Clark Construction/PD3 Presentation - McCormick HQ

Preview:

Citation preview

McCORMICK PLACEHEADQUARTERS HOTEL & EVENT CENTER

Metropolitan Pier and Exposition Authority

McCormick Experience

Why Design Build ?

(MBE)

(MBE)

(MBE)

(MBE/WBE)

(MBE)

(Hotel) (Event Center)

DESIGN-BUILD LEAD

DIVERSITY/ COMMUNITY

OUTREACH MANAGER

CONSTRUCTION MANAGEMENT

PARTNERS

DESIGN LEADS

Past Success at McCormick Place

2. Hotel Overview

Key Facts• 1206-room, 40-floor, Marriott Marquis

Hotel• (2) 25,000sf Ballrooms• 90,000sf Meeting Space• Renovation of Historic ABC Building• Central Plant Upgrades• Anticipated Completion – Q3 2017

Aerial View Southeast East Elevation

Street Level – Podium Street Level – Pedestrian Walkways

Hotel Base Design Hotel Alternate Design

Hotel Base Design

Hotel Alternate Design

Design Refinement Results• Reduced Elevators• Reduced Enclosure• Removed Building Maintenance Unit• Refined Structure• Mechanical Floor Removed

Schedule Highlights• 32-month Design-Build Contract• Schematic & Design Development• Early Demolition & Enabling Work• 25-month Construction Schedule• Potential Early Occupancy

3. Event Center Overview

Key Facts• MPEA/DePaul University Partnership• 10,000-seat, 300,000sf Basketball

Arena & Multi-Purpose Venue• Anticipated Completion – Q3 2017• Pelli Clarke Pelli – Design Architect • Moody Nolan – Architect-of-Record

Design Refinement ResultsMaintained the Spirit of the Pelli Clarke Pelli Design Concept• Raised Event Floor To Grade (was -22.5’)• Building Area Reduced By (approximately) 30,000

GSF• Simplified Roof Expression/Structure• Simplified Façade Materials & Detailing• Simplified HVAC Distribution

Event Center Options

Original

Modified

Aerial View - Original Aerial View - Modified

Event Center– Entry at Cermak Road

Event Level - Original Event Level - Modified

Building Section – Viewing North

Entry Lobby

Event Space /Arena

Schedule Highlights• 30-month Design-Build Contract• Initial Design “Reset” Phase• Schematic & Design Development• Early Demolition & Enabling Work• 23-month Construction Schedule

McCORMICK PLACEHEADQUARTERS HOTEL & EVENT CENTER