DESCRIPTION

This is the presentation on how transformer are manufactured in Areva factory , it gives detailed view of tranformers and uses too.

Citation preview

1

Manufacturing Of Transformer&

It’s Accessories

Harshit SrivastavaDepartment Of Electrical And Electronics Engineering

Fall Semester 2010Roll No. 0705621028

29-08-2010

2

This presentation is an overview of some of the ideas and techniques used by Areva T&D Ltd. In developing transformers.In Areva the transformer development department is mainly divided into 3 categories:1. Power Transformer ( P.T)2. Medium Power Transformer (M.P.T)3. Distributed Transformer (D.T)

INTRODUCTIONINTRODUCTION

29-08-2010

3

1. Introduction of Areva2. Steps for manufacturing of

transformerI. Overview of stepsII. Relationships between them

3. Uses of transformer4. Accessories of Transformer5. Steps done to solve issues in

industries

TopicsTopics

29-08-2010

4Source: 2010 AREVA annual report

T&D: 1/3 of AREVA’s energy business

AREVA T&D WITHIN THE GROUPAREVA T&D WITHIN THE GROUP

29-08-2010

5

Products

Circuit BreakersGenerator Circuit Breakers

Disconnectors

Gas-InsulatedInstrument TransformersPower

Transformers

Primary Distribution Secondary Distribution Distribution Transformers

Systems

Substations Power Electronics Distributed Energy Power Distribution

Automation

Automation SupportAutomation Products Automation Systems

Service

Maintenance & Repair Total Asset Care

Erection & Commissioning Retrofit Spare Parts Training & Network

Consulting

COMPLETE PORTFOLIO OF ELECTRICITY TRANSMISSION & DISTRIBUTION

COMPLETE PORTFOLIO OF ELECTRICITY TRANSMISSION & DISTRIBUTION

Substations

29-08-2010

629-08-2010

PRODUCT LINE - POWER TRANSFORMERPRODUCT LINE - POWER TRANSFORMER

7

CanoasBrazil

MönchengladbachGermany

ShanghaiChina

GebzeTurkey

NainiIndia

Le Petit-QuevillyFrance

Saint-OuenFrance

StaffordUnited-Kingdom

JakartaIndonesia

BrisbaneAustralia

March 2002- 7

PTI - Technology

Power Transformer29-08-2010

Worldwide Manufacturing FacilitiesWorldwide Manufacturing Facilities

8

RAW MATERIA

L

• Raw material basically used is CRGO(cold rolled grained oriented)silicon steel.

• The purpose of using CRGO is to reduce the Hysteresis Losses.

CORE CUTTING

• It is in the form of thin sheets & cut to size as per design.

• Generally three different shapes of core laminations are used in one assembly.

COIL WINDING

• Coil Winding is of two types:-• R-S COIL • HELICAL COIL • SPIRAL COIL

CORE

FITTING

• The core assembly is vertically placed with the foot plate touching the ground. the top yoke of the core is removed. The limbs of the core are tightly wrapped with cotton tape and then varnished.

Manufacturing Process Of Transformer

Manufacturing Process Of Transformer

ASSEMBLY

• The coils as specified in the design may be of following types:• L.V COIL• H.V COIL

29-08-2010

9

TESTING

• COIL WINDING• CONNECTION

TANKING

• Tanking is a procedure of embracement of complete unit (active unit) in a mild steel tank, the unit being enclosed includes (core entrapped with windings).

TESTING AT

POWER

LEVEL

• ROUTINE TEST• RATIO METER METHOD• DIELECTRIC TESTS • IMPULSE TEST LEVELS• TEMPERATURE RISE TEST

DISMANTLING &

DISPATCH

• After testing is completed and before dispatch from the factory all necessary work, e.g. removal of bushings etc. shall be performed.

• A shipping list is made concerning the General arrangement drawing which list out the external attachments of a power transformer to be send to customers .

29-08-2010

10

RAW MATERIAL USEDRAW MATERIAL USED

MATERIAL- CRGO SILLICON STEEL

DIFFERENT GRADES OF CRGO

CTC-Continuous transposed material

TYPICAL LOSS VALUE (W/Kg) AT 50 Hz & B (Tesla)

GRADE LOSS VALUE B (Telsa)

27M-4 0.83 1.22

MOH 0.72 0.99

ZH100 0.70 0.96

ZDKH90 0.60 0.83

CRGO

CTC (Continuous Transposed Conductors)29-08-2010

11

CORE CUTTINGCORE CUTTING

I shape

E shape

V shape

29-08-2010

12

COIL WINDINGCOIL WINDING

HELICAL WINDING SPIRAL WINDING

CONTINUOUS DISC WINDING INTERLEAVED DISC WINDING29-08-2010

13

CORE FITTINGCORE FITTING

CONSTRUCTION

1.THREE LEG (NORMAL)2.FIVE LEG (TO REDUCE HEIGHT)

CLAMPING ARRANGEMENT

1.END FRAME & INSULATION2.CLAMPING PLATES3.YOKE BOLTS OR YOKE STEEL BAND

(NO HOLE PUNCHING REQ )

PROPER TIGHTENING TO REDUCE NOISE LEVEL

VARNISH AT EXPOSED SURFACES29-08-2010

14

The steps are being continued..The steps are being continued..

29-08-2010

15

ASSEMBLY(BEFORE TERMINAL GEAR STAGE)

ASSEMBLY(BEFORE TERMINAL GEAR STAGE)

TOP YOKE REMOVAL

LEVELING OF BOTTOM SUPPORT BLOCK

LEG PREPARATION VISUAL CHECKING OF COIL

LOWERING OF COIL IN PROPER ORIENTATION

TOP INSULATION & CLAMPING RINGS

MOUNTING OF ENDFRAMES

SHRINKAGE IN HEATER

TOP YOKE FITTING

BTG TEST FOR CHECKING CORRECTNESS29-08-2010

16

TYPES OF TESTS

STAGE TESTING ( DURING MANUFACTURING STAGE)

ROUTINE TEST

TYPE TEST

SPECIAL TEST

TESTINGTESTING

CORE ASSEMBLY COIL MANUFACTURING

AFTER TG STAGE

DRYING & PROCESSING

FINAL SERVICING

FINAL TANKING,OIL FILLING29-08-2010

17

TANKINGTANKING

Oil filling station where tanking is done

29-08-2010

18

DISMANTLING & DISPATCHDISMANTLING & DISPATCH

Shipping list

Commissioning

Physical inspection of tank before placing it

Onto trailor

Final inspection for traveling point of view

29-08-2010

19

IN COIL • PRECAUTION

Conductors with rounded of edgeStrip & spacers shouldn't have sharp edgesClean winding & insulation shop

• STABILISATION OF WINDINGSAlignment2 to 3 heating cycle & pressing under hydraulic press HYDRAULIC PRESS FOR COIL

PRECAUTION & GENERAL PRACTICES ADOPTED

PRECAUTION & GENERAL PRACTICES ADOPTED

29-08-2010

20

5-10 x Scale-up REQUIRED IN RATE OF CAPACITY ADDITION

Source: Powering India – Road to 2017, McKinsey 2008

Annual Capacity Addition in GW / year

Source: Powering India – Road to 2017, McKinsey 2008

Estimated capacity shortfall in GW

If business as usual continues…India is likely to face a capacity shortfall of 95-140 GW by 2017

POWER MARKETPOWER MARKET

29-08-2010

21

ULTRA MEGA POWER PROJECTS- LARGE GENERATOR

TRANSFORMER -936 MVA

POWERGRID AS MAIN NODAL AGENCY

FORMATION OF CENTERAL GRID

INTERCONNECTION OF GRIDS

TECHNOLOGY REQUIREMENTSTECHNOLOGY REQUIREMENTS

29-08-2010

22

765kV System & Network

800kV HVDC Transmission

1200kV Development System

TECHNOLOGY CHALLENGESTECHNOLOGY CHALLENGES

29-08-2010

23

Uses

Power Transformers are used for a variety of reasons, but they all have one thing in common; namely that the power being received must be tailored for the specific use.

USESUSES