Cockermouth 8 Mnths On

Preview:

DESCRIPTION

A return to Cockermouth after the floods on on the eve of the visit by Princess Anne

Citation preview

Cockermouth

Eight Months On

Main Street

Abandonment

Restoration

Adaptation

Wordsworth House

Flood Level

Education

Riverside

Despair

Hope

Brewery Bridge

Defence

1 Million from the EA

Workington North Station

• At the end of September 2010 Workington North Railway Station closed

• Serving 2000 passengers following the bridge collapse this has now dropped to 60.

Credits

• Photos

Mark OLLIS

• based on the Cockermouth flood trail leaflet – purchased to raise funds for town’s recovery