التي تؤثر على فقدان

.%3وهو بحدود elastic shortening of cocncrete انضغاط الخرسانه المرن .1

%7-6بحدود creep of cocncrete & shrinkage انكماش وزحف الخرسانه .2

%3-2بحدود relaxation of creep in trndons ارتخاء وزحف حديد التسليح .3

post tenstion في الشد الالحقاالحتكاك بين حديد التسليح واالنابيب المستخدمة .4

5. tension friction along the duct used in post

حديد التسليح داخلد دات على طول حديد التسليح واسلوبمقدار الفقدان في االجها ويعتم -

.فقدان باالجهاد لالسباب اعاله% 22-51االنابيب بشكل مستقيم او منحني وبشكل عام يمكن قبول بنسبة

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

77

78

79

80

81

82

83

84

85

86

87

88

89

90

91

92

93

94

95

96

97

98

99

100

101

102

103

104

105

106

107

108

109

110

111

112

113

114

115

116

117

118

119

120

121

122

123

124

125

126

127

128

129

130

131

132

133

134

135

136

Dr. hammida

Recommended