Yale Science Building Column Removal Look Ahead Logistics Plan · Look Ahead Logistics Plan Note:...

Preview:

Citation preview

Class of

1954

Chemistry

Research

Building

Class of

1954

Chemistry

Research

Building

Edwards

Building

Edwards

Building

Kline

Biology

Tower

Kline

Biology

Tower

Kline

Chemistry

Laboratory

Kline

Chemistry

Laboratory

Kline

Biology

Tower

Library

Kline

Biology

Tower

Library

Sloane

Physics

Laboratory

Sloane

Physics

Laboratory

Sterling

Chemistry

Laboratory

Sterling

Chemistry

Laboratory

Kline

Biology

Tower

Kline

Biology

Tower

Kline

Geology

Laboratory

Kline

Geology

Laboratory

Wright

Laboratory

West

Wright

Laboratory

West Accelerator

Laboratory

Accelerator

Laboratory

Wright

Laboratory

Wright

Laboratory

Sage

Hall

Sage

Hall

Bus StopBus Stop

Lo

ad

ing

Do

ck

Lo

ad

ing

Do

ck

Bass

Center

Bass

Center

Gibbs LaboratoryGibbs Laboratory

Accessible Pedestrian Walkways

Accessible Pedestrian Walkways

Dimeo Office

Trailers

Dimeo Office

Trailers

Access for Debris Removal

Access for Debris Removal

Yale Science Building

Look Ahead Logistics Plan

Note:

• Dimeo to coordinate Peabody Museum

tractor trailer deliveries with Peabody

Museum

Note:

• Dimeo to coordinate Peabody Museum

tractor trailer deliveries with Peabody

Museum

Access Road –Vehicles and

Bicycles

Access Road –Vehicles and

Bicycles

Temporary Pedestrian Walkway

Temporary Pedestrian Walkway

Temporary Pedestrian Walkway

Temporary Pedestrian Walkway

Bike RacksBike Racks

Bike RacksBike Racks

Handicap Ramp

Handicap Ramp

Pedestrian WalkwayPedestrian Walkway

2/8/17 - 2/22/17

Curtain WallDemo

Install storm piping

Intermittent work inWhitney Ave

Pipe installation throughaccess road. Access will bemaintained. Work starts 2/16

Cloister Removal

Column Removal

Pipe installation through road.Access will be maintained.Work starts 2/13

Install manhole