View
213
Download
0
Category
Preview:
Citation preview
Publication DetailsTitleDescription of program
VersionOwnerContact
CategoryLicence
DatasetName
Eligibility Criteria
ResourceFormatFile sizeRelease dateNext review dateContents
Notes about data or limitations of use
Description
Data DictionaryBaselinesIdentified_OpportunitiesImplemented_Opportunities
Notes about data or limitations of use
Publication DetailsNSW Energy Savings Action Plan Program
1.0Data and Evaluation Team, Metro Branch, Regional Operations GroupErin Harwood, Senior Information Analyst - Data and Evaluation(02) 9995 6386
BusinessThis dataset carries the following licence:
DatasetEnergy Savings Action Plan dataData for 265 Energy Savings Action Plans that were approved by the Minister for the Environment.
OEH databasexls989 kbdd/mm/2016
Description of fields in OEH databaseElectricity and natural gas baselines identified in approved plansAll electricity and natural gas opportunities identified in approved plans with estimated savingsImplemented electricity and natural gas opportunities reported to OEH with actual savings
Energy Savings Action Plans identified a range of cost-effective and potentially cost-effective energy efficiency opportunities that could deliver significant energy and cost savings. Organisations were required to submit annual reports on the implementation of energy efficiency opportunities for the three years following the approval of their Plans. The program ran from 28 October 2005 to 31 December 2012.
erin.harwood@environment.nsw.gov.au
Creative Commons Attribution 3.0 Australia
You are free to reproduce, incorporate, adapt and distribute this work, even commercially. Under the terms of the license you are required to attribute OEH material in the manner specified but not in any way that suggests that OEH endorses you or your use of the work.OEH dataset used as suppliedProvided you have not modified or transformed OEH material in any way the material contained in this dataset may be reused provided one of the following attributions is given: Source: OEH, NSW Government or Source: Office of Environment and Heritage, NSW Government.Derivative materialIf you have modified or transformed OEH material, or derived new material from those of OEH in any way, one of the following attributions must be used: Based on OEH, NSW Government data or Based on Office of Environment and Heritage data, NSW Government.
The Energy Savings Action Plan (ESAP) program was established in the Energy Savings Order 2005 under the Energy and Utilities Administration Act 1987. It required all NSW businesses and government agencies with premises that used more than 10 gigawatt hours a year of electricity and all NSW local councils with populations of more than 50,000 people to develop an ESAP. The Act states an ESAP expired four years after the date it was approved. In December 2012 the NSW Premier announced the ESAP program had ceased.
1. This dataset has been de-identified to comply with the Privacy and Personal Information Protection Act 1998 (NSW) (PPIP Act) and Government Information (Public Access) Act 2009 (GIPA Act), and to minimise the risk of identifying a particular commercial entity. Only the highest order ANZSIC Division has been published.
2. 267 ESAPs were approved by the Minister for the Environment. The names of the organisations required to prepare plans were published in the NSW Government Gazette. Two ESAPs were exempt following approval. This data has been excluded.
3. Published ESAP baseline and savings data is restricted to electricity and natural gas only. Opportunities saving other fuel types or other fuel types in combination with electricity and/or natural gas have been excluded.
8. Some measure descriptions have been edited to remove nomenclature that could be used to identify a particular entity.
4. Data includes opportunties identified as cost-effective or potentially-cost effective in approved plans only. Cost-effective energy savings measures were those that exceeded the organisation’s hurdle rate of return (cost of capital). Generally measures with a payback period of less than 2 to 4 years were cost-effective. New opportunities identified in annual reports have not been included as the data could not be verified.
5. Opportunity start and completion dates are as reported to OEH. Where there are no start and completion dates, for the purpose of conducting analysis on the ESAP program OEH generally attributes: a) the opportunity start date to the year it was identified in the plan based on the plan approval dateb) the completion date to the year prior to the date the annual report was submitted.The time taken for the plan to be approved could mean that some opportunities were identified well before the date of plan approval and in fact some organisations actually implemented opportunities before their plan was approved.
7. All costs are as reported to OEH and are reflective of that point in time. Costs have not been adjusted in any way. Estimated cost to implement ($) is attributable to the year the opportunity was identified in the Plan. Actual cost to implement ($) is attributable to the year the project was implemented. Care should be exercised in determining the relevance of this information as time passes.
9. It is likely that implementation is underestimated in this dataset. Organisations were required to submit three annual reports post-approval detailing progress against energy savings actions identified in the plan but annual reporting was not mandatorily enforced. Only one third of organisations met annual reporting requirements.
10. Unless the opportunity was implemented and actual savings were reported to OEH, savings are assumed to be the value identified in the approved plan. An opportunity that does not have a status implies the organisation did not submit an annual report or did not update progress on implementing that opportunity.
11. Opportunities can be linked to the plan baseline using the organisation unique identifier (OrgID). Implemented opportunities can be linked to identified opportunities using the opportunity unique identifier (OppID).
Field
OrgID
Suburb
Postcode
ANZSIC Division
Electricity (MWh)
Natural Gas (GJ)
Baseline Start Date
Baseline End Date
Approval
OppID
Measure Description
Measure Type
Equipment Type
Estimated cost ($)
Estimated electricity savings (MWh/yr)
Estimated natural gas savings (GJ/yr)
Status
Actual cost ($)
Actual electricity savings (MWh/yr)
Actual natural gas savings (GJ/yr)
Start Date
Completion Date
Definition
Unique ID for site (i.e. a business with 3 sites will have 3 different OrgIDs)
Suburb name of business (site address)
Postcode of business (site address)
ANZSIC Division
Baseline electricity consumption from approved plan (annual)
Baseline natural gas consumption from approved plan (annual)
Baseline start date from approved plan
Baseline end date from approved plan
Year plan was approved
Unique ID for each measure/opportunity identified in the approved plan
Description of the measure/opportunity identified in the approved plan
Identified measures were categorised as cost-effective or potentially cost-effective (based on the organisation's own investment criteria) in the approved plan
Technology/equipment classification applied by OEH to identified measure/opportunity
Cost to implement measure/opportunity identified in the approved plan
Electricity savings (annual) identified in the approved plan
Natural gas savings (annual) identified in the approved plan
Status of measure/opportunity reported to OEH in annual report: implemented, ongoing, under-investigation, to be implemented, not to be implemented, blank (no status reported).
Cost to implement measure/opportunity reported to OEH in annual report
Electricity savings (annual) reported to OEH in annual report
Natural gas savings (annual) reported to OEH in annual report
Implementation start date of measure/opportunity reported to OEH in annual report
Implementation completion date of measure/opportunity reported to OEH in annual report
OrgID Suburb Postcode ANZSIC Division
280 Penrith 2750 C - Manufacturing
281 Mulwala 2647 M - Professional, Scientific and Technical Services
282 Garden Island 2011 M - Professional, Scientific and Technical Services
283 Botany 2019 C - Manufacturing
284 Yennora 2161 C - Manufacturing
285 Revesby 2212 N - Administrative and Support Services
286 Matraville 2036 N - Administrative and Support Services
288 Huntingwood 2148 C - Manufacturing
289 The Domain 2000 R - Arts and Recreation Services
290 Macquarie Park 2113 C - Manufacturing
291 Hexham 2322 C - Manufacturing
292 Lidcombe 2141 C - Manufacturing
293 Wetherill Park 2164 C - Manufacturing
294 Berkeley Vale 2261 C - Manufacturing
295 Berkeley 2506 C - Manufacturing
296 Bankstown 2200 H - Accommodation and Food Services
297 Hanwood 2680 A - Agriculture, Forestry and Fishing
298 Beresfield 2322 A - Agriculture, Forestry and Fishing
299 Toongabbie 2146 C - Manufacturing
300 Muswellbrook 2333 B - Mining
301 Smithfield 2164 C - Manufacturing
302 Berrima 2577 C - Manufacturing
303 Picton 2571 C - Manufacturing
304 Marulan South 2579 C - Manufacturing
305 Port Kembla 2505 C - Manufacturing
306 Port Kembla 2505 C - Manufacturing
307 Cringila 2502 C - Manufacturing
308 Wentworthville 2145 C - Manufacturing
309 Camellia 2142 B - Mining
311 Emu Plains 2750 B - Mining
312 Eastgardens 2036 C - Manufacturing
313 Broadway 2007 L - Rental, Hiring and Real Estate Services
314 Belmore 2192 H - Accommodation and Food Services
315 Kurnell 2231 C - Manufacturing
316 Singleton 2330 B - Mining
317 Kooragang 2304 F - Wholesale Trade
318 Tamworth 2340 C - Manufacturing
319 Bomen 2650 C - Manufacturing
320 Narrabri 2390 F - Wholesale Trade
321 Tumut 2720 C - Manufacturing
322 Oberon 2787 C - Manufacturing
323 Kandos 2848 C - Manufacturing
324 Clarence 2790 B - Mining
325 Mandalong 2264 B - Mining
327 Wangi Wangi 2267 B - Mining
328 Lidsdale 2790 B - Mining
329 Wagga Wagga 2678 P - Education and Training
330 Lemington 2330 B - Mining
331 Cobar 2835 B - Mining
332 Northmead 2152 C - Manufacturing
333 Burwood 2134 J - Information Media and Telecommunications
334 Kurnell 2231 C - Manufacturing
335 Roselands 2196 L - Rental, Hiring and Real Estate Services
336 Penrith 2750 C - Manufacturing
337 Wetherill Park 2164 C - Manufacturing
338 Ingleburn 2565 C - Manufacturing
339 Darling Harbour 2000 H - Accommodation and Food Services
340 Kelso 2795 C - Manufacturing
341 Raglan 2795 C - Manufacturing
342 Orange 2800 C - Manufacturing
343 Cobar 2835 B - Mining
344 Greenacre 2190 C - Manufacturing
345 Dubbo 2830 C - Manufacturing
346 Enfield 2136 C - Manufacturing
347 Ermington 2115 C - Manufacturing
348 Kurri Kurri 2327 C - Manufacturing
349 Mascot 2015 C - Manufacturing
350 Glennies Creek 2330 B - Mining
351 Ultimo 2007 M - Professional, Scientific and Technical Services
352 Stratford 2422 B - Mining
353 Sydney 2000 L - Rental, Hiring and Real Estate Services
354 Sydney 2000 L - Rental, Hiring and Real Estate Services
355 Kurnell 2231 C - Manufacturing
356 Bankstown Airport 2200 C - Manufacturing
357 Helensburgh 2508 B - Mining
358 Concord West 2138 G - Retail Trade
359 Oberon 2787 C - Manufacturing
360 Windsor 2756 C - Manufacturing
361 Tomago 2322 D - Electricity, Gas, Water and Waste Services
362 New Lambton 2305 Q - Health Care and Social Assistance
363 Loxford 2326 C - Manufacturing
364 Tumbarumba 2653 C - Manufacturing
365 Artarmon 2064 J - Information Media and Telecommunications
366 West Pennant Hills 2125 J - Information Media and Telecommunications
367 Baulkham Hills 2153 J - Information Media and Telecommunications
368 Appin 2560 B - Mining
369 Douglas Park 2569 B - Mining
370 Appin 2560 B - Mining
371 Kooragang Island 2304 B - Mining
372 Lisarow 2250 A - Agriculture, Forestry and Fishing
373 Hoxton Park 2171 A - Agriculture, Forestry and Fishing
374 Seven Hills 2147 C - Manufacturing
377 Rosehill 2142 C - Manufacturing
378 Oberon 2787 C - Manufacturing
379 Botany 2019 C - Manufacturing
380 Albury 2640 C - Manufacturing
381 Ingleburn 2565 C - Manufacturing
382 Mayfield 2304 C - Manufacturing
383 Vales point 2259 B - Mining
384 The Rocks 2000 H - Accommodation and Food Services
385 Lidcombe 2141 C - Manufacturing
386 North Ryde 2113 P - Education and Training
387 Manildra 2865 C - Manufacturing
388 Camellia 2142 C - Manufacturing
389 Granville 2142 C - Manufacturing
390 Port Kembla 2505 C - Manufacturing
391 North Sydney 2060 K - Financial and Insurance Services
394 Ultimo 2000 R - Arts and Recreation Services
395 Chullora 2190 J - Information Media and Telecommunications
396 Blayney 2799 C - Manufacturing
397 Orange 2800 B - Mining
398 Sydney 2000 L - Rental, Hiring and Real Estate Services
400 Albury 2640 C - Manufacturing
401 Parkes 2870 B - Mining
402 Casino 2470 C - Manufacturing
403 St Leonards 2065 Q - Health Care and Social Assistance
404 Darlinghurst 2010 O - Public Administration and Safety
405 Bathurst 2795 C - Manufacturing
406 Mayfield 2304 C - Manufacturing
407 Rooty Hill 2766 C - Manufacturing
408 Mayfield 2304 C - Manufacturing
410 Scone 2337 C - Manufacturing
411 Chullora 2190 C - Manufacturing
413 Matraville 2036 I - Transport, Postal and Warehousing
414 Bomaderry 2541 C - Manufacturing
415 Banksmeadow 2019 I - Transport, Postal and Warehousing
416 Cobar 2835 B - Mining
417 Lane Cove 2066 C - Manufacturing
418 Tamworth 2340 C - Manufacturing
419 Penrith 2750 H - Accommodation and Food Services
420 Broken Hill 2880 B - Mining
422 Ingleburn 2565 C - Manufacturing
423 Moorebank 2170 J - Information Media and Telecommunications
424 Wollongong 2500 I - Transport, Postal and Warehousing
425 Carrington 2294 I - Transport, Postal and Warehousing
426 Moorebank 2170 C - Manufacturing
427 Mascot 2020 I - Transport, Postal and Warehousing
428 Matraville 2036 C - Manufacturing
429 Sydney 2000 K - Financial and Insurance Services
430 Deniliquin 2710 C - Manufacturing
431 Leeton 2705 C - Manufacturing
432 Wagga Wagga 2650 C - Manufacturing
433 Yanco 2703 C - Manufacturing
434 Lisarow 2250 C - Manufacturing
435 Greenwich 2065 C - Manufacturing
436 Rosehill 2142 C - Manufacturing
437 Sydney 2000 H - Accommodation and Food Services
438 Bomaderry 2541 C - Manufacturing
439 Bathurst 2795 F - Wholesale Trade
440 Kelso 2795 F - Wholesale Trade
441 Rosebery 2018 J - Information Media and Telecommunications
442 Banksmeadow 2019 C - Manufacturing
443 Huntingwood 2148 M - Professional, Scientific and Technical Services
444 Randwick 2031 Q - Health Care and Social Assistance
445 Kogarah 2217 Q - Health Care and Social Assistance
446 yennora 2161 C - Manufacturing
447 The Rocks 2000 H - Accommodation and Food Services
448 Kogarah 2217 K - Financial and Insurance Services
452 Wahroonga 2076 Q - Health Care and Social Assistance
453 Sydney International Airport 2020 I - Transport, Postal and Warehousing
454 Flemington 2140 L - Rental, Hiring and Real Estate Services
455 Sydney 2000 R - Arts and Recreation Services
456 Bankstown 2200 Q - Health Care and Social Assistance
457 Campbelltown 2560 Q - Health Care and Social Assistance
458 Concord West 2138 Q - Health Care and Social Assistance
459 Liverpool 2170 Q - Health Care and Social Assistance
460 Camperdown 2050 Q - Health Care and Social Assistance
461 Cronulla 2230 D - Electricity, Gas, Water and Waste Services
462 Malabar 2036 D - Electricity, Gas, Water and Waste Services
463 Manly 2095 D - Electricity, Gas, Water and Waste Services
464 Prospect 2148 D - Electricity, Gas, Water and Waste Services
465 St Marys 2760 D - Electricity, Gas, Water and Waste Services
466 West Ryde 2114 D - Electricity, Gas, Water and Waste Services
467 Kingswood 2747 Q - Health Care and Social Assistance
468 Westmead 2145 Q - Health Care and Social Assistance
469 Tahmoor 2573 B - Mining
470 Rooty Hill 2766 C - Manufacturing
471 Willoughby 2068 J - Information Media and Telecommunications
472 Haymarket 2000 J - Information Media and Telecommunications
473 North Sydney 2060 J - Information Media and Telecommunications
474 Parramatta 2150 J - Information Media and Telecommunications
475 Sydney 2000 J - Information Media and Telecommunications
477 Horsley Park 2175 C - Manufacturing
478 Horsley Park 2175 C - Manufacturing
479 Waratah 2298 C - Manufacturing
480 Westmead 2145 Q - Health Care and Social Assistance
481 Alexandria 2015 J - Information Media and Telecommunications
482 Lidcombe 2141 C - Manufacturing
484 Sydney 2000 K - Financial and Insurance Services
485 University of Sydney 2006 P - Education and Training
486 Tomago 2322 C - Manufacturing
488 Tweed Heads 2485 H - Accommodation and Food Services
489 Minto 2566 C - Manufacturing
490 Appin 2560 D - Electricity, Gas, Water and Waste Services
491 Armidale 2350 P - Education and Training
492 Randwick 2031 P - Education and Training
493 Callaghan 2308 P - Education and Training
494 Gwynneville 2500 P - Education and Training
495 Smithfield 2164 C - Manufacturing
496 Smithfield 2164 C - Manufacturing
497 Tumut 2720 C - Manufacturing
498 Smithfield 2164 C - Manufacturing
499 Kings Park 2148 C - Manufacturing
500 Prestons 2170 C - Manufacturing
501 Wetherill Park 2164 C - Manufacturing
502 Warkworth 2330 B - Mining
503 Mount Thorley 2330 B - Mining
504 Artarmon 2064 C - Manufacturing
505 Miranda 2228 L - Rental, Hiring and Real Estate Services
506 Parramatta 2150 L - Rental, Hiring and Real Estate Services
508 North Ryde 2113 K - Financial and Insurance Services
509 Tumut 2720 C - Manufacturing
510 Cullen Bullen 2790 B - Mining
511 Singleton 2330 B - Mining
512 Teralba 2284 B - Mining
513 Killingworth 2278 B - Mining
514 Ravensworth 2330 B - Mining
515 Ulan 2850 B - Mining
516 Inverell 2360 C - Manufacturing
561 Auburn 2144 O - Public Administration and Safety
562 Bankstown 2200 O - Public Administration and Safety
563 Blacktown 2148 O - Public Administration and Safety
564 Katoomba 2780 O - Public Administration and Safety
565 Camden 2570 O - Public Administration and Safety
566 Campbelltown 2560 O - Public Administration and Safety
567 Campsie 2194 O - Public Administration and Safety
568 Drummoyne 2047 O - Public Administration and Safety
569 Coffs Harbour 2450 O - Public Administration and Safety
570 Sydney 2000 O - Public Administration and Safety
571 Wakeley 2176 O - Public Administration and Safety
572 Gosford 2250 O - Public Administration and Safety
573 Windsor 2756 O - Public Administration and Safety
574 Merrylands 2160 O - Public Administration and Safety
575 Hurstville 2220 O - Public Administration and Safety
576 Kogarah 2217 O - Public Administration and Safety
577 Gordon 2072 O - Public Administration and Safety
578 Speers Point 2284 O - Public Administration and Safety
579 Leichhardt 2040 O - Public Administration and Safety
580 Liverpool 2170 O - Public Administration and Safety
581 Maitland 2320 O - Public Administration and Safety
582 Petersham 2049 O - Public Administration and Safety
583 Newcastle 2300 O - Public Administration and Safety
584 North Sydney 2060 O - Public Administration and Safety
585 Parramatta 2124 O - Public Administration and Safety
586 Penrith 2750 O - Public Administration and Safety
587 Warriewood 2102 O - Public Administration and Safety
588 Port Macquarie 2444 O - Public Administration and Safety
589 Raymond Terrace 2324 O - Public Administration and Safety
590 Randwick 2031 O - Public Administration and Safety
591 Rockdale 2216 O - Public Administration and Safety
592 Ryde 2112 O - Public Administration and Safety
593 Shellharbour 2529 O - Public Administration and Safety
594 Nowra 2541 O - Public Administration and Safety
595 Sutherland 2232 O - Public Administration and Safety
596 Tamworth 2340 O - Public Administration and Safety
597 Castle Hill 2154 O - Public Administration and Safety
598 Hornsby 2077 O - Public Administration and Safety
599 Murwillumbah 2484 O - Public Administration and Safety
600 Wagga Wagga 2650 O - Public Administration and Safety
601 Dee Why 2099 O - Public Administration and Safety
602 Bondi Junction 2022 O - Public Administration and Safety
603 Chatswood 2067 O - Public Administration and Safety
604 Wollongong 2500 O - Public Administration and Safety
605 Double Bay 2028 O - Public Administration and Safety
606 Wyong 2259 O - Public Administration and Safety
Electricity (MWhNatural Gas (GJ)Baseline Start D Baseline End DaApproval
110,169 2,247,454 1/01/06 31/12/06 2007
16,733 190,566 1/05/05 30/04/06 2007
61,705 11,492 1/05/05 30/04/06 2007
73,631 1/07/05 30/06/06 2008
95,105 1,006,189 1/01/07 31/12/07 2009
12,330 38,361 1/07/04 30/06/05 2007
118,468 1,818,347 1/07/04 30/06/05 2006
25,846 176,446 1/08/06 31/07/07 2009
8,705 43,036 1/03/05 1/03/06 2008
33,019 1/01/05 31/12/05 2007
9,888 60,827 1/07/05 30/06/06 2007
13,022 45,863 1/07/05 30/06/06 2007
17,054 115,412 1/07/05 30/06/06 2008
13,910 106,943 1/07/05 30/06/06 2007
11,040 1/06/06 1/07/07 2009
10,844 1/04/05 31/03/06 2007
23,537 146,818 1/01/05 1/01/06 2007
44,461 57,289 1/01/05 1/01/06 2008
11,843 70,363 1/01/06 31/12/06 2008
58,124 1/01/04 31/12/04 2009
11,110 67,015 1/07/05 30/06/06 2007
135,085 30/06/04 1/07/05 2007
57,097 31/12/04 31/12/05 2007
16,483 628,764 31/12/04 31/12/05 2007
2,229,975 2,521,100 1/01/04 31/12/04 2007
329,952 1,466,379 1/07/03 30/06/05 2007
222,973 31,075 1/01/05 31/12/05 2006
10,440 101,231 1/07/05 30/06/06 2007
11,362 429,591 1/07/05 30/06/06 2007
12,843 1/01/05 31/12/05 2007
30,589 92,865 1/01/05 1/01/06 2007
15,830 1/07/05 1/06/06 2007
11,348 1/03/06 1/03/07 2008
114,598 2,551,895 1/01/05 31/12/05 2009
28,092 1/07/05 1/07/06 2007
10,831 220,828 1/06/05 31/05/06 2007
11,731 4/05/05 5/04/06 2007
23,038 148,517 1/05/05 30/04/06 2007
16,679 1/06/05 1/06/06 2007
25,406 1/01/05 1/01/06 2006
118,816 603,027 1/01/05 1/01/06 2006
497,024 1/07/05 30/06/06 2009
35,893 1/07/05 30/06/06 2007
46,523 1/01/05 31/12/05 2007
27,948 1/01/05 31/12/05 2007
46,854 1/01/05 1/01/06 2006
12,084 48,337 1/05/05 30/04/06 2007
139,639 1/01/05 1/01/06 2007
80,719 1/01/06 31/12/06 2008
12,294 37,039 1/01/05 31/12/05 2007
28,104 1/09/06 31/08/07 2008
19,003 75,398 1/01/05 31/12/05 2007
7,156 1/07/05 1/07/06 2008
15,290 185,556 1/02/05 31/01/06 2007
31,603 451,422 1/04/04 31/03/05 2007
47,274 140,276 1/04/04 31/03/05 2007
19,736 1/09/04 31/08/05 2007
12,984 161,755 1/07/05 30/06/06 2007
34,670 207,739 1/01/05 1/01/06 2006
20,212 47,000 1/01/05 1/01/06 2007
78,328 1/07/05 30/06/06 2007
23,966 29,818 1/01/05 1/01/06 2007
25,799 241,573 1/01/06 31/12/06 2007
20,892 35,431 1/08/05 31/07/06 2007
11,720 42,110 5/09/05 3/09/06 2008
10,637 2,957 1/07/05 1/07/06 2007
12,245 175,604 1/07/05 30/06/06 2007
14,948 1/08/05 1/08/06 2007
24,335 1/07/06 30/06/07 2009
21,954 1/07/05 30/06/06 2009
12,416 8,830 1/08/05 31/07/06 2008
17,096 1/12/05 30/11/06 2008
16,738 307,000 1/01/05 1/01/06 2006
19,182 41,637 1/07/04 30/06/05 2009
33,861 1/07/05 30/06/06 2007
9,512 1/07/05 30/06/06 2008
21,143 61,387 1/01/05 31/12/05 2007
10,495 1,500 1/07/05 30/06/06 2007
20,117 1/11/05 1/11/06 2008
25,757 43,212 1/07/06 30/06/07 2008
2,610,913 540,945 1/01/04 31/12/04 2006
24,306 1/07/05 30/06/06 2007
25,919 1/01/05 31/12/05 2009
20,961 1,011 1/01/05 31/12/05 2009
21,958 1/01/06 31/12/06 2009
55,463 1/01/05 1/01/06 2007
31,432 1/01/05 1/01/06 2007
116,554 1/01/05 1/01/06 2007
93,451 10,552,243 1/10/04 30/09/05 2006
18,880 144,126 1/06/05 31/05/06 2008
11,893 26,752 1/05/05 30/04/06 2008
42,371 33,612 1/07/04 30/06/05 2007
27,275 8,790 1/07/05 30/06/06 2007
22,121 95,242 1/01/05 31/12/05 2006
37,972 333,802 1/07/05 30/06/06 2007
26,638 2,752 1/01/05 1/01/06 2006
27,338 20,754 1/02/05 1/02/06 2007
13,020 205,834 1/07/05 30/06/06 2007
12,074 1/07/05 30/06/06 2007
12,133 35,028 1/01/07 31/12/07 2008
30,812 242,286 1/01/05 1/01/06 2007
29,391 67,028 1/11/04 31/10/05 2009
50,997 1/04/05 31/03/06 2007
7,941 26,702 1/07/05 1/07/06 2007
15,616 25,333 1/01/07 31/12/07 2009
34,181 330,534 1/01/05 31/12/05 2007
11,090 1/10/04 31/10/05 2008
10,170 3 1/09/05 31/08/06 2007
22,655 34,544 1/07/05 30/06/06 2007
22,062 151,525 1/01/05 1/01/06 2007
608,000 1/03/04 28/02/06 2007
8,562 1/09/05 31/08/06 2007
702,714 1,365,677 1/08/06 31/01/07 2008
204,228 1/01/05 31/12/05 2007
17,872 1/01/05 31/12/05 2007
20,996 33 1/01/05 1/01/06 2009
9,860 1/03/06 28/02/07 2007
12,587 14,559 1/01/06 31/12/06 2007
27,199 138,184 1/01/04 1/01/05 2009
308,848 612,783 1/01/04 1/01/05 2007
151,269 1,590,879 1/01/04 1/01/05 2007
12,724 1/01/06 31/12/06 2008
31,346 105,792 1/08/05 31/07/06 2007
10,715 1/01/05 31/12/06 2008
24,131 5/05/06 10/05/07 2007
9,448 1/08/05 31/07/06 2008
55,296 1/01/05 1/01/06 2006
15,977 156,776 30/06/05 30/06/06 2007
95,563 1/07/05 30/06/06 2007
12,950 18,960 1/01/05 31/12/05 2008
120,332 1/07/07 30/06/08 2008
27,695 1,177,939 1/04/05 1/04/06 2007
21,172 74,581 1/08/04 1/08/05 2007
17,607 1/01/05 31/12/05 2007
91,199 1/01/05 31/12/05 2007
32,582 1/01/06 31/12/06 2009
17,354 1/01/05 31/12/05 2007
196,529 2,267,199 1/07/04 1/07/05 2007
15,725 1/07/05 30/06/06 2008
12,372 1/05/05 30/04/06 2008
14,017 17,642 1/05/05 30/04/06 2008
13,531 37,731 1/10/05 1/10/06 2007
15,151 212,914 1/07/05 30/06/07 2007
17,105 44,924 1/03/05 28/02/06 2007
14,200 88,200 1/01/05 1/04/06 2007
295,000 16,040,000 1/01/05 30/04/06 2006
12,521 15,272 1/03/06 1/03/07 2007
123,047 157,891 1/04/05 31/03/06 2007
32,701 1/09/05 31/08/06 2007
12,248 21,000 1/01/06 30/12/06 2008
13,234 1/07/05 30/06/06 2007
14,654 283,275 1/01/05 31/12/05 2007
26,771 16,377 1/03/06 1/03/07 2009
39,990 78,050 1/01/06 31/12/06 2007
37,738 1/01/06 31/12/06 2007
15,374 40,914 1/07/05 1/07/06 2007
10,079 19,954 1/01/06 31/12/06 2008
14,638 5,652 1/10/05 30/09/06 2007
15,026 52,289 30/09/07 30/09/08 2009
86,489 66,592 1/07/04 30/06/05 2006
44,528 1/07/04 30/06/05 2006
19,030 1/07/05 30/06/06 2008
10,293 21,819 1/07/06 30/06/07 2008
12,101 24,715 1/07/06 30/06/07 2009
17,924 101,324 1/07/06 30/06/07 2008
33,048 57,561 1/07/06 30/06/07 2009
43,329 56,424 1/07/06 30/06/07 2008
10,704 3,088 1/05/05 1/05/06 2007
15,949 1/07/05 1/07/06 2007
40,654 1/02/05 1/02/06 2007
44,923 1/03/05 1/03/06 2007
11,720 1/03/05 1/03/06 2007
30,893 3,901 1/04/05 1/04/06 2007
15,816 22,777 1/07/04 30/06/06 2008
50,468 122,237 1/07/04 30/06/06 2008
205,706 1/01/05 1/01/06 2007
20,492 69,143 30/06/06 30/06/07 2007
10,524 481 1/04/05 31/03/06 2007
14,132 1/01/05 31/12/05 2007
10,069 1/01/05 31/12/05 2007
11,282 1/01/05 31/12/05 2007
15,661 1/01/05 31/12/05 2007
10,896 381,674 1/07/02 30/06/03 2007
15,292 598,284 1/07/02 30/06/03 2007
234,766 1,193,642 1/02/05 31/01/06 2006
23,269 45,206 1/07/03 30/06/04 2009
36,962 147,464 1/01/05 1/12/05 2006
22,168 69,932 1/01/05 31/12/05 2006
12,347 1,187 1/01/05 31/12/05 2007
69,003 17,495 1/01/06 1/01/07 2009
7,402,771 1,548,051 1/01/05 31/12/05 2006
10,347 9,078 1/12/05 1/12/06 2007
13,655 25,834 1/04/05 31/03/06 2009
13,429 1/01/05 31/12/05 2007
14,616 85,223 31/12/04 31/12/05 2007
64,240 53,562 1/01/04 1/01/05 2007
26,387 20,835 1/01/05 31/12/05 2007
25,911 23,492 1/01/05 31/12/05 2007
17,969 1/01/05 1/01/06 2007
12,220 44,658 1/03/05 1/03/06 2006
59,212 382,913 1/05/05 1/05/06 2007
117,646 1/01/05 31/12/05 2006
58,932 39,612 1/04/05 1/04/06 2007
11,408 31,775 1/05/05 30/04/06 2007
15,797 8,925 1/04/05 1/04/06 2007
20,996 1/07/04 30/06/05 2007
165,219 1/01/05 1/01/06 2007
22,962 29,055 1/07/05 30/06/06 2007
14,814 1/07/05 30/06/06 2007
24,200 1/07/05 30/06/06 2007
11,463 1/11/05 31/10/06 2008
19,297 31,608 1/01/06 31/12/06 2008
27,408 1/01/05 1/01/06 2007
142,544 1/01/05 1/01/06 2007
47,335 1/01/05 1/01/06 2007
294 1/01/05 1/01/06 2007
28,644 1/01/05 1/01/06 2007
88,821 1/01/05 1/01/06 2007
18,325 1/07/07 30/06/08 2009
5,323 13,988 1/07/05 1/07/06 2007
5,228 5,545 1/07/04 30/06/05 2007
8,553 33,383 31/12/04 31/12/05 2007
5,483 3,622 1/07/04 1/07/05 2008
2,853 3,059 1/01/06 31/12/06 2009
18,203 21,376 1/01/06 31/12/06 2008
2,744 11,491 1/09/02 1/10/03 2008
1,544 5,021 1/07/04 30/06/05 2008
9,871 1/04/05 1/04/06 2007
13,230 6,610 1/01/05 31/12/05 2007
15,930 3,386 1/01/05 31/12/05 2007
20,032 1/07/07 30/06/08 2008
8,037 12,564 1/07/06 30/06/07 2008
2,442 13,980 1/06/05 1/06/06 2007
2,729 30/11/03 30/11/04 2007
3,670 2,378 30/06/05 30/06/06 2008
7,293 1/07/02 30/06/03 2009
3,364 8,352 1/07/04 30/06/05 2008
5,135 62 1/07/05 30/06/06 2007
5,370 14,214 1/01/05 1/01/06 2007
4,334 1/01/05 31/12/05 2007
2,520 1/07/05 30/06/06 2007
7,255 2,083 1/07/04 30/06/05 2008
4,594 1/01/05 31/12/05 2007
6,879 1,679 1/07/06 1/07/07 2009
20,858 1/05/05 1/05/06 2007
1,933 1,889 1/07/04 1/07/05 2007
17,986 1/01/06 1/01/07 2007
5,261 4,253 1/02/05 1/02/06 2007
3,451 3,028 1/07/04 30/06/05 2008
1,451 1/07/05 30/06/06 2008
5,742 10,778 1/04/05 1/04/06 2007
1,745 4,413 1/01/05 31/12/05 2007
19,407 887 1/02/06 31/01/07 2008
17,515 1/09/05 31/08/06 2007
11,628 1/07/04 1/07/05 2007
5,972 2,278 1/07/06 30/06/07 2009
2,992 12,372 1/07/05 1/07/06 2007
5,866 1/07/05 30/06/06 2007
8,782 13,058 1/01/06 1/01/07 2009
4,231 1/07/04 30/06/05 2008
4,528 1/01/04 31/12/04 2008
3,076 11,436 1/07/05 30/06/06 2009
8,348 9,059 1/07/06 30/06/07 2009
1,392 490 1/07/03 30/06/04 2008
20,433 1/07/04 30/06/05 2008
OrgID OppID Measure Description Measure Type
601 2682 Temperature reset controls and timing rescheduling Cost-Effective
601 2683 Temperature reset controls and timing rescheduling Cost-Effective
597 5694 Install solar water heating system as an auxiliary pool heating system Potentially Cost-Effective
305 931 ‘Lights off initative’ Cost-Effective
492 4106 Staff are encouraged to report energy and water waste online Cost-Effective
492 4107 Staff are encouraged to report energy and water waste online Cost-Effective
492 4092 Staff are encouraged to report energy and water waste online Cost-Effective
492 4093 Staff are encouraged to report energy and water waste online Cost-Effective
492 4104 Aims to monitor and reduce energy consumption via research projects,Cost-Effective
492 4083 Aims to monitor and reduce energy consumption via research projects,Cost-Effective
492 4090 Aims to monitor and reduce energy consumption via research projects,Cost-Effective
492 4091 Aims to monitor and reduce energy consumption via research projects,Cost-Effective
330 440 Dragline Digital Drive & Tritronics Installation and Optimisation of OperPotentially Cost-Effective
514 4612 20 Minute rule on the dragline. Cost-Effective
352 2340 200kVAr Power Factor Correction Duralie - demand reduction 83kVA Cost-Effective
342 1154 24 hour, 7 day timers on natural gas comfort heaters Cost-Effective
570 839 24 hours fluorescent lighting: convert to T5 lamps Cost-Effective
390 4861 Drawbench main drives Potentially Cost-Effective
303 3590 Improve efficiency of compressed air distribution Cost-Effective
303 3583 Cement mill diaphragm allowing media escape - repair and replace Cost-Effective
302 3560 Improve the reuse & recycling of reject material Cost-Effective
303 3591 Link all compressors to DCS to improve on/off and load/unload control.Cost-Effective
303 3585 VSD on slag dryer colling fan(s) Potentially Cost-Effective
303 3576 Install VSDs on clinker cooling fans Potentially Cost-Effective
302 3561 On-line fineness analyser for Cement Mills Potentially Cost-Effective
302 3559 Upgrade cement milling capacity by installing a new cement mill #7 Cost-Effective
583 2954 8Watt 24V Double Wedge-1Watt LED Crystal flex Potentially Cost-Effective
501 4249 A compressor scheduling system on the high pressure compressors has Cost-Effective
298 2145 Action to ensure doors to freezers and refrigerated areas closed: instrucCost-Effective
445 4208 Activate Energy Star feature on PCs Potentially Cost-Effective
580 5306 Activate Energy Star on computers Cost-Effective
575 1502 Add 7-day time switch to control domestic hot water circulation pump Cost-Effective
575 1515 Add 7-day timers to boiling water units Cost-Effective
349 1322 Add light switches to intermittently used offices and rooms Potentially Cost-Effective
466 3149 Add stiffening bracings on units Cost-Effective
438 3117 Adjust feedwater pump on boiler Cost-Effective
564 1755 Adjust HVAC control, introduce economy cycle and replace A/C unit withCost-Effective
594 5058 Adjust Start/Finish times of air conditioner Cost-Effective
571 3244 Adjust steam generator timer to operate only when required. Cost-Effective
434 2181 Adjust Suction Pressure on Ammonia Refrigeration Cost-Effective
561 2739 Adjust the time clock on the water feature pump to turn off during high Cost-Effective
582 4709 Adjust the timer controls for the change room lighting. Cost-Effective
571 3315 Adjust time switch on movement detector that controls the toilet blocks' Cost-Effective
414 4824 Advanced Air Compressor Control System Potentially Cost-Effective
465 1599 Aerobic sludge digestion controls Potentially Cost-Effective
318 4462 After Burner gas reduction Potentially Cost-Effective
480 5357 After Hours Shut-Down Cost-Effective
336 5942 Afterburner Potentially Cost-Effective
290 3409 AHU temperature Set-point setback Cost-Effective
336 5941 Air compressor Potentially Cost-Effective
379 1189 Air compressor and chiller energy management control system. Potentially Cost-Effective
379 1177 Air compressor cooling tower recirculation pump VSD Cost-Effective
482 418 Air Compressor Inlet Air Supply (Heat Exhaust) Potentially Cost-Effective
334 3803 Air compressor leak reduction Cost-Effective
291 4293 Air compressor operation Cost-Effective
312 787 Air compressor optimal control Cost-Effective
495 1290 Air compressor replacement Cost-Effective
411 2528 Air compressor room lighting timer switch Cost-Effective
332 4507 Air Compressors Cost-Effective
486 218 Air Compressors: Investigate potential savings through: 1) elimination Potentially Cost-Effective
583 3000 Air Con System Review Cost-Effective
583 3027 Air Con System Review Cost-Effective
583 3009 Air Con System Review(site 10% of AC consumption) Cost-Effective
378 16 Air Conditioning – Install timer control to office air conditioning units. Cost-Effective
489 4147 Air Conditioning & Ventilation – office Potentially Cost-Effective
460 1892 air conditioning control to outer buildings Cost-Effective
595 5436 Air conditioning economy cycle Potentially Cost-Effective
377 4847 Air knife systems Potentially Cost-Effective
336 5943 Air preheater on shaft furnace Potentially Cost-Effective
280 4237 Air rinse on elevators Cost-Effective
480 5355 Air-Conditioning System Improvements Cost-Effective
455 1920 Air-conditioning to the Box office Foyer area Potentially Cost-Effective
455 1915 Air-conditioning to the Venue areas Cost-Effective
595 5435 Air-cooled heat exchanger to CoGen Potentially Cost-Effective
506 4279 Car Park Shutdown - Centre security to isolate access to Car Park at 8:Cost-Effective
428 4406 Installation of Master Batch extruder in a unit Cost-Effective
305 940 Enable power saving feature on all PC's Cost-Effective
305 1021 Install sensors for lights in infrequently used areas Potentially Cost-Effective
305 941 Install timers on Air Con units Cost-Effective
486 216 Improve current efficiency of ALPYSYS Pot Regulation System Cost-Effective
486 214 Improve current efficiency of ALPYSYS Pot Regulation System Cost-Effective
486 217 Improve current efficiency of ALPYSYS Pot Regulation System Cost-Effective
604 2265 Alter the air conditioning controls to suit the current occupancy Cost-Effective
594 5077 Alter the control system to increase the aeration delay time Cost-Effective
485 5817 Alter the controls on Mechanical SW/BD Cost-Effective
485 5815 Alter the controls on the level 2 common/staff room air conditioners Cost-Effective
485 5816 Alter the controls on the laboratory console air conditioners Cost-Effective
571 3276 Alterations and additions to light control system Cost-Effective
583 3037 Alterations to site staff sheds Potentially Cost-Effective
502 4526 Alternative conveyor route Potentially Cost-Effective
426 5350 Aluminium Wire drawing lubrication system Potentially Cost-Effective
577 2491 Amenities block lighting upgrade Cost-Effective
604 2319 Amenities Blocks solar hot water with additional 600 litres storage (optiPotentially Cost-Effective
429 6558 Amenities Light Sensors Cost-Effective
440 6532 Ammonia Back pressure valves for Spirals Potentially Cost-Effective
318 4436 Ammonia pipe lagging Cost-Effective
411 2542 Ammonia pump VSD Potentially Cost-Effective
371 367 Ammonia storage refrigeration plant efficiency Potentially Cost-Effective
318 4438 Application fo lumitrols Cost-Effective
329 1676 Application of air cooled condenser Cost-Effective
468 6476 Application of C-Bus system for controlling lighting - Upgrade of lightin Potentially Cost-Effective
318 4453 Application of occupancy sensors (50 units) Potentially Cost-Effective
339 2657 Application of Skycool to roof surface Potentially Cost-Effective
373 5513 Application of VSD on high pressure fan Potentially Cost-Effective
401 702 Application of VSD’s - Improve the efficiency of larger drives by appli Potentially Cost-Effective
321 294 Application of VSDs to Dryers Potentially Cost-Effective
419 2119 Apply "SkyCool" Heat Reflective Paint to Roof Potentially Cost-Effective
455 1917 Appoint an energy Manager Cost-Effective
379 1190 Apron feeder recirculation fan VSD Potentially Cost-Effective
443 5830 Department Economy Cycle Cost-Effective
509 6502 Artifical Demand - Cylinders Cost-Effective
509 6518 Artifical demand - Rise to Pressure Potentially Cost-Effective
336 442 Artificial Lighting Measures Cost-Effective
397 4014 Assess all air-conditioning systems for efficiency and install latest gen Potentially Cost-Effective
397 4017 Assess all site electric motor operation for operating efficiency – inclu Cost-Effective
397 4015 Assess possibility of using external air for cooling of substations durin Potentially Cost-Effective
464 1637 Assess the Feasibility of Implementing a Hydro-Turbine Potentially Cost-Effective
466 3155 Assess the feasibility to purchase, implement and operate a water pumPotentially Cost-Effective
464 1633 Assess the Feasibilityto Purchase, Implement and Use a Water Pump Potentially Cost-Effective
498 2831 Assorted variable speed drives Cost-Effective
386 4069 Atrium Lighting Upgrade Potentially Cost-Effective
324 1657 audit and repair of the compressed air network Cost-Effective
515 4657 Audit of the Compressed Air System Cost-Effective
396 626 Auto - shutdown for milling operations based on duty requirement Cost-Effective
465 1602 Auto bleeders on RAS pumps Potentially Cost-Effective
396 645 Auto shutdown for minor road dump elevator Cost-Effective
396 634 Auto stop controls for 'Product control' transfer drag conveyors Cost-Effective
297 535 Automate Intake System to enable shutdown of entire system when notCost-Effective
298 2165 Automate Intake System on PLC Potentially Cost-Effective
297 6043 Automate Intake System; interlink silo and silo blower controls to ena Cost-Effective
298 2149 Automate refrigeration plant Potentially Cost-Effective
499 4275 Automate shut down of perform conveyors when the IMM s are off Cost-Effective
396 653 Automate start / stop conveyors Potentially Cost-Effective
440 6525 Automated compressor staging, compressor capacity control and ReplCost-Effective
396 638 Automated oxygen trim for Steambloc boiler Cost-Effective
349 1320 Automatic control of Barometric and Cooling Water pumps. Connect Potentially Cost-Effective
417 4388 Automatic Timed Shutdown of Delivery Dust Collector Potentially Cost-Effective
581 3944 Automatic water test linked to pump to reduce hours of operations (as Cost-Effective
581 3948 Automatic water test linked to pump to reduce hours of operations (as Cost-Effective
571 3321 Automatically switch off the shower block's hot water system when it is Potentially Cost-Effective
571 3322 Automatically switch off the shower block's lighting when not required. Potentially Cost-Effective
493 6168 Automation of natural ventilation louvres Potentially Cost-Effective
512 4582 Automation of surface conveyor Cost-Effective
396 637 auto-sequence shut-down based on drier status Cost-Effective
285 1568 Auto-shut on hydraulic pump Cost-Effective
497 1335 Dryer hood humidity control. Install %RH or dew point measurements inCost-Effective
497 1339 Use oversize wood chips as boiler fuel. The resizer can then be turned Cost-Effective
497 1341 Reduce compressed air pressure. Cost-Effective
497 1342 Increase lime mud %solids to kiln. Cost-Effective
497 1348 Mill condensate pump - motor too large. Cost-Effective
486 212 Installation of U Main balancing dampers Cost-Effective
486 229 O2 / CO inline analysis. Better control of excess air Potentially Cost-Effective
282 3163 Balance heating and cooling and reset set points Cost-Effective
604 2241 Bank one of the hot water boilers at all times Cost-Effective
570 843 Bar radiator time delay switches. Cost-Effective
354 2891 Basement carpark lighting control — motion sensors Cost-Effective
280 4255 Batch house vacuum system Cost-Effective
486 219 Bathhouse hot water system: Investigate alternative options to existing Potentially Cost-Effective
293 2765 Battery charging bay lighting Potentially Cost-Effective
292 4349 Battery charging bay lighting Cost-Effective
491 739 Benchmark electricity use from metering data and apply recommendatiCost-Effective
491 740 Benchmark SNG use from metering data and apply recommendations frCost-Effective
433 3855 Bio Mas Plant Potentially Cost-Effective
318 4435 Biofilter Cost-Effective
319 2423 Biogas Collection from Anaerobic ponds Potentially Cost-Effective
486 215 Riser Bolted Joints (reduced voltage drop) Cost-Effective
575 1527 Blank off outside air louvres behind the seating gallery in the pool hall. Cost-Effective
356 2552 Lay-up AHU,modify unit to replace electric hot water service with hot Potentially Cost-Effective
458 1878 evaporative fluid cooler refurbishment Cost-Effective
458 1879 Bld refurbishment Cost-Effective
299 2633 Blowdown heat recovery Cost-Effective
485 5731 BMS scheduling of centre a/cs Cost-Effective
458 1882 BMS time clock control building 3 air handling and fan coil units Cost-Effective
337 1046 Boardline Oven Energy options Potentially Cost-Effective
408 1231 Boiler - Use waste heat in boiler blowdown to preheat feed water. CurrenCost-Effective
426 5345 Boiler air/fuel ratio adjustment Cost-Effective
319 2428 Boiler Blowdoen Heat Exchanger Potentially Cost-Effective
299 2634 Boiler economiser Cost-Effective
291 4300 Boiler economiser Potentially Cost-Effective
292 4360 Boiler economiser Potentially Cost-Effective
349 1318 Boiler efficiency Project Cost-Effective
411 2539 Boiler Feedwater pump VSD Potentially Cost-Effective
291 4297 Boiler feedwater tank insulation Potentially Cost-Effective
291 4310 Boiler house lighting Potentially Cost-Effective
379 1179 Boiler house lighting. Cost-Effective
382 3683 Boiler optimisation Potentially Cost-Effective
308 3782 Boiler optimisation Cost-Effective
291 4301 Boiler Oxygen Trim Control Potentially Cost-Effective
438 4840 Boiler pass out steam turbines Potentially Cost-Effective
379 1170 Boiler precision combustion control Cost-Effective
411 2536 Boiler precision combustion control Potentially Cost-Effective
372 5484 Boilers feed pump speed control Potentially Cost-Effective
328 249 Bore Pumps 3xVVVF & Power Factor Correction Potentially Cost-Effective
305 960 BOS off-gas (LDG) recovery Potentially Cost-Effective
318 4456 Build MCC & air condition Potentially Cost-Effective
329 1688 Building Cost-Effective
329 1700 Building Cost-Effective
329 1701 Building Cost-Effective
329 1702 Building Cost-Effective
329 1703 Building Cost-Effective
379 1174 Dryer recirculation fan VSD Cost-Effective
379 1192 Process Hydraulic Pump VSD Potentially Cost-Effective
329 1681 Building Cost-Effective
329 1682 plant room Cost-Effective
329 1683 plant room Cost-Effective
329 1678 Building Cost-Effective
329 1679 Building Cost-Effective
329 1680 Tlectronic bar heaters Cost-Effective
379 1181 Oven recirculation fan VSD Cost-Effective
329 1685 Building Cost-Effective
329 1684 Building Cost-Effective
379 1186 Building dryer circulation fan VSD Potentially Cost-Effective
379 1191 Building Dryer recirculation fan VSD Potentially Cost-Effective
379 1182 Building Oven recirculation fan VSD Cost-Effective
379 1173 Building daylight compensation Cost-Effective
329 1686 Building laboratory section Cost-Effective
329 1687 Building pharmacy section Cost-Effective
329 1690 Building Cost-Effective
329 1689 Building Cost-Effective
329 1707 Building Cost-Effective
329 1691 Building Cost-Effective
329 1692 Building Cost-Effective
329 1706 Building Cost-Effective
292 4338 Building Air Con Cost-Effective
292 4339 Building lighting Cost-Effective
329 1711 Building Cost-Effective
329 1705 Building Cost-Effective
329 1697 Building Cost-Effective
329 1698 Building Cost-Effective
329 1695 Building Cost-Effective
329 1694 Building Cost-Effective
329 1693 Building Cost-Effective
329 1696 Building Cost-Effective
282 3168 Building Management System Potentially Cost-Effective
455 1926 Building Management System replacement Potentially Cost-Effective
344 530 Building Management System, Metering & HVAC plant initiatives Potentially Cost-Effective
454 108 Building T refrigeration control Cost-Effective
329 1710 Buildings Cost-Effective
492 4094 Bulk change over of all 50W halogen light globes to 35/20W IRC lampsCost-Effective
329 1670 Bus shed lights off Cost-Effective
497 1352 Recover condensate from all sources Potentially Cost-Effective
506 4344 C02 control of minimum outside air. Currently AHU s (24 off) have betwePotentially Cost-Effective
497 1353 C02. Use cold fresh air to rooms to reduce A/C load. Potentially Cost-Effective
497 1354 Use VSD's in energy plant where warranted. Potentially Cost-Effective
497 1355 Improve insulation to rooms to reduce A/C load and danger of drives trPotentially Cost-Effective
497 1356 Install high efficiency motors. Potentially Cost-Effective
497 1357 Install VSD drives in paper machine where warranted. Potentially Cost-Effective
497 1360 Agitator power variation with VSD. Potentially Cost-Effective
604 2273 Cabin Incandescent lamp replacement Cost-Effective
366 5678 Cafeteria and Corridors Lamp Replacement - Replace 490 100W incandesCost-Effective
414 4811 Canteen Lighting Automation Cost-Effective
325 764 Capture Compressor Waste Heat 10 space-heat house (using Heat PuPotentially Cost-Effective
387 1273 Capture heat from air compressors to pre-heat boiler feedwater. Cost-Effective
505 4379 Car Park and House Flourescent Lighting - T5 kit lamp conversion of houPotentially Cost-Effective
505 4382 Car Park and Loading Dock Ventilation Control - VSD Control of supplyPotentially Cost-Effective
506 4352 Car Park and Pelmet Flourescent Lighting - T5 kit lamp conversion of lPotentially Cost-Effective
570 847 Car park lighting: dimming control system Cost-Effective
570 848 Car park lighting: separate store area circuits Cost-Effective
506 4330 Car Park Ventilation Control -VSD Control of Car Park Ventilation fans Potentially Cost-Effective
602 2777 Carbon dioxide sensors and variable speed drives to control supply anPotentially Cost-Effective
433 3862 Carcass decontamination unit Potentially Cost-Effective
433 3857 Carcass wash water to paunch chute Potentially Cost-Effective
580 5181 Carpark - Delamp fluorescent lighting with triphosphor tubes and modifyCost-Effective
339 2655 Carpark Lighting replace 150 Watt ligh with lower wattage flurorescent Cost-Effective
329 1666 Building Cost-Effective
573 3464 Carry out a lighting refit to a T5 LL MT adaptor System Potentially Cost-Effective
573 3462 Carry out a lighting refit to all T5 LL MT Adaptor System Potentially Cost-Effective
363 325 Casting Plant optimisation, installing multiple thermocouples to reduce Cost-Effective
455 1921 C-BUS incorporating lighting control and implementation of lighting sc Potentially Cost-Effective
342 1156 C-bus programmable lighting control Potentially Cost-Effective
396 633 Cease use of P4 cyclone fan Cost-Effective
312 788 Ceiling Space Ventilation above cigarette manufacturing area Cost-Effective
468 6477 Central Cogeneration Project Potentially Cost-Effective
569 3677 Office lighting upgrade Potentially Cost-Effective
590 2904 CFL's in ground floor lobbies, service area Cost-Effective
592 1413 Change fittings with 54W T5 globes to 28W T5 globes Potentially Cost-Effective
284 4028 Change from continuous operation to 3 out of 4 shifts Cost-Effective
320 4415 Change from Pneumatic to Mechanical Meal Conveying Potentially Cost-Effective
571 3343 Change incandescent lights to compact fluorescent Cost-Effective
372 5477 Change Mercury Vapour to Metal Halide lamps Cost-Effective
594 5075 Change operation of Blowers so that both Blowers operate on full VSD Cost-Effective
417 4385 Change Service Agreement for Service of Burners Cost-Effective
363 326 Change to launder refractory Potentially Cost-Effective
373 5511 Change to mercury halide lamps Cost-Effective
581 3949 Changing luminaires to more efficient types Cost-Effective
581 3950 Changing luminaires to more efficient types Cost-Effective
581 3951 Changing luminaires to more efficient types Cost-Effective
571 3235 Changing the pool water temperature to 27oC. Cost-Effective
485 5892 Check all control systems and schedules of HVAC systems Cost-Effective
587 5028 Check time clock program and analyse time use Cost-Effective
329 1712 Factory Cost-Effective
400 1734 Chemical addition to reduce specific energy consumption in primary stagPotentially Cost-Effective
329 1704 Building Cost-Effective
444 4045 HW boilers - link North and South boilers Potentially Cost-Effective
297 541 Chilled water manufacturing plant on Citec to enable pump cycling, st Cost-Effective
482 421 Chilled Water Pump Replacement (Further investigation required bas Potentially Cost-Effective
344 529 Chilled Water System Initiatives Cost-Effective
445 4211 Chiller 1&2 VSDs on cooling tower fans Potentially Cost-Effective
366 5683 Chillers replacement - 6 chillers will be replaced by 4 Centrifugal Chi Cost-Effective
370 1461 Address Vacuum Pump V-belt slippage Cost-Effective
370 1460 Repair cell compressor line leak Cost-Effective
370 1465 Shut down Shale Belt Potentially Cost-Effective
370 1464 Shut down raw coal belts and trash screen Potentially Cost-Effective
370 1466 VVVF drive on conveyors Potentially Cost-Effective
370 1458 VVVF drive on reclaim conveyor Cost-Effective
370 1463 VVVF drive on stack out conveyors Potentially Cost-Effective
370 1459 Washdown water use and sump pump water level management Cost-Effective
444 4031 CHW temperature reset - central campus chillers Cost-Effective
444 4030 CHW temperature reset chillers Cost-Effective
366 5684 Circulating pumps for HVAC replaced with VSDs Cost-Effective
396 641 Citect control for roof fans Cost-Effective
396 632 Citect control of Air Handling units (roof & rear factory inlets / roof exhaCost-Effective
396 639 Citect Control of dust collectors Cost-Effective
512 4583 Citect Warning on train loading belts running empty Cost-Effective
458 1881 clean all evaporative fluid cooler jets Cost-Effective
282 3164 Clean light shields and de-lamp Cost-Effective
500 509 Clean up wash line water Cost-Effective
408 1230 Baking furnaces in cleaning house tend to all be left on, but can make Cost-Effective
570 845 Cleansing Bay lighting: change to 250W metal halide Cost-Effective
298 2167 Close off holes in walls where extractor fans have been removed Cost-Effective
583 2960 Close pool in June, July and August Cost-Effective
284 4029 Close production areas Cost-Effective
574 5137 CO control of car park ventilation Potentially Cost-Effective
570 831 CO Sensors and On/Off controls for car park ventilation fan Cost-Effective
505 4384 CO2 control of minimum outside air - Currently AHU's (32 off) have betwPotentially Cost-Effective
354 2892 CO2 monitoring & Minimum outside air control Cost-Effective
469 479 Coal washery energy efficiency improvements Potentially Cost-Effective
355 312 Co-Gen; Steam turbine generator Potentially Cost-Effective
359 465 Cogeneration Potentially Cost-Effective
439 3301 Cogeneration Potentially Cost-Effective
345 3831 Cogeneration Potentially Cost-Effective
290 3414 Co-generation facility Potentially Cost-Effective
335 1761 Co-generation including Absorption Chiller Potentially Cost-Effective
340 3892 Co-generation system Cost-Effective
603 2604 Co-generation to provide electricity and water heating requirements Cost-Effective
318 4455 Cold air recovery from boning room Potentially Cost-Effective
379 1180 Combination Line Oven recirculation fan VSD Cost-Effective
371 364 Combination of 2 and 4 Potentially Cost-Effective
371 349 Combination of two options Cost-Effective
322 5952 combine oil circuit Potentially Cost-Effective
318 4441 Combustion air preheating for the boiler Potentially Cost-Effective
319 2421 Combustion control for 10MW Boiler Potentially Cost-Effective
318 4434 Combustion control to control oxygen to fuel ratio to the boiler Cost-Effective
596 4973 Commercial refrigerator control Cost-Effective
568 3512 Communications network tool coupled with data collected from an existCost-Effective
568 3514 Communications network tool coupled with data collected from an existCost-Effective
568 3518 Communications network tool coupled with data collected from an existCost-Effective
570 857 Community Room - HVAC time control Cost-Effective
587 5027 Compare bills. We appear to be significantly overcharged Cost-Effective
604 2255 Complete commissioning of the ammonia stripping system and fine tuneCost-Effective
453 1082 Complete program to replace old BMCS with new Metasys BMCS Cost-Effective
573 3434 Completed - Soft starters installed on key equipment Potentially Cost-Effective
573 3450 Completed - Upgrade to more efficient units (some pump stations) Potentially Cost-Effective
573 3424 Completed automatic doors installed to minimise heat loss Potentially Cost-Effective
301 1142 Compressed air - demand control Cost-Effective
446 4570 Compressed air - leaks - identify and fix Cost-Effective
446 4567 Compressed air - resize the main compressor / install small unit for lowCost-Effective
335 1766 Compressed Air System Cost-Effective
344 533 Compressed Air and Vacuum System lnitiaitves Potentially Cost-Effective
498 2829 Compressed air controls Cost-Effective
299 2637 Compressed air inlet air temperature reduction Cost-Effective
323 5395 Compressed air inlet temperature reduction Cost-Effective
438 3119 Compressed air leak control and system enhancements Cost-Effective
422 717 Compressed air leak initiative Cost-Effective
328 242 Compressed air leak reduction Cost-Effective
469 472 Compressed air leak reduction Cost-Effective
434 2179 Compressed Air leak reduction Cost-Effective
477 524 Compressed Air leak repair initiative Cost-Effective
338 3523 Compressed Air leak repair initiative Cost-Effective
478 753 Compressed air leak repair initiative. Cost-Effective
511 6599 Compressed air leak review Cost-Effective
439 3294 Compressed air leak survey/zoning Cost-Effective
337 1042 Compressed Air Leakage Cost-Effective
323 5400 Compressed air leakage programme Potentially Cost-Effective
282 3200 Compressed air leakage reduction Potentially Cost-Effective
411 2535 Compressed air leakage reduction program Potentially Cost-Effective
426 5347 Compressed air leakage reduction program Potentially Cost-Effective
414 4828 Compressed Air Leakage Reduction Programme Potentially Cost-Effective
377 4845 Compressed Air Leakage Reduction Programme Potentially Cost-Effective
318 4423 Compressed Air leakages awarness programme Cost-Effective
443 5833 Compressed Air Leakge Reduction Program Cost-Effective
355 309 Compressed Air Leaks Cost-Effective
342 1159 Compressed Air Leaks Potentially Cost-Effective
293 2762 Compressed Air Leaks Cost-Effective
418 3418 Compressed Air Leaks Cost-Effective
291 4294 Compressed air leaks Cost-Effective
407 3721 Compressed air main fume plant - utilise existing interconnector to re Potentially Cost-Effective
288 5722 Compressed air optimisation Cost-Effective
322 305 Compressed air optimisation - New Schedule incorporating improved conCost-Effective
337 1044 Compressed air pressure reduction Potentially Cost-Effective
337 1041 Compressed Air Production Cost-Effective
346 3815 Compressed air refurb, WAN Potentially Cost-Effective
346 3814 Compressed air refurb, WM Potentially Cost-Effective
318 4465 Compressed Air removal for water removal on packages isolation valv Potentially Cost-Effective
383 2456 Compressed Air review Cost-Effective
357 2488 Compressed air review and ongoing 10% leakage reduction Potentially Cost-Effective
325 766 Compressed Air Review and Ongong 10% Leakage Reduction Potentially Cost-Effective
469 473 Compressed air staging controls Cost-Effective
340 3891 Compressed air system - comprehensive review Cost-Effective
504 579 Compressed Air System Comprehensive upgrade - compressor replacemenCost-Effective
299 2635 Compressed air system pressure reduction Cost-Effective
318 4422 Compressed Air System Pressure Reduction Cost-Effective
442 1574 Compressed air system reduction from 7.4 bar to 7.0 bar. Cost-Effective
511 4562 Compressed Air system review Potentially Cost-Effective
321 290 Compressed air use reduction (e.g. solenoid, blowers) Cost-Effective
424 4245 Compressed air. Replace and relocate site air compressors. Replace eCost-Effective
357 2481 Compresses Air reciever installation Cost-Effective
411 2543 Compressor Air intake Potentially Cost-Effective
359 461 Compressor Control Upgrade Cost-Effective
282 3199 Compressor for after hours load Potentially Cost-Effective
510 4492 Compressor Leak Review Cost-Effective
514 4614 Compressor Leak Review Cost-Effective
378 21 Compressor Management Cost-Effective
299 2638 Compressor replacement for VSD compressor Cost-Effective
322 5955 Compressor replacement (VSD in place of fixed) Potentially Cost-Effective
512 4591 Compressor review Potentially Cost-Effective
499 4277 Compressor scheduling package- control both high and low pressure Cost-Effective
515 4650 Compressor system review Potentially Cost-Effective
492 4108 Computer Laboratories: Air conditioning and lighting controlled using aCost-Effective
384 1968 Computer Monitor Upgrade Potentially Cost-Effective
365 5457 Computer raised floor Modules energy efficient lighting upgrade. UpgradCost-Effective
599 3205 Computer Shutdowns - turning off hard drives and monitors when not inCost-Effective
504 595 Computerised Energy Management and Control System - to progressively coPotentially Cost-Effective
508 2652 Computers - Replace CRT computer monitors with TFT monitors. Potentially Cost-Effective
318 4458 Condensat wast heat recovery from blood separation Potentially Cost-Effective
299 2632 Condensate Return Cost-Effective
439 3323 Condensate return Potentially Cost-Effective
426 5349 Condensate return pipe insulation Potentially Cost-Effective
434 2192 Condenser Fan VFD Control Potentially Cost-Effective
410 1777 condenser replacement Potentially Cost-Effective
389 4138 Conduct Air Leak Survey Cost-Effective
360 3493 Conduct an air leak survey and instigate a regular repair program Potentially Cost-Effective
298 2152 Conduct leak detection for air& vacuum systems Cost-Effective
479 199 Conduct Motor Efficiency and Motor System Audit Potentially Cost-Effective
583 3032 Conduct of review of the truckwash operations and energy tariffs Potentially Cost-Effective
445 4194 Conduct regular air leak checks on compressed air lines Cost-Effective
435 452 Conduct series of test runs to define boiler operating windows to deliveCost-Effective
379 1195 Conference Room Occupancy Sensors Potentially Cost-Effective
396 630 Connect factory lighting to Citect control system Cost-Effective
396 628 Connect packaging area 'Climate-master' system to Citect to facilitat Cost-Effective
454 101 Consider installation of replacement capacitors in PFC equipment Potentially Cost-Effective
338 3532 consider VSDs on water pumps Potentially Cost-Effective
448 3763 Consolidate printes, photocopiers and faxes by using single Multi FunctiCost-Effective
585 4189 Upgrade Potentially Cost-Effective
458 1883 Energy meeting to designed system to replace the need for reticulated Cost-Effective
294 1640 Continuation of above work on motors Cost-Effective
491 741 Continue connection of non-networked HVAC systems (progressive) Cost-Effective
580 5304 Continue delamping of fluorescent lights to triphosphor Cost-Effective
404 2749 Continue de-lamping strategy Cost-Effective
580 5402 Continue retrofitting of twin lamps with single Cost-Effective
580 5411 Continue to reduce twin lamps to single lighting Cost-Effective
465 1601 Control & maintenance of golf course pumps Potentially Cost-Effective
493 6229 Control carpark exhaust fan based on CO level / air quality with vsd Potentially Cost-Effective
305 1009 Control excess lighting Potentially Cost-Effective
305 1015 Control excess lighting Potentially Cost-Effective
485 5799 Control HHW pump and boiler to heating demands Cost-Effective
569 3675 Control of package AC units Potentially Cost-Effective
314 6484 Control switch for top deck of carpark lights Cost-Effective
396 623 Control System for Air compressors Cost-Effective
305 1016 Control tank level Potentially Cost-Effective
571 3275 Control the condenser water temperature to a minimum acceptable temCost-Effective
604 2307 Control the lights in intermittently occupied areas with movement sensoPotentially Cost-Effective
604 2328 Control the outside air dampers on the Hall air conditioner based on Potentially Cost-Effective
604 2287 Control the outside air dampers on the air conditioner based on C02 leCost-Effective
604 2297 Control the outside air dampers on the air conditioners based on CO2 Potentially Cost-Effective
604 2250 Control the outside air dampers on the air handling units based on C02Cost-Effective
595 5433 Conversion of 125W MV to 70WMH and 36W with T8 triphosphor lamp fPotentially Cost-Effective
390 4857 Conversion of electric induction furnace to gas Potentially Cost-Effective
380 258 Conversion of Electric Hot Water systems to instantaneous gas units Cost-Effective
592 1416 Convert two 18W PL-C lamps to one 13W PL-C lamp. Potentially Cost-Effective
592 1429 Convert 128 remaining fittings with 50W halogens to 35W halogens Cost-Effective
592 1412 Convert 18 fittings with two 26W Pl-C lamps to single 13W PL-C lampsCost-Effective
592 1410 Convert 90 fittings with 50W downlights to 35W LV downlight. Cost-Effective
600 2571 Convert AC4 to spill air ventilation from theatre Potentially Cost-Effective
571 3278 Convert chilled water pumps to variable speed Potentially Cost-Effective
296 2680 Convert existing electric and gas hot water units to solar units Cost-Effective
416 413 Convert from electric to solar hot water. Cost-Effective
592 1381 Convert mercury vapour lamps to metal halide lamps Cost-Effective
592 1398 Convert MV lamps to CFL Potentially Cost-Effective
586 5969 Convert pool heating for both the indoor and outdoor pools to a heat Potentially Cost-Effective
604 2295 Convert the air handling systems with bypass damper control to variablPotentially Cost-Effective
604 2312 Convert the Amenities Block hot water systems to solar(Gas) Potentially Cost-Effective
604 2331 Convert the outside air economy cycle air conditioner to fully modulatinPotentially Cost-Effective
604 2288 Convert the outside air economy cycle air conditioner to fully modulatinCost-Effective
604 2304 Convert the outside air economy cycle to fully modulating and upgrade thPotentially Cost-Effective
571 3344 Convert the restaurant hot water to natural gas Cost-Effective
381 669 Converting areas air conditioning olants temperature control set points Cost-Effective
511 4560 Conveyor Automation. Potentially Cost-Effective
383 2453 Conveyor Optimisation Cost-Effective
510 4496 Conveyor Sequencing Potentially Cost-Effective
510 4490 Conveyor Upgrade Cost-Effective
443 5826 Cooling Tower Capacity Cost-Effective
382 3665 Cooling tower fans & CW pump VFD control Potentially Cost-Effective
480 5356 Cooling Tower Operation Cost-Effective
307 29 Cooling tower re-life Cost-Effective
446 4573 Cooling Towers control - improved control of cooling towers. Turn off whPotentially Cost-Effective
366 5682 Cooling Towers replacement - replace Shinwa Cooling Towers with new Cost-Effective
322 5957 Core and Flake Drier Optimisation of gas use and possible fitting of VSPotentially Cost-Effective
312 786 Corporate air conditioning economy cycle repair Cost-Effective
312 793 Corporate air conditioning return air system. Change 100% outside air Potentially Cost-Effective
570 856 Court lighting controls Cost-Effective
306 777 CPL3 oven LEL increase Potentially Cost-Effective
367 5497 CRAC Unit load balance Cost-Effective
298 2143 Create PM for weekly leak detection programs on vacuum system and Cost-Effective
515 4643 Crusher Automated Shutdown Cost-Effective
401 697 Crusher optimisation - Improve primary crusher and conveyor energy pPotentially Cost-Effective
514 4613 Crusher start and shutdown Cost-Effective
292 4353 DAF lighting Cost-Effective
396 625 Dampers for Scrubbers to prevent short circuiting Cost-Effective
433 3847 Day time pressure cleaning Cost-Effective
314 6478 Daylight compensating control of main foyer lights Cost-Effective
426 5354 Daylight compensation control Potentially Cost-Effective
282 3162 Daylight compensation for lights Potentially Cost-Effective
282 3184 Daylight compensation for lights Cost-Effective
282 3193 Daylight compensation for lights Potentially Cost-Effective
282 3196 Daylight compensation for lights Potentially Cost-Effective
411 2534 Daylight compensation for wastewater treatment plant lighting Potentially Cost-Effective
592 1414 Daylight control of exterior lighting Potentially Cost-Effective
592 1407 Daylight harvesting for perimeter and metal halide lamps Potentially Cost-Effective
305 936 DC System Return Water Pond Agitator Cost-Effective
448 3766 Decomission existing computer centre supplementary HVAC and assosiCost-Effective
561 2708 Decommision the hot water boiler serving the change room showers ans iPotentially Cost-Effective
396 658 Decommission hot water generator Potentially Cost-Effective
381 670 Decommission air conditiong air handling and utilise second air handliCost-Effective
444 4034 Decommission Parkes building steam boilers Cost-Effective
433 3856 Dedicated steriliser supply line Potentially Cost-Effective
320 4417 Dehulling Upgrade Cost-Effective
440 6535 Dehumidification of Cool Store Potentially Cost-Effective
593 4902 De-lamp & retrofit existing 36W fluoro lights with T5 Save It Easy® kitsPotentially Cost-Effective
582 4711 Delamp all twin fluorescent fittings. Cost-Effective
584 5631 Delamp CFL fittings in function room Cost-Effective
582 4717 Delamp fluorescent light fittings in the office, rear administration area Potentially Cost-Effective
597 5707 De-lamp lighting in over-lit areas (office section) Cost-Effective
589 2572 Delamp Quad Fluorescent Lights Potentially Cost-Effective
589 2381 Delamp Quad Fluorescent Lights In Offices Cost-Effective
448 3760 Delamp selected fittings, eg corridors, breakout areas and café Cost-Effective
481 111 De-lamping Cost-Effective
333 1907 Delamping in the ground floor storage area Potentially Cost-Effective
379 1167 De-lamping. Cost-Effective
589 2360 Delay Activation of HVAC equipment Cost-Effective
569 3623 Demand based ventilation system Cost-Effective
477 520 Demand Control Review (load duration curve characteristics for electricCost-Effective
426 5353 Demand management and compressed air energy management syste Potentially Cost-Effective
575 1474 Derate hot water heater and lower the top thermostat setting to 60 degCost-Effective
575 1486 Derate hot water heater and lower the top thermostat setting to 60 degCost-Effective
575 1480 Derate hot water heater in the Centre and lower the top thermostat set Cost-Effective
575 1483 Derate hot water heater in the Centre and lower the top thermostat set Cost-Effective
575 1512 Derate hot water heater in the Centre and lower the top thermostat set Cost-Effective
353 3365 Design and execute an Energy Education Program that includes ways to Potentially Cost-Effective
290 3412 Dessicant de-humidification Potentially Cost-Effective
496 2817 Develop a procedural system for the standby compressor to be switcheCost-Effective
588 5044 Develop energy efficient street lighting strategies Potentially Cost-Effective
600 2577 Development of public lighting strategy Potentially Cost-Effective
442 1573 Devise and implement a program to routinely monitor compressed air syCost-Effective
442 1572 Devise and implement a program to routinely monitor steam trap operatiCost-Effective
513 4600 Dewatering pumping system Cost-Effective
418 3415 Dextrin reactors cooling vessels Cost-Effective
565 4151 DHW Cost-Effective
565 4154 DHW Cost-Effective
565 4158 DHW Cost-Effective
565 5261 DHW Potentially Cost-Effective
348 3253 Dichroic lamp replacement with CFLs Cost-Effective
378 17 Die Change Shutdown Procedure Cost-Effective
312 794 DIET plant chiller replacement Potentially Cost-Effective
424 4251 Direct coal loadout. Potentially Cost-Effective
485 5894 Disable fresh air fan and zone duct heaters when the outside air tempeCost-Effective
602 2775 Disable HVAC from operating during public holidays Cost-Effective
602 2780 Disable HVAC from operating during public holidays Cost-Effective
485 5767 Disable local setpoint adjustments on temperature sensors Cost-Effective
371 355 Disable NH3 storage CT temperature control Cost-Effective
566 1998 Disable plant from operating during public holidays Cost-Effective
566 2016 Disable plant from operating during public holidays Cost-Effective
593 4890 Disable plant from operating during public holidays Cost-Effective
595 5431 Disable plant from operating during public holidays Cost-Effective
595 5443 Disable plant from operating during public holidays Cost-Effective
595 5446 Disable plant from operating during public holidays Cost-Effective
396 621 Disconnect Fan Cost-Effective
356 2553 Disconnect un-used lighting from all areas where possible. (Start will d Potentially Cost-Effective
379 1168 Discontinue steam injection to Hotwell tank Cost-Effective
440 6527 Discontinue use of Compressed Air Guns Cost-Effective
377 4848 Distribution lighting control Potentially Cost-Effective
453 1070 Document and implement replacement program (including target dates) Cost-Effective
453 1116 Document and implement replacement program (including target dates)Cost-Effective
453 1115 Document and implement replacement program (including target dates) Cost-Effective
453 1075 Document and implement replacement program (including target dates) Cost-Effective
453 6039 Document and implement replacement program (including target dates) Potentially Cost-Effective
506 4285 Domestic Hot Water - Review and adjust temperature control setpoints Cost-Effective
570 838 Domestic hot water: Electric heat pump to replace electric storage typeCost-Effective
570 852 Domestic Hot Water-solar heat pump system with remote evaporators Cost-Effective
503 886 Dragline Optimisation/Tritonics Cost-Effective
469 469 Drfit conveyor operation control Cost-Effective
284 4049 Drossing off, melter practices, sequencing of product - standardisation Cost-Effective
407 3718 Develop efficient ladle preheating schedule as currently preheaters eithPotentially Cost-Effective
469 471 Belts operation control Cost-Effective
411 2541 Economiser Potentially Cost-Effective
379 1171 Economiser and heat recovery for boilers Cost-Effective
439 3291 Economiser and variable speed drive on one RM compressor, serving Cost-Effective
335 1765 Economy Cycle Cost-Effective
488 4113 Economy cycle + CO2 monitoring for seven units Cost-Effective
488 4121 Economy cycle fitted to the room Potentially Cost-Effective
282 3186 Economy cycle for AHU Potentially Cost-Effective
282 3189 Economy cycle for AHU Potentially Cost-Effective
282 3195 Economy cycle for AHU Potentially Cost-Effective
379 1187 Economy cycle for office AHU's Potentially Cost-Effective
488 4120 Economy cycle to FCU-1 Potentially Cost-Effective
597 5705 Educate staff on various measures and enable energy saving features Cost-Effective
340 3903 Efficiencies from heat recovery Potentially Cost-Effective
341 282 Efficiency potential from replacement of Extruder 0 DC motor with AC Potentially Cost-Effective
291 4309 Effluent farm aeration Potentially Cost-Effective
292 4345 Effluent plant hot water Cost-Effective
314 6481 Electric heater air temperature sensor control Cost-Effective
319 2419 Electrical condensate drain on air receivers Potentially Cost-Effective
411 2533 Electricity supply/compressor control room lighting Potentially Cost-Effective
485 5727 Electro-mechanical timers for air conditioners Cost-Effective
318 4448 Electronic Condensate Drains for Air receivers Potentially Cost-Effective
282 3157 Electronic expansion valve Potentially Cost-Effective
282 3188 Electronic expansion valve Potentially Cost-Effective
465 1604 Eliminate aeration in channels to clarifiers Potentially Cost-Effective
360 3492 Eliminate cooling tower for LRV pump and Centac air compressor (onlyPotentially Cost-Effective
509 6522 Eliminate Idle/Run on time requirement (Atlas Copco) Potentially Cost-Effective
509 6521 Eliminate Rise to Pressure Control Potentially Cost-Effective
282 3202 EMCS Cost-Effective
574 5132 Enable Energy Star settings Cost-Effective
561 2693 Enable Energystar facility on all computers Cost-Effective
404 2752 Enable powersave mode on printers and computers Cost-Effective
568 3516 Energy and Water Efficient Showerheads Cost-Effective
568 3520 Energy and Water Efficient Showerheads Potentially Cost-Effective
377 4855 Energy awareness & management programme Potentially Cost-Effective
405 2345 Energy Awareness & Monitoring Cost-Effective
481 116 Energy awareness & monitoring program Cost-Effective
414 4812 Energy Awareness & Monitoring Programme Cost-Effective
379 1184 Energy awareness and management program Cost-Effective
410 1770 Energy awareness and management program Cost-Effective
411 2529 Energy awareness and management program Cost-Effective
426 5348 Energy awareness and management program Potentially Cost-Effective
312 789 Energy Awareness and Monitoring Program Cost-Effective
443 5834 Energy Awareness Monitoring Programme Cost-Effective
282 3204 Energy Awareness Program Cost-Effective
583 3041 Energy Awareness Program for Park Patrons Cost-Effective
414 4813 Energy Best Practice Training Programme Cost-Effective
443 5835 Energy Best Practice Training Programme Cost-Effective
282 3172 Energy efficient chiller with VSD Potentially Cost-Effective
282 3165 Energy Efficient lighting design Potentially Cost-Effective
568 3513 Energy Efficient Lighting in Clubhouse Cost-Effective
568 3515 Energy Efficient Lighting in Clubhouse Cost-Effective
568 3519 Energy Efficient Lighting in Clubhouse Potentially Cost-Effective
363 330 Energy Efficient Pump Selection Potentially Cost-Effective
404 2756 Energy information and reporting system Cost-Effective
561 2705 Energy management and staff awareness Cost-Effective
410 1778 energy management control system Potentially Cost-Effective
411 2544 energy management control system Potentially Cost-Effective
480 5363 Energy Management Program Cost-Effective
372 5480 Energy management system Potentially Cost-Effective
319 2413 Energy Recovery from Flash Steam Cost-Effective
384 1965 Energy Save Units to Control Car Park Lights Potentially Cost-Effective
384 1967 Energy Save Units to Control Office Area Lights Potentially Cost-Effective
384 1964 Energy Save Units to Laundry Area Lights Potentially Cost-Effective
308 3773 Energy saving devices for lighting fixtures Cost-Effective
484 3536 Energy Star Activation Cost-Effective
292 4351 Engineering stores lighting Cost-Effective
359 459 Enhanced Process Control Cost-Effective
322 303 Enhanced Process Control in the Heat Plant Cost-Effective
573 3452 Ensure all pump stations are upgraded, as required to more efficient unPotentially Cost-Effective
575 1531 Ensure pool covers are used at night. Cost-Effective
453 1068 Ensure regular boiler tuning is included in boiler maintenance program.Cost-Effective
575 1524 Ensure the large panel lift doors leading to the outdoor area are shut in Cost-Effective
366 5696 Environmental controller for Computer Raised Floor Area (RFA). RFA manPotentially Cost-Effective
585 4186 Upgrade Potentially Cost-Effective
505 4377 Escalators - Raise awareness to ensure escalators and travellators are Cost-Effective
506 4322 Escalators - Raise awarness to ensure escalators and travellators are nCost-Effective
353 3368 Establish a system to ensure that the Tower floors house lighting is swiPotentially Cost-Effective
307 32 Evaporative cooler Cost-Effective
356 2551 Evaporative Humidification, replace steam generator with evaporative uPotentially Cost-Effective
433 3859 Evisceration belt wash-pulsed wash Potentially Cost-Effective
587 5026 Examine opportunities to reduce pump operation in winter. Cost-Effective
367 5500 Exist lighting upgrade to LEDs. Replace 10W fluorescent lighting with Potentially Cost-Effective
604 2298 Extend boiling water time clock control to kitchen boiling water units Potentially Cost-Effective
445 4197 External lighting - photocell control Cost-Effective
343 3954 External lighting on mill to be controlled by photoelectric (PE) cells Cost-Effective
467 6469 External Shading Cost-Effective
366 5679 Refurbishment with new lighting. Replace 203 36W T8 fluorescent lamCost-Effective
319 2422 Fab room Cooling C02/Air Heat exchanger Potentially Cost-Effective
470 4533 Factory - refurb 400W to 320W highbay Cost-Effective
426 5352 Factory 5 CCV high pressure water pumps Potentially Cost-Effective
323 5390 Factory Air Compressor Potentially Cost-Effective
337 1045 Factory Lighting Control System Potentially Cost-Effective
422 724 factory lighting control to selected factory area Potentially Cost-Effective
470 4531 Factory refurb 250W to 200W highbay Cost-Effective
470 4532 Factory refurb/replace flourescent lamps to 1x36W+kw2+E ballast Cost-Effective
504 589 Fettling Area Dust Extraction System fit VSD, shut off valves, control s Potentially Cost-Effective
479 124 Finalise Implementation of Auto Load Shedding Project Cost-Effective
561 2692 Fine Tune the operating times of the air conditioning plant Cost-Effective
593 4900 Fine tuning of HVAC system Cost-Effective
363 327 Fine Tuning of the holding furnace to reduce excess air levels over firi Cost-Effective
379 1178 Finishing process burner fan VSD s Cost-Effective
398 1061 Fire stair lighting Cost-Effective
371 372 Fire water sustaining pumps Potentially Cost-Effective
305 977 Fit a waste gas boiler on the Lime Kiln exhaust. Potentially Cost-Effective
571 3312 Fit low ballasts to florescent lights fittings Potentially Cost-Effective
280 4325 Fit sensors to start air knives on demand Potentially Cost-Effective
570 6498 Fit timer to large ZIP water heater in main kitchen area Cost-Effective
570 6488 Fit timer to ZIP water heater in staff kitchenette Cost-Effective
570 6494 Fit timer to ZIP water heater in staff kitchenette Cost-Effective
586 5984 Fit timers to ZIP hot water boilers Potentially Cost-Effective
305 937 Fit VVVF drives on CT fan for Scarfer system Cost-Effective
305 969 Fit VVVF drives on CT fan for Vacuum Degasser Potentially Cost-Effective
305 938 Fit VVVF drives on CT fan forVDG system Cost-Effective
305 968 Fit VVVF drives on CT fans for Mould & Machine Potentially Cost-Effective
305 967 Fit VVVF drives on CT fans for Slab cooling Potentially Cost-Effective
571 3234 Fix 25m pool’s leaks Cost-Effective
571 3329 Fix compressed air leaks Cost-Effective
290 3404 Fixed dimming for corridor fluorescent lighting Cost-Effective
289 1935 Fixed dimming in skylights above old Courts Potentially Cost-Effective
484 3541 Fixed dimming to T8 light fittings Potentially Cost-Effective
590 2909 Fixed dimming: Single T8s, car park Cost-Effective
411 2532 Flash Steam and Blowdown Heat Recovery System Potentially Cost-Effective
318 4432 Flash steam recovery for Boiler feed water heating Cost-Effective
318 4427 Flash steam recovery from faulty traps Cost-Effective
465 1603 Flow-pace Stage 3 MLR pumps Potentially Cost-Effective
318 4454 Fluorescent change to Tri phosphor tubes Potentially Cost-Effective
504 599 Fluorescent Light Controllers - various areas Potentially Cost-Effective
486 220 Fluorescent Lighting in Office Areas: Investigate the feasibility of ch Potentially Cost-Effective
372 5476 Fluorescent tubes change to triphosphor Cost-Effective
315 5426 Focused maintenance campaigns on steam traps and leaks Cost-Effective
593 4918 Formalise a maintenance schedule Cost-Effective
593 4921 Formalise a maintenance schedule Cost-Effective
408 1236 FPP - Chiller - shut down when plating not operating. Cost-Effective
408 1235 FPP - Shut down FPP scrubber fans and pump (2x37kW + 11kW) when nCost-Effective
323 5423 Front office air conditioning Potentially Cost-Effective
323 5419 Front office de-lamping Potentially Cost-Effective
486 222 FTC Fans: Investigate cost benefits of installing VSD's on FTC Fans Potentially Cost-Effective
347 1738 fuel gas analysis and adjustments on ovens Potentially Cost-Effective
382 3711 Full investigation of lagging of vessels, tanks, pipework and insulate a Potentially Cost-Effective
439 3296 Full refrigeration plant automation, including VSDs on one HT and on Potentially Cost-Effective
570 800 Full tenant condenser water system plus DX air- conditioning system t Cost-Effective
504 590 Furnace Area Dust Extraction System fit VSD /or repair service operatiPotentially Cost-Effective
446 4572 Furnace area ventilation - requires further investigation Potentially Cost-Effective
422 720 Furnace burner upgrade to low NOX pre mix systems Cost-Effective
422 719 Furnace survey Cost-Effective
446 4569 Furnaces - rescheduling in line with production levels, resulting reduc Cost-Effective
600 2565 Further investigation of after hours loads Cost-Effective
461 1585 Further optimisation of UV lamps Cost-Effective
280 4263 Future LP air operation (review after reduction opportunities complete) Potentially Cost-Effective
408 1232 FWG - Two existing compressors, one continuously loaded, the other Cost-Effective
570 842 Improve garage lighting & associated control Cost-Effective
439 3299 Gas driven chillers Potentially Cost-Effective
440 6533 Gas heating of plant floor Potentially Cost-Effective
488 4122 GEF-2 fan to have a VSD fitted and controlled thru the BMS Potentially Cost-Effective
509 6503 General Air Leaks Cost-Effective
282 3166 General Lighting Potentially Cost-Effective
282 3169 General Lighting Potentially Cost-Effective
282 3171 General Lighting Potentially Cost-Effective
282 3174 General Lighting Potentially Cost-Effective
282 3178 General Lighting Potentially Cost-Effective
282 3180 General Lighting Potentially Cost-Effective
282 3187 General Lighting Potentially Cost-Effective
282 3192 General Lighting Potentially Cost-Effective
282 3194 General Lighting Potentially Cost-Effective
282 3198 General Lighting Potentially Cost-Effective
282 3177 General lighting (service ducts) Potentially Cost-Effective
587 4988 General lighting retrofit (reflectors, single tube, reduce outout by 50%) Cost-Effective
587 4995 General lighting retrofit (reflectors, single tube, reduce output by 50%) Cost-Effective
379 1185 General office and canteen lighting Potentially Cost-Effective
570 6489 Get the A/C controls recommissioned form a Carrier technician + instalCost-Effective
411 2526 Glycol pump VSD Cost-Effective
344 531 Goldway Energy Saving unit(ESIJ) Initiative Potentially Cost-Effective
585 4187 Upgrade Potentially Cost-Effective
486 221 GTCs: Investigate feasibility of removing counterflow fans (64 fans *1 Potentially Cost-Effective
569 3638 Guest education program- based on Energy Smart Homes information anCost-Effective
384 1966 Guest Room Air-Conditioning Control Potentially Cost-Effective
384 1961 Guest Room Halogen Dichroic Lighting Replacement Potentially Cost-Effective
384 1959 Guest Room Incandescent Lamp Replacement Stage 2 Cost-Effective
384 1958 Guest Room Mini Bar Fridge Cost-Effective
585 4188 Upgrade Potentially Cost-Effective
570 855 Lighting - voltage reduction Cost-Effective
563 5526 Control modification on space temperature set points Cost-Effective
563 5551 Replace existing thermostatic expansion valve with electronic expansioCost-Effective
563 5539 Time delay switches for 17 electric radiant heaters Cost-Effective
563 5516 Variable speed drive to 2 of the 3 Air Handling Units for pool heating Cost-Effective
563 5541 VSDs for 3 chilled water pumps (1.2 and 3) controlled by CHW differenCost-Effective
563 5552 Modify control strategy: reheat set point to 20+-0.5 degC, space tem Cost-Effective
563 5517 Motion sensors to 4 ventilation fans in sporting hall with a fan cutting i Cost-Effective
563 5527 Variable speed drives for 6 condenser water pumps Cost-Effective
563 5542 VSDs for AHU1 fan with a sliding scale signal on O/A temperature: fu Cost-Effective
563 5543 Modify control strategy: reheat set poit to 20+-0.5 degC, space tempe Cost-Effective
408 1241 HC WD - Cold well overflowing to hot well, pumping is more than necesPotentially Cost-Effective
292 4358 Head pressure control ammonia refrigeration Potentially Cost-Effective
291 4303 Head pressure control ammonia refrigreation system Potentially Cost-Effective
386 4065 Heat Exchange Outside Air Cost-Effective
386 4067 Heat Exchange Outside Air Potentially Cost-Effective
386 4068 Heat Exchange Outside Air Potentially Cost-Effective
371 353 Heat loss reduction - ammonia area Cost-Effective
371 351 Heat loss reduction - Nitrates Area Cost-Effective
598 4938 Heat pump DHW Cost-Effective
598 4939 Heat pump DHW Cost-Effective
362 1747 Heat pump for domestic hot water Cost-Effective
568 3485 Heat Pumps for pool heating (high efficiency boiler) Potentially Cost-Effective
601 2681 Heat reclaim and temperature reset controls and timing rescheduling Cost-Effective
318 4459 Heat reclaim condenser Potentially Cost-Effective
387 1275 Heat reclaim on boiler blowdown. Potentially Cost-Effective
481 119 Heat recovery Potentially Cost-Effective
319 2412 Heat recovery from 180kW air compressor Cost-Effective
318 4460 Heat recovery from 75Kw compressor to the boiler combustion air prehPotentially Cost-Effective
439 3302 Heat recovery from blanched product Potentially Cost-Effective
379 1188 Heat recovery from Blowdown Cost-Effective
379 1172 Heat recovery from flash steam and process steam vent Cost-Effective
411 2537 heat recovery from hot gas Potentially Cost-Effective
499 4278 Heat relaim on pellet driers- in injection moulding Machines 1 to 11. Potentially Cost-Effective
501 4250 Heat relaim on pellet driers on four IMM - as per set-up of new IMM Potentially Cost-Effective
359 458 Heater Control Cost-Effective
342 1153 Heaters in 7 cabinet foaming tools running unnecessarily Cost-Effective
329 1668 heating general store Cost-Effective
322 302 HGG Gas Burner Improvement Cost-Effective
504 592 HID Light dimmers - to allow reduced lighting levels at selected times oPotentially Cost-Effective
509 6516 High efficiency 110 kW motor Potentially Cost-Effective
509 6517 High efficiency 15 kW motor Potentially Cost-Effective
509 6515 High efficiency 150 kW motor Potentially Cost-Effective
335 1764 High Efficiency Chiller Cost-Effective
569 3646 High efficiency electric motor Potentially Cost-Effective
371 366 High efficiency fans ammonia cooling tower Potentially Cost-Effective
515 4648 High Efficiency Moter review Potentially Cost-Effective
512 4588 High Efficiency Motor review Potentially Cost-Effective
514 4618 High Efficiency Motor review Potentially Cost-Effective
511 6603 High efficiency motor review Potentially Cost-Effective
511 4558 High Efficiency Motor Review: large motors Potentially Cost-Effective
511 4555 High efficiency motor review: Large motors:total Potentially Cost-Effective
511 4556 High efficiency motor review: small motors Potentially Cost-Effective
299 2631 High efficiency motors (HEM) in air conditioning units Cost-Effective
334 3806 High efficiency motors as motors reach end of life: 49 motors from 1.5 Potentially Cost-Effective
339 2656 High Efficient compressors to chillers Potentially Cost-Effective
486 228 Holding Furnace door sealing upgrade. Will result in less losses, therefPotentially Cost-Effective
486 227 Homo Furnaces - Use of exhaust gasses to pre-heat the charge Potentially Cost-Effective
583 3002 Hot Water Boiling Units Cost-Effective
583 3025 Hot Water Boiling Units Cost-Effective
583 3014 Hot Water Boiling Units Time Control(9) Cost-Effective
511 4557 Hot Water Boost with Solar Heating Potentially Cost-Effective
578 6545 Hot water pipe insulation Cost-Effective
443 5824 Hot Water Pump VSD Cost-Effective
319 2434 Hot water reduction - Viscera Table Potentially Cost-Effective
569 3640 Hot water system insulation- based on insulation leading to a 10% red Cost-Effective
401 704 Hot Water Systems - Replace Electric Hot Water Systems for offices andPotentially Cost-Effective
328 241 Housekeeping practices on overland conveyor supply Cost-Effective
577 2448 HVAC Cost-Effective
577 2451 HVAC Cost-Effective
577 2461 HVAC Cost-Effective
565 4150 HVAC Cost-Effective
565 4153 HVAC Cost-Effective
565 4157 HVAC Cost-Effective
565 5260 HVAC Potentially Cost-Effective
494 4221 HVAC - chiller and condensor water systems Cost-Effective
494 4219 HVAC - control improvements Cost-Effective
494 4224 HVAC - control of personal equipment and general awareness Cost-Effective
494 4223 HVAC - economy cycle, CO2, outside air and night purge Cost-Effective
494 4222 HVAC - Holiday scheduling and time of day Cost-Effective
508 2647 HVAC - Install Variable Speed Drives on pumps and fans in the HVAC Cost-Effective
494 4225 HVAC - new or refurbished plant Cost-Effective
446 4564 HVAC - Office reschedule controls to switch off the system when not reCost-Effective
494 4226 HVAC - other Cost-Effective
389 4144 HVAC - Retro commissioning (RCx) - Conduct Phase II study using MePotentially Cost-Effective
389 4143 HVAC - Retro commissioning (RCx) - Expense 'Actionable' items depePotentially Cost-Effective
508 2648 HVAC - Upgrade aged motors (8x15kW pumps, 2x55kW fans, 2x37kW fans &Cost-Effective
570 853 HVAC 365 day time-switch Cost-Effective
598 4936 HVAC control, economy cycle and VSD application Cost-Effective
570 826 HVAC controls tuning: time of use Cost-Effective
601 2678 HVAC upgrade including VSD on the HVAC pump and Heat reclaim. Cost-Effective
362 1743 HVAC/BMS controls strategies: modifications to the operational time scCost-Effective
570 824 HVAC: Adjust temperature set- points to widen dead-band Cost-Effective
570 823 HVAC: Function Rooms - Occupancy Sensor control + Reassignment oCost-Effective
570 844 HVAC: install push-button timers and contactors for 8 units Cost-Effective
570 828 HVAC: Optimum start and stop Cost-Effective
510 4493 Hydraulic Circuits Cost-Effective
445 4200 Hydrotherapy pool cover Cost-Effective
604 2275 Identify and Rectify the significant gas consumption increase associat Cost-Effective
580 5249 Identify and reduce idle equipment operation baseload Cost-Effective
423 2556 Identify and repair air leaks Cost-Effective
348 3255 Implement 75KW VSD Air Compressor for site compressed air distributCost-Effective
285 1570 Implement a base-load reduction program (e.g. label change and ext Potentially Cost-Effective
433 3853 Implement a leak reduction program and compressor control Cost-Effective
297 543 Implement a maintenance and leak detection program in MEX for the Cost-Effective
297 544 Implement a maintenance and leak detection program in MEX for the Cost-Effective
423 2557 Implement a range of lighting measures Cost-Effective
571 3274 Implement a strategy to minimize the conflict between heating and cooCost-Effective
394 3635 Implement adiobatic rehumidification and rewrite the matrix for humidityCost-Effective
448 3772 Implement ambient temperature boiler cutoff in BMS Cost-Effective
589 2365 Implement an Economy Cycle Potentially Cost-Effective
482 417 Implement an Energy Awareness Program Cost-Effective
571 3277 Implement chilled water flow temperature reset Cost-Effective
433 3858 Implement Citect control and monitoring system in the Rendering PlantPotentially Cost-Effective
404 2759 Implement comprehensive sub-metering system Potentially Cost-Effective
448 3765 Implement comprehensive sub-metering system Cost-Effective
587 5022 Implement education program - including appropriate signage Cost-Effective
602 6038 Implement energy efficient street lighting as part of participation in SSROCost-Effective
587 5008 Implement HVAC Controls - 365 days (50%) Cost-Effective
298 2162 Implement leak detection program for compressed air system Cost-Effective
448 3756 Implement manual ON lighting system Cost-Effective
482 415 Implement Motor System Efficiency Cost-Effective
432 2221 Implement new evacuation system for removing dirt and other waste froPotentially Cost-Effective
353 3366 Implement night purge control strategy on air handlers where tenants Potentially Cost-Effective
448 3777 Implement night purge in BMS Cost-Effective
448 3779 Implement optimised start strategy for BMS Cost-Effective
604 2237 Implement optimum start/stop control in conjunction with a morning warCost-Effective
485 5818 Implement out of hours night setback on Supply Air Fan 1 heating Cost-Effective
363 332 Implement project to improve the life of pot linings Potentially Cost-Effective
348 3251 Implement remote pressure sensor for ne 75KW VSD Air Compressor Cost-Effective
333 1899 Implement Staff Awareness campaign to switch off Lights Cost-Effective
587 5019 Implement staff education program - including appropriate signage Cost-Effective
587 5011 Implement staff education program - including appropriate signage. Cost-Effective
445 4195 Implement steam trap survey and repair faulty steam traps Cost-Effective
468 6475 Implement upgrade of BMCS Cost-Effective
584 5578 Implementation of lighting policy with the cleaning contact Cost-Effective
492 4102 Implementation of the Thermal Comfort Policy: Establishes new therm Cost-Effective
571 3273 Improve after hours operation of chamber air conditioning Cost-Effective
571 3283 Improve after hours operation of the Administration building air conditi Potentially Cost-Effective
371 371 Improve AN storage dehumidification Potentially Cost-Effective
486 223 Improve Anode Stem Machine reliability Potentially Cost-Effective
486 224 Improve anodic voltage drop Potentially Cost-Effective
284 4052 Improve burner efficiency by tuning Cost-Effective
284 4053 Improve burner efficiency by tuning Cost-Effective
479 175 Improve compressed air end use efficiency - cease using compressed aiCost-Effective
350 3600 Improve Compressed Air Performance Cost-Effective
316 4501 Improve Compressed Air Performance Cost-Effective
503 490 Improve Control of Lighting Plants Cost-Effective
500 510 Improve insulation on tanks and pipe work for pelletiser water system Cost-Effective
509 6513 Improve lighting efficiency - replace dichroic lamps with UCFLs; pilot d Potentially Cost-Effective
280 4236 Improve O2 balance on SP2 and SP4 Cost-Effective
500 507 Improve plant power factor correction Cost-Effective
319 2417 Improve power factor from 0.92 to 0.98 Cost-Effective
349 1319 Improve Procedures to Identify and Repair Air Leaks Cost-Effective
298 2150 Improve steam demand management by programmed gradual opening ofCost-Effective
509 6520 Improved Compressor Efficiency & Control Methods Potentially Cost-Effective
570 6485 Improved HVAC efficiency through improved maintenance -production oCost-Effective
317 4481 Improved power factor correction - install additional capacitors Potentially Cost-Effective
424 4248 Improved power factor correction. Improve Site Power Factor. Supply,Cost-Effective
280 4268 Improved ventilation compressed air building Potentially Cost-Effective
598 4886 Improvement to air conditioning control system Cost-Effective
434 2208 Improvements in Hot Water Use (Enforce cleaning procedures, improved Potentially Cost-Effective
313 3729 Improvements to economy cycle Cost-Effective
580 5184 Include energy efficient outcomes within the Heating Ventilation and Cost-Effective
330 432 Include Review of Higher Efficiency Motors in Purchasing Procedures Cost-Effective
503 889 Include Review of Higher Efficiency Motors in Purchasing Procedures. Cost-Effective
580 5389 Include within existing air conditioning maintenance contract a trial t Cost-Effective
580 5346 Include within the air conditioning maintenance contract a trial to opt Cost-Effective
580 5305 Include within the existing air condition maintenance contract a trial Cost-Effective
455 1919 Incorporation of energy efficient motors Potentially Cost-Effective
455 1922 incorporation of variable speed drives to pumps Potentially Cost-Effective
436 382 Increase Boiler deaerator pressure Cost-Effective
312 785 Increase capacity of boilerhouse cooling towers Cost-Effective
333 1896 Increase setting on PAC Units Cost-Effective
296 2686 Increase existing CFL's from 13% to 80%, Year 1 18% to 30% Year 3 Cost-Effective
461 1587 Increase operation of cogen unit on nat gas Potentially Cost-Effective
417 4386 Increase Power Factor Correction Potentially Cost-Effective
486 213 Increase shift manning - place Process Technicians on shift to react moreCost-Effective
438 3116 Increase steam pressure to 3&4 Starch Dryers Cost-Effective
404 2753 Increase temperature set points on supplementary air-conditioning unitCost-Effective
436 394 Increase turndown ratio of HVU Potentially Cost-Effective
318 4444 Increasing Boiler drum TDS levels Potentially Cost-Effective
318 4425 Increasing the power factor from an average of 0.96 to 0.98. Cost-Effective
504 596 Induction Furnaces fit VSDs to cooling tower fans and pumps - 2 proje Potentially Cost-Effective
395 1286 Infrared reflective coating on Publishing Hall Roof. Potentially Cost-Effective
395 1285 Infrared reflective coating on Press Hall Roof. Cost-Effective
457 5243 Initiate a program to upgrade existing luminaires with triphosphor lampsPotentially Cost-Effective
459 5191 Initiate a program to upgrade existing luminaires with triphosphor lamps,Potentially Cost-Effective
594 5098 Replace remaining Time switch controls on system I Public Lighting sysPotentially Cost-Effective
594 5099 Develop and implement comprehensive Scheduled Maintenance programPotentially Cost-Effective
594 5101 Complete inventories of Public Lighting Systems 2,3 & 4 and undertake Potentially Cost-Effective
594 5097 Convert system 4 Public Lighting Systems to one of the other systems Potentially Cost-Effective
594 5089 Progressively replace exixting 50W & 80W MV S/L fittings and lamps wiCost-Effective
594 5092 Complete the change out of 250W & 400W MV & 310 HPS S/L fittings Cost-Effective
594 5095 Develop and implement procedures to confirm that individual street lighPotentially Cost-Effective
594 5091 Replace 81 X 80W MV Sphere Fittings with more efficient fittings an Cost-Effective
594 5090 Replace 17 X 80W MV Sphere lights in with more efficient fittings an Cost-Effective
325 765 Install (delay) timer switches on lights, with safety overrides Potentially Cost-Effective
349 1321 Install “best practice” air compressors and distribution system Potentially Cost-Effective
575 1504 Install 1 voltage reduction unit for Basement car park Lighting Cost-Effective
587 4994 Install 12 x movement sensors Cost-Effective
592 1409 Install 140kWe cogeneration plant Potentially Cost-Effective
587 4987 Install 15 x movement sensors (30%) Cost-Effective
587 4971 Install 16 x movement sensors (30%) Cost-Effective
591 1850 install 1x36W EL KW2 troffers to boost lighting levels in offices Potentially Cost-Effective
575 1516 Install 2 Voltage reduction units for Basement car park Lighting Cost-Effective
587 5025 Install 2 x movement sensors to control lighting in amenities block an Cost-Effective
587 4978 Install 2 x timers for water heaters & water coolers (30%) Cost-Effective
592 1376 Install 24hr timer on zip boilers. Potentially Cost-Effective
592 1371 Install 24hr timer on zip boiles. Cost-Effective
586 5983 Install 275L heat pump hot water system to be used in place of larger unPotentially Cost-Effective
587 5020 Install 3 x hot water timers Cost-Effective
587 5010 Install 30 x movement sensors (30%) Cost-Effective
591 1805 install 350 voltage reduction units for 1x36W troffer fittings-relamp tubePotentially Cost-Effective
587 4986 Install 365 day hot water timer to control 3 x HWHs (30%) Cost-Effective
587 4993 Install 365 day hot water timers to control 2 x HWSs (30%) Cost-Effective
580 5282 Install 365 day timer and optimise start-stop times for HVAC units Cost-Effective
580 5301 Install 365 day timer to switch off HVAC during holidays and optimise sCost-Effective
580 5381 Install 365 day timer to switch off HVAC during holidays and optimise sPotentially Cost-Effective
580 5386 Install 365-day timer to switch off HVAC during holidays and optimise sCost-Effective
587 4957 Install 4 timers (30%) Cost-Effective
587 5000 Install 4 x timers for hot water heaters & water coolers (30%) Cost-Effective
591 1829 install 4-5 star rated appliances Potentially Cost-Effective
592 1374 Install 5 star appliances Potentially Cost-Effective
587 4977 Install 5 x dimmer controls (30%) Cost-Effective
587 5009 Install 5 x hot water timers (40%) Cost-Effective
592 1378 Install 5kW photovoltaic panels Potentially Cost-Effective
592 1399 Install 5kW photovoltaic panels Potentially Cost-Effective
592 1417 Install 5kW photovoltaic panels Potentially Cost-Effective
592 1389 Install 5kW photovoltaic panels on the roof Potentially Cost-Effective
592 1421 Install 5kW photvoltaic panels on roof Potentially Cost-Effective
587 4996 Install 6 dimmer controls - incl. energy efficient lamps, minor repairs a Cost-Effective
587 4989 Install 6 dimmer controls - including energy efficient lamps, minor repa Cost-Effective
587 5018 Install 6 x movement sensors (30%) Cost-Effective
587 4963 Install 6 x movement sensors in amenities and storerooms, etc (30%) Cost-Effective
580 5313 Install 7-day timers on the hydro-boil units Potentially Cost-Effective
580 5396 Install 7-day timers on the hydro-boil units Potentially Cost-Effective
587 5001 Install 9 x movement sensors (30%) Cost-Effective
571 3339 Install a 1 hour run down timer to stop excessive operations of the radiPotentially Cost-Effective
590 2906 Install a 365 day, optimal start time clock in admin building plant room Cost-Effective
437 2628 Install a 600kW co-generation plant to supply electricity on site (FurtherPotentially Cost-Effective
456 6584 Install a 800kW cogeneration plant to supply electricity on site. The w Potentially Cost-Effective
571 3238 Install a BMS to upgrade air conditioning controls so the plant operate Cost-Effective
582 4689 Install a CBUS system to equip & materials storage area Potentially Cost-Effective
437 2627 Install a CO monitoring system and VSD on ventilation fans in the car Cost-Effective
604 2235 Install a dedicated air cooled system for the printing area air conditioni Cost-Effective
305 971 Install a lime kiln preheater. Potentially Cost-Effective
582 4692 Install a lux sensor in lunchroom Potentially Cost-Effective
561 2723 Install a movement detector in the staff room to control the lighting. Potentially Cost-Effective
561 2712 Install a movement detector to control the light fittings Cost-Effective
561 2717 Install a movement detector to control the lighting in the Crib Room. Potentially Cost-Effective
561 2711 Install a movement detector to control the mechanics pit lights. Cost-Effective
561 2718 Install a movement detector to control the opertaion of light fittings in thPotentially Cost-Effective
561 2734 Install a movement detector to control the waiting room lights. Potentially Cost-Effective
561 2722 Install a movement detector to trun off the waiting room's lighting when Potentially Cost-Effective
561 2736 Install a movement detector to turn off lighting in the Study/Meeting R Potentially Cost-Effective
561 2721 Install a movement detector to turn off lights in the staffroom/meeetin Potentially Cost-Effective
561 2709 Install a new solar heating system for the 25 metre pool. Potentially Cost-Effective
561 2731 Install a one hour electro-mechanical timer to turn off the meeting roomPotentially Cost-Effective
571 3241 Install a PE Cell to switch of pool change room corridor lighting when nCost-Effective
571 3240 Install a PE Cell to switch off the external plant security light when not Cost-Effective
604 2238 Install a photosensor control of lights in the staff dining area Cost-Effective
561 2726 Install a push button timer to control the boiling water unit. Cost-Effective
561 2716 Install a run down timer in each of the six storage bays to control the ligPotentially Cost-Effective
571 3236 Install a run down timer to control light in the sports hall. Cost-Effective
571 3237 Install a run down timer to control light in the squash court. Cost-Effective
561 2724 Install a run-down timer to turn off light fittings in the Store Room. Potentially Cost-Effective
594 5074 Install a Single Variable Speed Drive with a change over switch mec Potentially Cost-Effective
604 2278 Install a thermal blanket on the refrigerator glass door in the potting sh Cost-Effective
586 5974 Install a UV Treatment System on the indoor pool Potentially Cost-Effective
355 311 Install a VSD drive on C-14 Potentially Cost-Effective
405 2349 Install a VSD on Blower 26 Potentially Cost-Effective
471 707 Install a yearly timer to automatically switch AC units Cost-Effective
582 4762 Install A/C controls with thermostats. At present the 2 x 15.1 kW units Cost-Effective
597 5698 Install active roof air extraction system for theatre pavilion to minimis Cost-Effective
582 4833 Install additional switches to enable lights to be switched off during th Cost-Effective
448 3768 Install advanced chiller controls (eg electronic expansion valves, VSDsCost-Effective
568 3499 Install advanced HVAC control Potentially Cost-Effective
568 3507 Install advanced HVAC control Potentially Cost-Effective
298 2151 Install alarms on both freezer doors to sound when doors are left open Cost-Effective
486 233 Install ALF3 Hoppers on side of pot Potentially Cost-Effective
593 4916 Install an advance control system for A/C Potentially Cost-Effective
297 562 Install a pressure contoller on the second biofilter fan so that it runs Potentially Cost-Effective
582 4715 Install an occupancy sensor in the kitchen to control the 15 x 36W singCost-Effective
582 4727 Install an occupancy sensor to control the lighting in the staff lunchroo Potentially Cost-Effective
416 408 Install and repair non-return valves in the mine dewatering system. Cost-Effective
301 1143 Install antechamber or fast closing doors on the freezer Cost-Effective
442 1577 Install application occupancy sensors, photocells and lumitrols throu Cost-Effective
571 3331 Install auto transformer to control fluroescent lighting within the generalCost-Effective
477 522 Install automated high bay lighting contro system Cost-Effective
478 751 Install automated high bay lighting control system Cost-Effective
416 411 Install automatic timers, motion sensorsor photo-electric cells on the suCost-Effective
561 2720 Install auto-transformer to control fluorescent light fittings Potentially Cost-Effective
561 2735 Install auto-transformer to control the fluorescent light circuits Potentially Cost-Effective
561 2729 Install auto-transformers to control the car park fluorescent lights. Cost-Effective
590 2907 Install BMS Cost-Effective
590 2911 Install BMS Cost-Effective
493 6314 Install BMS control & occupancy based control of AC systems Potentially Cost-Effective
493 6289 Install BMS control to AC systems inculding economy cycle Potentially Cost-Effective
493 6232 Install BMS controls to replace time clock & local controls Potentially Cost-Effective
312 790 Install Boiler Economiser into existing steam boilers in the boilerhouse.Potentially Cost-Effective
570 858 Install boiling hot-water time switch. Cost-Effective
582 4694 Install CBUS system in the Archives room Potentially Cost-Effective
493 6116 Install CHW & HW supply from one building to another building and re Potentially Cost-Effective
444 4037 Install CO control to car park fans Potentially Cost-Effective
589 2361 Install CO Sensor To Control Car Park Exhaust Fan Potentially Cost-Effective
298 2163 Install control system to turn off grinders when not required (currently boCost-Effective
298 2160 Install control system to turn off grinders when not required Cost-Effective
580 5251 Install controller to automate pool heating system (larger saving with poPotentially Cost-Effective
587 4979 Install controls for major HVAC i.e. micro process the thermostats & usePotentially Cost-Effective
587 4981 Install controls for major HVAC i.e. micro process the thermostats & usePotentially Cost-Effective
587 4982 Install controls for major HVAC i.e. micro process the thermostats & usePotentially Cost-Effective
588 5039 Install controls on Lift Motor Room fans Potentially Cost-Effective
569 3671 Install controls to external lighting & selected circuits Cost-Effective
420 3131 Install Correctly Sized Compressors Potentially Cost-Effective
405 2347 Install Daylight Compensation Control in warehouse Cost-Effective
337 883 Install daylight control on external lights Cost-Effective
592 1383 Install daylight sensor and separate circuits near exterier of carpark. Cost-Effective
604 2329 Install daylight sensor control of the perimeter downlights Potentially Cost-Effective
360 3475 Install daylight sensors and controls in the warehouse section with skylCost-Effective
586 5973 Install daylight switching on the Metal Halide floodlights located under sPotentially Cost-Effective
317 4471 Install dearator on boiler Cost-Effective
470 4527 Install demand management controller for ac units Cost-Effective
466 3154 Install differential pressure and real-time monitoring of pump efficiency Potentially Cost-Effective
464 1632 Install Differential Pressure Cells and Real Time Monitoring of PumpingPotentially Cost-Effective
415 2128 Install dimming controls to take advantage of natural light availability Cost-Effective
575 1488 Install dimming photoelectric cell switches where appropriate Cost-Effective
573 3454 Install domestic heat pump hot water system for amenities area Potentially Cost-Effective
573 3458 Install domestic heat pump hot water system for building Potentially Cost-Effective
573 3460 Install domestic heat pump hot water system for change rooms Potentially Cost-Effective
573 3442 Install domestic heat pump how water system for amenities area Potentially Cost-Effective
453 6040 install domestic hot water solar pre-heater Potentially Cost-Effective
453 1091 Install domestic hot water solar pre-heater. Potentially Cost-Effective
580 5188 Install economy air cycle on to four Air Handling Units (AHUs) Cost-Effective
493 6164 Install economy cycle & BMS controls on remaining AC unit Potentially Cost-Effective
493 6103 Install economy cycle and pushbutton control of small package AC Potentially Cost-Effective
493 6115 Install economy cycle on AC Potentially Cost-Effective
493 6193 Install economy cycle on AC system Potentially Cost-Effective
493 6295 Install economy cycle on AC systems Potentially Cost-Effective
488 4127 Install economy cycle on AHU Potentially Cost-Effective
493 6067 Install economy cycle on all small ducted AC systems Potentially Cost-Effective
493 6160 Install economy cycle on network room AC Potentially Cost-Effective
571 3246 Install Economy Cycle on the building air conditioning Potentially Cost-Effective
488 4126 Install Economy cycle to AHU Potentially Cost-Effective
445 4199 Install economy cycle to ward block lift motor room process coolers Cost-Effective
474 4371 Install Economy Cycles in building Potentially Cost-Effective
594 5057 Install ECO-Save on remainder of lighting circuits Cost-Effective
580 5405 Install electronic ballasts on all lamps Potentially Cost-Effective
580 5415 Install electronic ballasts on all lamps Potentially Cost-Effective
442 1575 Install electronic condensate drains on the instrument air compressor anCost-Effective
591 1800 install electronic expansion valves on chiller Potentially Cost-Effective
391 3087 Install electronic expansion valves to the coolroom compressors Cost-Effective
391 3088 Install electronic expansion valves to the reciprocating water-cooled chillCost-Effective
582 4672 Install electronic TX valves to the air conditioning compressors. Cost-Effective
573 3463 Install energy efficient hi-bay replacements (~ fittings) Potentially Cost-Effective
573 3459 Install energy efficient hi-bay replacements(~100 fittings) Potentially Cost-Effective
337 1050 Install energy efficient motors on a replacement basis. Potentially Cost-Effective
353 3354 Install energy management software to analyse and manage building coCost-Effective
585 4163 Install Energy Save Units Cost-Effective
585 4174 Install energy save units for lighting in change rooms Potentially Cost-Effective
585 4181 Install energy save units for lighting in change rooms Potentially Cost-Effective
585 4176 Install energy save units Potentially Cost-Effective
585 4184 Install Energy Save Units to control fluorescent lighting Cost-Effective
589 2575 Install energy save units to control lighting Potentially Cost-Effective
589 2586 Install energy save units to control lighting in building Potentially Cost-Effective
589 2587 Install energy save units to control lighting in building Potentially Cost-Effective
589 2581 Install energy save units to control lighting in building Potentially Cost-Effective
589 2584 Install energy save units to control lighting in building Potentially Cost-Effective
589 2585 Install energy save units to control lighting in building Potentially Cost-Effective
589 2582 Install energy save units to control lighting in building Potentially Cost-Effective
589 2583 Install energy save units to control lighting in building Potentially Cost-Effective
589 2364 Install Energy Save Units To Control Lighting in Car Park Potentially Cost-Effective
589 2352 Install Energy Save Units To Control Lighting In Change Rooms Potentially Cost-Effective
589 2367 Install Energy Save Units To Control Lighting In Change Rooms Potentially Cost-Effective
589 2375 Install Energy Save Units To Control Lighting In Change Rooms Potentially Cost-Effective
589 2384 Install Energy Save Units To Control Lighting In Change Rooms Potentially Cost-Effective
589 2354 Install Energy Save Units To Control Lighting In Foyer Potentially Cost-Effective
589 2382 Install Energy Save Units To Control Lighting In Hallways Potentially Cost-Effective
589 2599 Install energy saving units to control lighting in change rooms Potentially Cost-Effective
575 1487 Install Energy star rated fridges and appliances when current applianc Cost-Effective
584 5613 Install ESM 4000 Abbotly chiller controls Cost-Effective
482 416 Install Factory Lighting Control Cost-Effective
437 2626 Install fixed dimmer in the car park for the fluorescent lighting circuits Cost-Effective
475 4402 Install fixed dimming sytems to common area lighting. Potentially Cost-Effective
475 4401 Install fixed dimming to car park lighting. Potentially Cost-Effective
473 4342 Install Fixed Dimming to Fire Stairs. Cost-Effective
333 1911 Install Flywheel System to Replace UPS Potentially Cost-Effective
493 6199 Install gas boost to hydronic condenser water loop to reduce usage of ePotentially Cost-Effective
493 6237 Install gas boost to hydronic condenser water loop to reduce usage of ePotentially Cost-Effective
493 6132 Install gas boost to hydronic condenser water loop to reduce use of elecPotentially Cost-Effective
585 4177 Install gas domestic hot water heater Potentially Cost-Effective
453 1093 Install grid connected solar power array as part of future airport expansPotentially Cost-Effective
493 6094 Install heat recovery equipment on chillers to provide concurrent heatinPotentially Cost-Effective
493 6281 Install heat recovery equipment to utilise waste heat from chillers for r Potentially Cost-Effective
561 2707 Install high efficency motors on the pool filter pumps. Potentially Cost-Effective
592 1435 Install high efficiency air cooled chiller Potentially Cost-Effective
592 1384 Install high efficiency flourescent lamps single 36W in lieu of twin 36W Potentially Cost-Effective
592 1382 Install high efficiency flourescent lamps single 56W in lieu of twim 56WCost-Effective
470 4524 Install high efficiency motors on blowers and pumps Cost-Effective
320 4409 Install Hull Diverter Valve Cost-Effective
588 5035 Install insulation Potentially Cost-Effective
587 4969 Install inverter type reverse cycle air conditioners Potentially Cost-Effective
437 2625 Install key card/tag in guest rooms (To be included next refurbishment)Cost-Effective
569 3667 Install key operated switches for plant room Cost-Effective
333 1900 Install key tag switches to plant room lighting Cost-Effective
445 4192 Install key tag switches to plant room lighting Cost-Effective
317 4477 Install larger boiler economiser Cost-Effective
575 1479 Install LCD computer screens for customer use when current screens aCost-Effective
575 1495 Install LCD computer screens for customer use when current screens aCost-Effective
568 3489 Install LED based exit lighting Potentially Cost-Effective
582 4705 Install light switch in handicap bathroom. Potentially Cost-Effective
570 812 Install light switches Cost-Effective
493 6163 Install lighting control on atrium lights for daytime Potentially Cost-Effective
579 3991 Install lighting control PIR sensor in meeting room Cost-Effective
579 3993 Install lighting control PIR sensor in toilets Cost-Effective
509 6506 Install lighting controls Cost-Effective
472 4328 Install Lighting Controls to nominated areas Cost-Effective
474 4368 Install Lighting Controls to nominated areas Cost-Effective
473 4350 Install Lighting Controls to nominated areas. Cost-Effective
584 5632 Install lighting controls to the function room bathrooms Cost-Effective
475 4399 Install lighting controls to the Office, carpark and equipment room. Cost-Effective
584 5624 Install lighting controls Cost-Effective
573 3429 Install lighting occupancy sensors in the aerobics room (note: additionaPotentially Cost-Effective
587 5007 Install lighting retrofit for remianing half of the building - built since last Cost-Effective
597 5718 Install lighting sensors on 12 double fluorescent fixtures. Currently lef Cost-Effective
363 331 Install Lighting System upgrades to pot line and replace metal halide li Cost-Effective
604 2282 Install local switching of the high bay lights Cost-Effective
562 2070 Install low flow shower heads Cost-Effective
285 1569 Install low pressure (3.5 bar) air compressor for the VSD unit Potentially Cost-Effective
582 4703 Install lux sensor to control external lighting. Cost-Effective
584 5641 Install lux sensors to control carpark lighting Cost-Effective
585 4183 Install Lux Sensors to control change room lighting Cost-Effective
589 2351 Install Lux Sensors To Control Compact Fluorescent Lights In The FoyPotentially Cost-Effective
562 2059 Install lux sensors to control external lights. Cost-Effective
589 2356 Install Lux Sensors To Control Lighting In Kiosk Potentially Cost-Effective
333 1906 Install Manual Switches where possible Potentially Cost-Effective
485 5866 Install MDs in four labs Cost-Effective
594 5086 Install Metered Power Heads on Storage Van sites Cost-Effective
417 4337 Install Mill Starch Thickener Cost-Effective
448 3785 Install modulating boilers with heat recovery Potentially Cost-Effective
321 299 Install modulation for second boiler. Cost-Effective
404 2744 Install motion activated control for all open plan areas Cost-Effective
404 2746 Install motion activated control for selected car park lighting Cost-Effective
404 2745 Install motion activated control in enclosed rooms Cost-Effective
448 3783 Install motion activated lighting control in all offices, meeting rooms, u Potentially Cost-Effective
453 1090 Install motion activated lighting control. Potentially Cost-Effective
493 6064 Install motion sensor control of lighting in all teaching rooms Potentially Cost-Effective
584 5564 Install motion sensor Cost-Effective
569 3669 Install motion sensors at car park & toilets Cost-Effective
360 3473 Install motion sensors in toilets and change rooms Cost-Effective
593 4879 Install motion sensors to change rooms Potentially Cost-Effective
485 5843 Install movement control of the lights in selected intermittently occupie Cost-Effective
485 5885 Install movement control of the lights in selected intermittently occupie Cost-Effective
485 5897 Install movement control of the lights in selected intermittently occupie Cost-Effective
485 5898 Install movement control of the lights in selected intermittently occupie Cost-Effective
485 5911 Install movement control of the lights in selected intermittently occupie Cost-Effective
485 5925 Install movement control of the lights in selected intermittently occupie Cost-Effective
561 2741 Install movement detector in the distribution area. Potentially Cost-Effective
485 5804 Install Movement Detectors in selected rooms Cost-Effective
561 2715 Install movement detectors to control male staff bathroom light fittings. Potentially Cost-Effective
571 3346 Install movement detectors to switch off restaurant dining, function roo Cost-Effective
562 2067 Install movement sensor control for lights in general purpose hall Cost-Effective
485 6610 Install movement sensor control in 11 rooms Cost-Effective
561 2700 Install movement sensor control of lights in intermittently occupied areaPotentially Cost-Effective
561 2743 Install movement sensor control of the change room lighting. Potentially Cost-Effective
604 2267 Install movement sensor control of the lights in the Archives Room Cost-Effective
604 2281 Install movement sensor controlled lights in intermittently occupied are Cost-Effective
587 5029 Install movement sensors in amenities (50%) Cost-Effective
587 5031 Install movement sensors in amenities (50%) Cost-Effective
594 5055 Install movement sensors on lighting circuits. Cost-Effective
568 3486 Install movement sensors to AC units in meeting rooms Cost-Effective
604 2296 Install movement sensors to control lights in intermittently occupied ar Potentially Cost-Effective
493 6079 Install natural ventilation control devices to improve indoor air quality Potentially Cost-Effective
493 6304 Install natural ventilation controls and devices Potentially Cost-Effective
493 6155 Install natural ventilation to improve thermal comfort Potentially Cost-Effective
441 2226 Install New Economy Cycle for FCU 6/7 to provide 100% capacity, currePotentially Cost-Effective
333 1898 Install new IT equipment with broader temp and RH specs Cost-Effective
329 6032 install new meters Cost-Effective
353 3367 Install new NO2 and CO car park gas monitoring systems and control Potentially Cost-Effective
432 2220 Install new process for extracting a burr by-product from the main procePotentially Cost-Effective
460 1894 install new sensible heat exchanges to reclaim energy from operating tPotentially Cost-Effective
337 1051 Install notched vee belts on a replacement basis Potentially Cost-Effective
471 711 Install O.5MW co generation plant Potentially Cost-Effective
582 4708 Install occ sensors in external the male & female bathroom. Cost-Effective
582 4691 Install occ sensors in the bathrooms and locker rooms Potentially Cost-Effective
582 4696 Install occ sensors in the office & lunchroom Potentially Cost-Effective
582 4693 Install occ sensors in offices Potentially Cost-Effective
582 4688 Install occ sensors to meeting, bathrooms & training. Potentially Cost-Effective
582 4687 Install occ sensors to offices Potentially Cost-Effective
493 6278 Install occupancy & timer control of lighting Potentially Cost-Effective
493 6250 Install occupancy control for teaching room lighting and offices Potentially Cost-Effective
568 3504 Install occupancy control in selected areas Cost-Effective
493 6181 Install occupancy control of lab lighting Potentially Cost-Effective
493 6298 Install occupancy control of lighting & upgrade lighting Potentially Cost-Effective
582 4676 Install occupancy sensor in the carpark to control the lighting. Potentially Cost-Effective
597 5716 Install occupancy sensor on lighting in the access corridor on the bottoCost-Effective
582 4729 Install occupancy sensor to control the lighting in the bathroom. Potentially Cost-Effective
582 4674 Install occupancy sensor to male and female bathrooms. Potentially Cost-Effective
597 5708 Install occupancy sensors for lighting in low use areas (meeting area Potentially Cost-Effective
358 3094 Install occupancy sensors in low utilisation areas such as disaster recoPotentially Cost-Effective
582 4712 Install occupancy sensors in the male and female locker rooms. Potentially Cost-Effective
415 2127 Install occupancy sensors in the office and amenity buildings to reduce Cost-Effective
584 5628 Install occupancy sensors to administration office to control lighting Cost-Effective
582 4673 Install occupancy sensors to all individual offices. Most offices had be Potentially Cost-Effective
604 2252 Install occupancy sensors to control fan coil units serving meeting roomCost-Effective
589 2383 Install Occupancy Sensors To Control Lighting In Bathrooms Potentially Cost-Effective
589 2355 Install Occupancy Sensors To Control Lighting In Office Potentially Cost-Effective
358 3091 Install occupancy sensors to control the air-conditioning in meeting r Cost-Effective
584 5669 Install occupancy sensors to courtside bathrooms, first aid room, store Cost-Effective
570 809 Install occupancy sensors to main office and staff room lights Cost-Effective
570 810 Install occupancy sensors to office, common room and store lights of buCost-Effective
570 811 Install occupancy sensors to the office, common room and corridor lighCost-Effective
582 4704 Install occupancy sensors to the male and female locker rooms. Potentially Cost-Effective
582 4728 Install occupancy sensors to the reading room, computer room, youth Potentially Cost-Effective
586 5980 Install occupancy/motion sensors on lighting in low traffic areas Potentially Cost-Effective
355 310 Install oil cooler on compressor drive (C-06) Cost-Effective
571 3286 Install optimum start control of HVAC systems Cost-Effective
485 5742 Install outside air compensation on levels 2,3 and 4 fan coils' chilled w Cost-Effective
415 2125 Install partition in the office to enable night shift operation within limit Cost-Effective
570 817 Install PE cell control to car park fluorescent and halogen flood lamps Cost-Effective
493 6202 Install PE cell daylight sensor on external stair lights Cost-Effective
448 3759 Install PE cell lighting control in selected areas, eg Café Cost-Effective
561 2713 Install PE cell to control the lights under the roof eave near the male baCost-Effective
570 818 Install PE light switch and occupancy sensor with On/Off timer to fluo Cost-Effective
509 6505 Install Photocell control and over-ride switch - Exterior lighting Cost-Effective
509 6504 Install Photocell control and over-ride switch - High mast Cost-Effective
304 4808 Install photo-detectors on remaining lights Potentially Cost-Effective
604 2283 Install photoelectric / movement control of Gang shed awning lights Cost-Effective
561 2689 Install Photoelectric control of the Atrium uplights. Cost-Effective
561 2699 Install Photoelectric control of the shelf lighting West end first floor. Potentially Cost-Effective
561 2702 Install photoelectric control of the pool entry lights Cost-Effective
604 2322 Install photosensor control Potentially Cost-Effective
596 4959 Install photovoltaic arrays Potentially Cost-Effective
571 3314 Install photovoltaic cells Potentially Cost-Effective
592 1436 Install photovoltaic panels. Potentially Cost-Effective
591 1810 install PIR for 2x163W fittings, L/S in 1st floor female bathroom Potentially Cost-Effective
591 1811 install PIR for 2x163W fittings, L/S in 1st floor male bathroom Potentially Cost-Effective
591 1847 install PIR for 3x136W + 1x218W fittings, L/S in female toilets Cost-Effective
591 1848 install PIR for 3x136W + 1x218W fittings, L/S in male toilets Cost-Effective
591 1814 install PIR for 3x136W fittings, L/S in 2nd floor female bathroom Potentially Cost-Effective
591 1815 install PIR for 3x36W fittings, L/S in 2nd floor male bathroom Potentially Cost-Effective
568 3509 Install PIR movement sensor Cost-Effective
591 1807 install PIR with 2x136W fittings, L/S in ground floor female bathroom Potentially Cost-Effective
591 1808 install PIR with 2x136W fittings, L/S in ground floor male bathroom Potentially Cost-Effective
586 5965 Install pool blankets over indoor and outdoor pools Cost-Effective
593 4876 Install Pool cover & timer on boilers Cost-Effective
593 4894 Install power Factor Correction Cost-Effective
573 3427 Install power factor correction equipment at this site Cost-Effective
573 3438 Install power factor correction equipment at this site Potentially Cost-Effective
594 5073 Install Power Factor Equipment to raise PF from an average.78 to.98 Cost-Effective
320 4416 Install Presifting in Meal Grinding Potentially Cost-Effective
604 2302 install push button time control of local space heaters Potentially Cost-Effective
604 2305 Install push button timer control in conjunction with occupancy sensing oPotentially Cost-Effective
485 6613 Install push button timer control in two rooms Cost-Effective
485 5785 Install push button timer control of lights in selected intermittently occ Cost-Effective
571 3261 Install push button timer control of the aerobics room air conditioning anCost-Effective
485 5766 Install push button timer control of the mail room Cost-Effective
604 2324 Install push button timer control of lighting Potentially Cost-Effective
485 5906 Install push button timer control on selected air conditioners Cost-Effective
485 5932 Install push button timer control on the air conditioner serving laborato Cost-Effective
562 2071 Install push button timer of the tennis room boiling water unit Cost-Effective
570 814 Install push-button timer switch to bar radiators. Cost-Effective
284 4047 Install realtime metering to report energy usage, energy per tonne, eneCost-Effective
305 973 Install recuperative burners on ladle dryer Potentially Cost-Effective
561 2688 Install reduced voltage control on office building fluorescent lighting Cost-Effective
561 2698 Install reduced voltage control on carpark HID lights Potentially Cost-Effective
453 1077 Install reflectors in conjunction with de-lamping of twin flourescent fittinCost-Effective
571 3348 Install room air-conditioning units in restaurant managers office Potentially Cost-Effective
561 2737 Install run down timer to control electric heaters in the distribution area.Cost-Effective
604 2311 Install run on timer contol of boiling water units in the kitchen and roomPotentially Cost-Effective
604 2306 Install run on timer control of boiling water units Potentially Cost-Effective
604 2327 install run on timer control of boiling water units Potentially Cost-Effective
604 2332 Install run on timer control of boiling water units in the kitchen and the Potentially Cost-Effective
604 2284 Install run on timer control of local electric heaters Cost-Effective
604 2269 Install run on timer control of the kitchen domestic hot water systems Cost-Effective
604 2325 Install run on timers on reverse cycle air conditioners Potentially Cost-Effective
317 4474 Install sensing electronic drain valves for air receivers Cost-Effective
587 5021 Install sensor lighting in room & add 5 movement sensors (25%) Cost-Effective
298 2142 Install sensors to shut off vacuum system when not in use for a certain Cost-Effective
604 2249 Install separate controls for hall & 2 and set back the temperature in t Cost-Effective
604 2268 Install separate run down timers to control the hall air conditioners Cost-Effective
290 3413 Install Siemens LMV system on lead boiler Potentially Cost-Effective
445 4205 Install Skycool product to roof Potentially Cost-Effective
500 514 Install smaller chiller unit to run at a more even load Potentially Cost-Effective
592 1373 Install SMS based shutdown of floodlights Potentially Cost-Effective
470 4522 Install solar panel for domestic hot water preheating. Cost-Effective
591 1802 install solar panels for domestic hot water Potentially Cost-Effective
568 3501 Install solar panels for domestic hot water generation Potentially Cost-Effective
591 1855 install solar panels for domestic hot water heating Potentially Cost-Effective
568 3510 Install solar panels for hot water generation Potentially Cost-Effective
592 1377 Install solar panels to preheat dhw Potentially Cost-Effective
592 1388 Install solar panels to preheat dhw Potentially Cost-Effective
592 1397 Install solar panels to preheat dhw Potentially Cost-Effective
592 1422 Install solar panels to preheat dhw Potentially Cost-Effective
592 1415 Install solar panels to preheat domestic hot water (dhw) Potentially Cost-Effective
592 1434 Install solar panels to preheat domestic hot water and plumbing to requPotentially Cost-Effective
592 1408 Install solar panels to preheat ten domestic hot water units Potentially Cost-Effective
592 1405 Install Solar Pool heating Cost-Effective
604 2300 install solar pool heating Potentially Cost-Effective
604 2309 install solar pool heating Potentially Cost-Effective
493 6279 Install solar preheat to DHWS Potentially Cost-Effective
448 3764 Install solar pre-heaters on existing DHW systems Cost-Effective
404 2758 Install solar system for domestic hot water Potentially Cost-Effective
573 3426 Install solar water heating system on available roof space Potentially Cost-Effective
341 277 Install solenoids on nozzle on packing line and air knife on Pockets lineCost-Effective
492 4110 Install split-system AC unit to air-condition server room. Potentially Cost-Effective
562 2068 Install spring return taps in the showers to reduce showering time Cost-Effective
583 2930 install submetering to promote energy awareness Cost-Effective
583 2949 install submetering to promote energy awareness Cost-Effective
484 3539 Install T5 conversation to tenancy lighting Potentially Cost-Effective
600 2570 Install T5 retrofit to plant rooms Potentially Cost-Effective
596 4980 Install T5 streetlights Potentially Cost-Effective
591 1798 install temp reset on A/C units Potentially Cost-Effective
591 1817 install temp reset on A/C units Cost-Effective
591 1849 install temp reset on A/C units Potentially Cost-Effective
591 1825 install temp resets on A/C units Cost-Effective
592 1433 Install temperature reset, time scheduling and demand savings on ac unPotentially Cost-Effective
561 2703 Install time clock and photoelectrric control of the change room lights. Cost-Effective
561 2701 Install time clock control of the domestic hot water circulating pumps. Potentially Cost-Effective
448 3762 Install time clocks on general power equipment to prevent operation a Cost-Effective
488 4118 Install time clocks on instantaneous hot water heaters Potentially Cost-Effective
602 2779 Install time motion sensors Cost-Effective
604 2245 Install time of day control of the potable water circulating pump Cost-Effective
493 6294 Install time schedule control of compressed air system Potentially Cost-Effective
594 5056 Install time switches on Boiling Water Units Cost-Effective
493 6065 Install timed pushbutton control of all small remote AC systems Potentially Cost-Effective
493 6066 Install timed pushbutton controls on all office lighting Potentially Cost-Effective
493 6260 Install timer control on electric heaters Potentially Cost-Effective
493 6161 Install timer controls on wall mounted RAC's Potentially Cost-Effective
448 3758 Install timer delay switches in all store rooms Cost-Effective
404 2747 Install timer delay switches in selected store/computer rooms Cost-Effective
298 2170 Install timer for auto shut off of office & canteen airco over part of wee Cost-Effective
602 2774 Install timer motion sensors Potentially Cost-Effective
602 2782 Install timer motion sensors Cost-Effective
575 1482 Install timer switch for air conditioning system in tandem with manual sCost-Effective
589 2357 Install Timer Switch To Control Spa Operation Potentially Cost-Effective
589 2379 Install Timer Switch To Control Spa Operation Potentially Cost-Effective
593 4924 Install timer to air compressor Cost-Effective
570 6497 Install timer to the large refrigerator plug such that the fridge only op Cost-Effective
591 1797 install timers for zip boilers Potentially Cost-Effective
305 930 Install timers on air conditioning equipment for several office complexeCost-Effective
588 5032 Install timers on boiling water units Cost-Effective
404 2751 Install timers on BWU's Cost-Effective
423 2555 Install timers on Office A/C systems Cost-Effective
586 5981 Install timers on small hot water services/zip boilers Potentially Cost-Effective
586 5991 Install timers on the Air Compressors Potentially Cost-Effective
597 5706 Install timers on vending machines and wall mounted AC units to preveCost-Effective
585 4168 Install timers to foyer, administration and bathroom areas Potentially Cost-Effective
593 4892 Install timers to ZIP water boiler units Cost-Effective
593 4925 Install timers to ZIP water boiler units Cost-Effective
587 5012 Install translucent roofing for work areas Potentially Cost-Effective
562 2089 Install two inverter air conditioners, which draw a variable amount of cuCost-Effective
569 3627 Install TX Valve Potentially Cost-Effective
580 5182 Install ultrasonic motion detection devices for the lighting in three roomCost-Effective
416 410 Install upgraded compressor controller modules to manage loads. Cost-Effective
493 6198 Install usage control on compressed air & cool room systems Potentially Cost-Effective
571 3257 Install variable speed control of indoor pool filter pumps Cost-Effective
571 3258 Install variable speed control of outdoor pool filter pumps Cost-Effective
604 2263 Install variable speed control of the heat pump circulating system Cost-Effective
604 2260 Install variable speed control of the pool filter pump Cost-Effective
317 4476 Install variable speed drive on boiler combustion fan Cost-Effective
591 1801 install variable speed drive on chilled water pump Potentially Cost-Effective
579 3970 Install Variable Speed Drive on heat pump to reduce flow to 50% duringCost-Effective
594 5082 Install Variable Speed Drive on Outdoor Circulation Pump Cost-Effective
594 5085 Install Variable Speed Drive on Outdoor Circulation Pump Cost-Effective
584 5565 Install variable speed drive to recirculating pump Cost-Effective
460 1890 install variable speed drives for chilled water and condenser water pu Cost-Effective
471 708 Install variable speed drives for studio condenser water pumps Potentially Cost-Effective
571 3239 Install Variable Speed Drives on 25 meter pool pumps. Cost-Effective
591 1799 install variable speed drives on Air handling unit 1 Potentially Cost-Effective
516 5734 Install variable speed drives on boilers ID Fans, FD Fans and boiler f Potentially Cost-Effective
594 5071 Install Variable Speed Drives on each of the six 37KW Aerators Potentially Cost-Effective
573 3453 Install Variable Speed Drives on irrigation pumps and aim to reduce opPotentially Cost-Effective
573 3443 Install Variable Speed Drives on other key variable-demand equipmentPotentially Cost-Effective
437 2624 Install variable speed drives on pumps, fans and upgrade aged pump mCost-Effective
444 4041 Install variable speed drives to CDW pumps and isolate generator heat Potentially Cost-Effective
496 2816 Install VFDs on 4 blowers Cost-Effective
448 3757 Install voltage control and re-lamp general office lighting Cost-Effective
453 1079 Install voltage control units in selected areas. Cost-Effective
592 1380 Install Voltage controller Cost-Effective
592 1411 Install Voltage Controller for lighting Cost-Effective
592 1394 Install voltage controllers Potentially Cost-Effective
568 3490 Install voltage controllers Potentially Cost-Effective
592 1430 Install voltage controllers on each level. Cost-Effective
333 1905 Install Voltage Reduction Cost-Effective
485 5772 Install voltage reduction control of the level 3 open plan office area roo Cost-Effective
575 1529 Install voltage reduction unit for car park lighting Cost-Effective
570 832 Install voltage reduction unit to fluorescent lamps in main hall and two lCost-Effective
570 6495 Install voltage reduction unit to the fluorescent lamps in ground floor t Cost-Effective
360 3481 Install voltage reduction units - FL light in offices and factory Potentially Cost-Effective
591 1795 install voltage reduction units for 1x36W troffer fittings for 2 nd floor 3/ Cost-Effective
591 1824 install voltage reduction units for 21 of 1x36W diffused batterns + rela Potentially Cost-Effective
591 1796 install voltage reduction units for 2x18W batten fittings in the fire stairs Cost-Effective
591 1837 install voltage reduction units for 2x26W downlight fittings in main offic Potentially Cost-Effective
591 1860 install voltage reduction units for 3 1x18W IP765 fittings in stairs and Potentially Cost-Effective
591 1793 install voltage reduction units for 3x18w troffer fittings on the 2nd floor Cost-Effective
591 1861 install voltage reduction units for 45x1x36W batten fittings Cost-Effective
591 1787 install voltage reduction units for 94 of 1x36W troffer + 12 of 2x18W dowCost-Effective
591 1791 install voltage reduction units in 4 1x36W troffer fittings in first floor offi Cost-Effective
562 2061 Install voltage reduction units on fluorescent light circuits Potentially Cost-Effective
580 5250 Install voltage reduction units on fluorescent lighting Cost-Effective
570 6487 Install voltage reduction units to fluorescent lamps Cost-Effective
475 4398 Install voltage reduction units to the lighting circuits in equipment roomsCost-Effective
473 4354 Install voltage reduction units to the lighting circuits in the chiller plant Potentially Cost-Effective
472 4282 Install voltage reduction units to the lighting circuits on plantroom. Cost-Effective
474 4367 Install voltage reduction units to the lighting circuits on plantroom. Cost-Effective
475 4381 Install voltage reduction units to the lighting circuits on roof and plantr Cost-Effective
591 1812 install VRU for 3x18W troffer fittings in 2nd floor manager offices Potentially Cost-Effective
582 4695 Install VRU in the Archives room Potentially Cost-Effective
341 278 Install VSD control for 3 x biofilter fans to replace damper control Cost-Effective
341 279 Install VSD control and exhaust fans to replace damper control Cost-Effective
493 6230 Install vsd control to all fume exhaust systems Potentially Cost-Effective
470 4530 Install VSD fitted compressors on all three circuits Cost-Effective
500 513 Install VSD instrument air compressor Potentially Cost-Effective
298 2157 Install VSD on 11 kW waste water pump Potentially Cost-Effective
298 2153 Install VSD on 30kW Wolfking Mixer/Grinder Potentially Cost-Effective
298 2155 Install VSD on 75 kW Block Grinder Potentially Cost-Effective
298 2156 Install VSD on 90 kW Bowl Cutter Potentially Cost-Effective
493 6306 Install VSD on CHW / CW & HW pumps Potentially Cost-Effective
493 6146 Install vsd on CHW / CW / HW pumps & CT Fan Potentially Cost-Effective
493 6282 Install VSD on cooling tower fan Potentially Cost-Effective
320 4411 Install VSD on Cooling Tower Fan Drive Cost-Effective
493 6200 Install vsd on CW pumps & control valves on each AC unit Potentially Cost-Effective
493 6238 Install VSD on CWP & CT fan including control valves at each AC unit Potentially Cost-Effective
297 536 Install VSD on Pellet Press 03 (315 kW) Potentially Cost-Effective
493 6097 Install vsd on screw chiller primary CHW pump Potentially Cost-Effective
349 1317 Install VSD on Cooling Tower Fan Cost-Effective
493 6068 Install VSD to all fans & pumps with variable load Potentially Cost-Effective
360 3474 Install VSD to control chilled water supply pump - lid line chilled water Cost-Effective
585 4161 Install VSD to control cooling tower fan Cost-Effective
580 5252 Install VSD to control Recirculating pumps - dependent on pool and pl Potentially Cost-Effective
493 6133 Install vsd to CW pumps and control valves on each AC unit Potentially Cost-Effective
491 743 Install VSD to HVAC plant (progressive) Cost-Effective
593 4919 Install VSD to main circulation pumps Cost-Effective
593 4922 Install VSD to main circulation pumps Cost-Effective
474 4372 Install VSDs and Zone Controls to AHUs in Building 2 Potentially Cost-Effective
298 2164 Install VSDs on 5 pelleters to reduce operating load,enable better cont Potentially Cost-Effective
298 2166 Install VSDs on A1/A2 grinders Potentially Cost-Effective
493 6123 Install vsd's on CHW & CW pumps Potentially Cost-Effective
493 6231 Install vsd's on CHW / CW system pumps Potentially Cost-Effective
594 5065 Install VSD's on Circulation Pumps Cost-Effective
448 3769 Install VSD's on cooling tower fans Cost-Effective
573 3428 Install VSD's on main circulation pumps (eg 80% of usual flow rate overPotentially Cost-Effective
444 4044 Install VSDs on selected HW pumps Potentially Cost-Effective
592 1387 Install VSDs on Supply and Return Fans (Hall AHU) Potentially Cost-Effective
473 4336 Install VSDs to AHUs Cost-Effective
444 4039 Install VSDs to Central campus CHW pumps Potentially Cost-Effective
444 4043 Install VSDs to central campus cooling towers Potentially Cost-Effective
444 4042 Install VSDs to cooling towers Potentially Cost-Effective
444 4040 Install VSDs to CHW pumps Potentially Cost-Effective
333 1909 Install VSD's to Chilled Water Pumps Potentially Cost-Effective
595 5440 Install VSDs to circulation pumps Cost-Effective
566 2010 Install VSD's to circulation pumps Potentially Cost-Effective
566 2014 Install VSD's to circulation pumps Potentially Cost-Effective
445 4209 Install VSDs to CSB heating hot water pumps Potentially Cost-Effective
333 1910 Install VSD's to Main Chillers Potentially Cost-Effective
445 4207 Install VSDs to main CHW pumps Potentially Cost-Effective
593 4884 Install VSDs to main circulation pumps Cost-Effective
493 6096 Install VSD's to supply fans to reduce operation out of high load times Potentially Cost-Effective
445 4206 Install VSDs to tower block heating hot water pumps Potentially Cost-Effective
462 1618 Install VVVF drives on sewage pumps Potentially Cost-Effective
383 2454 Install weekly timer on bathouse heating to turn off on weekends Cost-Effective
592 1379 Install wet bulb sensor to minimize cooling tower fan run. Potentially Cost-Effective
587 5002 Install window tinting (10%) Cost-Effective
589 2362 Install Window Tinting To Windows On The Northern Side Potentially Cost-Effective
354 2894 Installation high efficiency motors Cost-Effective
593 4910 Installation of “occupancy button” to ACU-2 Cost-Effective
578 6552 Installation of 10 Solarhart 151L hot water units - one on each of the sePotentially Cost-Effective
493 6316 Installation of 120kWe cogeneration plant for pool heating Potentially Cost-Effective
493 6093 Installation of 500kWe cogeneration plant & 1000kWr absorption chiller Potentially Cost-Effective
352 2339 Installation of 900kVAr of PFCE Cost-Effective
391 3090 Installation of a 2.4MW cogeneration plant, including 2 x 1.2MW Natur Potentially Cost-Effective
599 3207 Installation of a Building Management System Cost-Effective
599 3211 Installation of a Building Management System Cost-Effective
574 5138 Installation of a Building Management System (BMS) Potentially Cost-Effective
599 3222 Installation of a Buliding Management System & Variable Speed DrivesCost-Effective
574 5149 Installation of a Business Management System (BMS) Potentially Cost-Effective
574 5151 Installation of a Business Management System (BMS) Potentially Cost-Effective
594 5081 Installation of a Compressor control system to shut down the second Potentially Cost-Effective
350 3602 Installation of a Heat Pump hot Water Service at the bath house Potentially Cost-Effective
564 1759 installation of a solar pool heating system to replace the exisitng heat Cost-Effective
574 5159 Installation of a hood Potentially Cost-Effective
599 3213 Installation of a Humidity Control Unit for humidity control. Potentially Cost-Effective
593 4901 Installation of additional light switches Cost-Effective
593 4903 Installation of advance HVAC control system Potentially Cost-Effective
600 2567 Installation of air change units to pre cool and pre heat outside air Potentially Cost-Effective
596 4955 Installation of BMCS Cost-Effective
599 3223 Installation of Building Management System & Variable Speed Drives Cost-Effective
493 6240 Installation of CHW AC units for offices Potentially Cost-Effective
493 6178 Installation of CHW central cooling plant to replace multizone DX syst Potentially Cost-Effective
566 2049 Installation of co-generation Potentially Cost-Effective
493 6312 Installation of daylight control of external lighting Potentially Cost-Effective
352 2342 Installation of demand management on remote pumping whilst train unloPotentially Cost-Effective
574 5164 Installation of economy cycle Potentially Cost-Effective
574 5169 Installation of economy cycle Potentially Cost-Effective
574 5174 Installation of economy cycle Cost-Effective
574 5135 Installation of economy cycle and CO2 control Potentially Cost-Effective
574 5144 Installation of economy cycle and CO2 control Potentially Cost-Effective
493 6130 Installation of economy cycle on AC system Potentially Cost-Effective
574 5158 Installation of economy cycle to meeting rooms Potentially Cost-Effective
600 2564 Installation of economy cycle to the NAGG Cost-Effective
597 5690 Installation of electronic expansion valves on DX units. Refer to att Potentially Cost-Effective
569 3632 Installation of energy efficient shower heads in all villas and amenities Cost-Effective
566 2041 Installation of Energy Reduction Controllers Cost-Effective
595 5434 Installation of Energy Reduction Controllers Cost-Effective
595 5439 Installation of Energy Reduction Controllers Cost-Effective
595 5442 Installation of Energy Reduction Controllers Cost-Effective
595 5445 Installation of Energy Reduction Controllers Cost-Effective
595 5449 Installation of Energy Reduction Controllers Cost-Effective
595 5450 Installation of Energy Reduction Controllers Potentially Cost-Effective
595 5451 Installation of Energy Reduction Controllers Cost-Effective
595 5452 Installation of Energy Reduction Controllers Cost-Effective
595 5453 Installation of Energy Reduction Controllers Potentially Cost-Effective
566 2001 Installation of Energy Reduction Unit (ERC) to lighting circuits Cost-Effective
596 4940 Installation of Energy Save Units Potentially Cost-Effective
596 4958 Installation of Energy Save Units Potentially Cost-Effective
596 4964 Installation of Energy Save Units Potentially Cost-Effective
596 4945 Installation of Energy Save Units to Control Lights in the Car Park Potentially Cost-Effective
596 4946 Installation of Energy Save Units to Control Lights in the Offices Potentially Cost-Effective
566 2031 Installation of ERC Cost-Effective
566 2046 Installation of ERC Cost-Effective
566 2048 Installation of ERC Cost-Effective
596 4965 Installation of external door Potentially Cost-Effective
589 2563 Installation of Flow Restrictors to Taps Potentially Cost-Effective
350 3604 Installation of Heat Pump Hot Water Services on bath house Potentially Cost-Effective
350 3601 Installation of Heat Pump Hot Water Services on bath house Potentially Cost-Effective
574 5154 Installation of heat pump hot water system Potentially Cost-Effective
574 5171 Installation of heat pump hot water systems Potentially Cost-Effective
574 5120 Installation of heat pump pool heating Potentially Cost-Effective
574 5130 Installation of heat pump pool heating Potentially Cost-Effective
574 5111 Installation of heat pump water heaters Potentially Cost-Effective
574 5118 Installation of heat pump water heating Potentially Cost-Effective
574 5129 Installation of heat pump water heating Potentially Cost-Effective
574 5112 Installation of heat pumps for pool heating Potentially Cost-Effective
346 3810 Installation of Light Eco in Mill Cost-Effective
596 4974 Installation of light sensors to control external lighting Potentially Cost-Effective
584 5654 Installation of lux sensors to control carpark lighting Cost-Effective
575 1520 Installation of Motion Detector in meeting room 2, to review performancePotentially Cost-Effective
493 6119 Installation of motion sensor & push button control of lighting Potentially Cost-Effective
593 4928 Installation of motion sensors Cost-Effective
493 6105 Installation of motion sensors and pushbuttons on lighting and AC Potentially Cost-Effective
493 6100 Installation of motion sensors and timed pushbuttons on lighting and A Potentially Cost-Effective
593 4906 Installation of motion sensors to amenities block Cost-Effective
593 4911 Installation of motion sensors to change rooms & toilets Cost-Effective
566 2004 Installation of Motion Sensors to offices, meeting rooms Cost-Effective
493 6197 Installation of natural & forced ventilation systems to improve building Potentially Cost-Effective
493 6137 Installation of natural ventilation / economy cycle into AC system Potentially Cost-Effective
429 6556 Installation of new air conditioner controls Cost-Effective
574 5126 Installation of non return dampers on pool room vents Cost-Effective
493 6259 Installation of occupancy / timer controls to lighting Potentially Cost-Effective
493 6241 Installation of occupancy control of lighting Potentially Cost-Effective
493 6209 Installation of occupancy control of office lighting Potentially Cost-Effective
493 6218 Installation of occupancy control to auditorium lighting & AC Potentially Cost-Effective
493 6191 Installation of occupancy or pushbutton time controlled lighting to officePotentially Cost-Effective
596 4941 Installation of Occupancy Sensors Potentially Cost-Effective
584 5649 Installation of occupancy sensors to bathrooms Cost-Effective
584 5579 Installation of occupancy sensors to file storage area Cost-Effective
493 6220 Installation of occupany control of lights to foyer & meeting rooms Potentially Cost-Effective
447 1869 installation of ozone wash treatment for the 3 valet 25kg washers Potentially Cost-Effective
596 4951 Installation of Photovoltaic Arrays Potentially Cost-Effective
596 4956 Installation of Photovoltaic Arrays Potentially Cost-Effective
596 4975 Installation of Photovoltaic Arrays Potentially Cost-Effective
600 2569 Installation of pool blankets Potentially Cost-Effective
595 5441 Installation of pool solar heating system Potentially Cost-Effective
315 5725 installation of Power Factor capacitance(5 MVAr) with new site substatCost-Effective
566 2000 Installation of power factor correction units Cost-Effective
493 6088 Installation of pushbutton and motion sensor lighting controls Potentially Cost-Effective
493 6147 Installation of pushbutton timer for AC & economy cycle Potentially Cost-Effective
493 6219 Installation of roof insulation and sealing to prevent loss of heating fro Potentially Cost-Effective
566 2015 Installation of solar hot water to replace current storage tank setup Cost-Effective
566 2035 Installation of Sensors Potentially Cost-Effective
584 5661 Installation of sensors to carpark bathroom to control lighting Cost-Effective
578 6543 Installation of shower duration timers Cost-Effective
593 4913 Installation of skytube Potentially Cost-Effective
571 3341 Installation of solar hot water Potentially Cost-Effective
589 2368 Installation of solar hot water heater Potentially Cost-Effective
589 2578 Installation of solar hot water heaters Potentially Cost-Effective
593 4930 Installation of solar hot water system Cost-Effective
579 3994 Installation of Solar Hot Water System to replace current Electric SystemCost-Effective
579 3989 Installation of Solar Hot Water System to supplement current Gas BoileCost-Effective
566 2007 Installation of solar system (glazed panels) Potentially Cost-Effective
583 2918 installation of sub-metering to raise energy usage awareness Cost-Effective
574 5153 Installation of T5 lighting Potentially Cost-Effective
388 3467 Installation of temperature control of cooling tower fans Cost-Effective
566 2047 Installation of time clock to HVAC Cost-Effective
493 6208 Installation of timed pushbutton control of small package AC Potentially Cost-Effective
320 4410 Installation of timed switches on Seed Shed lighting Cost-Effective
583 3030 Installation of timers for BWU and water cooling units Cost-Effective
571 3350 Installation of timers for hot water systems in parks - trial in 4 parks to Cost-Effective
566 2003 Installation of timers to switch off hot water boiler units (ZIP) overnight Potentially Cost-Effective
319 2415 Installation of variable speed control for ammonia compressor Cost-Effective
319 2416 Installation of variable speed control for BAC cooling tower fans Cost-Effective
319 2431 Installation of variable speed control for watse water lagoon aeration unPotentially Cost-Effective
599 3225 Installation of Variable Speed Drive Potentially Cost-Effective
599 3224 Installation of Variable Speed Drives and PLCs Potentially Cost-Effective
314 6480 Installation of variable speed drives for chilled and hot water pumps ef Cost-Effective
308 3776 Installation of variable speed motors on jet dyeing Cost-Effective
606 3066 Installation of variable speed pump to provide the reclaimed water sys Potentially Cost-Effective
604 2240 Installation of Verosol Blinds on the Eastern, Northern and Western e Cost-Effective
320 4413 Installation of VSD on Boiler Feedwater Pump Drive Cost-Effective
596 4949 Installation of VSDs Chilled Water Pumps Potentially Cost-Effective
596 4947 Installation of VSDs Condensor Water Pumps Potentially Cost-Effective
596 4967 Installation of VSDs Condensor Water Pumps Potentially Cost-Effective
493 6111 Installation of VSD's on CHW & HW pumps Potentially Cost-Effective
493 6095 Installation of VSD's on cooling tower fans Potentially Cost-Effective
596 4952 Installation of VSDs to Control Pumps Potentially Cost-Effective
596 4960 Installation of VSDs to Control Pumps Potentially Cost-Effective
596 4968 Installation of VSDs to Cooling Towers Potentially Cost-Effective
589 2562 Installation of Water efficient device to taps Cost-Effective
589 2385 Installation of water efficient shower heads and taps Potentially Cost-Effective
589 2568 Installation of water efficient shower heads and taps Cost-Effective
589 2580 Installation of water efficient shower heads and taps Potentially Cost-Effective
589 2588 Installation of water efficient shower heads and taps Cost-Effective
589 2589 Installation of water efficient shower heads and taps Cost-Effective
589 2590 Installation of water efficient shower heads and taps Potentially Cost-Effective
589 2591 Installation of water efficient shower heads and taps Cost-Effective
589 2592 Installation of water efficient shower heads and taps Potentially Cost-Effective
589 2593 Installation of water efficient shower heads and taps Potentially Cost-Effective
589 2600 Installation of water efficient shower heads and taps Potentially Cost-Effective
583 3043 Installation timed showers (projected costs without water savings) Potentially Cost-Effective
337 1047 Installed notched type vee belts on drives when belts are due for repla Potentially Cost-Effective
374 1165 Installing Eco-motor controllers for 22 motors Potentially Cost-Effective
298 2147 Insulate 10,000L Feedwater Preheat Tank Potentially Cost-Effective
573 3457 Insulate ceiling (minimum R3.5) and under floor (where accessible) Potentially Cost-Effective
597 5712 Insulate building (inc. bulk insulation to accessible roof space and sealiPotentially Cost-Effective
440 6529 Insulate CIP pipes Potentially Cost-Effective
293 2768 Insulate extruder barrels Potentially Cost-Effective
495 1293 Insulate extrusion chilled water tank Cost-Effective
292 4363 Insulate glycol plate heat exchangers Potentially Cost-Effective
440 6528 Insulate hot water system pipes Potentially Cost-Effective
291 4296 Insulate hot water tank Potentially Cost-Effective
439 3295 Insulate hot water tanks Cost-Effective
301 1150 Insulate pasteurisers Potentially Cost-Effective
440 6523 Insulate refrigeration pipes to cold stores Cost-Effective
439 3300 Insulate steam piping Potentially Cost-Effective
417 4395 Insulate Steep Tanks Potentially Cost-Effective
382 3652 Insulate the deaerator tank and all associated pipes and fittings Cost-Effective
485 5934 Insulate the flow and return pipework from the potable and non potable Cost-Effective
571 3247 Insulate the pool hall return air ductwork Potentially Cost-Effective
516 5737 Insulate uninsulated refrigerant pipe Potentially Cost-Effective
318 4463 Insulating the dryer cylinder Potentially Cost-Effective
346 3816 Insulation improvements - boiler house Cost-Effective
346 3822 Insulation improvements - steam pipes Potentially Cost-Effective
295 5327 Insulation of external hot water pipes where possible Cost-Effective
319 2432 Insulation of tallow storage tanks Potentially Cost-Effective
387 1272 Insulation of unlagged valves and fittings in the steam system. Cost-Effective
318 4442 Insulting Tallow tank heat loss Potentially Cost-Effective
594 5062 Integrate Zane solar system into BMS Cost-Effective
596 4942 Integration of Pumps with SCADA system Potentially Cost-Effective
379 1183 Interconnect MP and HP Steam Headers Cost-Effective
434 2216 Interconnection of the refrigeration plant rooms to create a plant-wide Potentially Cost-Effective
485 6609 Interface tempered air systems to the BMS to provide time of day schedCost-Effective
349 1315 Interlock Line 6 air conditioning unit to light switch Cost-Effective
396 655 Interlock P4 coater / cooler rotary valves Potentially Cost-Effective
396 656 Interlock P4 gearbox oil motor Potentially Cost-Effective
396 640 Interlock P4 rotary valves & spreaders Cost-Effective
396 636 Interlock rotary valve associated with re-seed system Cost-Effective
396 629 Interlock system that transfers from small ingredients to mill tower Cost-Effective
485 5740 Interlock the boiler with the associated air handling plant Cost-Effective
587 5023 Interrogate where the floodlights are being billed. Supposed to be off Cost-Effective
363 6029 Introduce Efficient Pot room exhaust motors on replacement Potentially Cost-Effective
594 5080 Introduce Energy Awareness & Monitoring Prograramme to motivate staff Potentially Cost-Effective
337 1048 Introduce energy efficient electric motors. Potentially Cost-Effective
594 5079 Introduce Motor System Efficiency Programme to raise maintenance staPotentially Cost-Effective
422 721 Introduce water injection to enhance regenerator performance Cost-Effective
354 2900 introducing chilled ceiling & beams system Potentially Cost-Effective
354 2901 introducing photo voltaic cells Potentially Cost-Effective
294 1649 Investigate adjustments to mixture/combustible variability in gas burnerPotentially Cost-Effective
575 1467 Investigate alternative court lighting for greater efficiency and reduction oCost-Effective
575 1490 Investigate alternative floodlighting for greater efficiency and reduction Cost-Effective
575 1469 Investigate alternative sporting field lighting for greater efficiency and redCost-Effective
573 3447 Investigate and address strange operation of power factor correction Potentially Cost-Effective
296 2670 Investigate and implement improvement of A/C efficiency Cost-Effective
597 5711 Investigate and price opportunity for 'heat reflective' coating on roof of Potentially Cost-Effective
597 5710 Investigate and price opportunity for natural lighting in works sheds (viaPotentially Cost-Effective
580 5283 Investigate and reduce baseload Cost-Effective
580 5303 Investigate and reduce baseload - all year Cost-Effective
580 5325 Investigate and reduce baseload (2kW) Cost-Effective
580 5302 Investigate and reduce winter baseload Cost-Effective
570 6490 Investigate and resolve high 'base power' issues. Cost-Effective
575 1510 Investigate causes of high pre-occupancy energy consumption in the Cost-Effective
381 671 Investigate compressed air pressure reduction of up to 50 kPa. Cost-Effective
587 5030 Investigate consolidation of meters as we are being charged rental cosCost-Effective
580 5290 Investigate cost and security feasibility of creating perimeter lighting at Potentially Cost-Effective
580 5289 Investigate current circuit setup and potential to install motion detectorsPotentially Cost-Effective
580 5310 Investigate current circuit setup and potential to install motion detectorsPotentially Cost-Effective
423 2561 Investigate feasibility of replacing ring main pumps with VSD on chilled Potentially Cost-Effective
579 3990 Investigate hour of hours usage - airconditioning controls Cost-Effective
453 1069 Investigate leaving CHW temperature rise (once controls upgrade compCost-Effective
294 1648 Investigate load/unload to improve refrigeration plant efficiency Potentially Cost-Effective
453 1076 Investigate loss of chilled water from secondary chilled water circuit ( Cost-Effective
333 1902 Investigate negative air pressure in basement area Cost-Effective
573 3451 Investigate opportunities for further saving (including Variable Speed DPotentially Cost-Effective
580 5294 Investigate opportunities to reduce heat impacts on the HVAC system thPotentially Cost-Effective
583 2945 Investigate options to sell electricity to the grid from solar panels Potentially Cost-Effective
575 1470 Investigate partial de-lamping of sporting field lights following installatioCost-Effective
588 5043 Investigate possibility of reducing pool temperature and avoiding sum Potentially Cost-Effective
351 5375 Investigate potential for Cogeneration (replace current power systems)Potentially Cost-Effective
381 672 Investigate Replacement of Large motors with high energy efficient moPotentially Cost-Effective
562 2096 Investigate replacing exterior lamps with energy efficient lamps when Potentially Cost-Effective
346 3821 Investigate sources of boiler feedwater pre-heat Potentially Cost-Effective
575 1494 Investigate the causes of baseload (mainly lights and office equipmen Cost-Effective
575 1511 Investigate the causes of high baseload (mainly lights and office equi Cost-Effective
575 1501 Investigate the causes of high mechanical load overnight and on weekendCost-Effective
488 4123 Investigate the correct sizing of pumps or alternatively fit VSD' to pu Potentially Cost-Effective
580 5198 Investigate the cost and feasibility of installing an occupancy sensor in Potentially Cost-Effective
580 5311 Investigate the current circuit setup and the potential to install a photo cPotentially Cost-Effective
580 5324 Investigate the current circuit setup and the potential to install motion Cost-Effective
580 5231 Investigate the feasibility of consolidating refrigeration in the off-seasonCost-Effective
423 2558 Investigate the feasibility of installing a low pressure air loop for bind Potentially Cost-Effective
423 2560 Investigate the feasibility of installing VSD air compressor to replace t Potentially Cost-Effective
580 5239 Investigate the feasibility of shutting down the 50 metre pool in winte Cost-Effective
327 449 investigate the installation of additional underground tunnels and roadsPotentially Cost-Effective
575 6035 Investigate the viability of installing translucent panelling on sporting st Potentially Cost-Effective
575 1497 Investigate the viability of retrofitting existing double low bay aisle li Potentially Cost-Effective
575 1475 Investigate viability of motion detector switches for club house and worPotentially Cost-Effective
381 673 Investigate Voltage control of existing flourescents. Preliminary estimatPotentially Cost-Effective
491 744 Investigate/monitor operation of Heating/Cooling plant Cost-Effective
572 3129 Investigations are underway to reduce the compressor runtime each day.Potentially Cost-Effective
594 5083 Isolate one of the two indoor Circulation Pumps outside normal hours Cost-Effective
367 5496 IT refresh - It technology refresh for IBM Lotus Notes Applications provCost-Effective
367 5495 IT refresh for client providing energy saving at data centre Cost-Effective
390 4869 Building air conditioning dampers Potentially Cost-Effective
359 462 Kiln Control System Upgrade Potentially Cost-Effective
509 6507 Kilns - correctly apply edge baffles Cost-Effective
382 3693 Conduct a full review of motor efficiency and motor systems to determiPotentially Cost-Effective
382 3689 Engage suitably qualified contractors to conduct a building services sy Potentially Cost-Effective
563 5544 Light save transformers Cost-Effective
563 5525 MLS using occupancy/daylight sensors Cost-Effective
563 5518 Replace CF fittings with triphosphor lamps, install 5 light save transfor Cost-Effective
563 5533 Voltage controller Cost-Effective
333 1913 L3 Server Room - Install Specialist Humidity Control System Potentially Cost-Effective
329 1709 Laboratory Cost-Effective
329 1708 Laboratory Cost-Effective
323 5424 Laboratory Air Conditioning Potentially Cost-Effective
305 947 Laboratory Services -Enable power saving feature on all non-critical PCCost-Effective
318 4431 Lagging hot water steam & condensate pipes, costings & paybacks basCost-Effective
495 1297 Lamp upgrade Extrusion Cost-Effective
604 2318 Laundry Dryer replacement with air preheating or exhaust air flow con Potentially Cost-Effective
568 3498 LED based exit lighting at Civic Hall Potentially Cost-Effective
583 3004 LED Exit Fittings Potentially Cost-Effective
583 3028 LED Exit Fittings Potentially Cost-Effective
366 5700 LEDs for Emergency Exit Lighting - all exit lighting is conventional 10WPotentially Cost-Effective
577 2440 Level 2 lighting control Potentially Cost-Effective
485 5840 Level 4 Research lab Cost-Effective
328 248 Level control of compressed air pumps (subject to 10% trial to confirm viPotentially Cost-Effective
492 4095 Chillers staging software upgrade for optimised energy efficient operatiCost-Effective
329 1672 Economic cycle on packaged units Cost-Effective
329 1671 Economy cycle Cost-Effective
570 863 HVAC: 365 day time switch Cost-Effective
329 1673 Increase chilled water temperature Cost-Effective
577 2471 light conservation system (Light ECO) Cost-Effective
577 2483 light conservation system (Light ECO) Cost-Effective
577 2487 light conservation system (Light ECO) Cost-Effective
577 2464 Light conservation sytem (Light Eco) Cost-Effective
367 5498 Light de-lamping in Service Corridors Cost-Effective
313 3731 Light eco 4.8 energy controller - carpark Cost-Effective
313 3733 Light eco 4.8 energy controller - cove lighting Cost-Effective
340 3893 Light fittings upgrade Cost-Effective
453 1064 Light Level Survey (Optimise light levels and operating times) Cost-Effective
567 1972 Lighting Cost-Effective
567 1980 Lighting Cost-Effective
567 1984 Lighting Cost-Effective
567 1987 Lighting Cost-Effective
567 1989 Lighting Cost-Effective
567 1993 Lighting Cost-Effective
567 1995 Lighting Cost-Effective
567 1997 Lighting Cost-Effective
418 3440 Lighting Potentially Cost-Effective
489 4146 Lighting Potentially Cost-Effective
565 5254 Lighting Potentially Cost-Effective
565 5258 Lighting Potentially Cost-Effective
565 5263 Lighting Potentially Cost-Effective
565 5265 Lighting Cost-Effective
565 5291 Lighting Potentially Cost-Effective
480 5358 Lighting Cost-Effective
413 6569 Lighting - upgrade the luminaries on central roof, turn off northern end Cost-Effective
508 2646 Lighting - Install motion sensors in 38 rooms to switch off 85% of ligh Cost-Effective
378 20 Lighting – Install zone control of the high bay lighting and install timer Cost-Effective
489 4145 Lighting – office areas only Potentially Cost-Effective
413 6567 Lighting - Cranes turn off during the day Cost-Effective
508 2653 Lighting - Replace 250W exterior lights with 150W metal halide lights prPotentially Cost-Effective
441 2224 Lighting - Replace 50w lamps with 35w IRC equivalents for 30 dichroic'Cost-Effective
508 2645 Lighting - Replace 70W exterior bollard lights with 26W compact fluorescCost-Effective
508 2649 Lighting - Replace single 40W fluorescent lamps in offices and computePotentially Cost-Effective
508 2651 Lighting - Replace twin 40W fluorescent lights in plant rooms with a sinPotentially Cost-Effective
508 2650 Lighting - Replace twin 65W fluorescent lamps used in corridors, officePotentially Cost-Effective
599 3206 Lighting - Replacement of the 2 X 38 watt Fluorescents with triphosphorCost-Effective
508 2644 Lighting - Switch off external 70W and 150W downlights as the building Cost-Effective
413 6565 Lighting Admin Building - Static Dimmers Cost-Effective
362 1745 lighting and control Cost-Effective
577 2449 Lighting and Hot water Cost-Effective
577 2459 Lighting control Cost-Effective
569 3626 Lighting Control Cost-Effective
583 2952 Lighting control alterations Cost-Effective
583 3003 Lighting control alterations Cost-Effective
583 3011 Lighting Control Alterations (Timed switches on five stores) Cost-Effective
454 100 Lighting control modifications to three sheds Cost-Effective
359 463 Lighting Control System Potentially Cost-Effective
322 5953 lighting control system(timers,dimmers and sensors) Potentially Cost-Effective
321 296 Lighting control systems (e.g. timers, sensors and dimmers) Potentially Cost-Effective
570 819 Lighting control: Install switches in the car park store room, main stor Cost-Effective
605 2842 Lighting controls Cost-Effective
605 2843 Lighting controls Cost-Effective
605 2844 Lighting controls Cost-Effective
605 2845 Lighting controls Cost-Effective
605 2846 Lighting controls Cost-Effective
605 2874 Lighting controls Potentially Cost-Effective
605 2875 Lighting controls Potentially Cost-Effective
441 2233 Lighting Controls Equipment Rooms - Install controls to provide 50% conPotentially Cost-Effective
506 4283 Lighting Controls Loading Dock - Provide 24 hour security lighting and anCost-Effective
506 4284 Lighting Controls Mall & Car Park Areas - Review current zone control, Cost-Effective
505 4374 Lighting Controls Mall & Car Park Areas - Review current zone control, Cost-Effective
505 4390 Lighting Controls Malll & Car Park Areas - Review current zone, cleaninPotentially Cost-Effective
441 2232 Lighting Controls Office Areas- Install a reset after hours controls incl Potentially Cost-Effective
413 6564 Lighting Engineering Office - upgrade to new triphosphor lamps/luminariCost-Effective
446 4565 Lighting factory - lower luminaires and reduce wattage Cost-Effective
329 1667 lighting general store Cost-Effective
371 360 Lighting improvement - ammonia plant Cost-Effective
371 361 Lighting improvement - demin plant Cost-Effective
371 375 Lighting improvement - Industrial ammonia plant Potentially Cost-Effective
371 362 Lighting improvement Cost-Effective
371 376 Lighting improvement - Non manufacturing Potentially Cost-Effective
494 4229 Lighting initiatives Cost-Effective
506 4361 Lighting Lamp Replacement Dichroic 50w to 35w - Replace mall dichroicPotentially Cost-Effective
505 4393 Lighting Lamp Replacement Dichroic 50W to 35W - Replace mall dichroiPotentially Cost-Effective
352 2341 Lighting Management Potentially Cost-Effective
446 4566 Lighting Office Technology upgrade Cost-Effective
348 3252 Lighting option 1 - Turn off program Cost-Effective
441 2230 Lighting Option 1- Replace 1170, 2x36w luminairies in equipment rooms,Potentially Cost-Effective
441 2231 Lighting Option 2 - T5 kit lamp conversion of linear lighting (2340 lamp Potentially Cost-Effective
395 1283 Lighting refit / autotransformers Cost-Effective
506 4357 Lighting Replacement MV to MH Car Park and Loading Docks - Replace 5Potentially Cost-Effective
505 4391 Lighting Replacement MV to MH Car Park and Loading Docks - Replace 6Potentially Cost-Effective
568 3521 Lighting retrofit Potentially Cost-Effective
599 3210 Lighting Retrofit - replacement of the double fluorescent lamps with tr Cost-Effective
599 3220 Lighting Retrofit - replacement of the double fluorescent lamps with tr Cost-Effective
335 1767 Lighting System Cost-Effective
344 532 Lighting System Initiative - Refer Section 9.1 of DFS Report dated 7/ Potentially Cost-Effective
600 2566 Lighting technology review Potentially Cost-Effective
592 1372 Lighting upgrade Potentially Cost-Effective
577 2446 Lighting upgrade Cost-Effective
577 2475 Lighting upgrade Cost-Effective
578 6540 Lighting upgrade - meeting room Cost-Effective
578 6539 Lighting upgrade - Workroom Cost-Effective
570 833 Lighting upgrade from T8 to T5 lamps using retrofit kits - two seminar Cost-Effective
592 1420 Lighting upgrade of twin tubes Potentially Cost-Effective
570 803 Lighting upgrade to five levels - install voltage reduction units with T8 Cost-Effective
460 1895 lighting upgrade using new luminaires or retrofit existing units with Potentially Cost-Effective
329 1660 lighting upgrade Potentially Cost-Effective
577 2439 Lighting upgrade, Zip boilers, Water heaters, water coolers Cost-Effective
592 1386 Lighting Upgrade. Potentially Cost-Effective
385 1303 Lighting, compressed air, refrigeration and power factor correction. Cost-Effective
605 2876 Lighting, HVAC and Hot water controls - Annex Potentially Cost-Effective
570 822 Lighting: Exterior PE cell control Cost-Effective
570 827 Lighting: Incandescent to CFLs upgrade Cost-Effective
570 825 Lighting: Levels 1&2 circuits separation + control Cost-Effective
570 820 Lighting: Occupancy sensor control in tea room Cost-Effective
485 5865 Link a/c MDs to Lighting in four rooms Cost-Effective
485 5867 Link a/c MDs to Lighting in seminar room Cost-Effective
371 357 Link compressed air systems Cost-Effective
485 5864 Link lecture theatre a/c MDs to lighting Cost-Effective
286 72 Link Trim Slusher Agitator to Winder Potentially Cost-Effective
298 2161 lnterlink control of pelleter and cooling fans to enable cooling fans to Cost-Effective
377 4837 Loading dock lighting control Cost-Effective
506 4331 Loading Dock Ventilation Control -VSD Control of Loading Dock VentilatPotentially Cost-Effective
301 1151 Localised gas water heating for pasteurisers. Potentially Cost-Effective
315 5427 Long-term replacement of electrical motors (several hundred) with EX-veCost-Effective
315 5428 Long-term upgrade of plant lighting with better quality, higher efficien Cost-Effective
308 3774 Loop control on the 6 bay stenter Cost-Effective
400 1735 Low Energy Refiner Plates.Improved design of refiner plates enable highPotentially Cost-Effective
286 57 Lower compressed air pressure Cost-Effective
295 5326 Lower hot water temperature on individual units to 60 degrees Cost-Effective
595 5448 Lower temperature setpoint in winter Cost-Effective
587 5017 Lower thermostat temperature of hot water heaters & install timers (30 Cost-Effective
571 3282 Luminaire Replacement Potentially Cost-Effective
286 85 Lumitrol South End First Floor Potentially Cost-Effective
286 71 Lumitrol Stockyard Lighting Potentially Cost-Effective
280 4262 Machine 11 cooling fans Potentially Cost-Effective
286 79 Machine Dip Seal Pump Impeller Potentially Cost-Effective
342 1155 Machines and conveyors running unnecessarily Cost-Effective
446 4568 Machines running when not required Cost-Effective
408 1160 Main compressors - Replace as operational risk Cost-Effective
570 862 Main Hall Foyer: CFLs in chandelier Cost-Effective
570 860 Main Hall: dimmable CFLs in chandeliers Cost-Effective
445 4213 Main lighting - retrofit with single 37W quadphosphor fittings Potentially Cost-Effective
445 4212 Main lighting option 2 - retrofit with "save it easy" T5 kit (24/7) Potentially Cost-Effective
408 1213 Main Mill - Shut down NTM/stelmor fans when not used Cost-Effective
414 4832 Main Office Air Conditioning Heat Load Reduction Potentially Cost-Effective
433 3861 Main product belt wash-pulsed Potentially Cost-Effective
323 5421 Main Store lighting Cost-Effective
328 239 Main ventilation fan optimisation Cost-Effective
567 1991 Maintain Fire Booster Pump Cost-Effective
455 1918 Maintenance improvement Cost-Effective
593 4899 Maintenance schedule Cost-Effective
323 5420 Lighting Cost-Effective
448 3788 Major BMCS Upgrade Potentially Cost-Effective
448 3789 Major Lighting Upgrade Potentially Cost-Effective
313 3730 Make up air for kitchen exhaust Cost-Effective
380 254 Manual Slide Gate for MB BWE duct to minimise waste air vacuum Cost-Effective
570 849 Masonry Store external lighting: Install PE cell control Cost-Effective
570 841 Masonry Store lighting: occupancy sensor control Cost-Effective
570 840 Masonry Store lighting: central control Cost-Effective
570 837 Masonry Store Lighting: turn off some lighting Cost-Effective
413 6566 Mast Lighting - staged switching Cost-Effective
404 2754 Match HVAC operating times to staff requirements and consolidate afteCost-Effective
448 3778 Match HVAC operating times to staff requirements and consolidate AHCost-Effective
284 4050 Maximise hot charging Cost-Effective
306 774 MCL3 Electric Launder Cost-Effective
329 1665 Mechanical shed Cost-Effective
379 1194 Medium Pressure Lead Boiler Feedwater Pump VSD Potentially Cost-Effective
306 775 MG Set replacement Cost-Effective
463 1624 Micro-Hydro Power generation - Feasibility study Potentially Cost-Effective
440 6534 Microwave thawing instead of air tempering room fans Potentially Cost-Effective
290 3378 Migrate production of respules and PE processes from Altis to Nova to Cost-Effective
293 2769 Milk intake lighting Potentially Cost-Effective
291 4295 Milk intake lighting Cost-Effective
292 4343 Milk intake lighting Cost-Effective
408 1218 Mill cooling - install VSDs on 2x225 kW Mill low pressure pumps to mPotentially Cost-Effective
408 1199 Mill cooling - replce 2x337kW De-scaler pumps Cost-Effective
408 1212 Mill drives - shut down NTM and other rolling stands when idle Cost-Effective
324 1659 mine ventilation Potentially Cost-Effective
370 1457 Mine: Optimisation of underground conveyors operating procedures. Cost-Effective
434 2180 Minimise compressed air delivery pressure Cost-Effective
385 1306 Minimise DAW cooling and thermal storage Potentially Cost-Effective
561 2694 Minimise the outside air intake of the air conditioner Potentially Cost-Effective
570 836 Minor Lighting: Turnoff practices Cost-Effective
395 1284 Miscellaneous lighting projects Cost-Effective
461 1584 Modification of secondary aeration controls Cost-Effective
596 4954 Modify air conditioning schedule Cost-Effective
570 850 Modify escalators to incorporate VSDs and time control, slowing stairs Cost-Effective
575 1532 Modify pool hall air conditioing control system to enable night setback Cost-Effective
486 6030 Modify pot startup procedures using coke/graphite to eliminate need foPotentially Cost-Effective
465 1598 Modify secondary aeration blower controls Cost-Effective
354 2898 Modify tenancty lighting controls Potentially Cost-Effective
583 3036 Modify the administration area to segregate airconditioning zones Potentially Cost-Effective
604 2276 Monitor the reduced gas and electricity consumption resulting from th Cost-Effective
363 324 Monitoring air compressor operations, to ensure miniumum number of aCost-Effective
503 888 Monitoring and Management Cost-Effective
330 431 Monitoring and Management SCADA - Electricity Cost-Effective
390 4868 More efficient water drain for compressed air receivers Potentially Cost-Effective
571 3256 Mothball pool changerooms in winter Cost-Effective
581 3941 Motion detector installation for lighting where appropriate Cost-Effective
313 3732 Motion sensor controller - carpark Cost-Effective
338 3527 Motive Drives - where cost effective intent to use efficient motors Potentially Cost-Effective
338 3528 Motive drives - where cost effective, intend to use notched type vee bePotentially Cost-Effective
477 526 Motive drives intent to use efficient motors Potentially Cost-Effective
478 754 Motive Drives intent to use efficient motors Cost-Effective
336 443 Motor Control Measures Cost-Effective
429 6562 Motor Control System for Lifts Potentially Cost-Effective
408 1204 Motor Cooling - shut down Motor CT cooling fans (11kW) when temps Potentially Cost-Effective
356 2550 Motor Efficiency Program, setup a program to ensure correct purchasePotentially Cost-Effective
378 23 Motor Load Optimisation Cost-Effective
378 19 Motor Replacement Program – Cost-Effective
408 1219 Motor rooms - interlock operation of motor room fans to Drive Motor opPotentially Cost-Effective
481 115 Motor system efficiecy program Cost-Effective
410 1769 motor system efficiency program Cost-Effective
411 2525 motor system efficiency program Cost-Effective
426 5343 motor system efficiency program Cost-Effective
323 5425 motor system efficiency program Cost-Effective
379 1166 Motor system efficiency program. Cost-Effective
414 4818 Motor System Efficiency Programme Potentially Cost-Effective
377 4854 Motor System Efficiency Programme Potentially Cost-Effective
443 5832 Motor System Efficiency Programme Cost-Effective
282 3203 Motor Systems Efficiency Cost-Effective
322 304 Motor Upgrades - Example presented for selecting 10 x 150 kw high efCost-Effective
359 460 Motor Upgrades - Example presented for selecting a 150 kw high efficiCost-Effective
297 540 Movement activate sensors for processing plant lighting Cost-Effective
485 5754 Movement detector in rooms Cost-Effective
485 5858 Movement sensor control to four labs Cost-Effective
485 5859 Movement sensor in room for split a/c Cost-Effective
485 5860 Movement sensor in two rooms split a/cs Cost-Effective
403 2334 Multi-Level Car Park Lighting Upgrade Potentially Cost-Effective
417 4389 Natrual Gas Powered Refrigeration with Cogeneration of Dryer Heat Potentially Cost-Effective
418 3441 Natural Gas Cogeneration Potentially Cost-Effective
289 6587 New 500KW steam Generator Potentially Cost-Effective
579 3973 New AC system for indoor air heating and cooling with heat exchange (Potentially Cost-Effective
489 4148 New Air compressor and pressure reduction Potentially Cost-Effective
463 1627 New air compressors. Note that this project is linked to a management Potentially Cost-Effective
598 4878 New controls for heat pump and solar pool heating systems Cost-Effective
385 1305 New energy monitoring system Cost-Effective
356 2546 New lighting method for vertical tasks Potentially Cost-Effective
322 5947 New press plattern. This produces smoother boards hence less sandingCost-Effective
341 281 New small motor HEM selection & small motor operating practices / conPotentially Cost-Effective
477 525 New smaller air compressor for non production periods (replace compressCost-Effective
341 280 New technology & controls for office and plant lighting Potentially Cost-Effective
286 74 Heat Recovery to Hot Water Potentially Cost-Effective
479 157 Ball Plant 3kHz Inverter Upgrade Cost-Effective
293 2760 Boiler Insulation Cost-Effective
286 69 Condensate Line Insulation Potentially Cost-Effective
286 77 HP Wash Up Pumps Press. Control Potentially Cost-Effective
286 60 Steam and condensate leaks Cost-Effective
286 63 Steam Line Insulation Cost-Effective
286 64 Ceiling heating Cost-Effective
286 80 Condensate Line Insulation Potentially Cost-Effective
286 78 HP Wash Up Pumps Pres. Control Potentially Cost-Effective
286 59 Machine Lead Group Pres. Control Cost-Effective
286 62 Main Slusher Agitator on Demand Cost-Effective
286 61 Steam and Condensate Leaks Cost-Effective
286 66 Steam Line Insulation Cost-Effective
372 5469 Nonworking days energy management Cost-Effective
469 470 North West two belts operation control Cost-Effective
406 5178 Mill-shut down bag house fan when galvaising not operating Cost-Effective
406 5215 Mill-Use VSD (not manual slide plate ) on 15 KW ILG fume fan to controPotentially Cost-Effective
406 5203 Mill-Use VSD on 7.5KW ILG acid scrubber fan and pump to reduce ventiPotentially Cost-Effective
406 5200 Mill- use waste heat from drying oven to dry paint. Potentially Cost-Effective
406 5213 Compressed air #4 Mill-Shut down compressor on pressure, when unloadPotentially Cost-Effective
406 5177 Galvanising fume baghouse: Limit operation of baghouse to productionCost-Effective
406 5201 Galvanising- Use VSDs on HDG combustion air blowers (2x22 KW) withPotentially Cost-Effective
406 5199 Galvanising-Install regenerative burners or recuperators on HDG zinc batPotentially Cost-Effective
406 5212 Galvanising-Replace outlet dampers with VSD to control HDG bag house Potentially Cost-Effective
406 5214 Lighting Mill-Reduce lighting levels in discussed production areas . Potentially Cost-Effective
406 5175 Site Compressors- Review site air needs as part of compressor replacemCost-Effective
406 5202 Site-Install regenerative or recuperative burners on other baths and dryePotentially Cost-Effective
406 5180 Site-limit use of lighting outside production periods Cost-Effective
406 5219 Site-Resite 4 main compressors to reduce large pressure loss. Potentially Cost-Effective
406 5176 Site-shut down 30KW cooling tower pumps out of hours Cost-Effective
406 5204 Site-Shut down hydraulic pumps during down times. Potentially Cost-Effective
406 5179 Site-Turn off compressors during downtimes Cost-Effective
406 5205 Site-VSD on 15-20 KW transformer room fan to control temperature to sPotentially Cost-Effective
408 1245 VSD on hot well pumps. Currently DCL, one starts every 3 minutes. ProPotentially Cost-Effective
408 1244 Air tower 19(12 kW) compressor runs unloaded much of the time when sPotentially Cost-Effective
408 1243 5.6 kW Zalcote combustion air blower restricted by control ,valve to Potentially Cost-Effective
408 1259 Fluidised bed furnace hood temperature 840C, no heat recovery, air intPotentially Cost-Effective
408 1260 No air connection facility to rest of mill. Compressors in facility to ope Potentially Cost-Effective
408 1242 Valve inside building to restrict flow, water recycled if :emperature too Potentially Cost-Effective
408 1254 Zinc bath no heat recovery. Opportunity for air preheating with recuperPotentially Cost-Effective
408 1261 Heat recovery on fluid bed furnace. Potentially Cost-Effective
408 1262 Heat recovery on zinc furnace. Potentially Cost-Effective
408 1248 Heat recovery or reduced flue temperature on annealing line. Flue abouPotentially Cost-Effective
408 1263 Rationalise galvanising lines operation. Two lines each run about 50% Potentially Cost-Effective
408 1250 CT fans and pumps running longer and/or harder than required by coolingPotentially Cost-Effective
408 1264 Ensure motor cooling fans are shut down when machines are idle - egPotentially Cost-Effective
408 1265 Improve gas submetering and monitor use per production. Three alreadPotentially Cost-Effective
408 1251 Nitrogen compressor appears to load and unload with nitrogen demandPotentially Cost-Effective
408 1266 No condensate return - live steam or heat exchangers with condensate tPotentially Cost-Effective
408 1267 Poor air connection N-S; small pipes, no ring main. Compressors in item Potentially Cost-Effective
408 1252 Shut down ventilation fan(s) when not needed. Lots of small ans 5.5 k Potentially Cost-Effective
408 1271 Use waste heat rather than steam for process applications Potentially Cost-Effective
408 1246 Wire drawing - CT continue running during down time - eg zinc plant Potentially Cost-Effective
292 4362 O2 trim control Potentially Cost-Effective
293 2766 O2 trim control and VSD's on fans Potentially Cost-Effective
493 6077 Occupancy Control of lighting & heating systems Potentially Cost-Effective
493 6222 Occupancy control of lighting in offices and lecture teaching rooms Potentially Cost-Effective
333 1904 Occupancy Controls Cost-Effective
445 4198 Occupancy controls on lighting Cost-Effective
282 3197 Occupancy sensor for conference room lighting Potentially Cost-Effective
372 5475 Occupancy Sensors Cost-Effective
570 861 Off control of manually switched HVAC plant Cost-Effective
379 1193 Office AHU suppy fan VSD Potentially Cost-Effective
494 4230 Office and other equipment initiatives Cost-Effective
384 1962 Office Area Halogen Dichroic Lighting Replacement Potentially Cost-Effective
379 1169 Office boiler and chiller supervisory control Cost-Effective
377 4849 Office building air conditioning economy cycle Potentially Cost-Effective
366 5680 Office Lighting dimming system upgrade Option 1. There are approximatelyCost-Effective
377 4843 Office lighting timer control reprogramming Cost-Effective
377 4850 Office lighting voltage control Potentially Cost-Effective
470 4528 Office Refurb/replace troffers Cost-Effective
470 4529 Offices refurb 50W to 35W downlights Cost-Effective
570 854 Offices/Reception areas lighting - voltage reduction Cost-Effective
323 5417 Old stock house Cost-Effective
321 289 Ongoing motor replacement (HEM). Example of 5 x 150 kW units. MarCost-Effective
322 300 Ongoing optimisation of Refiners including enhanced operational contrCost-Effective
325 761 Operate one duty ventilation fan at mine Cost-Effective
604 2277 Operate the Mercury Fountain periodically thought the day on a time duCost-Effective
604 2259 Operate the solar heating system automatically as the first stage of heatCost-Effective
604 2264 Operate two Hall air conditioners from the average temperature in the Cost-Effective
371 356 Operate two main pumps - NH3 storage CT Cost-Effective
368 1445 Operating and Maintenance Procedures: Optimise ON/OFF Control of Cost-Effective
368 1449 Operating and Maintenance Procedures: Optimise ON/OFF Control of MPotentially Cost-Effective
368 1450 Operating and Maintenance Procedures: Optimise ON?OFF Control of UPotentially Cost-Effective
368 1448 Operating and Maintenance Procedures: review Ventilation Run Hours aPotentially Cost-Effective
311 618 Change plant regime to operate Crushing Plant at full capacity Cost-Effective
311 619 Increase capacity of two sand pumps to enable 24% increase in CrushingPotentially Cost-Effective
311 616 Reduce lost time by 12% to improve Plant throughput and avoid energy lCost-Effective
311 615 Fit ultrasonic or radar sensor to control the overflow crusher to avoid Cost-Effective
311 614 Shut down pump 4 and screen 3 when transfer is complete and controCost-Effective
311 612 Reconfigure process water pumps to reduce operating times made possCost-Effective
311 611 Install level control to header tank supplied by 150mm water pump (ie Cost-Effective
280 4266 Operation of Dessicant dryer. Investigate further Potentially Cost-Effective
280 4260 Operation of existing fans with VSDs (needs specialist resource) Potentially Cost-Effective
280 4238 Operation of HP air compressors Cost-Effective
280 4239 Operation of LP air compressors Cost-Effective
311 617 Reduce lost time (eg from meal breaks, stockpile full, lack of stone, Cost-Effective
311 613 Change current interlocks to allow mannual control to stop unecessaryCost-Effective
495 1295 Operators to isolate chilled water to extrusion line when not in use Cost-Effective
347 1739 opportunistic installation of high efficiency motors Potentially Cost-Effective
346 3811 opportunistic installation of high efficiency motors Potentially Cost-Effective
347 1740 opportunistic installation of T5 lighting Potentially Cost-Effective
346 3824 Opportunistic installation of T5 lighting (Lab & Offices) Potentially Cost-Effective
346 3812 Opportunistic installation of T5 lighting (plant) Potentially Cost-Effective
578 6546 Opportunistic metering of unmetered sites Potentially Cost-Effective
578 6551 Opportunistic metering of unmetered sites Potentially Cost-Effective
578 6553 Opportunistic replacement of fluorescent lamps with T5 fittings Cost-Effective
481 114 Optima area lighting control Cost-Effective
377 4846 Optimal air compressor control Potentially Cost-Effective
443 5825 Optimal Chiller Control Cost-Effective
405 2348 Optimal Control of LP Blowers Cost-Effective
463 1620 Optimisation of sewage pump operations Cost-Effective
462 1614 Optimisation of sewage pump selection Cost-Effective
453 1071 Optimise air conditioning operating times in Bus Bays Cost-Effective
591 1854 optimise air conditioning controls and rebalancing system Cost-Effective
396 643 Optimise auto shutdown on major truck dump Cost-Effective
485 5878 Optimise BMS control functions Cost-Effective
423 2559 Optimise chilled water supply temperature Potentially Cost-Effective
570 805 Optimise CHW and condenser water chiller control Cost-Effective
312 784 Optimise control of three chillers located in the boilerhouse. Cost-Effective
485 5857 Optimise Lecture theatre duct heater ops Cost-Effective
485 5856 Optimise Lecture threatre economy cycle Cost-Effective
453 1072 Optimise lighting operating times in Bus Bays Cost-Effective
371 368 Optimise cooling water pumps Potentially Cost-Effective
371 369 Optimise cooling water pumps Potentially Cost-Effective
462 1615 Optimise Operation of VSD speed setpoints on Odour Scrubber Fans Cost-Effective
300 2290 Optimise plant allocation based on feed rate. Schedule plant to minimisePotentially Cost-Effective
424 4244 Optimise rail delivery conveyors and stackers. Automate and OptimiseCost-Effective
569 3644 Optimise reclaim water pump operation Cost-Effective
424 4243 Optimise road delivery conveyors and stackers. Automate and OptimisCost-Effective
337 881 Optimise scheduling of compressors Cost-Effective
485 5893 Optimise the operation of the rundown timers Cost-Effective
285 1564 Optimise the speed of the bodymaker filter mesh fan - re-size pulley Cost-Effective
285 1565 Optimise the speed of the old incinirator vent fan - re-size pully Cost-Effective
422 726 Optimise warehouse heating controls, destratification fans and potential Potentially Cost-Effective
340 3899 Optimising controls and maintenance of lighting systems Potentially Cost-Effective
485 5923 Optimum start/stop and scheduling of A/c Cost-Effective
443 5829 Orders Department Economy Cycle Cost-Effective
328 245 Other Pump Control Opportunities - eg VSD / Variable Displacement pPotentially Cost-Effective
485 5741 Outside air compensation on the heating for two lecture theathres and Cost-Effective
354 2893 Outside air dampers Cost-Effective
328 240 Overland conveyor delivery optimisation Cost-Effective
284 4036 Oxygen enrichment to reduce gas consumption Cost-Effective
563 5547 Install new thermostat with accuracy to +-0.5 degC Cost-Effective
563 5549 Install new thermostat with accuracy to +-0.5 degC Cost-Effective
563 5536 VSDs for 2 filtration pumps Cost-Effective
563 5550 Install several pool covers on the smallest pool, and regular use of pooCost-Effective
563 5548 Install several pool covers on the smallest pool, and regular use of the Cost-Effective
563 5519 Turn off 1 HW circulation pump when 1 boiler runs, and run 1 filtratio Cost-Effective
408 1240 11kW P2 acid scrubber fan on continuously, flow could be reduced durPotentially Cost-Effective
408 1239 11kW P2 zinc combustion air blower on continuously vanes restricted Potentially Cost-Effective
408 1225 Ensure zinc bath is covered with vermiculite (not covered during inspecCost-Effective
408 1229 Some fans left on that don't need to be while plant is down, eg entry a Cost-Effective
408 1233 37 -45kW plant air blower providing trench and lead bath cooling on c Cost-Effective
563 5538 Pool covers for indoor and outdoor pools Cost-Effective
396 627 Drier auto shut-down when idle time exceeded Cost-Effective
396 622 Auto shut-down when idle running timer exceeded Cost-Effective
443 5828 Packaging Area Economy Cycle Cost-Effective
443 5827 Packaging Area VSD Cost-Effective
292 4333 Packing air conditioning set point Cost-Effective
293 2770 Packing line conveyor control Potentially Cost-Effective
292 4359 Packing line conveyor control Potentially Cost-Effective
498 2828 Paper machines optimisation study Cost-Effective
481 113 Paper store control lighting Cost-Effective
463 1625 PAR Project: Treating screenings below ground Potentially Cost-Effective
511 4553 Paste Thickener Cost-Effective
485 5876 PBT control on the staff room 727 lights Cost-Effective
485 5919 PBT for two rooms Cost-Effective
485 5921 PBT for Tutorial Room Cost-Effective
404 2757 PE cell control of perimeter lighting Potentially Cost-Effective
506 4280 PE Lighting Controls - PE control of selected interior mall and perimeterCost-Effective
505 4376 PE Lighting Controls - PE control of selected interior mall and perimeterCost-Effective
297 546 Peak load shedding on refrigeration compressors with third party sellinPotentially Cost-Effective
563 5540 PF- Inspect and test existing power factor correction equipment, upgraCost-Effective
563 5521 PF- Install 250kVAr power factor correction equipment Cost-Effective
282 3201 Phase Balance Cost-Effective
439 3293 Phase out use of compressed air in aligning tins to filling machine Cost-Effective
327 450 Phase out utilisation of air operated diaphragm pumps for mine dewaterPotentially Cost-Effective
453 1080 Photelectric cell control of lights near skylights and windows. Cost-Effective
455 1924 Photo sensor installation in Western office, Ground Floor; using proposePotentially Cost-Effective
485 5844 Photo-sensor lighting control to select perimeter aeras Cost-Effective
293 2773 Pipe insulation air conditioned areas Potentially Cost-Effective
293 2771 Pipework insulation Potentially Cost-Effective
291 4286 Pipework insulation Cost-Effective
292 4347 Pipework insulation Cost-Effective
597 5717 Place day-light sensor or timer controls on the up-lighting in the front a Cost-Effective
573 3461 Place non-perishable drinks fridges and vending machines on timer swPotentially Cost-Effective
573 3423 Place the central up-lights on a light-sensor override (so thay are alwaysPotentially Cost-Effective
573 3444 Planned - Upgrade of building's HVAC systems (8-12 reverse cycle unitsPotentially Cost-Effective
363 333 Planning to increase capacity of pot lines Potentially Cost-Effective
515 4646 Plant Control System upgrade Potentially Cost-Effective
379 1196 Plenum #1 and #2 fan VSD Potentially Cost-Effective
565 5259 Pool & Mech Potentially Cost-Effective
444 4033 Pool cover Cost-Effective
561 2704 Pool heating boiler replacement Cost-Effective
566 2011 Pool solar heating system Potentially Cost-Effective
566 2013 Pool solar heating system Potentially Cost-Effective
565 4159 Pool VSD Cost-Effective
495 1300 Portable blowers for extrusion plant Potentially Cost-Effective
318 4451 Power Demand Improvement Cost-Effective
324 1658 power factor correction Cost-Effective
431 2123 Power Factor Correction Cost-Effective
331 2139 Power Factor correction Potentially Cost-Effective
602 2776 Power factor correction Cost-Effective
602 2778 Power factor correction Cost-Effective
505 4378 Power Factor Correction - Install PFC equipment (160KVAR) at main swPotentially Cost-Effective
329 1662 power factor correction Cost-Effective
342 1158 Power factor correction equipment Potentially Cost-Effective
469 476 Power Factor Correction for new main ventilation system Cost-Effective
328 247 Power factor correction on overland conveyor supply Potentially Cost-Effective
328 243 Power Factor Correction Shaft 3 Potentially Cost-Effective
328 244 Power Factor Correction Sub0 Potentially Cost-Effective
356 2554 Power Factor Correction,installation fo Approx 1,850 KVAR of capacitors.Potentially Cost-Effective
416 407 Power factor correction. Cost-Effective
433 3854 Power Factor upgrade from 0.91 to 0.96 Potentially Cost-Effective
400 1736 Power generation from steam by installing backpressure turbine betw Potentially Cost-Effective
294 1646 Pre heat East boiler water feed water with waste heat from the processCost-Effective
294 1647 Pre heat West boiler feed water with waste heat from the boiler blowd Cost-Effective
386 4066 Precinct Central Chiller Cost-Effective
312 791 Precision combustion control on each steam boiler in the boilerhouse. Potentially Cost-Effective
441 2225 Pre-condition (space temperatures) for Disaster Recovery Room (mainlCost-Effective
401 703 Pre-crushing mill feed - By reducing the mill feed top-size from 90mm toPotentially Cost-Effective
319 2420 Pre-heat combustion air for 10MW Boiler Potentially Cost-Effective
338 3526 Pressure settings for 6 Bar system is currently 7 Bar. Review to asce Potentially Cost-Effective
514 4611 Pre-strip Productivity Team Cost-Effective
574 5131 Prevent unnecessary operation of air conditioning Cost-Effective
401 701 Examine the potential benefit of moving the first stage cyclone underfloPotentially Cost-Effective
443 5831 Printing Area Economy Cycle Cost-Effective
293 2764 Process hot water system Potentially Cost-Effective
511 4552 Product Centrifuge Cost-Effective
382 3653 Product transfer VSD control - dehydrated tar circulating pump Cost-Effective
382 3712 Product transfer VSD control - pitch reboiler pump Potentially Cost-Effective
382 3656 Product transfer VSD control - soft pitch feed pump Cost-Effective
382 3655 Product transfer VSD control - Tar Feed Pump Cost-Effective
382 3654 Product transfer VSD control - Tar Reboiler Pump Cost-Effective
401 698 Proflote technology - The Proflote system uses innovative technology toCost-Effective
453 1065 Program automatic boiler cut-off when ambient temperature high in B Cost-Effective
453 1112 Program automatic boiler cut-off when ambient temperature high in B Cost-Effective
597 5720 Program the BMS to turn off lighting at the front of the building. CurrentCost-Effective
389 4139 Promote energy conservation & awareness Cost-Effective
455 1914 proposed chiller strategy Cost-Effective
575 1530 Provide 7-day time switch to switch of domestic hot water circulation p Cost-Effective
575 1528 Provide 7-day time switch to switch off air conditioning unit overnight. Cost-Effective
457 5244 Provide a new small air cooled chiller to replace obsolete Carrier chille Potentially Cost-Effective
457 5235 Provide automatice control to switch lights off in main staff dining ro Cost-Effective
575 1514 Provide carbon monoxide (CO) monitoring system to control car park meCost-Effective
575 1505 Provide carbon monoxide (CO) monitoring system to control car park mePotentially Cost-Effective
404 2750 Provide light switch signage Cost-Effective
459 5195 Provide lighting control in small offices, administrative areas and cons Potentially Cost-Effective
457 5245 Provide lighting control in small offices, administrative areas and cons Potentially Cost-Effective
604 2236 Provide more specific instructions to staff on office equipment manage Cost-Effective
604 2248 Provide more specific instructions to staff on office equipment manage Cost-Effective
604 2279 Provide more specific instructions to staff on office equipment manage Cost-Effective
604 2286 Provide more specific instructions to staff on office equipment manage Cost-Effective
459 5185 Provide new automatic sequencing controller for management of main cCost-Effective
396 657 Provide operator capability to turn off conveying between fillers and c Potentially Cost-Effective
592 1404 Provide pool covers on olympic pool. Cost-Effective
575 6033 Provide solar preheating for pool water Potentially Cost-Effective
592 1396 Provide temp. reset, demand savings and deadband modicfications on Potentially Cost-Effective
575 1498 Provide variable speed drive for air conditioner condenser water pump Potentially Cost-Effective
575 1518 Provide variable speed drive for condenser water pump Potentially Cost-Effective
471 706 Provide variable speed drives for 2 main building chilled water pumps Cost-Effective
471 705 Provide variable speed drives for 2 studio chilled water pumps Cost-Effective
457 5234 Provide variable speed drives for chilled water and condenser water p Cost-Effective
459 5196 Provide variable speed drives for cooling tower fans Potentially Cost-Effective
381 675 Provide water to water heat exchangers to allow condenser water coolingPotentially Cost-Effective
280 4256 Pulse bubblers SP4 Cost-Effective
572 3123 Pump 2 is scheduled to be replaced. This will bring a 5% saving in enerPotentially Cost-Effective
572 3122 Pump 3 is scheduled to be replaced. This will bring a 5% saving in enePotentially Cost-Effective
360 3479 Purchase a smaller air compressor and install a more efficient rimmer Potentially Cost-Effective
352 2338 Purchase and install smaller compressor as determined by review Cost-Effective
360 3478 Purchase multi-purpose reactor PET drier for the existing extruder Potentially Cost-Effective
319 2414 Purchase of hand held steam trap monitor to allow weekly checks of s Cost-Effective
598 4888 Push button time delay switches to control AC unit Cost-Effective
485 5880 Push button timer control of twp training room air conditioners Cost-Effective
485 5800 Push button timers for acoustic lab a/c Cost-Effective
358 3093 Put all computers in disaster recovery centre on a central switch for Cost-Effective
305 962 Put common variable speed drives on BOS First DC pumps Potentially Cost-Effective
305 961 Put variable speed drives on BOS First Stage Dust Collection pumps Potentially Cost-Effective
565 5293 PV Potentially Cost-Effective
579 4003 Quad 36W fluorescent fitting refurbished to twin 37W quad lamp with refCost-Effective
305 945 Enable power saving feature on all PC's Cost-Effective
305 946 Turn off single room A/C units Cost-Effective
293 2767 Rapid shut doors cold room Potentially Cost-Effective
292 4356 Rapid shut doors cold room Potentially Cost-Effective
295 5323 Rationalising air compressor control Cost-Effective
511 4551 Raw Coal Feed Upgrade Cost-Effective
512 4586 Raw coal shutdown on no coal Cost-Effective
407 3724 Raw materials - use VSD (not inlet vane control) to slow materials handPotentially Cost-Effective
281 3144 RDX cooling water Cost-Effective
281 3143 RDX vacuum Cost-Effective
281 3145 RDX water supply pumps Cost-Effective
485 6612 Rearrange light switching in the Levels 2 and 3 foyers so that only acceCost-Effective
578 6544 Rearrangement of lighting circuits Cost-Effective
408 1203 Rec Yard - Turn off 50 high bays lights outside production periods. Cost-Effective
453 1118 Recalibrate space temperature sensors Cost-Effective
290 3405 Re-calibrate the automatic TDS senors Cost-Effective
570 804 Recommission AHU pressure control strategy Cost-Effective
453 1078 Recommission system and evaluate upgrade options. Cost-Effective
561 2696 Re-commission and fine tune the HPM Wizard automatic light control sPotentially Cost-Effective
570 808 Recommission boiler controls and heating valves Cost-Effective
367 5499 Re-commission CRAC unit environmental controls Cost-Effective
570 799 Recommission domestic hot water (DHW) controls Cost-Effective
453 1114 Re-commission existing T2 voltage control sytems Cost-Effective
304 4787 Re-commission fuzzy logic Cost-Effective
570 806 Recommission outside economy air-cycles Cost-Effective
448 3755 Re-commissioning existing lighting controls (time settings, holidays setCost-Effective
570 830 Recommissioning of chiller control strategy Cost-Effective
492 4109 Recommissioning Cost-Effective
492 4097 Recommissioning Cost-Effective
492 4098 Recommissioning Cost-Effective
307 31 Recondensing of vented oxygen Potentially Cost-Effective
402 3840 Reconfigure bloodmeal process flow to allow replacement of 55kW motPotentially Cost-Effective
291 4298 Recover additional steam condensate-evap.building Potentially Cost-Effective
291 4289 Recover evaporator condensate to boiler feedwater Cost-Effective
417 4396 Recover Flash Steam from Germ Dryer Potentially Cost-Effective
417 4397 Recover Flash Steam from Gluten Dryer Potentially Cost-Effective
318 4449 Recover heat from the flue gases and utilise for heating the feed water tPotentially Cost-Effective
594 5067 Recover heat loss from 25m pool exhaust system Cost-Effective
594 5068 Recover heat loss from female change room exhaust system Cost-Effective
594 5070 Recover heat loss from pool exhaust system Cost-Effective
594 5061 Recover heat loss from male change room exhaust system Cost-Effective
317 4472 Recover preparation area flash steam during sunflower processing Cost-Effective
462 1617 Recovery of benefit for cogen exports Cost-Effective
571 3272 Rectify AHU 2 damper operation Cost-Effective
485 5739 Rectify operation of the heating hot water pump Cost-Effective
504 583 Recuperative burners for HT Furnace - Foundry Cost-Effective
504 582 Recuperative burners for HT Furnace - Foundry Cost-Effective
504 581 Recuperative burners for HT Furnace - Foundry Cost-Effective
433 3849 Recycle evaporation water from stick water process Cost-Effective
304 4793 Recycle kiln dust into finished product Potentially Cost-Effective
304 4799 Recycle spillage from pre-heater Potentially Cost-Effective
563 5586 Redefine operating hours - Control and AC modification Cost-Effective
569 3613 Reduce air conditioner hours- change winter start-up from 4am to 7am Cost-Effective
574 5141 Reduce air conditioning operating times Cost-Effective
337 882 Reduce air leakage throughout site. Cost-Effective
337 885 Reduce air supply pressure. Potentially Cost-Effective
429 6561 Reduce and replace existing HWS Potentially Cost-Effective
309 2661 Reduce board grammage Cost-Effective
284 4056 Reduce charge time Potentially Cost-Effective
461 1591 Reduce compressed air leaks Potentially Cost-Effective
317 4475 Reduce compressed air pressure Cost-Effective
485 5771 Reduce domestic hot water from 70C to 60C Cost-Effective
397 3995 Reduce electricity consumption of external lights Cost-Effective
397 4012 Reduce electricity consumption of sump pumps by restoring automatic Potentially Cost-Effective
571 3328 Reduce hot water temperature in the sites main crib room and bathroo Cost-Effective
280 4259 Reduce HP air pressure (review after reduction opportunities completePotentially Cost-Effective
330 435 Reduce Idle Load on Conveyors and Plant Cost-Effective
503 488 Reduce Idle Load on Conveyors and Plant Cost-Effective
360 3471 Reduce idle time of chillers on plastic line Cost-Effective
341 276 Reduce idle time of mills, associated blowers and vent units via impro Cost-Effective
327 446 Reduce leaks in underground compressed air piping Cost-Effective
457 5238 Reduce lighting intensity in Medical Records to 320 lux level to reduc Cost-Effective
486 235 Reduce metal left in stopped pots requiring remelt Potentially Cost-Effective
396 631 Reduce mixing of Dye colour tanks Cost-Effective
371 354 Reduce operation of ammonia CT fans Cost-Effective
465 1605 Reduce operation of anoxic zone mixers Potentially Cost-Effective
461 1586 Reduce operation of RE pumps Cost-Effective
594 5059 Reduce operation time of Gas Boiler Cost-Effective
348 3254 Reduce outlet temperature of Electric Hot Water Heaters Cost-Effective
506 4334 Reduce Outside Air - Investigate the reduction of O/A requirement throuPotentially Cost-Effective
284 4048 Reduce pit cycle time, soak time Cost-Effective
500 508 Reduce plant air leaks Cost-Effective
562 2066 Reduce pool temperature by 2 degrees celsius to 30 degrees celsius Cost-Effective
573 3425 Reduce pool temperature set points by 1c (26-27C) Potentially Cost-Effective
593 4871 Reduce pool temperature to 26C Cost-Effective
604 2243 Reduce pool temperatures by 1°C throughout the year Cost-Effective
594 5066 Reduce pool water temperature Cost-Effective
595 5438 Reduce pool water temperature Cost-Effective
291 4306 Reduce refrigeration load- Air con. Evap. Building Potentially Cost-Effective
291 4304 Reduce refrigeration load- Rapid shut doors cold room Potentially Cost-Effective
291 4290 Reduce refrigeration load-Chilled water leaks Cost-Effective
291 4291 Reduce refrigeration load-loss of chilled water for cheese Cost-Effective
337 884 Reduce rework of fibreboard by 300 tonne target per month. Cost-Effective
567 1990 Reduce Run Hours Cost-Effective
284 4057 Reduce scrapped coils Potentially Cost-Effective
561 2714 Reduce temperature of the hot water system Cost-Effective
571 3303 Reduce the building's hot water temperature Cost-Effective
604 2253 Reduce the chiller condenser water set point in accordance with the m Cost-Effective
571 3349 Reduce the dam pump operations by installing movement detector Potentially Cost-Effective
571 3316 Reduce the grandstand & function centre's entrance foyer lighting operaCost-Effective
562 2069 Reduce the hot water temperature to 60 degrees celsius Cost-Effective
571 3248 Reduce the infriltration through the ceiling vents Potentially Cost-Effective
571 3345 Reduce the operation of the farm hall hot water by installing a run on t Cost-Effective
571 3342 Reduce the operation of the lighting in the nursery building by installingCost-Effective
604 2247 Reduce the plant room domestic hot water temperature to 60°C Cost-Effective
604 2258 Reduce the plant room domestic hot water temperature to 60°C Cost-Effective
604 2251 Reduce the push button timer control of fan coil units serving areas o Cost-Effective
571 3336 Reduce the temperature of the building trade's hot water system and instaCost-Effective
571 3334 Reduce the temperature of the city works kitchen hot water system Cost-Effective
561 2733 Reduce the temperature of the hot water system Cost-Effective
561 2732 Reduce the temperature of the hot water system in the Women's Rest Cost-Effective
561 2738 Reduce the temperature of the residential laundry's hot water system. Cost-Effective
571 3319 Reduce the trotting club's lighting operations to when it is required Cost-Effective
493 6243 Reduce time delay on lighting control Potentially Cost-Effective
284 4051 Reduce time doors are open (work practices) Cost-Effective
513 4599 Reduce time taken to shut down crusher at end of shift Cost-Effective
309 2660 Reduce time to do a size change (1Hr to 0.5Hr) Cost-Effective
360 3470 Reduce unnecessary idle time on the grinding motors Cost-Effective
500 512 Reduce warehouse lighting Potentially Cost-Effective
380 266 Reduced Chilled Water load by increasing operational setpoint of FDU Cost-Effective
380 263 Reduced Chilled Water load by increasing operational setpoint of Que Cost-Effective
359 466 Reduced compressed air for cleaning Potentially Cost-Effective
486 234 Reduced generation of scrap metal quads requiring remelt through impPotentially Cost-Effective
424 4254 Reduced lighting Potentially Cost-Effective
485 5806 Reduced voltage control on fluorescent lighting Cost-Effective
485 5883 Reduced voltage control on fluorescent lighting Cost-Effective
380 264 Reduction in compressor discharge pressure Cost-Effective
380 265 Reduction in Extruder Discharge pressure Cost-Effective
597 5692 Refine pool temp operation with aim to reduce set points by average 1 Cost-Effective
378 18 Refiner – Improve the pre-steaming of the chip which inturn will reduc Cost-Effective
305 942 Refractory Services - Computers off at the end of the day Cost-Effective
305 943 Refractory Services - Lights off at the end of the day (only appropriate lCost-Effective
305 944 Refractory Services - Turn off single room A/C units Cost-Effective
318 4457 Refrigeration system optimisation Potentially Cost-Effective
582 4741 Refurbish 1 x 36W twin fitting in the staff lunchroom and 2 x 36W twin fittiCost-Effective
591 1794 refurbish 11 50W low voltage downlights to 35W IRC + EL tranny for 2ndCost-Effective
591 1853 refurbish 15 50W low voltage downlights to 35W IRC+EL transformer in 1Cost-Effective
591 1826 refurbish 25 2x36W plaster troffers 1x36W KW2 +Y19 in main office Cost-Effective
584 5621 Refurbish 250 MH fittings with 150W MH fittings Cost-Effective
582 4746 Refurbish 30 x 36W twin fittings. Cost-Effective
582 4791 Refurbish 40 x 36W twin fittings to single fittings in the offices and pla Potentially Cost-Effective
584 5620 Refurbish 400W MV fittings with 250W MH fittings Cost-Effective
591 1803 refurbish 41 20W low voltage downlights with 35W globes IRC +EL trannPotentially Cost-Effective
582 4760 Refurbish 6 x 36W twin fittings to single fittings. Cost-Effective
591 1843 refurbish 7 50W low voltage downlights to 35W IRC +EL transformer Cost-Effective
582 4756 Refurbish 9 x 36W twin fittings to single fittings (Main Building). Cost-Effective
582 4765 Refurbish 9 x 36W twin fittings to single fittings in the offices and play Cost-Effective
569 3670 Refurbish all 50w LV fittings Cost-Effective
584 5639 Refurbish carpark office light fittings from twin to single fittings Cost-Effective
472 4272 Refurbish fluorescent light fittings in the corridors and lift lobbies. Cost-Effective
474 4365 Refurbish fluorescent light fittings in the corridors and lift lobbies. Cost-Effective
475 4375 Refurbish fluorescent light fittings in the corridors and MDF. Cost-Effective
473 4346 Refurbish fluorescent light fittings in the corridors, offices and foyer. Cost-Effective
569 3625 Refurbish light fittings Cost-Effective
591 1786 refurbish light fittings in main foyer-replace 42 50W globes with 35W g Cost-Effective
294 1641 Refurbish Low Bays light fittings as per report Cost-Effective
584 5643 Refurbish metal halide fittings Cost-Effective
582 4675 Refurbish quad fluorescent light fittings to single fittings. Potentially Cost-Effective
582 4809 Refurbish twin fittings to single fittings in the administration offices. Potentially Cost-Effective
582 4732 Refurbish twin fluorescent light fittings from twin fittings to single fittingsPotentially Cost-Effective
582 4734 Refurbish twin fluorescent light fittings from twin fittings to single fittingsPotentially Cost-Effective
582 4736 Refurbish twin fluorescent light fittings from twin fittings to single fittingsPotentially Cost-Effective
582 4690 Refurbish twin light fittings to single fittings – in one building. Potentially Cost-Effective
584 5660 Refurbishment fluorescent light fittings in carpark Cost-Effective
604 2234 Refurbishment of water cooled packaged air conditioners with a new chCost-Effective
305 964 Regulate slab water cooler flow based on water temperature Potentially Cost-Effective
408 1200 Reheat Furnace - Continuous excess oxygen monitoring to minimisw eCost-Effective
407 3722 Reheat furnace - direct rolling of billets from caster Potentially Cost-Effective
407 3714 Reheat furnace - Hot charging of billets Cost-Effective
408 1202 Reheat Furnace - improve furnace sealing - doors (staying open), and pCost-Effective
408 1222 Reheat Furnace - improve furnace sealing around loading arms Potentially Cost-Effective
407 3720 Reheat furnace - improve operation of tempering air fan. Fan runs contiPotentially Cost-Effective
408 1214 Reheat Furnace - increase recuperators operating temperature Cost-Effective
408 1217 Reheat furnace - install continuous excess oxygen monitoring Cost-Effective
408 1198 Reheat Furnace - install regenerative burners Cost-Effective
407 3717 Reheat furnace - install regenerative burners Cost-Effective
408 1211 reheat furnace - install regenerative burners. Cost-Effective
408 1201 Reheat Furnace - Maximise heat transfer in recuperator by determiningCost-Effective
408 1207 Reheat furnace - Provide better flame supervision to enable turndown Potentially Cost-Effective
407 3719 Reheat furnace - reduce discharge door open time - observed to be opePotentially Cost-Effective
408 1215 Reheat furnace - reduce furnace push-out door pen times Cost-Effective
407 3723 Reheat furnace - use direct measurement of stock temp to control furn Potentially Cost-Effective
407 3715 Reheat furnace - VSD on Combustion Air Fan Cost-Effective
407 3713 Reheat furnace - Warm Charging of billets Cost-Effective
445 4190 Re-instate CHW valves on theatre AHU's - electricity savings Cost-Effective
445 4191 Re-instate CHW valves on Theatre AHU's - gas savings Cost-Effective
485 5896 Re-instate disconnected movement sensor control on examination room Cost-Effective
485 5736 Re-instate the economy cycle control for selected systems Cost-Effective
570 851 Reinstate time switch control of ventilation fans Cost-Effective
591 1827 relamp 18 50W LV spotlights with 35W IRC lamps in main office Cost-Effective
593 4895 Re-lamp existing twin fluorescent 36W fittings with 28W T5 Save It EasPotentially Cost-Effective
593 4905 Relamp incandescent lamps with compact fluorescent lamps Cost-Effective
580 5183 Relamp with one less lamp and install ultrasonic motion detection devi Cost-Effective
481 117 Relative humidity control Potentially Cost-Effective
485 5758 Relocate motion sensors to get better perfomance Cost-Effective
324 1656 relocate water pump from main dam to settling ponds Cost-Effective
515 4645 Relocation of crusher and conveyor 1099 Cost-Effective
578 6549 Removal and replacement of existing light fittings as per ECS specificaPotentially Cost-Effective
492 4101 Removal of DHW from hand basins in all but disabled toilets. Cost-Effective
295 5320 Remove air leaks in compressed air system Cost-Effective
570 6493 Remove leaking 50 litre hot water heater and connect piping to existin Cost-Effective
445 4204 Remove primary brine loop from chiller 1&2 Potentially Cost-Effective
580 5414 Remove the empty commercial fridge or turn off when not being used Cost-Effective
509 6501 Remove/Isolate SMC Desiccant Dryer Cost-Effective
433 3860 Rendering belt conveyor wash-pulsed Potentially Cost-Effective
504 606 Renewable Energy - solar pv array - 200 kW Potentially Cost-Effective
459 5197 Renewal of Carrier R11 Chiller no.5 Potentially Cost-Effective
420 3132 Renovate Lighting on Surface Buildings Cost-Effective
280 4258 Repair air leaks Cost-Effective
433 3851 Repair co-generator Cost-Effective
604 2280 Repair compressed air leaks and isolate compressors out of hours Cost-Effective
420 3136 Repair cooling tower controls to shut down unneeded towers Cost-Effective
453 1129 Repair corroded HHW 3-way control valve Cost-Effective
445 4210 Repair large steam leak Potentially Cost-Effective
305 1014 Repair leakage Potentially Cost-Effective
453 1134 Repair Leaking HHW 2-way control valves Cost-Effective
327 447 Repair leaks in compressed air piping on surface Cost-Effective
485 5908 Repair odour problem and install push button timers with movement seCost-Effective
368 1444 Repair of major air leaks and optimisation of air distribution system Cost-Effective
338 3522 Repair outdoor lighting contorl Cost-Effective
580 5280 Repair outside air damper - activate ECO cycle Cost-Effective
291 4288 Repair passing steam traps Cost-Effective
604 2246 Repair potable hot water circulating pump Cost-Effective
445 4196 Repair small steam leak Cost-Effective
291 4287 Repair steam and condensate leaks Cost-Effective
305 1010 Repair steam leaks Potentially Cost-Effective
305 1012 Repair steam traps Potentially Cost-Effective
445 4203 Repipe condensate for hydrotherapy pool to condensate return tank Potentially Cost-Effective
439 3292 Re-piping retort cooling systems to minimise mixing Cost-Effective
575 1526 Replace low efficiency shower heads with high efficiency low flow heaCost-Effective
591 1819 replace 10 2x36W battens with 1x36W EL+KW2 diffused battens in groCost-Effective
591 1838 replace 10 2x36W reflector battens with 1x36W EL+KW2 reflector batt Potentially Cost-Effective
591 1831 replace 10 2x58W reflector battens with 2x36W EL+KW2 reflector battePotentially Cost-Effective
586 5986 Replace 1000W Up Lights with 250W Metal Halides Potentially Cost-Effective
570 6496 Replace 100W halogen wall lamps with 23W CFLs in the foyers Cost-Effective
591 1836 replace 11 2x36W reflector battens with 1x36W EL+KW2 reflector batt Potentially Cost-Effective
591 1841 replace 11 HL 400W MV with 250W PSMH with light switch Potentially Cost-Effective
491 742 Replace 125 watt street lights with 70 watt HPS (progressive) Cost-Effective
591 1828 replace 13 2x36W battens with 1x36W EL KW2 diffused battens in mainCost-Effective
591 1830 replace 13 2x36W battens with 1x36W EL+KW2 diffused battens in stoPotentially Cost-Effective
591 1822 replace 14 2x36W battens with 1x36W EL+KW2 EP fittings Cost-Effective
591 1823 replace 14 2x36W battens with 1x36W EL+KW2 EP fittings in section ofPotentially Cost-Effective
592 1406 Replace 150W Metal Halide lamps with 40W CFL Cost-Effective
591 1858 replace 16 2x36W battens with 1x58W EL+KW2 WG fittings in 1st floorPotentially Cost-Effective
591 1839 replace 18 2x36W reflector battens with 1x36W EL+KW2 reflector batt Potentially Cost-Effective
591 1813 replace 1x36W LL with 2x36W EL+KW2 in 2nd floor toilets Potentially Cost-Effective
591 1835 replace 2 2x36W battens with 1x36W EL+KW2 diffused battens Potentially Cost-Effective
591 1790 replace 2 2x36W LL with 1x36W EL+KW2 in first floor sick room Cost-Effective
298 2159 Replace 2 speed motor on meals intake drag with VSD to allow greater fCost-Effective
591 1852 replace 20 2x36W T-Bar troffer with 1x36 EL KW2 troffers in communitPotentially Cost-Effective
419 2120 Replace 20W Halogen Dichroic Lamps with 7W LED Lamps Potentially Cost-Effective
591 1840 replace 24 2x36W reflector battens with 1x36W EL+KW2 reflector batt Potentially Cost-Effective
584 5656 Replace 250W metal halide light fittings with 37W twin quadphosphor ligCost-Effective
591 1818 replace 2x36W battens with 1x36W EL+KW2 diffused battens in variouCost-Effective
591 1856 replace 2x36W fittings with 1x36 EL KW2 EP fittings in various offices Potentially Cost-Effective
591 1804 replace 2x36W LL with 1x36W EL+KW2 in ground floor foyer behind coPotentially Cost-Effective
591 1845 replace 2x36W T-Bar troffer with 1x36 EL KW2 troffers in lift foyer Cost-Effective
591 1851 replace 2x36W T-Bar troffer with 1x36 EL KW2 troffers in offices Potentially Cost-Effective
591 1844 replace 2x36W T-Bar troffer with 1x36 EL KW2 troffers in toilets Cost-Effective
591 1832 replace 3 2x36W reflector battens with 1x36W EL+KW2 reflector battenPotentially Cost-Effective
586 5985 Replace 300W Quartz Halogen Uplights with 75W Metal Halide lmaps Potentially Cost-Effective
485 5757 Replace 36W lamps with T5s Cost-Effective
358 3095 Replace 36W twin fluorescent lamps in offices with a single 36W triphosPotentially Cost-Effective
456 6586 Replace 36W twin fluorescent lamps in offices with single T5 lamps Potentially Cost-Effective
456 6583 Replace 36W twin fluorescent lamps in offices, waiting rooms, corridors,Cost-Effective
415 2134 Replace 36W twin fluorescent lamps in the office and amenity buildingsPotentially Cost-Effective
360 3487 Replace 36W twins with single 37W quads-phosphor lamps Potentially Cost-Effective
333 1912 Replace 36W with 31W phillips Potentially Cost-Effective
591 1820 replace 4 2x36W battens with 1x36W EL+KW2 diffused battens Cost-Effective
591 1833 replace 4 2x36W battens with 1x36W EL+KW2 diffused battens in staffPotentially Cost-Effective
591 1789 replace 4 2x36W LL with 1x36W EL+KW2 in first floor corridor near liftsCost-Effective
485 5884 Replace 40 watt fluorescent tubes with 36 watt tubes Cost-Effective
485 5910 Replace 40 watt raoid start tubes (single fittings) with 32 watt rapid starCost-Effective
485 5784 Replace 40 watt rapid start tubes with 32 watt rapid start tubes Cost-Effective
415 2126 Replace 400W mercury vapour with 250W metal halide achieving approprCost-Effective
594 5069 Replace 400W Mercury Vapour lamps with more efficient 250W HPI P Cost-Effective
593 4926 Replace 400W mercury vapour with 250W metal halide lamps Potentially Cost-Effective
374 1163 Replace 400W to the new 300W Pulse start lamps Cost-Effective
485 5760 Replace 40W lamps with 36W Cost-Effective
580 5288 Replace 40W rapid start with 36W electronic ballast in staff carpark Potentially Cost-Effective
417 4387 Replace 44 HG Vapour Lights with MH Lights Potentially Cost-Effective
591 1821 replace 5 2x36W battens with 1x36W EL+KW2 diffused battens Cost-Effective
591 1792 replace 5 2x36W LL with 1x36W EL+KW2 in first floor back of house toiCost-Effective
561 2695 Replace 50 watt halogen down light lamps with 35 IRC lamps. Potentially Cost-Effective
604 2310 Replace 50 watt halogen down light lamps with 35 watts IRC lamp Potentially Cost-Effective
604 2303 Replace 50 watt halogen downlights with 35 watt lamps Potentially Cost-Effective
571 3306 Replace 50w Dichroic Lamps with 35w IRC Lamps Potentially Cost-Effective
394 3636 Replace 50W Dichroic lamps with 35W units Cost-Effective
580 5342 Replace 50W dichroic with 35W equivalent Cost-Effective
289 1932 Replace 50w dichroic with 35w IRC type lamps (100 off) Potentially Cost-Effective
358 3092 Replace 50W dichroics in office space, entrance, corridors with 35W IRCCost-Effective
333 1903 Replace 50W Dichroics with 35W IRC Dichroics Cost-Effective
570 6491 Replace 50W Low voltage down lights with 35W IRC lamps Cost-Effective
570 6499 Replace 50W Low voltage down lights with 35W IRC lamps Cost-Effective
582 4726 Replace 50W low voltage lamps in the foyer area. Cost-Effective
437 2629 Replace 50W LV downlights, 300 W PAR 56 lamps, 60W strip incandescenPotentially Cost-Effective
582 4806 Replace 50W LV lamps in the corridor. Cost-Effective
484 3538 Replace 50W LV with 35W IRC and electronic ballast Potentially Cost-Effective
593 4896 Replace 50W LVDL with 13W RCF Potentially Cost-Effective
358 3096 Replace 58W twin fluorescent lamps in offices with a single 36W triphosPotentially Cost-Effective
295 5328 Replace 5x individual hot water systems with heat pumps (as required)Potentially Cost-Effective
591 1842 replace 6 2x36W reflector battens with 1x36W EL+KW2 reflector battensPotentially Cost-Effective
591 1834 replace 6 2x36W T-bar troffers with 1x36W KW2 troffers Potentially Cost-Effective
591 1788 replace 7 2x36W LL with 1x36W EL+KW2 in back of house toilets and Cost-Effective
591 1857 replace 72 2x36W battens with 1x58W EL+KW2 WG fittings in 1st floorCost-Effective
591 1846 replace 79 2x36W T-Bar troffer with 1x36 EL KW2 troffers in offices Cost-Effective
582 4755 Replace 8 x 60W incandescent lamps in the infant’s playroom (Rear BuiCost-Effective
298 2168 Replace aged & inefficient air conditioning system with an appropriate Potentially Cost-Effective
586 5971 Replace air conditioning for the main pool hall will a heat recovery packPotentially Cost-Effective
493 6167 Replace air cooled AC equipment with central CHW plant Potentially Cost-Effective
493 6308 Replace air cooled AC systems with higher efficiency water cooled c Potentially Cost-Effective
493 6275 Replace air cooled chiller with pipework from central CHW system to ouPotentially Cost-Effective
493 6288 Replace air cooled package AC equipment with CHW from high efficiencPotentially Cost-Effective
301 1141 Replace Air powered pumps with electric Cost-Effective
573 3433 Replace all (~1,400) 80W mercury vapour lamps with twin T5 alternati Potentially Cost-Effective
587 4966 Replace all hot water units in accommodation with heat pump technol Potentially Cost-Effective
569 3678 Replace all twin 36w fittings Potentially Cost-Effective
582 4747 Replace all window and door seals. Also seal each room where ductworCost-Effective
566 2002 Replace and De-Lamp Cost-Effective
566 2028 Replace and De-Lamp Cost-Effective
604 2270 Replace area mercury vapour lamps with metal halide Cost-Effective
486 211 Replace Bake Oven 1 Ringmain - reduce air leakage and gas flow Cost-Effective
383 2455 Replace bath house heating coils with heat pumps Cost-Effective
584 5640 Replace bathroom lamps from incandescent to compact fluorescent Cost-Effective
312 797 Replace boilerhouse chiller number 3 with larger high efficiency chiller. CCost-Effective
301 1144 Replace cap dryers with electrically heated blowers Cost-Effective
574 5147 Replace car park fluorescent lighting with T5 Potentially Cost-Effective
408 1210 Replace Champion air compressor (Energy Savings and Operational SecuriCost-Effective
604 2244 Replace change room shower taps with spring return type Cost-Effective
445 4215 Replace chiller 2 Potentially Cost-Effective
282 3156 Replace chiller with energy efficient chiller Potentially Cost-Effective
474 4370 Replace chillers Cost-Effective
391 3089 Replace compressor lubricant Cost-Effective
590 2902 Replace computer CRT monitors with LCD monitors Cost-Effective
325 763 Replace bath house 5000L boiler with Heat pumps and 2x340L hot watPotentially Cost-Effective
325 762 Replace bath house space heating with heat pumps Cost-Effective
415 2135 Replace CRT computer screens with TFT screens. Potentially Cost-Effective
358 3097 Replace CRT computer screens with TFT screens Potentially Cost-Effective
456 6585 Replace CRT computer screens with TFT screens Potentially Cost-Effective
437 2611 Replace CRT computer screens with TFT screens (Ongoing) Cost-Effective
562 2074 Replace CRT computer screens with TFT screens. Potentially Cost-Effective
562 2091 Replace CRT computer screens with TFT screens. Potentially Cost-Effective
562 2093 Replace CRT computer screens with TFT screens. Potentially Cost-Effective
562 2099 Replace CRT computer screens with TFT screens. Potentially Cost-Effective
590 2912 Replace CRT Monitors Cost-Effective
585 4179 Replace CRT monitors with LCD monitors Potentially Cost-Effective
585 4182 Replace CRT monitors with LCD monitors Potentially Cost-Effective
585 4185 Replace CRT monitors with LCD monitors Potentially Cost-Effective
562 2077 Replace CRT screens with TFT screens Potentially Cost-Effective
594 5063 Replace current gas boilers with Rotex/Rinnai gas package for main poCost-Effective
597 5693 Replace degraded training pool cover with higher quality/high R-value aPotentially Cost-Effective
317 4478 Replace desolventiser toaster with new. Potentially Cost-Effective
396 649 Replace dessicant air driers with refrigerated drier Potentially Cost-Effective
485 5755 Replace Dichroics with CF and install MDs Cost-Effective
485 5756 Replace Dichroics with IRC types Cost-Effective
466 3152 Replace dividing valve at site Potentially Cost-Effective
562 2060 Replace domestic hot water heaters with natural gas heaters Potentially Cost-Effective
493 6109 Replace DX AC equipment with CHW/HW fan coil units Potentially Cost-Effective
492 4100 Replace electric DHW with gas DHW units Cost-Effective
493 6153 Replace electric duct heaters with gas heating and reciprocating comprPotentially Cost-Effective
493 6061 Replace electric duct heaters with natural gas fired boilers and hot watePotentially Cost-Effective
493 6297 Replace electric duct heating with gas duct furnace Potentially Cost-Effective
493 6263 Replace electric duct heating with gas duct furnace or boiler/coil/pump Potentially Cost-Effective
562 2062 Replace electric heat pump with gas boiler for outdoor pool Potentially Cost-Effective
589 2353 Replace Electric Heat Pumps and Gas Boilers with New High-EfficiencPotentially Cost-Effective
493 6157 Replace electric heaters for lecture theatre with gas heating or reversePotentially Cost-Effective
493 6185 Replace electric heating to Lecture Theatre with gas or reverse cycle Potentially Cost-Effective
585 4180 Replace electric hot water heaters with gas hot water heaters Cost-Effective
493 6110 Replace electric hot water system with gas or solar Potentially Cost-Effective
493 6159 Replace electric HWS with gas Potentially Cost-Effective
493 6124 Replace electric HWS with gas or solar Potentially Cost-Effective
493 6128 Replace electric HWS with gas or solar Potentially Cost-Effective
493 6136 Replace electric HWS with gas or solar Potentially Cost-Effective
493 6144 Replace electric HWS with gas or solar Potentially Cost-Effective
493 6165 Replace electric HWS with gas or solar Potentially Cost-Effective
493 6169 Replace electric HWS with gas or solar Potentially Cost-Effective
493 6179 Replace electric HWS with gas or solar Potentially Cost-Effective
493 6186 Replace electric HWS with gas or solar Potentially Cost-Effective
493 6195 Replace electric HWS with gas or solar Potentially Cost-Effective
493 6228 Replace electric HWS with gas or solar Potentially Cost-Effective
493 6235 Replace electric HWS with gas or solar Potentially Cost-Effective
493 6249 Replace electric HWS with gas or solar Potentially Cost-Effective
493 6287 Replace electric HWS with gas or solar Potentially Cost-Effective
493 6301 Replace electric HWS with gas or solar Potentially Cost-Effective
493 6173 Replace electric HWS with solar or gas Potentially Cost-Effective
493 6256 Replace electric HWS with solar or gas Potentially Cost-Effective
493 6078 Replace electric space heaters with gas fired water heaters Potentially Cost-Effective
445 4201 Replace evaporator CHW control valves on chillers 3&4 Cost-Effective
593 4893 Replace existing 125W MV foyer lighting with 28W Compact Fluoresc Cost-Effective
290 3407 Replace existing 400W metal halide lamps with UPS 320W Cost-Effective
586 5979 Replace existing 50W halogen down lights with energy saving lamps andPotentially Cost-Effective
493 6139 Replace existing air cooled AC with fan coil units fed from central CH Potentially Cost-Effective
586 5978 Replace existing centralised air conditioning unit with more energy effi Potentially Cost-Effective
575 1468 Replace existing club house fluorescent luminares with more efficient Potentially Cost-Effective
586 5990 Replace existing conventional storage hot water systems with heat pumpPotentially Cost-Effective
493 6192 Replace existing DX water cooled heat pumps including electric duct hPotentially Cost-Effective
597 5689 Replace existing electric hot water service with heat pump or gas alte Cost-Effective
571 3245 Replace existing electric storage hot water system with heat pumps Potentially Cost-Effective
586 5993 Replace existing Fluorescent lights with 2X14W T5 Streetlights or otherPotentially Cost-Effective
357 2474 Replace existing heatcoil ducting with heat pumps Cost-Effective
586 5994 Replace existing incandescent lights with 2X14W T5 Streetlights or othPotentially Cost-Effective
586 5976 Replace existing indoor T8 fluorescent light fittings with T5 fittings Potentially Cost-Effective
581 3940 Replace existing internal lights to more energy efficient types Cost-Effective
581 3942 Replace existing internal lights to more energy efficient types Cost-Effective
581 3943 Replace existing internal lights to more energy efficient types Cost-Effective
581 3947 Replace existing internal lights to more energy efficient types Cost-Effective
445 4214 Replace existing linear accelerator process coolers Potentially Cost-Effective
351 5376 Replace existing luminaires with T5 lamps Potentially Cost-Effective
319 2433 Replace existing ring type blood drier with contact disc drier Potentially Cost-Effective
586 5992 Replace existing Small MV Lights with 2X14W and 2X24W T5 StreetlightPotentially Cost-Effective
586 5970 Replace existing spa heating system with a dedicated heat pump syst Potentially Cost-Effective
581 3946 Replace existing Stage lights and fittings to more energy efficient typesCost-Effective
586 5989 Replace existing T8 and incandescent fittings with t% fittings Potentially Cost-Effective
586 5972 Replace existing T8 indoor fluorescent light fittings with T5 fittings Potentially Cost-Effective
575 1492 Replace existing translucent roofing and installation of new translucent Potentially Cost-Effective
471 710 Replace existing twin and quad tube fittings in office areas Potentially Cost-Effective
280 4267 Replace existing vacuum pumps Potentially Cost-Effective
493 6280 Replace existing VAV control with space based VAV including occupancPotentially Cost-Effective
586 5995 Replace exisying Large MV lights with HP Sodium Streetlights or other Potentially Cost-Effective
575 1478 Replace exterior lights timer switch with photoelectric cell switch Cost-Effective
562 2097 Replace fluorescent lamps with half as many triphosphor lamps and highCost-Effective
562 2090 Replace fluorescent lamps with half as many triphosphor lamps and high Cost-Effective
475 4380 Replace fluorescent light fittings in the plant rooms and entry foyer. Cost-Effective
473 4348 Replace fluorescent light fittings in the plant rooms and MDF. Cost-Effective
472 4281 Replace fluorescent light fittings in the plant rooms. Cost-Effective
474 4366 Replace fluorescent light fittings in the plant rooms. Cost-Effective
574 5145 Replace fluorescent lighting with T5 Potentially Cost-Effective
349 1324 Replace fluorescent lights in production areas with HID fittings Potentially Cost-Effective
589 2358 Replace Halogen Dichroic Lamps in Office Potentially Cost-Effective
589 2380 Replace Halogen Dichroic Lamps in Office Potentially Cost-Effective
589 2597 Replace Halogen Dichroic Lamps in Office Potentially Cost-Effective
589 2598 Replace halogen dichroic lamps in water view cabins Potentially Cost-Effective
589 2363 Replace Halogen Dichroic Lights Potentially Cost-Effective
588 5040 Replace Halogen DLs in Cust Service area Potentially Cost-Effective
586 5982 Replace Halogen downlights with more energy efficient lamps Potentially Cost-Effective
351 5377 Replace halogen lamps with metal halide Potentially Cost-Effective
294 1642 Replace High Bay light fittings as per report Cost-Effective
343 3957 Replace high-bay lights with special fluroescents Potentially Cost-Effective
597 5709 Replace high-intensity discharge lamps in storage areas with fluorescenPotentially Cost-Effective
493 6226 Replace hydraulic lift with rope counterweight lift Potentially Cost-Effective
493 6234 Replace hydraulic lift with rope counterweight lift Potentially Cost-Effective
493 6242 Replace hydraulic lift with rope counterweight lift Potentially Cost-Effective
493 6131 Replace hydraulic lift with rope/counterweight lift Potentially Cost-Effective
493 6141 Replace hydraulic lift with rope/counterweight lift Potentially Cost-Effective
493 6194 Replace hydraulic lift with rope/counterweight lift Potentially Cost-Effective
493 6318 Replace hydraulic lift with rope/counterweight lift Potentially Cost-Effective
354 2896 Replace ice storage plant Potentially Cost-Effective
561 2706 Replace incandescant and mercury vapour lamps and replace with metaPotentially Cost-Effective
585 4164 Replace incandescent downlights with CFL downlights Cost-Effective
561 2740 Replace incandescent globes with compact fluorescent lamps. Potentially Cost-Effective
582 4742 Replace incandescent lamp in sleeping room with CFL. Cost-Effective
589 2371 Replace Incandescent Lamps In Bathrooms Cost-Effective
582 4671 Replace incandescent lamps in bathrooms with compact fluorescent laCost-Effective
589 2374 Replace Incandescent Lamps In Cedar Cabin Cost-Effective
582 4710 Replace incandescent lamps in First Aid room with CFLs. Cost-Effective
585 4165 Replace incandescent lamps in foyer with CFL lamps Cost-Effective
589 2370 Replace Incandescent Lamps In Cabins Cost-Effective
589 2594 Replace incandescent lamps in cabins Potentially Cost-Effective
589 2596 Replace incandescent lamps in cabins Potentially Cost-Effective
589 2373 Replace incandescent lamps in cabins Potentially Cost-Effective
589 2372 Replace Incandescent Lamps In Office Cost-Effective
589 2369 Replace incandescent lamps in cabins Cost-Effective
589 2376 Replace incandescent lamps in cabins Potentially Cost-Effective
589 2366 Replace Incandescent Lamps In Staff Bathrooms Cost-Effective
589 2595 Replace incandescent lamps in cabins Potentially Cost-Effective
597 5688 Replace incandescent lamps throughout building with dimmable CFL's (Cost-Effective
585 4175 Replace incandescent lamps with 13W CFL Cost-Effective
582 4798 Replace incandescent lamps with CFLs in staff bathrooms, back of housCost-Effective
582 4804 Replace incandescent lamps with CFLs. Cost-Effective
493 6257 Replace individual electric heating with central gas heating system Potentially Cost-Effective
573 3431 Replace kiosk halogen lighting with 20W IRC halogens Potentially Cost-Effective
600 2574 Replace ladies HWS Potentially Cost-Effective
305 1011 Replace lagging Potentially Cost-Effective
585 4167 Replace laundry electric hot water unit with gas hot water unit Cost-Effective
568 3511 Replace lighting in administration section of the facility & replace merc Potentially Cost-Effective
493 6307 Replace lighting with high efficiency including occupancy based controlPotentially Cost-Effective
493 6154 Replace lighting with high efficiency light fittings and occupancy controlPotentially Cost-Effective
493 6152 Replace lighting with high efficiency lighting & improved dimming syst Potentially Cost-Effective
493 6102 replace lighting with triphosphor Potentially Cost-Effective
493 6113 replace lighting with triphosphor Potentially Cost-Effective
493 6135 replace lighting with triphosphor Potentially Cost-Effective
493 6158 replace lighting with triphosphor Potentially Cost-Effective
493 6170 replace lighting with triphosphor Potentially Cost-Effective
493 6174 replace lighting with triphosphor Potentially Cost-Effective
493 6180 replace lighting with triphosphor Potentially Cost-Effective
493 6196 replace lighting with triphosphor Potentially Cost-Effective
493 6227 replace lighting with triphosphor Potentially Cost-Effective
493 6248 replace lighting with triphosphor Potentially Cost-Effective
493 6188 Replace lighting with triphosphor & install occupancy control Potentially Cost-Effective
493 6286 Replace lighting with triphosphor & occupancy based control Potentially Cost-Effective
493 6166 Replace lighting with triphosphor & occupancy control Potentially Cost-Effective
493 6118 Replace lighting with Triphosphor fittings Potentially Cost-Effective
493 6236 Replace lighting with triphosphor including occupancy control Potentially Cost-Effective
493 6293 Replace lighting with triphosphor including occupancy control Potentially Cost-Effective
493 6302 Replace lighting with Triphosphor including occupancy/timer control Potentially Cost-Effective
493 6083 Replace lighting with triphosphour Potentially Cost-Effective
493 6127 Replace lighting with Triphospohor Potentially Cost-Effective
360 3480 Replace liquid ring vacuum pump with dry vacuum pump Potentially Cost-Effective
568 3503 Replace low voltage down lights Cost-Effective
568 3500 Replace low voltage down lights and install electronic transformers Potentially Cost-Effective
586 5987 Replace low voltage Halogen Spotlights with 35W IRC lamps and electrPotentially Cost-Effective
586 5977 Replace low voltage Halogens with more efficient lamps and upgrade witPotentially Cost-Effective
582 4670 Replace low voltage lamps in meeting rooms no 1 & 2 on level 3 and kCost-Effective
584 5580 Replace low voltage light fittings Cost-Effective
584 5634 Replace low voltage light fittings in the Mollie Dive function room wit Cost-Effective
600 2576 Replace Mercury Vapor high bays Potentially Cost-Effective
582 4800 Replace mercury vapour lamps with compact fluorescent lamps in Hall.Potentially Cost-Effective
570 834 Replace metal halide lamps in car park to T5 fluorescent lamps Cost-Effective
457 5236 Replace metal halide lamps in main entry foyer with lower wattafe la Cost-Effective
444 4035 Replace mild steel dampers in AHUs Potentially Cost-Effective
493 6284 Replace multiple air cooled process chillers with circulated cooling s Potentially Cost-Effective
582 4810 Replace MV lamps with compact fluorescent lamps. Potentially Cost-Effective
371 365 Replace NAP1 Expander Potentially Cost-Effective
371 363 Replace nitrates boilers Potentially Cost-Effective
597 5695 Replace old 36W batten luminaires with energy efficient 36W fittings at vaPotentially Cost-Effective
438 4842 Replace old air compressors Potentially Cost-Effective
444 4032 Replace old motors in AHUs with high efficiency Cost-Effective
416 409 Replace older motors with high efficiency motors. Cost-Effective
471 709 Replace one existing studio chiller with new variable speed centrifugal Potentially Cost-Effective
295 5335 Replace outstanding electrical motors with energy efficient ones Potentially Cost-Effective
283 4314 Replace Oxygen compressor head for life extension and cooling effici Cost-Effective
585 4173 Replace PAR38 incandescent lamps with PAR38 CFL lamps Cost-Effective
597 5697 Replace PAR38 spotlights in foyer of theatre paviliion with CFL alternatCost-Effective
604 2274 Replace pole top 250 watt mercury vapour lamps with 150 watt metal Cost-Effective
575 6034 Replace pool hall exhaust air heat recovery coils with dry media air to Potentially Cost-Effective
562 2065 Replace pool halogen lights with metal halide lamps due to high failureCost-Effective
485 5793 Replace reading lamps with compact fluorescents Cost-Effective
493 6299 Replace reciprocating compressor AC system with CHW from Central pPotentially Cost-Effective
493 6223 Replace reciprocating compressors on 2x 400kWr Carrier chillers with Potentially Cost-Effective
493 6264 Replace Reciprocating DX AC system with CHW coil fed from high efficiPotentially Cost-Effective
493 6283 Replace remaining lift controls with vsd based control Potentially Cost-Effective
502 4516 Replace ROM conveyor and bypass ROM pumps Cost-Effective
445 4216 Replace seized dampers in ward block and re-instate economy cycle Potentially Cost-Effective
343 3956 Replace selected mill motors with super high efficient motors Potentially Cost-Effective
343 3958 Replace selected surface motors with super high efficient motors Potentially Cost-Effective
343 3952 Replace selected underground motors with super high efficient motors Potentially Cost-Effective
466 3148 Replace SER drives with VVVF controllers on units 14, 3, 4, 5, 6 and 7Cost-Effective
493 6069 Replace small air & water cooled package AC systems with central chilPotentially Cost-Effective
486 209 Replace Sniff unit on VDC 1 with an ACD Unit which uses no electricalCost-Effective
297 534 Replace soft starter on with VSD on (315 kW) mill Cost-Effective
298 2141 Replace standard (halophosphur) T8 flourescents with Triphosphor fluCost-Effective
442 1576 Replace standard fluorescent tubes with Tn- phosphor tubes for general Cost-Effective
493 6063 Replace standard light fittings with Triphosphor Potentially Cost-Effective
298 2169 Replace standard(halophosphur)T8 flourescents with triphosphor fluor Potentially Cost-Effective
459 5192 Replace suction vacuum pumps in Building Potentially Cost-Effective
586 5968 Replace T8 fluorescent light fittings with T5 fittings Potentially Cost-Effective
571 3249 Replace the 50m pool pump's motors with high efficiency motors Potentially Cost-Effective
582 4761 Replace the 50W low voltage lamp in the kitchen with 20W lamps. Cost-Effective
582 4766 Replace the 60W incandescent lamp at entry to a compact fluorescent Cost-Effective
582 4718 Replace the 60W incandescent lamp in the cleaners store with an 11WPotentially Cost-Effective
604 2308 Replace the change room domestic hot water systems with instantane Potentially Cost-Effective
571 3250 Replace the existing large air conditioning with chilled water air condit Potentially Cost-Effective
604 2321 Replace the main fountain pump electric motor with a high efficiency mPotentially Cost-Effective
604 2272 Replace the office 50 watt halogen down lights with 35 watt IRC lampsCost-Effective
604 2323 Replace the glasshouse gas heating with solar Potentially Cost-Effective
604 2326 Replace the truck wash medium bay lights with weatherproof fluorescenPotentially Cost-Effective
349 1313 Replace the upstairs A/C Unit in Building No. 2 Cost-Effective
578 6554 Replace time switches with PE sensor control Cost-Effective
575 1489 Replace timer switch on night time security lighting with photoelectric cCost-Effective
509 6511 Replace Timer Valves (Drains) Potentially Cost-Effective
585 4166 Replace top loading washing machines with front loading washing macCost-Effective
584 5622 Replace triple 36W fittings with twin 37W quadphosphor fittings Cost-Effective
568 3506 Replace twin 26W downlights Potentially Cost-Effective
584 5623 Replace twin 58W fittings with single 58W triphosphor fittings Cost-Effective
589 2579 Replace twin florescent lights Potentially Cost-Effective
584 5633 Replace twin fluorescent fittings with single fittings including new reflecCost-Effective
569 3645 Replace twin watt fitting Potentially Cost-Effective
381 667 Replace two reciprocating chillers with a single high efficiency chiller. Potentially Cost-Effective
322 5956 replace V-belt motors with Notched belts (250KW example) Potentially Cost-Effective
493 6233 Replace water cooled DX heat pumps with CHW central system & gas Potentially Cost-Effective
493 6156 Replace window mounted RAC's with central AC plant Potentially Cost-Effective
579 3974 Replacement Heat Pumps of higher efficiency as old ones wear out (dePotentially Cost-Effective
504 580 Replacement induction furnace for No.3 Heat Recovery Cost-Effective
447 1866 Replacement of 1060 room standing lamp incandescant 100 watt lamps Cost-Effective
394 3637 Replacement of 45 Vapac Electrical steam injection humidifiers with m Potentially Cost-Effective
493 6062 Replacement of AC control system with BMS DDC on all buildings withPotentially Cost-Effective
493 6149 Replacement of AC with higher efficiency system Potentially Cost-Effective
434 2214 Replacement of air Atlas Copco with new compressor Potentially Cost-Effective
574 5134 Replacement of air conditioning equipment Potentially Cost-Effective
574 5148 Replacement of air conditioning equipment Potentially Cost-Effective
493 6106 Replacement of air cooled chiller with connection to central chiller tha Potentially Cost-Effective
493 6210 Replacement of air cooled DX AC equipment with central high efficien Potentially Cost-Effective
604 2313 Replacement of Cabin Hot water units with solar (electricity) Potentially Cost-Effective
604 2316 Replacement of Cabin hot water units with solar(electricity) Potentially Cost-Effective
604 2317 Replacement of Cabin hot water units with solar(gas) Potentially Cost-Effective
319 2430 Replacement of compressed air conveying of raw materials Potentially Cost-Effective
318 4466 Replacement of compressed air to conveyor for material handling Potentially Cost-Effective
447 1867 Replacement of Cooling tower drive motors 18.5kw to 7.5 kw with soft stCost-Effective
596 4944 Replacement of Cooling Towers Potentially Cost-Effective
596 4950 Replacement of CRT Monitors Potentially Cost-Effective
484 3533 Replacement of CRT monitors with TFT Cost-Effective
493 6086 Replacement of DX cooling plant with CHW from central plant Potentially Cost-Effective
493 6126 Replacement of DX water cooled package AC units with CHW/HW fan coil uPotentially Cost-Effective
493 6108 Replacement of electric duct heater with heating water coil Potentially Cost-Effective
493 6122 Replacement of electric heating with gas Potentially Cost-Effective
493 6075 Replacement of electric HWS with gas or Solar Potentially Cost-Effective
493 6087 Replacement of electric HWS with gas or Solar Potentially Cost-Effective
493 6099 Replacement of electric HWS with gas or Solar Potentially Cost-Effective
493 6121 Replacement of electric HWS with gas or Solar Cost-Effective
493 6206 Replacement of electric HWS with gas or Solar Potentially Cost-Effective
493 6214 Replacement of electric HWS with gas or Solar Potentially Cost-Effective
493 6217 Replacement of electric HWS with gas or Solar Potentially Cost-Effective
387 1274 Replacement of electric motors with high efficiency units. Potentially Cost-Effective
574 5163 Replacement of existing air conditioning Potentially Cost-Effective
578 6542 Replacement of existing black polythene tubing solar collector with totaPotentially Cost-Effective
581 3945 Replacement of existing fluorescent lighting with energy efficient lighti Cost-Effective
488 4116 Replacement of existing incandescent and halogen lighting with CompaPotentially Cost-Effective
488 4124 Replacement of existing incandescent and halogen lighting with CompaPotentially Cost-Effective
380 262 Replacement of Extruder V-belts with more efficient timing belts Cost-Effective
596 4961 Replacement of fixed theatre lights Potentially Cost-Effective
574 5136 Replacement of fluorescent lighting with T5 Potentially Cost-Effective
574 5162 Replacement of fluorescent lighting with T5 equipment Potentially Cost-Effective
574 5167 Replacement of fluorescent lighting with T5 equipment Potentially Cost-Effective
574 5170 Replacement of fluorescent lighting with T5 equipment Potentially Cost-Effective
434 2217 Replacement of glycol HE with plate HE Potentially Cost-Effective
574 5140 Replacement of halogen lighting with IRC or Megaman equipment Potentially Cost-Effective
574 5156 Replacement of halogen with IRC or Megaman equipment Potentially Cost-Effective
380 261 Replacement of high bay Mercury Vapour lamps with more efficient, lo Cost-Effective
381 674 Replacement of high-bay lights with special fluorescents. Preliminary ePotentially Cost-Effective
493 6205 Replacement of hydraulic lift with rope/counterweight lift Potentially Cost-Effective
493 6313 Replacement of hydraulic lift with rope/counterweight lift Potentially Cost-Effective
493 6089 Replacement of hydraulic lifts with rope lifts Potentially Cost-Effective
569 3633 Replacement of incandescent globes with CFL. This should only occur wiCost-Effective
596 4972 Replacement of incandescent lamps Cost-Effective
584 5648 Replacement of incandescent lamps with compact fluorescent lamps in Cost-Effective
574 5166 Replacement of incandescent lighting Potentially Cost-Effective
493 6076 Replacement of light fittings with Triphosphor Potentially Cost-Effective
493 6150 Replacement of lighting with high efficiency and occupancy control Potentially Cost-Effective
493 6143 Replacement of lighting with triphosphor Potentially Cost-Effective
493 6207 Replacement of lighting with triphosphor Potentially Cost-Effective
493 6213 Replacement of lighting with triphosphor Potentially Cost-Effective
493 6148 Replacement of lighting with triphosphor and perimeter dimming Potentially Cost-Effective
493 6107 Replacement of lighting with Triphosphor fittings Potentially Cost-Effective
442 1578 Replacement of main office air conditioning unit and installation of PLC Potentially Cost-Effective
574 5172 Replacement of Mercury Vapour High Bays Potentially Cost-Effective
574 5168 Replacement of Mercury Vapour lighting Potentially Cost-Effective
574 5173 Replacement of Mercury Vapour lighting Potentially Cost-Effective
574 5155 Replacement of PAR fittings Potentially Cost-Effective
574 5165 Replacement of PAR lighting Potentially Cost-Effective
596 4943 Replacement of pumps Potentially Cost-Effective
596 4948 Replacement of Reciprocating Chillers Potentially Cost-Effective
493 6145 Replacement of reciprocating compressor chiller with Turbocor high efficPotentially Cost-Effective
493 6084 Replacement of reciprocating compressors on Carrier 30LA1100 chillerPotentially Cost-Effective
493 6085 Replacement of roof sheeting with light colour and installation of R3 InsPotentially Cost-Effective
606 3068 Replacement of sludge pumps with variable speed type. Potentially Cost-Effective
606 3065 Replacement of smaller Effluent Discharge pump to handle Average DPotentially Cost-Effective
574 5128 Replacement of space heating equipment Potentially Cost-Effective
569 3630 Replacement of T-bar with high efficiency type Potentially Cost-Effective
354 2899 Replacing existing 'Luke' chillers Potentially Cost-Effective
363 329 Replacing other motors Potentially Cost-Effective
435 453 Replacing steam tracing with electrical tracing Potentially Cost-Effective
455 1925 replacing T12 halo-phosphor lamps with T5 tri-phosphor lamps Potentially Cost-Effective
354 2897 Replacing tenancy light fittings Potentially Cost-Effective
604 2271 Reposition the Block PE cell Cost-Effective
282 3183 Reprogram C-Bus for lights and AHU Cost-Effective
485 5805 Reprogram Cbus system Cost-Effective
570 807 Reschedule all after-hour fans and misc. A/C loads to limit use to 7am Cost-Effective
593 4891 Reschedule HVAC start time Cost-Effective
365 5458 Re-set automatic lighting timer for all 12 modules. Cost-Effective
282 3191 Reset condenser pressure Cost-Effective
595 5432 Reset HVAC start time Cost-Effective
595 5444 Reset HVAC start time Cost-Effective
595 5447 Reset HVAC start time Cost-Effective
593 4898 Reset HVAC timer to disable plant on Public Holidays Cost-Effective
593 4909 Reset HVAC timer to disable plant on Public Holidays Cost-Effective
571 3285 Reset space temperature base on outside temperature Cost-Effective
445 4202 Reset steam pressure Cost-Effective
459 5186 Reset time schedule for air handling units in Building and others to m Cost-Effective
457 5240 Reset time schedules for air handling units and fan coil units through Cost-Effective
459 5189 Reset time schedules for chillers and air handling units in health Serv Cost-Effective
384 1963 Restaurant Halogen Dichroic Lighting Replacement Potentially Cost-Effective
514 4615 Restore 5000 tonne bin capacity Potentially Cost-Effective
353 3364 Retail Light Efficiency Upgrade Potentially Cost-Effective
583 2956 Retrofit 18 Watt Fluro Exit light-2Watt Exit light Potentially Cost-Effective
583 2923 Retrofit 18Watt Fluro Exit light-2Watt Exit light Potentially Cost-Effective
583 3022 Retrofit 18Watt Fluro Exit light-2Watt Exit light Potentially Cost-Effective
447 1865 Retro-fit 2 of the existing AC chilllers with a soft start speed drive Cost-Effective
583 2921 Retrofit 250Watt Mercury Vapour with 80Watt CFL Lamp Potentially Cost-Effective
583 3010 Retrofit 400Watt MH Hi/Lo bay with 80Watt CFL Lamp Cost-Effective
583 3012 Retrofit 400Watt MH Hi/Lo bay with 80Watt CFL Lamp Cost-Effective
583 3016 Retrofit 400Watt MH Hi/Lo bay with 80Watt CFL Lamp Cost-Effective
583 3040 Retrofit 400Watt MH Hi/Lo bay with 80Watt CFL Lamp Cost-Effective
583 3031 Retrofit 400Watt Spot with 80Watt CFL Lamp Cost-Effective
360 3483 Retrofit 440W mercury vapour with 250W pulse start metal halide lampPotentially Cost-Effective
583 3029 Retrofit 500Watt Spot with 80Watt CFL Lamp Cost-Effective
575 1537 Retrofit de-superheater to pool hall air conditioning units to produce d Potentially Cost-Effective
575 1517 Retrofit exisitng office lighting in room to more efficient lamps and con Cost-Effective
593 4912 Retrofit existing 36W fluoro lights with T5 Save It Easy® kits Potentially Cost-Effective
593 4915 Retrofit existing 36W fluoro lights with T5 Save It Easy® kits Potentially Cost-Effective
593 4927 Retrofit existing 36W fluoro lights with T5 Save It Easy® kits Potentially Cost-Effective
593 4929 Retrofit existing 36W fluoro lights with T5 Save It Easy® kits Cost-Effective
575 1473 Retrofit existing double fluorescent luminares with more efficient lamp Cost-Effective
575 1477 Retrofit existing double fluorescent luminares with more efficient lamp Cost-Effective
575 1484 Retrofit existing double luminaries with more efficient lamps and contr Potentially Cost-Effective
575 1491 Retrofit existing low bay luminaires with more efficient lamps and contrPotentially Cost-Effective
576 2083 Retrofit Lighting -retrofit plasterboard troffer,replace battens, replace mCost-Effective
576 2079 Retrofit Lighting -install voltage reduction unit, upgrade lamp fittings Cost-Effective
576 2029 Retrofit Lighting Cost-Effective
576 2084 Retrofit Lighting Cost-Effective
576 2080 Retrofit Lighting Cost-Effective
576 2086 Retrofit Lighting Cost-Effective
576 2034 Retrofit Lighting Cost-Effective
576 2087 Retrofit Lighting Cost-Effective
576 2036 Retrofit Lighting Cost-Effective
576 2085 Retrofit Lighting Cost-Effective
576 2078 Retrofit of Lighting -Install electronic ballasts and convert twin 36 wa Cost-Effective
583 3024 Retrofit Single 20Watt Fluro - Single Quad 28Watt,elect ballast and higPotentially Cost-Effective
583 3023 Retrofit Single 40Watt Fluro - Single Quad 28Watt,elect ballast and higPotentially Cost-Effective
583 2955 Retrofit Single 40Watt Fluro Exit light-2 Watt Exit light Potentially Cost-Effective
583 2924 Retrofit Single 40Watt Fluro-Single Quad 28Watt,elect ballast and highbPotentially Cost-Effective
447 1868 Retro-fit the 1 remaining York AC chillers with a soft start speed drive Potentially Cost-Effective
583 3020 Retrofit Twin 20Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective
604 2299 Retrofit twin 36 watt fluorescent light fittings with single 28 watt T5 light Potentially Cost-Effective
583 2919 Retrofit Twin 40 watts Fluro with Single Quad 28 Watt, elect ballast andPotentially Cost-Effective
583 2932 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elec ballast and hiPotentially Cost-Effective
583 2933 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elec ballast and hiPotentially Cost-Effective
583 2938 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elec ballast and hiPotentially Cost-Effective
583 2939 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elec ballast and hiPotentially Cost-Effective
583 2941 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elec ballast and hiPotentially Cost-Effective
583 2942 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elec ballast and hiPotentially Cost-Effective
583 3013 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiCost-Effective
583 3017 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective
583 3018 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective
583 3019 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective
583 3021 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective
583 3033 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective
583 3034 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective
583 3035 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective
583 3042 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective
587 4962 Re-tube with single tri-phosphors (50%) Cost-Effective
382 3668 Return as much condensate at as high of temperature as possible to thePotentially Cost-Effective
500 511 Reuse exhausted heat from Novatec dryer Cost-Effective
566 2040 Review & revised BMCS control strategies Cost-Effective
575 1503 Review air conditioning plant operating schedules to match occupancy Cost-Effective
575 1513 Review air conditioning plant operating schedules to match occupancy Cost-Effective
575 1496 Review air conditioning plant operating schedules to match occupancy Cost-Effective
433 3848 Review air requirements for product lines in rendering plant Cost-Effective
349 1325 Review all cooling systems and install VSDs to save energy Potentially Cost-Effective
566 1999 Review and revise BMS control strategies Cost-Effective
425 3546 Review automatic control of lighting Cost-Effective
425 3552 Review automatic control of lighting Cost-Effective
448 3775 Review BMS economy cycle setpoints and operation Cost-Effective
453 1111 Review boiler tuning strategy and schedule Cost-Effective
448 3771 Review chiller sequencing to match chiller capacity to load Cost-Effective
448 3780 Review cleaning hours Cost-Effective
587 5024 Review cleaning times policy for toilet block. Lights on all night, not on Cost-Effective
587 5036 Review cleaning times policy for toilet block. Lights on all night, not on Cost-Effective
363 323 Review compressed air leakage and establish repair program Cost-Effective
425 3545 Review control and temperature settings for air conditioning units in o Cost-Effective
425 3550 Review control and temperature settings for air conditioning units in o Cost-Effective
580 5187 Review control strategy of the Building Management System (BMS) Cost-Effective
389 4141 Review current metering and evaluate energy consumption data requi Potentially Cost-Effective
573 3422 Review electricity contract pricing (once co-gen equipment operation isCost-Effective
479 149 Review feasibility of Heat Recovery from Hot Billet (Hot Box) Potentially Cost-Effective
479 146 Review feasibility of Cogeneration/Waste Heat Boiler using Billet Cast Potentially Cost-Effective
479 144 Review feasibility of Cogeneration/Waste Heat Boiler using EAF Off GaPotentially Cost-Effective
479 145 Review feasibility of Cogeneration/Waste Heat Boiler using EAF Off GaPotentially Cost-Effective
479 187 Review feasibility of Degasser Boiler Controls upgrade Potentially Cost-Effective
479 138 Review feasibility of EAF Scrap Pre Heating Potentially Cost-Effective
479 173 Review feasibility of Mill (EWM) Electrical Upgrade (do away with DC Potentially Cost-Effective
479 198 Review feasibility of implementing a High Efficiency Motor (HEM) purchPotentially Cost-Effective
479 128 Review feasibility of Ingot Waste Heat Recovery using Organic RankinPotentially Cost-Effective
479 156 Review feasibility of installation of VSD on Furnace Inlet Fan (remove Potentially Cost-Effective
479 189 Review feasibility of installation of Waste Heat Boiler using EAF off g Potentially Cost-Effective
479 190 Review feasibility of installation of Waste Heat Recovery from Boiler F Potentially Cost-Effective
479 185 Review feasibility of installing a compressed air dryer or cooler to elim Potentially Cost-Effective
479 177 Review feasibility of installing CAPS Intelligent compressor controller ( Cost-Effective
479 186 Review feasibility of reducing air compressor intake air temperature b Potentially Cost-Effective
479 183 Review feasibility of reducing compressed air system pressure by 50 Potentially Cost-Effective
479 188 Review feasibility of replacing boilers with vacuum pumps for steel degPotentially Cost-Effective
479 176 Review feasibility of retrofitting of different VSD on an existing air com Cost-Effective
479 129 Review feasibility of Steelmaking Slag Waste Heat Recovery Potentially Cost-Effective
479 147 Review feasibility of VSD on Dust Extraction System (Remove Damper Potentially Cost-Effective
604 2254 Review heat pump staging Cost-Effective
588 5041 Review hot water options Potentially Cost-Effective
479 122 Review installation of Arc Furnace Electrode Control Upgrade Cost-Effective
479 121 Review installation of VSD on Dust Extraction System (Remove DampeCost-Effective
479 123 Review installation of VSD on Dust Extraction System (Remove DampeCost-Effective
296 2685 Review kitchen equipment for energy efficiency improvements Cost-Effective
349 1314 Review lighting controls in the Warehouse Cost-Effective
583 3001 Review Lighting Operation Cost-Effective
583 3026 Review Lighting Operation Cost-Effective
583 3015 Review Lighting Operation Cost-Effective
349 1323 Review number and type of security lights Potentially Cost-Effective
583 2915 Review of cleaning times (savings based on 6 am start) Cost-Effective
390 4859 Review of compressed air system Potentially Cost-Effective
511 6604 Review of compressed air system and usage Cost-Effective
583 2950 Review of lighting and air-conditioning requirements Cost-Effective
600 2573 Review of lighting opportunities Cost-Effective
328 238 Review procedures for U/G conveyor operation Cost-Effective
364 3938 Review site compressed air system, address system deficiencies thro Cost-Effective
571 3311 Review the air conditioning control strategies Potentially Cost-Effective
604 2266 Review the condenser pump controls to ensure that each pump only operatCost-Effective
604 2262 Review the heat pump control strategy to utilize all eight stages Cost-Effective
434 2215 Review VFD Control for No. 1 Refrigeration System Compressors Potentially Cost-Effective
338 3531 Review viability of Pneumatic Return replacement with counter weight Potentially Cost-Effective
484 3535 Revised Air Conditioning schedules Cost-Effective
484 3534 Revised lighting schedules Cost-Effective
569 3628 Revised time scheduling Potentially Cost-Effective
454 99 Revision to the chiller control system in shed Cost-Effective
582 4686 Rewire lighting circuits in the ground floor equipment and materials stoCost-Effective
584 5642 Rewire lighting circuits to allow every second light to be switched Cost-Effective
570 816 Rewire lighting in building and install occupancy sensors to the lamps Cost-Effective
584 5655 Rewiring of lighting circuits to allow every second light to be switched Cost-Effective
584 5662 Rewiring of lighting circuits to allow every second light to be switched Cost-Effective
486 225 Investigate Primary Crusher run time with no load. Maybe able to run itPotentially Cost-Effective
410 1771 roof space lighting Cost-Effective
323 5416 Ropeway drive room lighting Potentially Cost-Effective
566 2009 Rotex/Rinnai Solar hot water unit Cost-Effective
566 2005 Rotex/Rinnai Solar hot water unit installation to replace current storageCost-Effective
315 5429 Suite (~80) of minor improvement projects, some with energy improvemCost-Effective
280 4324 Run 2 compressor cooling water pumps (after air use reduced) Potentially Cost-Effective
290 3411 Run boilers on a lead-lag system Potentially Cost-Effective
604 2315 Run Down timer control of air conditioners Potentially Cost-Effective
604 2314 Run Down timer control of Cabin heaters Potentially Cost-Effective
604 2320 Run down timer control of Cabin heaters Potentially Cost-Effective
286 91 Run Saveall Recd. Stock Pump on demand Potentially Cost-Effective
305 981 Run Out Table pumps soft starter and condition monitoring control Potentially Cost-Effective
504 591 Sand reclaim/ Shakeout Area Dust Extraction System fit VSD, control Potentially Cost-Effective
465 1607 SCADA monitoring of power consumption Potentially Cost-Effective
297 548 Scalder Hot Water Heat Exchanger Potentially Cost-Effective
408 1216 Scale pit - install VSDs on scale pit pumps Cost-Effective
604 2242 Schedule cleaning operations to reduce energy consumption Cost-Effective
504 598 Schedule melting times at times of low cost electricity Potentially Cost-Effective
495 1296 Scrap Reduction Program Cost-Effective
434 2178 Screw Refrigeration Compressor VFD Control Cost-Effective
404 2755 Seal all computer rooms doors and vents Cost-Effective
305 966 Seal Type 1 tundish covers. Potentially Cost-Effective
453 1083 Seasonal adjustment of HVAC Set points in selected areas. Cost-Effective
379 1175 Secondary chilled water pump VSD Cost-Effective
304 4807 Secondary Crusher replacement Cost-Effective
312 796 Secondary Manufacturing Department air cooled chiller rationalisation.Potentially Cost-Effective
492 4099 Selection, training and support of “Energy Champions” for each buildingCost-Effective
485 5926 Selectively de-lamp museum Cost-Effective
485 6611 Selectively relamp triple 40 W rapid start light fittings in a room Cost-Effective
396 642 Sequenced shut-down capability for P4 exit conveying & shakers Cost-Effective
396 654 Sequenced shutdown elevator thru to P8 coater Potentially Cost-Effective
396 624 Sequenced shutdown for Extruder 3 (feed bin to PEC) based on extrudeCost-Effective
396 648 Sequenced Shutdown of Process 1/2 (feed bin to POC) to minimise idlPotentially Cost-Effective
396 652 Sequenced shutdown of Process 1/2 output systems Potentially Cost-Effective
414 4826 Service Center Lighting Modifications Potentially Cost-Effective
367 5501 Service Corridor Lighting Modifications. Rewire corridor lighting to creaPotentially Cost-Effective
311 620 Replace wheel wash spray pump motor with correctly sized (only 45% loaPotentially Cost-Effective
311 608 Fit movement sensor to admin building lunch room lights Cost-Effective
311 610 Implement programmed compressed air system leak detection regime, iCost-Effective
354 2895 Serving domestic hot water by reverse cycle heaters only Cost-Effective
573 3439 Set air conditioning in control room to minimum 24C-21C Potentially Cost-Effective
448 3767 Set new computer centre supplementary air conditioning units setpoi Cost-Effective
604 2285 Set the BMCS time of day schedules to core occupancy times Cost-Effective
604 2239 Setback space temperatures in the Function Room when it is unoccupiCost-Effective
297 539 Setup and implement a maintenance and leak detection program for theCost-Effective
336 5944 shaft furnace Potentially Cost-Effective
454 107 Shed cool room evaporator control Cost-Effective
424 4246 Ship loaders base load. Reduce Ship Loader base load. Provide electrCost-Effective
513 4601 Shut down crusher over crib Potentially Cost-Effective
455 1916 Side Foyer feature floodlights time switch installations Cost-Effective
579 3966 Single 50W dichroic fitting replaced with single 11W compact fluoro lampCost-Effective
579 3980 Single 50W dichroic fitting replaced with single 11W compact fluoro lampCost-Effective
408 1238 Site - electrical sub-metering to monitor energy consumption in differe Potentially Cost-Effective
408 1237 Site - Rationalise cooling systems eg CTs 13 and 14 and others Potentially Cost-Effective
408 1227 Site - reduce lighting levels in areas htat are unused for long periods ofCost-Effective
408 1226 Site - Reduce lighting levels in disused production areas Cost-Effective
407 3725 Site - Reduce lighting levels in rarely attended parts of mill Potentially Cost-Effective
408 1228 Site - Turn off high bay lights outside production periods where productiCost-Effective
514 4616 Site water management : transfer pumps Potentially Cost-Effective
440 6530 Sky lighting in Packaging Warehouse Potentially Cost-Effective
495 1298 Skylights in warehouses Potentially Cost-Effective
601 2684 Solar absorbers at the WAC to produce hot water Cost-Effective
480 5360 Solar Hot Water Cost-Effective
599 3218 Solar Hot Water & Pool Blankets Potentially Cost-Effective
299 2640 Solar hot water heating Potentially Cost-Effective
593 4907 Solar Hot Water System Cost-Effective
567 1977 Solar Pool Heating Cost-Effective
567 1982 Solar Pool Heating Cost-Effective
567 1979 Solar PV Cost-Effective
567 1983 Solar PV Cost-Effective
567 1988 Solar PV Cost-Effective
567 1992 Solar PV Cost-Effective
567 1996 Solar PV Cost-Effective
604 2301 Solar storage heating of potable hot water Potentially Cost-Effective
280 4269 SP3 Air Fuel ration control. Can only be done with control upgrade Potentially Cost-Effective
594 5064 Spa heating using Rotex system Cost-Effective
371 358 Speed control - AN1 CDC pusher fan Cost-Effective
371 373 Speed control AN2 02J01 blower Potentially Cost-Effective
371 374 Speed control AN2 02J02 blower Potentially Cost-Effective
371 359 Speed control AN2 02J06 fan Cost-Effective
330 439 Spirals Upgrade Potentially Cost-Effective
408 1234 SPRC - VSDs on CT pumps and fans for 3 CT on grassed area West of Cost-Effective
329 1661 Cultural Change Cost-Effective
329 1699 Staff club Cost-Effective
569 3615 Staff education and training- this should assist in reducing energy c Cost-Effective
411 2531 Standby Boiler Operation Potentially Cost-Effective
418 3437 Starch Fired Cogeneration Potentially Cost-Effective
286 97 Start/Stop HP Felt Spray Pumps Potentially Cost-Effective
286 96 Start/Stop Belbond Pumps Potentially Cost-Effective
293 2763 Steam and condensate leaks Cost-Effective
292 4341 Steam and condensate leaks Cost-Effective
485 5841 Steam boilers Cost-Effective
362 1746 steam boilers and steam system rationalisation Cost-Effective
359 464 Steam circuit integration Potentially Cost-Effective
371 352 Steam leak / trap improvement - nitrates Cost-Effective
318 4426 Steam Leaks-steam traps monitoring Cost-Effective
346 3820 Steam metering and review boiler operation Potentially Cost-Effective
372 5472 Steam monitoring Cost-Effective
299 2639 Steam Pipe Insulation Cost-Effective
411 2527 Steam pipe lagging Cost-Effective
385 1304 Steam Plant Upgrade (2 new boilers) Cost-Effective
319 2435 Sterilised waste heat recovery Potentially Cost-Effective
318 4445 Sterilised waste heat recovery Potentially Cost-Effective
433 3852 Stick water vacuum pump recycling Cost-Effective
498 2832 Stock preparation agitators Cost-Effective
498 2827 Stock pump efficiency audit Cost-Effective
280 4261 Stop-start pallet train. Requires IT resource currently on priority work Potentially Cost-Effective
414 4821 Store Area Lighting Automation Potentially Cost-Effective
482 420 Stores Lighting Replacement (Replaced only as required) Potentially Cost-Effective
308 3781 Streamlining production efficiency Cost-Effective
329 1677 Administration Cost-Effective
486 232 Study of low resistance cathode bars - Fundamental R&D Potentially Cost-Effective
486 231 Study of low resistance pots - Fundamental R&D Potentially Cost-Effective
346 3817 Subject to Op5, ductwork on D60 air compressor Cost-Effective
413 6574 Sub-metering - install automated system to capture sub meter data = rePotentially Cost-Effective
422 725 Supplementary bath heating through use of gas fired ceramic tube Potentially Cost-Effective
438 3118 Supply transformers - load sharing Cost-Effective
469 474 Surface coal haulage energy efficiency Cost-Effective
357 2495 Surface Lighting Optimisation Potentially Cost-Effective
570 815 Survey of site and installation of new air compressor Cost-Effective
384 1960 Swimming Pool Halogen Dichroic Lighting Replacement Potentially Cost-Effective
571 3332 Switch off store mezzanine lighting when not required Cost-Effective
298 2144 Switch off conveyors when not in use (e.g. in module wash area) Cost-Effective
285 1566 Switch off cooling fan - supply and exhaust Cost-Effective
571 3327 Switch off hot water system Cost-Effective
571 3313 Switch off lighting in kitchen and the toy store when not required Potentially Cost-Effective
333 1901 Switch off lighting in Server Rooms when not in use Cost-Effective
571 3340 Switch off pit lighting when not required Potentially Cost-Effective
575 1525 Switch off pool circulation pumps and UV sterilising equipment when thCost-Effective
586 5966 Switch off pool heat pumps during summer to avoid high monthly dem Cost-Effective
571 3304 Switch off radiant heater when not required Cost-Effective
360 3472 Switch off redundant vacuum pump for plastics area Cost-Effective
571 3305 Switch off room air conditioners when not required Potentially Cost-Effective
285 1567 Switch off heater when not required Cost-Effective
580 5404 Switch off street floodlights - adquate street lighting at night is availableCost-Effective
571 3318 Switch off the awnings lighting when there is adequate natural sun lightCost-Effective
571 3320 Switch off the condensor water pump and cooling tower when not requiPotentially Cost-Effective
571 3335 Switch off the crib room's lighting when not required Cost-Effective
571 3287 Switch off the hall's electric radiant heaters when not required Cost-Effective
571 3310 Switch off the hall's entrance lighting when there is adequate natural ligPotentially Cost-Effective
571 3307 Switch off the hall's lighting when not required Potentially Cost-Effective
571 3338 Switch off the lighting in the city works office's bathroom when it is not Cost-Effective
571 3337 Switch off the lighting in the city works office's crib room when it is not Cost-Effective
571 3309 Switch off the meeting rooms' lighting when not required Potentially Cost-Effective
571 3330 Switch off the meeting room's lighting when not required Cost-Effective
571 3333 Switch off the parks and garden storage areas lighting when not requir Cost-Effective
571 3317 Switch off the the grandstand & function centre's function room refrigerCost-Effective
571 3347 Switch off toilet lights and exaust fans when not required by installing Cost-Effective
396 647 Switch off boiler when Process 1/2 not in use Cost-Effective
453 1073 Switch off travelators and escalators during curfew and low usage peri Cost-Effective
580 5237 Switch off urn in staff room during winter and use a timer on the urn d Cost-Effective
509 6508 Switch off waste system for 2 hours overnight Cost-Effective
485 5912 Switching to provide access lighting through lab Cost-Effective
349 1316 Switch-Off Program for Out-of-Hours Equipment Cost-Effective
372 5482 System optimisation Potentially Cost-Effective
598 4937 T5 lighting upgrade Cost-Effective
590 2914 T5 Lighting: Car Park Cost-Effective
590 2903 T5 lighting: replace single T8's, car park Cost-Effective
590 2913 T5 Lighting: Replace twin T8s Cost-Effective
288 5719 T8 to T5 Fluorescent Lighting Replacement Cost-Effective
573 3446 Targeted 4kW reduction in building standby (after-hours audit, install ti Potentially Cost-Effective
280 4323 Temperature Comp. SP2 Comb. Air (investigation needed) Potentially Cost-Effective
601 2679 Temperature reset controls and timing rescheduling Cost-Effective
294 1650 Temperature/time analysis in air conditioning supply Potentially Cost-Effective
495 1291 Thermal insulation blankets for extruders Cost-Effective
390 4863 Thermostat control of radac cooling fans site wide Potentially Cost-Effective
280 4264 Thermostatic control furnace cooling towers. Check in winter Potentially Cost-Effective
463 1623 Ti 2 to T8 Lighting upgrade - Ongoing replacement Cost-Effective
599 3216 Time clock on drink fridge Cost-Effective
314 6479 Time clock/daylight sensor control of perimeter lights in carpark Cost-Effective
314 6482 Time clock/daylight sensor control of two levels of carpark Cost-Effective
599 3219 Time Clocks on Urns - installation of time clocks on the urn and zippiesCost-Effective
599 3214 Time Clocks on Urns - installation of time clocks on the zippy Cost-Effective
485 5729 Time of day scheduling of the computer access room air conditioner Cost-Effective
493 6172 Timed push buttons on split system AC units Potentially Cost-Effective
396 644 Timer control of office area water heaters Cost-Effective
297 542 Timer controls on Processing Plant air conditioning. Installation, progr Cost-Effective
592 1428 Timers for small electrical equipment using over 100W on standby Cost-Effective
590 2910 Timers on kitchenette equipment Cost-Effective
398 1062 Toilet lighting controls via PIR, lamp replacement, foyer lighting controlCost-Effective
305 951 Top Recovery Turbine at 6BF Potentially Cost-Effective
353 3363 Tower House Lighting Efficiency Upgrade Potentially Cost-Effective
353 3357 Tower Return Air System Cost-Effective
309 2659 TPM Maintenance Program TRACC Cost-Effective
294 1645 TPM3 team on ways to reduce energy usage on site by 4% through a Cost-Effective
347 1741 tracing & inspection of compressed air Potentially Cost-Effective
492 4105 Training and monitoring of practices by cleaning staff (turning lights off)Cost-Effective
492 4103 Training and support of security staff in energy conservation and wasteCost-Effective
453 1067 Trial Balltech device to improve chiller efficiency Cost-Effective
369 1443 Trial level control of centrifugal air pumps - 1 area Potentially Cost-Effective
368 1451 Trial level control of centrifugal air pumps - 1 area Potentially Cost-Effective
453 1089 Trial new T5 Flourescent lighting retrofit kits ffor standard 36W flouresPotentially Cost-Effective
319 2427 Tripe cooking waste heat recovery Potentially Cost-Effective
318 4447 Tripe cooking waste heat recovery Potentially Cost-Effective
579 3998 Triple 18W fluroescent fitting refurbished to twin 18W quad lamp with refCost-Effective
579 3996 Triple 36W fluorescent fitting refurbished to twin 37W quad lamp with refCost-Effective
336 5945 Tube wash steam boiler Potentially Cost-Effective
589 2377 Turn Fridge In Studio Rooms On Only When Require Cost-Effective
389 4140 Turn off air conditioning in docks 1,2,3 & 5 at night and upgrade ventilaCost-Effective
305 939 Turn off all computers, printers and copiers overnight if not needed. Cost-Effective
461 1590 Turn off centrifuge exhaust fan when not in use Potentially Cost-Effective
291 4292 Turn off cooling tower make up water pump Cost-Effective
390 4858 Turn off three hydraulic pumps if not used Potentially Cost-Effective
416 406 Turn off crusher when not in use for periods longer than 0.5hr. Cost-Effective
305 935 Turn off HVAC in Office buildings at night Cost-Effective
580 5232 Turn off kitchen lights and fans in off-season Cost-Effective
561 2719 Turn off lighting that operates continuosly within the Hall's storeroom ( Cost-Effective
286 58 Turn off lights Ceiling Space Cost-Effective
580 5233 Turn off main office air conditioner at night Cost-Effective
569 3614 Turn off major appliances at night and weekends (photocopiers etc.). BCost-Effective
593 4923 Turn off office equipment when not in use Cost-Effective
371 350 Turn off one boiler Cost-Effective
280 4240 Turn off soda ash dust collector Cost-Effective
561 2730 Turn off the continuosly operating roof pole light when there is adequatePotentially Cost-Effective
561 2742 Turn off the field change room hot water system. Cost-Effective
502 4515 Turn off U/G fans and pump Cost-Effective
284 4046 Turn synchronous motor to incoming bus to improve power factor Cost-Effective
580 5412 Turn the Zip boiler unit off and allow patrons to turn on as needed Cost-Effective
284 4054 Turning burners Potentially Cost-Effective
579 4005 Twin 18W fluorescent fitting replaced by new single 18W quad lamp with Cost-Effective
579 3986 Twin 36W and 58W fluorescent fitting replaced by new single 37W quad aCost-Effective
579 3983 Twin 36W fluorescent fitting refurbished to single 37W quad lamp with reCost-Effective
579 4004 Twin 36W fluorescent fitting replace by new single 37W quad lamp with reCost-Effective
579 3972 Twin 36W fluorescent fitting replaced by new single 37W quad lamp with Cost-Effective
579 4010 Twin 36W fluorescent fitting replaced by new single 37W quad lamp with Cost-Effective
579 4007 Twin 36W fluorescent fitting replaced by new single 37W quad lamp with Cost-Effective
579 3971 Twin 36W fluorescent fitting replaced by new single 37W quad lamp with rCost-Effective
579 3982 Twin 36W fluorescent fitting replaced by new single 37W quad lamp with Cost-Effective
579 3988 Twin 36W fluroescent fitting replace by new single 37W quad lamp with rCost-Effective
579 4006 Twin 36W fluroescent fitting replaced by new single 37W quad lamp with Cost-Effective
579 4000 Twin 36W fluroescent fitting replaced by new single 37W quad lamp with Cost-Effective
579 3999 Twin 36W flurorescent fitting replaced by new single 37W quad lamp withCost-Effective
579 3997 Twin 36W IND fluorescent fitting replaced by new single 37W quad lamp wCost-Effective
297 571 Two holding freezers on timers. Install time locks. Cost-Effective
455 1923 Ultrasound sensors installation for back of house area toilets using proPotentially Cost-Effective
369 1439 Underground conveyor controls. Cost-Effective
401 700 Underground Hauling - This project combines a number of optimisation Cost-Effective
324 1655 underground water management review Cost-Effective
364 3939 Undertake a more detailed analysis of energy usage (in particular - at Potentially Cost-Effective
575 1535 Undertake co-generation feasibility study to generate electricity and re Potentially Cost-Effective
479 174 Undertake compresed air leak reduction program Cost-Effective
571 3279 Undertake improvements to the economy cycle option Potentially Cost-Effective
561 2690 Undertake improvements to the night purge cycle to maximse the use of Cost-Effective
561 2691 Undertake improvements to the outside air economy cycle to maximise thCost-Effective
374 1162 Undertake manufacturing excellence project to reduce electricity con Cost-Effective
576 2082 Update HVAC -optimal time scheduling.floating space temperature reseCost-Effective
493 6292 Upgrade AC controls to BMS with occupancy control of AC & ventilatioPotentially Cost-Effective
456 6581 Upgrade aged 1 x 402kW reciprocating chiller with screw type chiller h Cost-Effective
466 3151 Upgrade air-conditioning of building Cost-Effective
606 3053 Upgrade based on Continuous Aeration with less tanks. Potentially Cost-Effective
584 5630 Upgrade bathroom light fittings in grandstands Cost-Effective
448 3770 Upgrade BMS field units and user interface and activate trending Cost-Effective
394 3634 Upgrade BMS interface and reprogramme the chillers staging control loCost-Effective
402 3836 Upgrade boiler conveying air motors Potentially Cost-Effective
402 3838 Upgrade boiler FD fan motor to high efficiency Potentially Cost-Effective
402 3837 Upgrade boiler feed water pump motors Potentially Cost-Effective
493 6276 Upgrade boilers to cast iron section higher efficiency including VSD's Potentially Cost-Effective
493 6060 Upgrade chiller & open shaft refrigeration compressors from reciprocatPotentially Cost-Effective
592 1431 Upgrade Hall lighting by replacing Mercury 125W Vapour Lamps with Potentially Cost-Effective
453 1074 Upgrade control of roof space lighting Cost-Effective
387 1276 Upgrade control system including blower controls. Potentially Cost-Effective
596 4976 Upgrade destratification system Potentially Cost-Effective
448 3787 Upgrade DHW heaters and pump Potentially Cost-Effective
448 3761 Upgrade ELV lamps to 35W Cost-Effective
448 3784 Upgrade ELV transformers to electronic Potentially Cost-Effective
459 5194 Upgrade existing BMCS to current standard Potentially Cost-Effective
488 4119 Upgrade existing Trane chillers with Carrier water cooled screw chillersPotentially Cost-Effective
387 1277 Upgrade flourescent lighting. Potentially Cost-Effective
419 2118 Upgrade Fluorescent Exit Signs to LED Exit Signs Potentially Cost-Effective
429 6557 Upgrade Fluorescent Lighting Cost-Effective
584 5629 Upgrade grandstand light fittings Cost-Effective
486 210 Upgrade Homogenising Furnace PLC and Burner Management system. (ExiCost-Effective
316 4504 Upgrade Hot Water System to heat pump technology Potentially Cost-Effective
488 4125 Upgrade hotel rooms AC controller with key tag link Potentially Cost-Effective
402 3832 Upgrade HS5 Compressor Motor Cost-Effective
576 2081 Upgrade HVAC (Heating,Ventilation,Air Conditioning) - install electronic Cost-Effective
576 2025 upgrade HVAC -install variable speed drives to the fan coil unit fans,outCost-Effective
453 1081 Upgrade inefficient light fittings Cost-Effective
592 1432 Upgrade lighting by replacing twin flourescent 58W tubes Potentially Cost-Effective
448 3786 Upgrade lift controllers and motor Potentially Cost-Effective
493 6317 Upgrade lighting & include occupancy/daylight based control Potentially Cost-Effective
297 6042 Upgrade lighting (1) halophosphate fluorescents to triphosphorous T8 Cost-Effective
568 3491 Upgrade lighting at Hall Potentially Cost-Effective
570 801 Upgrade lighting control and provide after-hour switches Cost-Effective
419 2117 Upgrade Lighting Controls in Flavours Restaurant Potentially Cost-Effective
573 3445 Upgrade lighting Potentially Cost-Effective
427 4509 Upgrade lighting installations Cost-Effective
493 6140 Upgrade lighting to triphosphor Potentially Cost-Effective
493 6277 Upgrade lighting to triphosphor Potentially Cost-Effective
297 549 Upgrade lighting(2): incandescent floods to metal halides Potentially Cost-Effective
297 537 Upgrade lighting: halophosphate fluorescents to triphosphorous T8 Potentially Cost-Effective
402 3839 Upgrade LS1 & LS2 refrigeration compressor motors Potentially Cost-Effective
586 5975 Upgrade main pumps with energy efficient motors and improve the systPotentially Cost-Effective
574 5139 Upgrade of AC2.1 controls Potentially Cost-Effective
574 5142 Upgrade of air conditioning controls Cost-Effective
367 5504 Up-grade of Air Handling Units. Raised floor area managed with conventiPotentially Cost-Effective
578 6580 Upgrade of lighting in office Cost-Effective
396 650 Upgrade office lighting to high efficiency alternative (costs shown as per 2Potentially Cost-Effective
570 802 Upgrade single T8 lamps with T5 retrofit kits to levels that have alrea Cost-Effective
583 2957 upgrade stage lighting Potentially Cost-Effective
488 4117 Upgrade the BMS to one proprietary brand system to integrate lighting,Potentially Cost-Effective
402 3835 Upgrade the boiler ID fan to high efficiency Cost-Effective
575 1519 Upgrade the building management system (BMS) to increase the reliabPotentially Cost-Effective
571 3284 Upgrade the supply air ductworkas part of a building refurbishment Potentially Cost-Effective
484 3543 Upgrade twin 36W fittings to high reflective single 36W Potentially Cost-Effective
592 1395 Upgrade twin flourescent lamps Potentially Cost-Effective
601 2671 upgrading of lighting Cost-Effective
601 2672 upgrading of lighting Cost-Effective
601 2673 upgrading of lighting Cost-Effective
601 2674 upgrading of lighting Cost-Effective
601 2675 upgrading of lighting Cost-Effective
601 2676 upgrading of lighting Cost-Effective
601 2677 upgrading of lighting Cost-Effective
307 30 Us of pipeline as buffer storage Potentially Cost-Effective
280 4257 Use air knives instead of air sweeps Cost-Effective
388 3466 Use biogas in process boilers, redirecting biogas from flare, and reduciCost-Effective
417 4394 Use Cooling Tower Water on some Reactors Potentially Cost-Effective
301 1148 Use cooling towers to cool product from pasteurisers instead of chilled Potentially Cost-Effective
573 3435 Use dissolved oxygen (or other process-specific) sensors linked to VSDPotentially Cost-Effective
300 2289 Use higher efficiency motors and drives to generally improve the effici Potentially Cost-Effective
371 348 Use of electric lube oil pumps Cost-Effective
502 4521 Use of HEM for motors in the new CH&PP Cost-Effective
371 347 Use of low fire burners - Nitrate boilers Cost-Effective
380 259 Use of Pellet Handling Vacuum Loader exhaust air to dry pellets Cost-Effective
606 3064 Use of valves to control chlorine injection rather than pumps. Potentially Cost-Effective
606 3055 Use of variable speed drives for effluent transfer pumps and aeration bPotentially Cost-Effective
502 4523 Use of VSDs on Maingate 2 conveyor Potentially Cost-Effective
502 4525 Use of VSDs on Maingate 3 conveyor Potentially Cost-Effective
305 1013 Use waste heat from roof vents to preheat feed water to the boilers Potentially Cost-Effective
436 397 Utility air system survey Potentially Cost-Effective
289 1927 V.S.D's Chilled and Condenser water pumps Potentially Cost-Effective
443 5823 Vacuum Pump VSD Cost-Effective
318 4429 valves lagging, costings and paybacks based on per valve Cost-Effective
322 306 Varaible Speed Drives for fans. Potentially Cost-Effective
515 4661 Variable Displacement pumps on the longwall Cost-Effective
335 1763 Variable Flow Chilled Water plant Cost-Effective
342 1157 Variable output air compressor Potentially Cost-Effective
306 779 Variable speed air compressors. Potentially Cost-Effective
343 3959 Variable speed air compressors. Testing of air systems Potentially Cost-Effective
318 4421 Variable speed control for hot water circulation pump Cost-Effective
319 2425 Variable speed control hot water pump transfer Potentially Cost-Effective
318 4437 Variable speed control hot water transfer pump Cost-Effective
319 2418 Variable speed control of Combustion Air Fan for 10MW Boiler Cost-Effective
319 2424 Variable speed control of hot water circulating pumps Potentially Cost-Effective
568 3484 Variable speed drive for reticulation pump – will reduce the speed fr Potentially Cost-Effective
318 4443 Variable speed drive for water feed pumps to boiler Potentially Cost-Effective
353 3358 Variable speed drive installation to 3 main condensor water pumps on tPotentially Cost-Effective
353 3359 Variable speed drive installation to all 5 primary chilled water pumps Potentially Cost-Effective
353 3360 Variable speed drive installation to the Dedicated Condensor water pu Potentially Cost-Effective
293 2772 Variable speed drive pumps Potentially Cost-Effective
599 3217 Variable Speed Drives Potentially Cost-Effective
599 3208 Variable Speed Drives - installation of VSD on some of the Air Conditi Cost-Effective
503 887 variable Speed Drives for Process Pumps Cost-Effective
439 3290 Variable speed drives on the condensor fans and head pressure controlCost-Effective
416 412 Variable speed motor drives. Cost-Effective
353 3353 Various retail and house lighting projects Cost-Effective
335 1762 VAV AHU Systems Cost-Effective
292 4335 Vendor ante room doors Employee awareness Cost-Effective
322 5954 ventilation re-sizing and control Potentially Cost-Effective
321 295 Ventilation re-sizing and control. Potentially Cost-Effective
335 1760 Ventilation Systems Potentially Cost-Effective
397 4013 Verify efficiency of all water pumping systems Potentially Cost-Effective
453 1113 Verify integration of TRANE chiller controls with BMCS is optimised. Cost-Effective
453 1066 Verify integration of TRANE chiller controls with BMCS is optimised Cost-Effective
569 3641 Villa insulation. Based on insulation leading to a 10% reduction in spacCost-Effective
407 3716 Voltage control - static var compensation system Cost-Effective
343 3955 Voltage control on existing fluorescent lights Potentially Cost-Effective
411 2538 Voltage controller for plant lighting Potentially Cost-Effective
404 2748 Voltage reduction in open plan areas Cost-Effective
579 3987 Voltage reduction unit (for 26 lamps) Cost-Effective
579 4001 Voltage Reduction Unit (for 30 lamps in amenities block) Cost-Effective
579 3985 Voltage Reduction Unit (for 44 lamps) Cost-Effective
579 3992 Voltage Reduction Unit (for 85 lamps for administration block) Cost-Effective
579 3969 Voltage Reduction Unit (for 52 lamps) Cost-Effective
569 3624 VRUs for car park lighting Cost-Effective
565 5266 VSD Potentially Cost-Effective
565 5268 VSD Potentially Cost-Effective
565 5269 VSD Potentially Cost-Effective
282 3158 VSD – Chilled water pump Potentially Cost-Effective
282 3159 VSD – Cooling tower fan Potentially Cost-Effective
282 3185 VSD - Supply air fan Potentially Cost-Effective
282 3190 VSD - Supply air fan Potentially Cost-Effective
282 3160 VSD – Supply air fan Potentially Cost-Effective
328 246 VSD (VVVF) for PS26 Pumps Potentially Cost-Effective
288 5721 VSD and Power Factor Correction Cost-Effective
583 2961 VSD and Smaller Pump Cost-Effective
488 4115 VSD Car park ventilation fans Cost-Effective
341 283 VSD Control for Cyclone Fans Potentially Cost-Effective
469 475 VSD control for new main ventilation system Potentially Cost-Effective
396 646 VSD control of coater atomising fan Cost-Effective
441 2227 VSD control on five (5) Chill water pumps. The pumps with VSD are to Potentially Cost-Effective
318 4439 VSD for all chillers fans Cost-Effective
282 3173 VSD for chilled water pumps Potentially Cost-Effective
312 792 VSD for Corporate chilled water pump Potentially Cost-Effective
414 4825 VSD for Recirculation Pump Potentially Cost-Effective
414 4822 VSD for Effluent Treatment Plant Secondary Feed Pump Potentially Cost-Effective
414 4823 VSD for Feed Water Pump Potentially Cost-Effective
312 795 VSD for High Temperature Dryer (HTD) combustion air fan Potentially Cost-Effective
300 2292 VSD for Hose Water Pump. Use a VSD to control the pressure on the hPotentially Cost-Effective
282 3176 VSD for jacking pump & Saltwater pump instrumentation & control sys Cost-Effective
463 1622 VSD for Vent Fans Cost-Effective
377 4852 VSD for preheater recirculation fans Potentially Cost-Effective
414 4819 VSD for Primary & Secondary FD Fans Potentially Cost-Effective
330 438 VSD for Process Pumps Potentially Cost-Effective
300 2291 VSD for Process Water Pumps. Use a VSD to control the pressure on tPotentially Cost-Effective
291 4308 VSD hot water pump Potentially Cost-Effective
291 4307 VSD main chilled water pump Potentially Cost-Effective
286 93 VSD Backwater Pump Potentially Cost-Effective
286 82 VSD Condensate Pump Potentially Cost-Effective
286 95 VSD Rejects Pump Potentially Cost-Effective
286 75 VSD Stock Pump to Mach. Chest Potentially Cost-Effective
286 87 VSD Backwater Pump to DAF Potentially Cost-Effective
286 73 VSD Bottom Ply XS Water Pump Potentially Cost-Effective
286 90 VSD Cloudy Filtrate Pump Potentially Cost-Effective
286 83 VSD Heat Ex Cooling Pump Potentially Cost-Effective
286 84 VSD Feed Stock Pump Potentially Cost-Effective
286 92 VSD Top Ply Headbox Pump Potentially Cost-Effective
318 4446 VSD of combustion fan of the boilers Cost-Effective
318 4450 VSD on 150kw screw compressor Potentially Cost-Effective
372 5488 VSD on aeration pumps Potentially Cost-Effective
318 4467 VSD on air compressors Potentially Cost-Effective
289 1928 VSD on Air Handling Units Potentially Cost-Effective
329 1675 VSD on air supply fans on stage 1 Cost-Effective
481 118 VSD on Baler hydrolics Potentially Cost-Effective
334 3804 VSD on boiler feed water pump Cost-Effective
484 3540 VSD on chilled water pumps Potentially Cost-Effective
329 1674 VSD on chilled water pumps Cost-Effective
502 4536 VSD on circulating medium pumps Potentially Cost-Effective
372 5473 VSD on combustion fan Cost-Effective
372 5485 VSD on combustion fan Potentially Cost-Effective
482 419 VSD on Compactor Hydraulics (Replaced only as required) Potentially Cost-Effective
484 3537 VSD on Condensor Water pumps Potentially Cost-Effective
590 2905 VSD on CT, Chilled water pump, condenser pump & Hot water pump. Cost-Effective
373 5515 VSD on circulation pump Potentially Cost-Effective
373 5514 VSD on feed no 1 pump Potentially Cost-Effective
318 4461 VSD on evaporative condenser fans Potentially Cost-Effective
329 1669 VSD on evaporative cooler fan Cost-Effective
318 4428 VSD on extraction and fresh air supply fans Cost-Effective
318 4464 VSD on Extraction fan at the blood plant Potentially Cost-Effective
372 5483 VSD on glycol pump Potentially Cost-Effective
372 5474 VSD on hot air circulating pump Cost-Effective
372 5486 VSD on hot water circulating pumps Potentially Cost-Effective
505 4383 VSD on HVAC Pumps - VSD control on Chill water pumps, Condensor WatPotentially Cost-Effective
506 4332 VSD on HVAC Pumps - VSD control on Chill water pumps, Condensor WatPotentially Cost-Effective
377 4851 VSD on hydraulics Potentially Cost-Effective
309 2662 VSD on Kiln recirculation fans Potentially Cost-Effective
502 4519 VSD on Module 1 dense medium cyclone feed pump Cost-Effective
502 4518 VSD on Module 1 desliming cyclone feed pump Cost-Effective
502 4535 VSD on Module 2 dense medium cyclone feed pump Potentially Cost-Effective
372 5471 VSD on new screw compressor Cost-Effective
318 4468 VSD on oil cooler water pump Potentially Cost-Effective
290 3408 VSD on primary chilled water pump (PCHWP-1) Cost-Effective
290 3406 VSD on Primary Chilled water pump (PCHWP-3) Cost-Effective
318 4430 VSD on screw compressor 320kw Cost-Effective
372 5481 VSD on screw compressors Potentially Cost-Effective
285 1571 VSD on the lubricant supply pump for the Schnieder Potentially Cost-Effective
318 4452 VSD on water pumps Potentially Cost-Effective
396 635 VSD optimisation of extruder drives Cost-Effective
454 109 VSD to building T condensor fans Cost-Effective
454 105 VSD to Plaza condensor water pumps Cost-Effective
454 104 VSD to Plaza Cooling tower fan Cost-Effective
454 106 VSD to Shed cooling tower fans Cost-Effective
286 68 VSD/small motor water pump Potentially Cost-Effective
286 88 VSDs @415V/ WPP Coarse Screen Pump Potentially Cost-Effective
484 3542 VSDs and CO monitoring on Car Park Potentially Cost-Effective
569 3629 VSDs for chilled water pumps Potentially Cost-Effective
280 4326 VSDs M/C furnace combustion fans Potentially Cost-Effective
280 4265 VSDs M/C machine cooling fans Potentially Cost-Effective
398 1063 VSD's on 7 off cooling tower fans. Control fans using temperature tra Potentially Cost-Effective
290 3410 VSDs on all 3 cooling tower fans Cost-Effective
331 2140 VSDs on concentrator drives Potentially Cost-Effective
398 1060 VSD's on condenser two water pumps serving the low load chillers. Cost-Effective
347 1737 VSDs on high stage refrig compressors and head pressure controls Cost-Effective
502 4513 VSDs on Maingate Conveyor 1 Tripper 1 Cost-Effective
502 4534 VSDs on Module 2 desliming cyclone feed pump Potentially Cost-Effective
365 5456 VSD's on secondary chilled water pumps. Install variable speed drives Cost-Effective
440 6526 VSDs on spiral fans Potentially Cost-Effective
502 4517 VSDs on two Thickener underflow pumps Cost-Effective
386 4070 W5C – Building Upgrade Potentially Cost-Effective
414 4831 Warehouse and Loading Dock Lighting Automation Potentially Cost-Effective
332 4508 Warm filling with ultrasonic defoaming Potentially Cost-Effective
439 3298 Waste cooking oil cogeneration Plant Potentially Cost-Effective
317 4479 Waste heat recovery - finished oil Potentially Cost-Effective
317 4473 Waste Heat Recovery from air compressor Cost-Effective
319 2429 Waste heat recovery from Condenser Potentially Cost-Effective
396 659 Waste heat recovery from main compressor Potentially Cost-Effective
317 4480 Waste heat recovery seed cooker Potentially Cost-Effective
414 4814 Waste Paper Plant Lighting Disconnection Cost-Effective
411 2530 Wastewater treatment plant steam trap Cost-Effective
480 5361 Water Conservation Cost-Effective
314 6483 Water feature pumps speed control Cost-Effective
411 2540 Water supply booster pump VSD Potentially Cost-Effective
379 1176 Water supply pump VSD Cost-Effective
599 3215 Water wise showers - water saver valves on shower roses Cost-Effective
386 4064 Web Energy Management Cost-Effective
366 5681 Office Lighting Upgrade 2. Automatic lighting control through the IntegrCost-Effective
370 1462 Whole site Power Factor Correction Potentially Cost-Effective
370 1456 Whole site: Embedded Generation - WestVAMP Cost-Effective
401 699 Winder upgrade - by increasing the winder Lifting rate from 815 to 95 Cost-Effective
593 4914 Window film Potentially Cost-Effective
282 3167 Window Tinting Potentially Cost-Effective
282 3170 Window Tinting Potentially Cost-Effective
481 112 WIP area control lighting Cost-Effective
509 6512 Wire secondary lighting circuit and install lighting controls Potentially Cost-Effective
366 5687 Workstation Power Management. Employee enable ENERGY STAR and TCost-Effective
286 65 WPP Bypass Long Fibre Chest Cost-Effective
286 67 WPP GSW ex Pump Potentially Cost-Effective
286 94 WPP Relocate Borewater Contrashear Potentially Cost-Effective
286 76 WPP Smaller Long Fibre Dilution Pump Potentially Cost-Effective
286 56 WPP Steam Isolation Cost-Effective
286 70 WPP VSD Long Fibre Silo Pump to No7/No.8 Potentially Cost-Effective
286 89 WPP VSD Short Fibre Dilution Pump Potentially Cost-Effective
286 81 WPP VSD Short Fibre Silo Pump to No7 Potentially Cost-Effective
286 86 WPP VSD Short Fibre Silo Pump to No8 Potentially Cost-Effective
Equipment Type Estimated cost (Estimated electrEstimated naturaStatus
HVAC $20,065 34 Not to be implemented
HVAC $17,390 34 Not to be implemented
Pool Covers/Heating $130,000 616 Under-investigation
Lighting NULL 8
Behaviour/Education $25,000 315
Behaviour/Education $26,250 331
Behaviour/Education $27,563 348
Behaviour/Education $28,941 365
Behaviour/Education $50,000 1,209
Behaviour/Education $52,500 1,269
Behaviour/Education $55,125 1,333
Behaviour/Education $57,881 1,400
Industrial Equipment $1,000,000 0 Ongoing
Other NULL 81 Ongoing
Power Factor Correction $17,000 NULL NULL Implemented
HVAC $4,000 9,600
Lighting $4,658 10 Implemented
Industrial Equipment $2,000 70
Air compressor $220,000 560 To be implemented
Other $150,000 1,550 Implemented
Other $161,000 720 To be implemented
Air compressor $100,000 560 To be implemented
Industrial Equipment $30,000 98 To be implemented
Industrial Equipment $90,000 270 To be implemented
Other $400,000 1,020 To be implemented
Industrial Equipment $25,500,000 9,010 Implemented
Lighting $140,000 206 Under-investigation
Air compressor $35,000 89 Implemented
Refrigeration $100 104
Computers & Printers $20,000 149
Computers & Printers NULL 1 Implemented
Hot Water System $300 1 24
Hot Water System $500 6
Lighting $2,000 9
Other $50,900 165 Implemented
Boiler $20,000 289
Mixed $13,643 29 Implemented
HVAC NULL 45 Under-investigation
Alternative power generation $1,000 3
Refrigeration $1,000 163 Implemented
Industrial Equipment $45 3 Not to be implemented
Lighting $200 6
Lighting $60 2
Air compressor $55,100 335
Other $18,000 280 Under-investigation
Industrial Equipment $6,500 17,000 Implemented
Other NULL 151 487
Industrial Equipment $71,000 1,581
HVAC $5,000 8 Implemented
Air compressor $63,000 49
Mixed $138,700 488 Implemented
Air compressor $9,500 83 Implemented
Air compressor $18,100 26 Implemented
Air compressor $6,365 158 Ongoing
Air compressor NULL 76 To be implemented
Air compressor $54,500 370 To be implemented
Air compressor $437,000 300
Lighting $500 11
Air compressor $258,421 349 Implemented
Air compressor $500,000 4,800 Implemented
HVAC $1,500 33 Ongoing
HVAC $1,500 5
HVAC $1,800 14 To be implemented
HVAC $850 52 Implemented
HVAC $500 110
HVAC $128,000 417 Under-investigation
HVAC $50,000 41
Other $13,000 105
Industrial Equipment $23,000 228
Other NULL 823 Implemented
HVAC NULL 1,172 4,038
HVAC $25,000 309 Under-investigation
HVAC $40,000 717 To be implemented
Cogeneration $25,000 219
Lighting NULL 128 Implemented
Industrial Equipment $1,500,000 1,600
Computers & Printers NULL 17
Lighting $500 2
HVAC $300 18
Industrial Equipment $4,500,000 5,935 To be implemented
Industrial Equipment $4,500,000 5,935 Implemented
Industrial Equipment $4,500,000 5,935 To be implemented
HVAC $1,200 64 To be implemented
HVAC $15,000 98 Implemented
Building Management Systems $1,500 8 Implemented
HVAC $2,175 6 Implemented
HVAC $7,500 21 Implemented
Lighting $17,830 182
HVAC $5,000 4
Industrial Equipment NULL 3,960 Under-investigation
Industrial equipment $17,439 25
Lighting $2,500 70
Hot Water System $26,560 181 Not to be implemented
Lighting $12,000 101
Other $25,000 50 Implemented
Industrial Equipment $50,000 245 Implemented
Industrial Equipment $12,500 57
Industrial Equipment $100,000 35 Implemented
Other $20,000 13 Implemented
HVAC $22,000 15
Lighting $300,000 400
Lighting $30,000 20 Ongoing
Ventilation $360,000 1,500
Industrial Equipment $10,000 34 Under-investigation
Industrial Equipment $50,000 557
Industrial Equipment $150,000 711
insulation $120,000 790 Not to be implemented
Behaviour/Education $100,000 NULL NULL Implemented
Industrial Equipment $31,500 96 Not to be implemented
HVAC $3,725 52
Air compressor $28,000 240
Air Compressor $255,000 77
Lighting $66,991 252
HVAC NULL 1,000 Not to be implemented
Industrial Equipment NULL 500 Implemented
HVAC NULL 1,000 Not to be implemented
Alternative power generation $6,600,000 10,000 Implemented
Industrial Equipment $4,000,000 1,500 Not to be implemented
Industrial Equipment $4,000,000 2,238 Not to be implemented
Industrial Equipment $636,000 3,696 To be implemented
Lighting $16,550 59 Under-investigation
Air compressor $64,000 846 Implemented
Air compressor NULL NULL NULL Ongoing
Industrial Equipment $1,440 98 Implemented
Industrial Equipment $12,000 49 Implemented
Other $120 3 Implemented
Industrial Equipment $2,400 15 Not to be implemented
Other $50 10
Industrial Equipment $3,000 12
Industrial Equipment $3,500 62
Refrigeration $150,000 3,494
Industrial Equipment $200 5 To be implemented
Industrial Equipment $1,920 6 Not to be implemented
Air compressor $380,000 2,779 Not to be implemented
Boiler $29,670 1,551 Implemented
Industrial Equipment $19,825 69
Industrial Equipment $400 38
Industrial Equipment $10,000 20
Industrial Equipment $10,000 8
Hot Water System $450 1
Lighting $500 1
ventilation $10,000 10
Industrial Equipment $3,000 8 Not to be implemented
Other $480 11 Implemented
Industrial Equipment $600 26
Industrial Equipment $14,000 3,187
Boiler $2,000 314
Air compressor $1,000 110
Other $28,800 13,608
Industrial Equipment $12,000 662
Industrial Equipment $500,000 400 Implemented
Industrial Equipment NULL 42,527 Under-investigation
HVAC $3,000 160
Boiler NULL 19 Not to be implemented
Ventilation $3,680 10 Implemented
Lighting $12,500 181 Implemented
Industrial Equipment NULL 84 Implemented
Hot Water System $137,200 184 To be implemented
Lighting $1,500 14
Lighting $1,500 14 To be implemented
Sub-Metering $25,000 14 To be implemented
Sub-metering $25,000 1,000 To be implemented
Industrial Equipment $20,000,000 180,000 To be implemented
Other NULL NULL NULL Implemented
Other $3,000,000 2,300 30,000 Ongoing
Other $391,000 2,208 Ongoing
Pool Covers/Heating $3,500 105
Waste heat recovery $11,000 79
Other $40,000 2 Implemented
Other $4,000 7
Waste heat recovery $7,360 405
HVAC $1,100 2 Not to be implemented
HVAC $10,000 3 Implemented
Other NULL 32,000 Ongoing
Waste heat recovery $20,000 1,840 Not to be implemented
Boiler $400 145
Waste heat recovery $10,000 300 Not to be implemented
Boiler $90,000 5,050
Boiler $20,000 1,350 To be implemented
Boiler $20,000 1,400 To be implemented
Boiler $28,000 4,730
Industrial Equipment $7,000 31
Boiler $3,000 444 To be implemented
Lighting $1,500 9 To be implemented
Lighting $3,000 28 Under-investigation
Boiler NULL 15,187
Boiler $54,000 100 2,430
Boiler $8,000 388 To be implemented
Boiler $2,200,000 12,889
Boiler $98,000 7,201 Implemented
Boiler $45,500 52 1,828
Boiler $6,000 9 Under-investigation
Power Factor Correction $1,240,000 5,854 Implemented
Industrial Equipment $350,000,000 358,000
HVAC $100,000 8 To be implemented
Building Management Systems $10,000 13 317
Building Management Systems $2,000 25
Building Management Systems $4,000 35 Not to be implemented
Building Management Systems $4,000 35 Not to be implemented
Building Management Systems $3,000 32 191
Industrial Equipment $27,500 180 Not to be implemented
Industrial Equipment $8,000 25 Not to be implemented
Building Management Systems $2,000 12 Not to be implemented
HVAC $2,000 6 340
HVAC $4,000 19 466 Not to be implemented
HVAC NULL 55 Implemented
HVAC NULL 30 Implemented
HVAC $1,000 10 Implemented
Industrial Equipment $30,000 293 Not to be implemented
Building Management Systems $3,000 6
Building Management Systems $3,000 31 250
Industrial Equipment $27,000 32 Not to be implemented
Industrial Equipment $27,000 67 Not to be implemented
Industrial Equipment $16,000 162 Not to be implemented
Lighting $1,100 5 Not to be implemented
Building Management Systems $3,000 32 282
Building Management Systems $12,000 37 370
Building Management Systems $3,000 25 163
Building Management Systems $6,000 18 1,196
HVAC $3,000 45 478
HVAC $1,000 15
HVAC $9,000 38
Building Management Systems $2,000 19 60
HVAC NULL 18 To be implemented
Lighting NULL 15 Implemented
HVAC $6,000 25
Building Management Systems $2,000 16 84
Other $5,000 185
Other $5,000 185
Building Management Systems $100 101
Building Management Systems $2,000 24
Building Management Systems $4,000 32
HVAC $500 171
Building Management Systems $76,000 215
Building Management Systems $1,000,000 476
Building Management Systems $207,822 258 Ongoing
Refrigeration $30,000 215 Not to be implemented
Building Management Systems $3,000 17 86
Lighting $71,754 715
Lighting $50 10
Other $10,000 108
Building Management Systems $280,000 523 Not to be implemented
HVAC $56,000 900
Industrial Equipment $15,000 185
Insulation $117,680 601
Industrial Equipment $16,540 211
Industrial Equipment $47,000 487
Industrial Equipment $100,000 730
Lighting NULL 8 Not to be implemented
Lighting $18,000 313 Implemented
Lighting $1,100 26
Waste heat recovery $45,100 213 Not to be implemented
Waste heat recovery $27,000 1,060
Lighting $135,000 603 Implemented
Building Management Systems $178,000 350 Not to be implemented
Lighting $268,218 940 Not to be implemented
Lighting $2,875 11 Implemented
Lighting $1,725 10 Implemented
HVAC $500,000 1,660 Not to be implemented
HVAC $58,000 461 Under-investigation
Industrial Equipment $10,000 36 19,400
Industrial Equipment $40,000 6 3,040 To be implemented
Lighting $400 3 Implemented
Lighting $104,000 520 Implemented
Lighting $50 4
Lighting $64,755 188 Implemented
Lighting $35,806 61 Ongoing
Other $15,000 5,478 Not to be implemented
Lighting $556,500 410 To be implemented
Lighting $20,000 108
Other $120 56 Implemented
Ventilation $4,000 29 To be implemented
Cogeneration $11,000,000 60,704 -218,533
Lighting $36,860 34 Implemented
Lighting $5,200 5
Lighting $10,108 13
Maintenance $50,000 5,127 Implemented
Other $115,000 320 Implemented
Lighting $300 2
Lighting $22,000 251 Ongoing
Industrial Equipment $10,000 37 Not to be implemented
Maintenance $9,000 3,868
Other NULL 3,652 Under-investigation
Lighting $8,000 22 Implemented
Lighting $2,415 3
Lighting $558,600 819
Lighting $6,090 7
Pool Covers/Heating $500 22
HVAC NULL 22 Ongoing
HVAC $500 3 Implemented
HVAC $2,000 24
Other NULL 14,400 Not to be implemented
Building Management Systems $1,000 1 64
Boiler $57,400 1,039
Industrial Equipment $10,000 125
Industrial Equipment $36,000 116 Ongoing
HVAC $59,599 336 Implemented
HVAC $18,000 66
Chiller NULL 1,818 Implemented
Industrial Equipment $10,000 208 Implemented
Maintenance $2,000 71 Implemented
Other $2,000 174 Implemented
Other $2,000 98
Industrial Equipment $34,812 130
Industrial Equipment $42,750 326 To be implemented
Industrial Equipment $54,582 215
Industrial Equipment $4,000 66 Implemented
Chiller $8,000 116
Chiller $9,000 96
HVAC NULL 363 Implemented
Industrial Equipment $480 10
HVAC $600 96 Implemented
Ventilation $1,200 16 Implemented
Other $360 0 Implemented
Other $1,000 4
Lighting $300 14
Other $3,500 63 Implemented
Industrial Equipment $20,000 680 Implemented
Lighting $3,795 11 Implemented
Maintenance $2,000 87
Pool Covers/Heating $1,500 246 Implemented
Behaviour/Education $500,000 9,604 Implemented
ventilation $6,320 8
Ventilation $4,600 6 Implemented
Building Management Systems $283,000 450 Under-investigation
HVAC $96,000 329 Under-investigation
Industrial Equipment $67,500 170 To be implemented
Cogeneration $1,400,000 5,000 Not to be implemented
Cogeneration $16,000,000 75,600 To be implemented
Cogeneration $1,135,000 2,843 -31,698 Ongoing
Cogeneration $8,000,000 33,333 -200,000
Cogeneration $2,900,000 2,900
Cogeneration $1,276,000 1,248 Not to be implemented
Cogeneration $4,404,000 3,599 To be implemented
Cogeneration $810,000 733 409
Other $150,000 470 Under-investigation
Industrial Equipment $34,000 292 Not to be implemented
Other $4,750,000 244,367 Not to be implemented
Other $2,000,000 209,945 Under-investigation
Other $500,000 19,620
Boiler $58,000 972 Under-investigation
Boiler $15,000 743 Ongoing
Boiler $34,500 1,995 Implemented
Industrial Equipment $20 0.38 Implemented
Other $91,666 26
Other $91,666 10
Other $91,666 7
HVAC $472 3 Implemented
Other $500 0 Implemented
Industrial Equipment NULL 426 Implemented
Building Management Systems NULL 80 113 Under-investigation
Other NULL NULL NULL Implemented
Industrial Equipment $15,000 NULL NULL Ongoing
Other $51,000 NULL NULL Implemented
Air compressor $52,425 518
Air compressor $3,600 105 Implemented
Air compressor $39,630 283 Not to be implemented
Air compressor $20,000 41 Implemented
Air compressor $144,621 668 Implemented
Air compressor $55,000 630 To be implemented
Air compressor $2,000 57
Air compressor $3,000 29
Air compressor $50,000 1,300
Air compressor $20,000 96 To be implemented
Air compressor $13,000 821 Implemented
Air compressor $13,000 474 Implemented
Air compressor $2,500 132 Under-investigation
Air compressor $15,000 79 Ongoing
Air compressor $15,000 356 Ongoing
Air compressor $15,000 4 Ongoing
Air compressor NULL NULL NULL Ongoing
Air compressor $5,520 63 Implemented
Air compressor $10,000 120 Ongoing
Air compressor $5,600 473
Air compressor $42,640 313 To be implemented
Air compressor $11,000 64
Air compressor $18,000 445
Air compressor $56,000 143
Air compressor $33,500 374
Air compressor $6,000 27 Implemented
Air compressor $56,000 30
Air compressor $3,520 41 Ongoing
Air compressor $10,000 75
Air compressor $200 20 Ongoing
Air compressor $4,950 111 Ongoing
Air compressor $300 20 Under-investigation
Air compressor $120,000 386
Air compressor $176,000 1,201
Air compressor $33,000 400 Not to be implemented
Air compressor NULL 24 Ongoing
Air compressor $150,000 392 Implemented
Air compressor $60,000 83
Air compressor $100,000 278 Under-investigation
Air compressor $3,450 13 Implemented
Air compressor $38,500 556
Air compressor $13,500 285 Implemented
Air compressor $26,000 578 Ongoing
Air compressor $25,000 250 Implemented
Air compressor $15,000 163 Implemented
Air compressor $210,000 1,400 Ongoing
Air compressor $5,500 38
Air compressor $1,600 7 Not to be implemented
Air compressor $200 6 Implemented
Air compressor NULL NULL NULL Implemented
Air compressor $33,000 400 Implemented
Air compressor $30,500 296 Implemented
Air compressor $10,000 100 Implemented
Air compressor $8,000 38
Air compressor $30,000 250 Implemented
Air compressor $202,000 344
Air compressor NULL NULL NULL Ongoing
Air compressor NULL NULL NULL Implemented
Air compressor $15,000 83 Implemented
Air compressor $42,000 284
Air compressor $53,000 300 To be implemented
Air compressor NULL NULL NULL Ongoing
Air compressor $160,000 1,768 Implemented
Air compressor NULL NULL NULL Implemented
Mixed $90,000 320
Computers & Printers $10,200 2
Lighting $48,500 51
Computers & Printers NULL 51 To be implemented
Mixed $65,000 1,100 Under-investigation
Computers & Printers $12,000 24 Implemented
Waste heat recovery $70,000 360 Not to be implemented
Waste heat recovery $9,065 1,906
Other $179,000 4,166 Not to be implemented
Insulation $6,400 373
Industrial Equipment NULL NULL NULL Implemented
Industrial Equipment $59,960 285
Air compressor $2,440 127
Air compressor $2,500 207 Implemented
Air compressor $100 57
Industrial Equipment NULL 4,680 To be implemented
Tariffs $2,500 4
Air compressor $1,920 63
Boiler $8,000 3,400 Under-investigation
Lighting $1,600 5 Implemented
Lighting $1,760 112 To be implemented
Other $1,450 36 1,382 Implemented
Power Factor Correction $45,000 NULL NULL Ongoing
Industrial Equipment $80,000 555 Implemented
Computers & Printers $5,000 15 Not to be implemented
HVAC $14,852 13
Other $5,000 5,000 Under-investigation
Industrial Equipment $18,500 8
HVAC $20,000 500 Ongoing
Lighting $975 7 To be implemented
Lighting $1,000 32
Lighting NULL 35 Implemented
Lighting NULL 1 To be implemented
Industrial Equipment $3,000 82 Not to be implemented
HVAC $10,000 20
Lighting NULL 660
Lighting NULL 189
Boiler $1,000 8 Implemented
HVAC $37,540 22 Under-investigation
Lighting $1,000 16
Air compressor $5,000 150 Not to be implemented
Other NULL 134
Industrial Equipment $4,000 26
Lighting $2,000 2 Not to be implemented
HVAC $2,400 6 Not to be implemented
HVAC $2,400 17 Implemented
HVAC $4,800 8 Implemented
HVAC $4,800 38 Implemented
Lighting $3,400 6
Industrial Equipment NULL 200
Hot Water System $2,900 14
Lighting $7,659 8 Implemented
Lighting $384 4
Lighting $1,242 2 Implemented
Lighting $270 8 Implemented
HVAC $2,500 3 Not to be implemented
Industrial Equipment $9,500 18
Hot Water System $50,000 108
Hot Water System $25,000 29 To be implemented
Lighting $9,070 13 Implemented
Lighting $680 0.28 Implemented
Pool Covers/Heating $392,000 -568 7,859 To be implemented
HVAC $66,513 179 Implemented
Hot Water System $40,420 470 Not to be implemented
HVAC $4,800 6 Not to be implemented
HVAC $4,800 13 Implemented
HVAC $9,600 27 Not to be implemented
Hot Water System $6,000 18
HVAC NULL 2,729 Implemented
Industrial Equipment NULL NULL NULL Implemented
Industrial Equipment NULL 111
Industrial Equipment NULL NULL NULL Implemented
Industrial Equipment $160,000 250 Implemented
HVAC $44,000 417
HVAC NULL NULL NULL Implemented
HVAC NULL 433
HVAC $224,664 1,483
HVAC $14,640 118 Implemented
HVAC NULL 14 Implemented
Industrial Equipment $80,000 450 12,500 Ongoing
HVAC $2,000 21 To be implemented
HVAC $42,000 166 Implemented
Lighting $7,475 35 Implemented
Industrial Equipment $100,000 10,950 To be implemented
Other NULL 168 Ongoing
Mixed $500 47
Industrial Equipment $2,000 22 Not to be implemented
Industrial Equipment $15,000 136 Implemented
Industrial Equipment $25,000 861 Implemented
Lighting $1,500 10 To be implemented
Industrial Equipment $4,400 11 Implemented
Other $20,000 1 800
Lighting $3,000 8
Lighting $19,500 262
Lighting $4,000 13
Lighting $1,250 27
Lighting $4,300 12
Lighting $3,300 10
Lighting $1,500 3
Lighting $9,520 3
Lighting $2,835 5
Other $100,000 477
HVAC $20,000 400 Implemented
Boiler $19,710 343
Hot Water System NULL 189 295 To be implemented
HVAC $80,000 361 1,035 Under-investigation
Boiler $31,040 4,041
Other $60,000 2 1,200
Industrial Equipment $2,615,000 2,000 Implemented
Other $50,000 5 Not to be implemented
Lighting $8,000 18 To be implemented
Lighting $1,080 3
Lighting $200 0.68 Implemented
Lighting $945 1 Implemented
Lighting $250 1 Under-investigation
Lighting $360 0
Lighting $2,640 11
Lighting $3,000 12 Implemented
Lighting NULL 48 Implemented
Lighting $3,300 21
Lighting NULL 194 To be implemented
HVAC $200 7
Ventilation $7,560 14 Implemented
Other $20,000 9 Implemented
Air compressor $236,000 970
Hot Water System NULL 3
Hot Water System NULL 3
Hot Water System NULL 1
Hot Water System NULL 2
Hot Water System NULL 4 Implemented
Other $15,000 120
Other $290,000 2,969 Not to be implemented
Air compressor $1 347
Lighting $2,316,500 994 Under-investigation
Lighting $1,433,000 381 Ongoing
Air compressor $5,000 44 Implemented
Industrial Equipment $4,000 1,078 Implemented
Industrial Equipment NULL NULL NULL Implemented
Industrial Equipment $10,000 262 Implemented
Other $700 1
Other $700 1
Other $21,987 42
Other $700 1
Lighting $330 2 To be implemented
Industrial Equipment $1,045 57 Implemented
Chiller $185,000 284 To be implemented
Other NULL 371
HVAC $2,200 9 Implemented
HVAC NULL 26 Implemented
HVAC NULL 3 Implemented
Building Management Systems $1,100 13 Implemented
Other $500 6 Not to be implemented
HVAC NULL 10 Implemented
HVAC $0 8
HVAC $0 8 Implemented
Other NULL 2
Other NULL 6
Other NULL 2
Other $480 273 Not to be implemented
Lighting NULL 162
Boiler NULL 1,898 Implemented
Air compressor $10,000 60 Implemented
Lighting $6,300 31
HVAC $23,040 151 141 Implemented
HVAC $11,700 76 59 Implemented
Industrial Equipment $13,440 91 143 Implemented
Industrial Equipment $28,060 181 338 Implemented
HVAC $2,100 6 7 Implemented
Hot Water System $800 23 Implemented
Hot Water System $10,350 14 Implemented
Hot Water System $17,250 25 Implemented
Industrial Equipment $300,000 1,983 Ongoing
Industrial Equipment $5,000 285 Implemented
Other $50,000 7,971 Ongoing
Other $100,000 8,569
Industrial Equipment $5,000 370 Not to be implemented
Boiler $46,000 2,971
Waste heat recovery $90,000 9,785 Ongoing
Air compressor $180,000 1,135 Implemented
HVAC $167,200 686 Ongoing
HVAC $31,500 128
HVAC $3,800 0
HVAC $5,000 8
HVAC $5,000 20
HVAC $3,000 4
HVAC $12,000 32 Implemented
HVAC $3,800 57
Computers & Printers $250 1 Under-investigation
Waste heat recovery $30,000 3,733 To be implemented
Industrial Equipment $60,000 154
Other $22,500 131 To be implemented
Hot Water System $2,000 588 Implemented
HVAC $2,000 10
Other $5,000 7 Not to be implemented
Lighting $500 1
HVAC $6,760 36 Implemented
Waste heat recovery $5,000 5 Not to be implemented
Other $13,000 59
Other $14,000 12
Other NULL 39 Under-investigation
Air compressor $1 265 Not to be implemented
Other NULL 390
Air Compressor NULL 148
Other $168,000 1,268
Other $0 6
Computers & Printers $0 12
Computers & Printers $24,000 72
Other $500 0
Other $500 0
Behaviour/Education $239,530 1,394
Behaviour/Education $15,000 120
Behaviour/Education $6,000 1,528 Under-investigation
Monitoring $15,000 396
Behaviour/Education $23,000 1,700 Implemented
Behaviour/Education $22,000 636
Behaviour/Education $22,000 1,567
Behaviour/Education $22,000 842
Behaviour/Education $15,000 1,529 To be implemented
Behaviour/Education $15,000 202
Behaviour/Education $25,000 730 Ongoing
Behaviour/Education $3,000 14
Behaviour/Education $7,000 396
Behaviour/Education $7,000 202
Chiller $280,000 154
Lighting $155,700 203
Lighting $2,000 0
Lighting $5,000 0
Lighting $5,000 0
Industrial Equipment NULL 219 Under-investigation
Other $12,050 100
Other NULL 18
Other $285,700 1,326
Other $272,500 1,528
Other NULL 325 1,580
Other $120,000 681 Under-investigation
Other $200,000 12,500 Implemented
Lighting $6,000 3
Lighting $10,000 3
Lighting $5,000 4
Lighting $14,933 104
Other NULL 293 Implemented
Lighting $3,000 33 To be implemented
Industrial Equipment $12,000 113 To be implemented
Other $75,000 12,500 Ongoing
Industrial Equipment NULL NULL NULL Ongoing
Pool Covers/Heating $10,000 253
Boiler $5,000 350 Implemented
Behaviour/Education NULL 32
HVAC $240,000 945 Under-investigation
HVAC $15,397 9
Behaviour/Education NULL 160 Implemented
Behaviour/Education NULL 160 Implemented
Lighting $282,000 530
Industrial Equipment $20,000 241
HVAC $6,320 50
Industrial Equipment $15,000 4 2,000
Industrial Equipment $750 33 To be implemented
Lighting $16,000 27 Ongoing
Other $700 1 Implemented
Lighting $1,500 12
Lighting $1,000 46
Other $200,000 571 Under-investigation
Lighting $30,000 52 Implemented
HVAC $180,000 425 Not to be implemented
Lighting $28,770 106 Ongoing
Industrial Equipment $21,948 80
Air compressor $65,000 540
Lighting $23,000 313 Ongoing
Lighting $20,000 37
Lighting $1,175 3 Ongoing
Lighting $9,045 30 Ongoing
Industrial Equipment $100,000 810 Not to be implemented
Other $47,000 0 To be implemented
HVAC $3,176 55
HVAC $2,700 15 To be implemented
Industrial Equipment $60,000 31,870 Implemented
Industrial Equipment $29,000 195 Not to be implemented
Lighting $6,375 63
Industrial Equipment $50,000 8 Implemented
Boiler $35,000,000 387,072
Lighting $16,324 20
Other $50,000 263
Hot Water System $350 1 Implemented
Hot Water System $35 0.28 Implemented
Hot Water System $100 0 Implemented
Hot Water System $1,500 2 Not to be implemented
Industrial Equipment $30,000 150
Industrial Equipment $30,000 110
Industrial Equipment $30,000 150
Industrial Equipment $90,000 365
Industrial Equipment $90,000 200
Other NULL 49
Air compressor $2,500 19
Lighting $2,661 21 Not to be implemented
Lighting $35,730 74
Lighting $126,000 215 To be implemented
Lighting $750 2
Waste heat recovery $30,000 875
Waste heat recovery $128,000 4,029 Implemented
Other $12,000 660 Implemented
Industrial Equipment $2,000 43 Not to be implemented
Lighting $7,000 22 Ongoing
Lighting $14,500 68 Ongoing
Lighting $326,000 214 Under-investigation
Lighting NULL 86 Implemented
Industrial Equipment $200,000 80,000 Implemented
Maintenance $0 20 To be implemented
Maintenance $0 5 To be implemented
Chiller $5,000 207 Implemented
Industrial Equipment $5,000 170 Implemented
HVAC $12,100 52
Lighting NULL 3
Industrial Equipment $600,000 1,760
Other NULL 1,830
Other $622,314 23,935
Air compressor $301,000 632 To be implemented
HVAC $569,250 1,415 Not to be implemented
Industrial Equipment $70,000 290 Not to be implemented
Ventilation $2,500 8 Implemented
Industrial Equipment NULL 10,228 Under-investigation
Other $25,000 13,636 To be implemented
Industrial Equipment $2,000 2,472 Implemented
Other NULL NULL NULL Under-investigation
Industrial Equipment NULL 133 Implemented
Other $500,000 5,755 To be implemented
Air compressor $10,000 104 Under-investigation
Lighting $16,100 39 Implemented
Chiller $788,400 2,433 -12,607 Not to be implemented
HVAC $300,000 220 -993 Not to be implemented
Industrial Equipment $2,700 0
Air compressor $8,000 75 Implemented
Lighting $16,020 18
Lighting $33,300 31
Lighting $18,720 24
Lighting $50,220 55
Lighting $10,080 10
Lighting $38,160 46
Lighting $56,700 63
Lighting $10,620 11
Lighting $55,980 62
Lighting $156,060 181
Lighting $14,240 44
Lighting $2,000 8 To be implemented
Lighting $2,000 8 To be implemented
Lighting $49,500 59 Implemented
HVAC $5,000 31 Implemented
Industrial Equipment $53,500 417
Other $135,717 224 Not to be implemented
HVAC $13,044 8
Industrial Equipment NULL 3,364 Not to be implemented
Behaviour/Education $4,000 32 To be implemented
HVAC $729,300 192
Lighting $73,190 112
Lighting $8,445 39
Refrigeration NULL 22
HVAC $7,903 5
Lighting $1,150 4 Implemented
HVAC $3,077 58 Implemented
Other $14,615 43 Implemented
HVAC $2,403 13 Implemented
HVAC $38,460 104 Implemented
Industrial Equipment $19,999 58 Implemented
Other $2,308 14 Implemented
Industrial Equipment $6,154 35 Implemented
Industrial Equipment $49,229 76 Implemented
HVAC $12,307 65 Implemented
Other $3,077 30 Implemented
Industrial Equipment $10,000 53 Under-investigation
Refrigeration $90,000 602 To be implemented
Refrigeration $45,000 164 To be implemented
HVAC $22,125 44 Not to be implemented
HVAC $54,000 110 Not to be implemented
HVAC $85,000 95 Not to be implemented
Other $60,000 14,206 To be implemented
Other $100,000 21,052 To be implemented
Hot Water System $14,630 32 To be implemented
Hot Water System $14,630 37 To be implemented
Hot Water System NULL -278 3,761
Pool Covers/Heating $64,000 873
HVAC $32,100 60 Implemented
Waste heat recovery $190,000 2,635 To be implemented
Waste heat recovery $1,300 146
Waste heat recovery $1,000,000 2,249 Not to be implemented
Waste heat recovery $30,000 780 Ongoing
Waste heat recovery $60,000 1,170 Under-investigation
Waste heat recovery $179,000 0 Not to be implemented
Waste heat recovery $28,600 1,454 Not to be implemented
Waste heat recovery $175,000 19,190 Not to be implemented
Waste heat recovery $77,000 132 2,634
Waste heat recovery $297,000 9,636 Not to be implemented
Waste heat recovery $108,000 3,075 Implemented
HVAC $12,000 180 To be implemented
Industrial Equipment NULL 294
HVAC $300 17
Industrial Equipment $2,500 2,000 Implemented
Lighting $79,000 118 Under-investigation
Industrial Equipment $6,300 17 Ongoing
Industrial Equipment $900 4 Ongoing
Industrial Equipment $8,200 13 Ongoing
Chiller $580,000 237 Implemented
Industrial Equipment $36,200 21
HVAC $200,000 72 Implemented
Industrial Equipment $940,000 1,125 Not to be implemented
Industrial Equipment $520,000 750 Not to be implemented
Industrial Equipment $350,000 500 Not to be implemented
Industrial Equipment NULL NULL NULL Implemented
Industrial Equipment $140,000 247
Industrial Equipment $210,000 806
Industrial Equipment $42,000 111 Not to be implemented
HVAC $7,731 39
Industrial Equipment $78,144 133 Ongoing
Chiller $200,000 716
Other NULL 382 To be implemented
Waste heat recovery $300,000 2,500 To be implemented
Hot Water System $200 2 Implemented
Hot Water System $250 2 Implemented
Hot Water System $1,260 4
Hot Water System $58,000 186 Not to be implemented
Hot Water System $300 56 Implemented
Hot Water System $4,500 15
Other $50,000 1,420 Implemented
Hot Water System $2,000 23 Implemented
Hot Water System $24,000 148
Industrial Equipment NULL 231 Implemented
HVAC $903 3
HVAC $11,094 8
HVAC $50,601 67
HVAC $21,998 46
HVAC $21,998 46
HVAC $15,851 26
HVAC $136,169 77
HVAC $116,700 350 Implemented
HVAC $258,050 1,668 Implemented
HVAC $123,150 233 Implemented
HVAC $57,000 423 Implemented
HVAC $92,650 2,001 Implemented
HVAC $75,958 515 Implemented
HVAC $800 65 Implemented
HVAC $1,450 4 Implemented
HVAC $24,680 43 Not to be implemented
HVAC $33,570 156
HVAC $72,000 120
HVAC $18,950 125 Under-investigation
HVAC $1,725 5 Implemented
HVAC $147,733 81 Implemented
HVAC $4,600 74 Implemented
HVAC $197,955 446 Implemented
HVAC NULL 2,005 3,898
HVAC $863 7 Implemented
HVAC $2,300 12 Implemented
HVAC $2,875 6 Implemented
HVAC $230 4 Implemented
Industrial Equipment NULL NULL NULL Implemented
Pool Covers/Heating $2,049 361
Other $0 512 Not to be implemented
Other $0 19 Implemented
Air compressor $8,000 290
Air compressor $59,200 487 To be implemented
Other NULL 168
Maintenance $10,000 502 Implemented
Air compressor $4,000 86
Maintenance $2,500 44
Lighting $5,000 202
HVAC $6,000 76
HVAC $61,000 54 To be implemented
Boiler $5,000 112 Implemented
HVAC $15,000 41
Behaviour/Education $12,000 1,108 Implemented
Other $4,000 21
Monitoring $250,000 700 12,000
Sub-metering $50,000 99
Sub-metering $50,000 146 Ongoing
Other $2,000 8 Ongoing
Lighting $80,000 NULL NULL Under-investigation
HVAC $4,000 14 Implemented
Air compressor $1,000 28
Lighting $7,500 74 Not to be implemented
Industrial Equipment NULL 720 Implemented
Other $15,000 255 Not to be implemented
Lighting $40,000 205
HVAC $2,500 12 Implemented
Building Management Systems $5,000 27 Implemented
HVAC $3,600 51 Implemented
HVAC $2,500 8 Not to be implemented
Industrial Equipment $10,000,000 1,540 Under-investigation
Air compressor $1,500 27 To be implemented
Lighting $200 12
Behaviour/Education $500 2 Ongoing
Behaviour/Education $2,000 8 Ongoing
Industrial Equipment $32,550 14,071
Building Management Systems $444,092 909 2,747
Lighting $200 7 Implemented
Behaviour/Education $50,000 2,125 6,721
HVAC $500 14
HVAC NULL 69
Other $150,000 189 Under-investigation
Industrial Equipment NULL 3,300 Implemented
Industrial Equipment NULL 37,000 Ongoing
Industrial Equipment $10,000 1,041 Ongoing
Industrial Equipment $50,000 1,921 Implemented
Air compressor NULL 965 To be implemented
Air compressor $10,000 2,200 Ongoing
Air compressor $10,000 141
Lighting $100,000 1,072 Implemented
Insulation $2,000 82 Implemented
Lighting $9,700 18 Ongoing
Other NULL 8,906 Implemented
Power Factor Correction $16,000 NULL NULL Implemented
Power Factor Correction $77,500 NULL NULL Ongoing
Maintenance NULL 158
Other $1,000 628
Air compressor NULL 276 Implemented
HVAC $7,000 13 Implemented
Power Factor Correction $24,000 26 Under-investigation
Power Factor Correction $52,200 NULL NULL Implemented
Ventilation $50,000 333 Implemented
HVAC $3,673 9 Implemented
Hot Water System NULL 6,714 Under-investigation
HVAC $12,000 170
HVAC NULL 161 To be implemented
Industrial Equipment $100,000 750 Implemented
Industrial Equipment $100,000 992 Implemented
HVAC NULL 0.50 Implemented
HVAC NULL 0.49 Implemented
HVAC NULL 0.50 Implemented
HVAC $30,954 70 Implemented
HVAC $87,000 263 Implemented
Boiler $50,000 200,000 Implemented
HVAC $93,000 699 To be implemented
HVAC NULL 58
Lighting $1,380 123
Cogeneration NULL NULL NULL Implemented
Power Factor Correction $44,011 382
Behaviour/Education $1,878,000 2,612 Ongoing
Industrial Equipment $50,000 8,700
HVAC $320 58
HVAC $50,000 511 Under-investigation
Boiler $5,000 122 Implemented
Power Factor Correction $18,630 NULL NULL Implemented
HVAC $5,000 8 Ongoing
Insulation $117,450 619 -641
Insulation $42,150 496 -481
Lighting $356,000 148
Lighting $468,200 243
Lighting NULL NULL NULL To be implemented
Lighting NULL NULL NULL To be implemented
Lighting NULL NULL NULL To be implemented
Lighting NULL NULL NULL Implemented
Lighting NULL 1,025 Not to be implemented
Lighting NULL 94 Ongoing
Lighting NULL NULL NULL Implemented
Lighting $40,000 17 Not to be implemented
Lighting $10,000 4 Implemented
Lighting $3,520 32 To be implemented
Air compressor $190,000 470
Lighting $655 4 Implemented
Lighting $2,200 25 Implemented
Cogeneration $476,000 368
Lighting $3,170 25 Implemented
Lighting $3,050 25 Implemented
Lighting $121 0
Lighting $1,365 14 Implemented
Lighting $700 3 To be implemented
Hot Water System $1,300 3 To be implemented
Hot Water System $850 2 To be implemented
Hot Water System $850 2 Implemented
Hot Water System $4,000 10 Implemented
Hot Water System $800 11 To be implemented
Lighting $6,100 13 Implemented
Lighting $12,819 0
Hot Water System $1,200 11 Implemented
Hot Water System $1,250 11 Implemented
HVAC $2,000 57 To be implemented
HVAC $1,000 5 Implemented
HVAC $1,000 2 To be implemented
HVAC $1,000 5 Implemented
HVAC $1,100 8 Implemented
Hot Water System $1,100 14 Implemented
HVAC $4,875 5
Other $3,855 3
Lighting $5,000 25 Not to be implemented
Hot Water System $900 3 Implemented
PV $53,835 16
PV $53,835 16
PV $53,835 16
PV $53,835 16
PV $53,835 16
Lighting $7,200 25 To be implemented
Lighting $7,200 25 To be implemented
Lighting $1,150 3 To be implemented
Building Management Systems $1,200 3 Implemented
Hot Water System $150 0.60 Implemented
Hot Water System $150 0.60 Implemented
Lighting $1,800 4 Implemented
HVAC $800 2
HVAC $2,500 17
Cogeneration $900,000 4,212
Cogeneration $1,200,000 11,182
HVAC $7,700 44
Other $9,000 13 To be implemented
Industrial Equipment $31,012 309
HVAC NULL 12 Implemented
Industrial Equipment $30,000,000 618,560
Lighting $375 1 Implemented
Lighting $355 0
Lighting $355 0.93 Implemented
Lighting $635 0.83 Implemented
Lighting $355 1 Not to be implemented
Lighting $355 0.58 Implemented
Lighting $355 0.06 Implemented
Lighting $355 0
Lighting $355 0.90 Implemented
Lighting $355 0
Pool Covers/Heating $35,000 1,072
Lighting $335 0.17 Implemented
Lighting $350 1
Lighting $400 1
Lighting $500 3 Implemented
Hot Water System NULL 0
Lighting $5,000 4 Implemented
Lighting $1,500 35
Lighting $500 4
Lighting $355 1
Industrial Equipment $29,000 42 To be implemented
Industrial Equipment $50 1 To be implemented
Pool Covers/Heating $60,000 -26 To be implemented
Industrial Equipment $42,500 90 Not to be implemented
Industrial Equipment $250,000 569 Implemented
HVAC $800 115 Implemented
HVAC $2,000 4
HVAC $2,000 3 Implemented
Lighting $600 2
Chiller $80,000 170 Implemented
HVAC $42,935 36
HVAC $39,870 21
Industrial Equipment $2,000 520
Industrial Equipment NULL 7,000 Not to be implemented
HVAC $15,000 20 To be implemented
Industrial Equipment $15,000 250
Lighting $375 1 Implemented
Lighting $375 0.35 Implemented
Industrial Equipment $4,500 8 Implemented
Other $12,000 226
Lighting $1,500 65 Not to be implemented
Lighting $700 3
Lighting $19,400 158 Implemented
Lighting $18,800 150 Not to be implemented
Lighting $10,000 29 Implemented
Lighting $3,184 2
Lighting $2,195 2 Implemented
Lighting $6,587 26 Implemented
Building Management Systems $50,000 114
Building Management Systems $50,000 65
HVAC $20,000 20
HVAC $20,000 20
Building Management Systems $60,000 50
Boiler $160,000 6,820 To be implemented
Hot Water System $58 1 Implemented
Other $6,000 12 To be implemented
HVAC $750,000 100
Other $125,000 1,128
HVAC $6,000 4
Industrial Equipment $4,000 334
Industrial Equipment $6,000 99
Pool Covers/Heating NULL 212 To be implemented
HVAC $6,000 50 To be implemented
HVAC $6,000 50 To be implemented
HVAC $6,000 0 To be implemented
Industrial Equipment $300 0 Not to be implemented
Lighting $785 4 Implemented
Air compressor $1,200,000 7,409
Building Management Systems $1,800 8 Implemented
Lighting $4,000 45 Implemented
Lighting $3,272 6 Implemented
Lighting $770 2 Not to be implemented
Lighting $6,000 57 Not to be implemented
Lighting $5,400 8 To be implemented
Boiler $150,000 2,624 Implemented
HVAC $5,670 9 Implemented
Monitoring $68,400 270 Implemented
Monitoring $44,700 NULL NULL To be implemented
Lighting $12,500 127
Lighting $700 6
Hot Water System $2,500 3
Hot Water System $2,500 3 Implemented
Hot Water System $2,500 7 Not to be implemented
Hot Water System $2,500 3
Hot Water System $5,000 17 Under-investigation
Hot Water System $5,000 115 Under-investigation
HVAC $10,000 28 To be implemented
HVAC $15,000 5
HVAC $5,000 2
HVAC $50,000 60
HVAC $60,000 30
HVAC $25,000 20
HVAC $10,800 28
HVAC $300,000 100
HVAC $3,000 1
HVAC $16,000 39 Implemented
HVAC $10,900 13
Industrial Equipment $5,000 46
HVAC $85,000 242 To be implemented
Lighting $12,000 35 Ongoing
Lighting $14,350 53 Not to be implemented
Lighting $2,350 6 To be implemented
Air compressor $1,200 8 Implemented
Chiller $19,495 17
Air compressor $2,300 36
Chiller $8,500 30
HVAC $26,000 127 To be implemented
Lighting $15,000 27
Lighting $25,000 46 Ongoing
Industrial Equipment $26,120 155 Ongoing
Other $30,000 180
Other $6,000 19
Lighting $2,400 6
Lighting $4,800 7
Other $1,000 3
Lighting $4,800 4
Lighting $11,000 7
Lighting $1,000 0
Lighting $1,000 0
Lighting $2,000 1
Lighting $1,000 0
Lighting $4,000 1
Lighting $4,000 1
Lighting $2,000 1
Lighting $4,000 6
Lighting $2,000 2
Lighting $1,000 0
Lighting $2,000 4
Lighting $1,000 1
Lighting $1,000 1
Lighting $2,000 1
Lighting $2,000 2
Other NULL 2
Chiller $46,480 30 Implemented
Lighting $46,350 236 Implemented
Lighting $12,000 70
Lighting $52,000 17 To be implemented
Lighting $8,000 2 To be implemented
Lighting $8,000 17 To be implemented
Other $425,000 1,129
HVAC $30,000 5
HVAC $40,000 5
HVAC $40,000 10
Hot Water System $2,000 11 -38
PV $430,000 66 To be implemented
Waste heat recovery $50,000 500
Waste heat recovery $40,000 10 30
Industrial Equipment $6,940 9
Chiller $198,335 73
Lighting $10,725 10
Lighting $2,505 3
Industrial Equipment $182,595 234 Under-investigation
Other $35,000 288 Implemented
Insulation $25,000 111 Not to be implemented
HVAC $60,000 97 Implemented
Lighting $83,550 274
Other $150 1 To be implemented
Lighting $200 11
Lighting $500 92
Boiler $110,000 6,594 To be implemented
Computers & Printers NULL 1
Computers & Printers NULL 11
Lighting $5,335 4
Lighting $100 0 Not to be implemented
Lighting $3,450 8 Implemented
Lighting $500 1
Lighting $250 1 Implemented
Lighting $250 0.69 Implemented
Lighting $26,050 247 Implemented
Lighting $13,300 55 Implemented
Lighting $38,200 48 Implemented
Lighting $11,900 41 Implemented
Lighting $2,400 0.22 Implemented
Lighting $13,700 66 Implemented
Lighting $1,200 2 Implemented
Lighting $1,000 1.75 Implemented
Lighting $5,000 33 To be implemented
Lighting $500 7 Under-investigation
Lighting $30,000 400 Implemented
Lighting $3,060 14 Not to be implemented
Other $400 37
Air compressor $175,000 615
Lighting $375 2 Not to be implemented
Lighting $4,500 6 Not to be implemented
Lighting $1,200 5
Lighting $500 0
Lighting $1,500 4 Implemented
Lighting $500 1
Lighting $3,000 19
Building Management Systems $1,600 8 Implemented
Sub-metering $135,000 333 Implemented
Industrial Equipment $180,000 7,750
Waste heat recovery $120,000 560 Not to be implemented
Boiler $10,000 2,000 Implemented
Lighting $115,000 394
Lighting $10,000 40
Lighting $55,000 181
Lighting $30,000 36 Ongoing
Lighting $17,000 50 Under-investigation
Lighting $15,000 50
Lighting $375 0.37 Implemented
Lighting $3,945 21 Ongoing
Lighting $3,835 17 To be implemented
Lighting $450 0 To be implemented
Lighting $900 2 Implemented
Lighting $4,500 11 Implemented
Lighting $4,200 19 Not to be implemented
Lighting $600 4 Not to be implemented
Lighting $5,100 12 Implemented
Lighting $3,000 10 Implemented
Other $355 0.51 Implemented
Building Management Systems $3,900 10 Implemented
Lighting $1,992 1 Implemented
Lighting $725 2
Lighting $400 1
Lighting $3,600 9 Not to be implemented
Lighting $1,255 4
Lighting $710 2
Lighting $800 8 Not to be implemented
Lighting $1,200 7 Not to be implemented
Lighting $600 3 To be implemented
Lighting $600 3 To be implemented
Lighting $8,000 50 Implemented
HVAC $830 2
Lighting $17,400 36 Implemented
ventilation $50,000 20
ventilation $50,000 5
ventilation $50,000 10
HVAC $35,000 170
Computers & Printers NULL 600
Sub-metering $105,000 NULL NULL Ongoing
Monitoring $106,500 269
Other $100,000 639 Not to be implemented
Other $84,000 52
Other NULL 40 To be implemented
Cogeneration $893,750 3,280 To be implemented
Lighting $375 1
Lighting $1,125 2 To be implemented
Lighting $750 0.34 Implemented
Lighting $1,500 5 Implemented
Lighting $2,250 4 To be implemented
Lighting $3,750 2 Not to be implemented
Lighting $20,000 50
Lighting $20,000 20
Lighting $830 2
Lighting $3,000 5
Lighting $15,000 5
Lighting $750 2 To be implemented
Lighting $1,000 7 Implemented
Lighting $375 1
Lighting $3,000 3 To be implemented
Lighting $1,000 1 Under-investigation
Lighting $3,388 5
Lighting $750 0
Lighting $2,500 15
Lighting $375 0.52 Implemented
Lighting $9,000 3 To be implemented
Industrial Equipment $1,500 8 To be implemented
Lighting $2,500 1
Lighting $500 1
HVAC $7,260 67
Lighting $2,300 2 To be implemented
Lighting $2,300 3 Implemented
Lighting $2,300 5 Implemented
Lighting $2,300 7 Implemented
Lighting $750 1 Not to be implemented
Lighting $1,500 1
Lighting $4,400 5 Not to be implemented
Air compressor $23,500 81 Implemented
HVAC $1,500 29 52
HVAC $2,000 6 Implemented
HVAC $5,000 36
Lighting $690 10 Implemented
Lighting $1,500 4
Lighting $5,500 16 Ongoing
Lighting $308 0.92 Implemented
Lighting $690 24 Not to be implemented
Lighting $15,800 93 Implemented
Lighting $3,200 36 Implemented
Lighting $5,000 5 Implemented
Lighting $400 2 Not to be implemented
Lighting $496 3
Lighting $485 2
Lighting $635 4
Lighting $770 2 Not to be implemented
PV $70,000 8
PV $12,750 12
PV $53,835 16
Other $226 0
Other $226 0
Lighting $226 1
Lighting $226 1
Other $226 0
Other $226 0
Lighting $830 2
Other $226 0
Other $226 0
Pool Covers/Heating $100,000 650 To be implemented
Pool Covers/Heating $10,500 898 Implemented
Power Factor Correction $8,000 0 Implemented
Power Factor Correction $14,000 NULL NULL Implemented
Power Factor Correction $14,000 NULL NULL Implemented
Power Factor Correction $11,600 3 Implemented
Other $45,000 200
HVAC $4,550 16 Not to be implemented
HVAC $3,500 9 Not to be implemented
Building Management Systems $400 4 Not to be implemented
Lighting $125 3 Implemented
Mixed $600 6 Implemented
Building Management Systems $850 4 Implemented
Lighting $500 1 Not to be implemented
HVAC $1,100 3 Not to be implemented
HVAC $2,600 8 Implemented
Hot Water System $200 1
Industrial Equipment $2,300 9 Implemented
Sub-metering $150,000 713 2,567 Not to be implemented
Industrial Equipment $1,500,000 70,000
Lighting $3,800 22
Lighting $1,280 4
Lighting $48,000 237 Under-investigation
HVAC $3,750 7
HVAC $455 2 Implemented
Hot Water System $700 1 Not to be implemented
Hot Water System $2,100 3 Not to be implemented
Hot Water System $1,750 2 Not to be implemented
Hot Water System $700 1 Not to be implemented
HVAC $7,000 23 Not to be implemented
Hot Water System $700 4 Not to be implemented
HVAC $8,050 21 Not to be implemented
Other $1,000 8 Under-investigation
Lighting $1,350 7 To be implemented
Industrial Equipment $3,000 28
Industrial Equipment $3,500 29 Implemented
HVAC $700 5 Not to be implemented
Boiler $50,040 2,604 Not to be implemented
Insulation $6,750 39
Chiller $70,000 191 Not to be implemented
Lighting $4,500 0 To be implemented
Hot Water System $6,235 5 Not to be implemented
Hot Water System $6,965 5
Hot Water System $5,905 2
Hot Water System $8,355 5
Hot Water System $5,905 2
Hot Water System $6,800 5
Hot Water System $6,800 5
Hot Water System $6,800 5
Hot Water System $6,800 5
Hot Water System $6,800 5
Hot Water System $6,800 5
Hot Water System $5,100 6
Pool Covers/Heating $107,670 2,549
Pool Covers/Heating $48,080 1,075 Not to be implemented
Pool Covers/Heating $140,000 152 Not to be implemented
Hot Water System $8,000 50
Hot Water System $30,000 548 Not to be implemented
Hot Water System $30,000 88
Hot Water System $90,000 100 500 Ongoing
Other $3,000 47 Not to be implemented
HVAC $40,000 55
Other $2,400 57
Sub-metering $5,000 22 Implemented
Sub-metering $1,500 22 Ongoing
Lighting $131,760 321 To be implemented
Lighting $3,198 4 Implemented
Lighting $1,021,500 188
HVAC $13,925 16
HVAC $6,965 16
HVAC $6,965 9
HVAC $6,965 16
HVAC $8,500 5 Implemented
Lighting $985 8
Hot Water System $1,248 4 9
Building Management Systems $9,800 42 Implemented
Hot Water System $1,800 10
Lighting $9,000 3 Implemented
Industrial Equipment $800 5 13 Not to be implemented
Air compressor $1,000 2
Hot Water System $3,000 12 Not to be implemented
HVAC $200,000 200
Lighting $500,000 300
HVAC $36,000 20
HVAC $10,000 5
Building Management Systems $6,000 13 Ongoing
Computers & Printers $12,050 47
HVAC $2,000 21
Lighting $5,500 9 Under-investigation
Lighting $2,500 3 Under-investigation
HVAC $250 7
Other $2,800 4
Other $2,800 4
Air compressor $500 7 Not to be implemented
Industrial Equipment $350 1 Implemented
Hot Water System $1,745 2
HVAC $3,036 131
Hot Water System $10 0 To be implemented
Other $9,000 32
HVAC $2,000 25
Hot Water System $300 0.51 Implemented
Air compressor $600 1 Not to be implemented
Other $250 1 Under-investigation
HVAC $1,000 0
Hot Water System $1,200 14 Implemented
Hot Water System $800 6 Implemented
Other $10,000 42 To be implemented
HVAC NULL NULL NULL Implemented
Other $33,750 28 Implemented
Lighting $600 2 To be implemented
Air compressor $24,000 70 Implemented
Air compressor $5,000 10
Industrial Equipment $9,500 114
Industrial Equipment $10,500 110
Industrial Equipment $2,610 11 Implemented
Industrial Equipment $3,860 32 Implemented
Boiler $8,800 51 Implemented
Industrial Equipment $4,595 4
Industrial Equipment $15,304 43 Under-investigation
Industrial Equipment $10,000 40 Not to be implemented
Industrial Equipment $10,000 40 Implemented
Industrial Equipment $15,000 34 Implemented
Industrial Equipment $66,000 327 To be implemented
Chiller $7,000 29 To be implemented
Industrial Equipment $10,000 40
HVAC $4,875 4
Boiler $45,550 109
Industrial Equipment $82,000 175 To be implemented
Industrial Equipment $10,000 26 Implemented
Other NULL NULL NULL Ongoing
Mixed $212,075 590
Industrial Equipment $70,500 411
Industrial Equipment $7,200 343
Lighting $135,000 210 Implemented
Lighting $96,600 664 Implemented
Lighting $1,700 13
Lighting $1,700 6
Lighting $1,700 2 To be implemented
Lighting $12,000 16
Lighting $23,800 34
Lighting $39,552 257
Lighting $4,000 10 Not to be implemented
Lighting $655 4 Implemented
Lighting $8,050 11 Implemented
Lighting $640 1 Implemented
Lighting $1,700 5 To be implemented
Lighting $641 2
Lighting $1,351 1
Lighting $641 1
Lighting $641 1
Lighting $1,922 1
Lighting $641 1
Lighting $641 2
Lighting $1,922 6
Lighting $2,562 7
Lighting $3,000 4
Lighting $1,500 5 Implemented
Lighting $2,140 4 Not to be implemented
Lighting $21,000 37 Implemented
Lighting $1,000 1 Implemented
Lighting $2,000 5 Implemented
Lighting $4,000 6 Implemented
Lighting $2,000 6 To be implemented
Lighting $641 0
Other $1,500 5 To be implemented
Industrial Equipment $100,000 546 Not to be implemented
Industrial Equipment $210,000 1,431 To be implemented
HVAC $60,000 30
Air compressor $342,270 914 Implemented
Air compressor $66,000 194 Not to be implemented
Industrial Equipment $7,000 6
Industrial Equipment $20,000 3
Industrial Equipment $20,000 6
Industrial Equipment $20,000 8
HVAC $25,000 5
HVAC $40,000 15
HVAC $8,000 5
HVAC $12,000 60
HVAC $40,000 8
HVAC $20,000 5
Industrial Equipment $45,600 217
Chiller $6,000 5
HVAC $7,060 23
HVAC $300,000 300
Industrial Equipment $8,000 55 Implemented
HVAC $5,000 22
Industrial Equipment $6,500 29 To be implemented
HVAC $40,000 5
HVAC $60,000 39 Under-investigation
Industrial Equipment $9,500 30 Not to be implemented
Industrial Equipment $10,500 32 Not to be implemented
HVAC $90,000 314 To be implemented
Industrial Equipment $100,000 214
Industrial Equipment $40,000 278
HVAC $15,000 10
HVAC $30,000 30
Industrial Equipment $40,000 101 Implemented
HVAC $30,000 65 Implemented
Industrial Equipment $10,000 33 Implemented
Industrial Equipment $29,500 156
HVAC $7,935 5
HVAC $45,000 225 Implemented
Industrial Equipment $42,000 170
HVAC $16,200 77
HVAC $25,900 81
Industrial Equipment $80,000 288
Industrial Equipment $37,200 160
Industrial Equipment $20,000 42
Industrial Equipment $12,000 46
Industrial Equipment $30,000 67
Hot Water System $6,640 21
Chiller $270,774 1,090
Industrial Equipment $98,000 350
Industrial Equipment $15,000 49 Not to be implemented
HVAC $35,000 25
Hot Water System $7,920 27
Industrial Equipment $2,000,000 710 Not to be implemented
HVAC $1,500 38
HVAC $2,270 1
Ventilation $1,500 3 Implemented
ventilation $25,000 24
Industrial Equipment $200,000 176 Ongoing
Other $1,500 18 To be implemented
Hot Water System $19,021 14 Not to be implemented
Cogeneration $300,000 300
Cogeneration $1,500,000 1,600
Power Factor Correction $67,500 NULL NULL Implemented
Cogeneration $2,000,000 7,535 -53,981
Building Management Systems $42,000 389 To be implemented
Building Management Systems $9,000 31 To be implemented
Building Management Systems $50,000 69
Building Management Systems $200,000 811 To be implemented
Building Management Systems $30,000 26
Building Management Systems $40,000 26
Air compressor $10,300 8 Implemented
Hot Water System $22,000 99 Not to be implemented
Pool Covers/Heating $73,645 NULL NULL Implemented
Other $4,700 0.28 Implemented
HVAC $37,000 66 To be implemented
Lighting $1,250 6 To be implemented
HVAC $20,000 20 To be implemented
HVAC $156,000 106 Not to be implemented
Building Management Systems $10,000 38
Building Management Systems $42,500 165 To be implemented
HVAC $200,000 5
HVAC $300,000 20
Cogeneration $1,200,000 1,000
Lighting $1,000 2
Industrial Equipment $18,000 NULL NULL Implemented
HVAC $29,250 8
HVAC $11,350 11
HVAC $68,100 26
HVAC $157,600 56
HVAC $48,750 34
HVAC $50,000 50
HVAC $9,750 8
HVAC $3,000 11 Not to be implemented
Other $20,460 44 Under-investigation
Other $2,280 57 Implemented
Other $3,250 13 Not to be implemented
Other $1,800 6
Other $2,500 6
Other $4,500 13
Other $1,900 8
Other $5,250 8
Other $14,200 21
Other $11,500 21 Implemented
Other $7,500 9
Other $5,200 9
Lighting $35,000 91 Not to be implemented
Other $5,600 3 Implemented
Other $6,400 5
Other $4,000 1
Lighting $8,000 3 Implemented
Lighting $24,000 8
Other $20,000 40 Not to be implemented
Other $5,300 21 Not to be implemented
Other $3,170 9 Not to be implemented
Other $5,000 2 Implemented
Other $600 1
Hot Water System $10,000 29 Not to be implemented
Hot Water System $8,500 28 Under-investigation
Hot Water System $5,700 31
Hot Water System $11,400 15
Pool Covers/Heating $112,000 -160 2,879
Pool Covers/Heating $126,000 -188 3,390
Hot Water System $11,400 5
Hot Water System $11,400 4
Hot Water System $11,400 16
Pool Covers/Heating $224,000 -356 6,403
Lighting $14,000 125
Lighting $4,000 2 Implemented
Lighting $3,000 3 Not to be implemented
Other $250 1
Lighting $5,000 5
Lighting $1,000 1 Not to be implemented
Mixed $15,000 30
Mixed $15,000 10
Lighting $1,000 3 To be implemented
Lighting $1,000 4 To be implemented
Lighting $8,500 7 To be implemented
ventilation $40,000 10
HVAC $50,000 10
HVAC $420,000 3,345
Industrial Equipment $4,600 102 Implemented
Lighting $36,000 20
Lighting $15,000 20
Lighting $10,000 5
Mixed $3,000 10 50
Lighting $10,000 10
Lighting $1,600 2 Implemented
Lighting $750 0 Not to be implemented
Lighting $375 0 Not to be implemented
Lighting $1,500 1
Other $36,244 7 Under-investigation
PV $214,000 23
PV $284,000 31
PV $142,000 16
Pool Covers/Heating $37,200 1,584 Implemented
Pool Covers/Heating $30,000 1,459
Power Factor Correction $150,000 NULL NULL Implemented
Power Factor Correction $11,000 NULL NULL Implemented
Lighting $30,000 100
HVAC $15,000 20
insulation $10,000 15
Hot Water System $20,500 274 Implemented
Lighting $2,700 3
Lighting $1,100 1 Not to be implemented
Other $2,000 23 Implemented
Other $4,000 8 Implemented
Hot Water System $4,000 3
Hot Water System $14,000 22
Hot Water System $14,000 8
Hot Water System $3,450 3 Not to be implemented
Hot Water System $5,606 39 Implemented
Hot Water System $8,394 49 Under-investigation
PV $120,000 1,260
Sub-metering $10,000 22 Ongoing
Lighting $9,300 5
HVAC $4,000 29
HVAC $1,000 69 Not to be implemented
HVAC $3,000 5
Lighting $5,600 43 Implemented
HVAC $480 2
Hot Water System $3,200 8
Hot Water System $4,200 5
Air compressor $50,000 310 Under-investigation
Industrial Equipment $15,000 42 Ongoing
Industrial Equipment $35,000 123 Not to be implemented
Other $33,000 114 Implemented
Other $30,000 56 To be implemented
HVAC $20,000 86
Industrial Equipment $9,600 47
Other NULL 18
Other NULL NULL NULL Implemented
Industrial Equipment $6,000 23
Industrial Equipment $16,000 9
Industrial Equipment $5,000 2
Industrial Equipment $5,000 2
Chiller $15,000 10
HVAC $15,000 10
Industrial Equipment $24,000 34
Industrial Equipment $60,000 72 To be implemented
HVAC $4,000 2
Other $600 3
Other $2,600 3
Other $2,200 3
Other $900 1
Other $3,480 3
Other $2,600 9
Other $16,900 3
Other $11,700 7
Other $12,000 9
Other $13,620 4
Other $10,340 1
Other $15,000 7
Other NULL 131 Ongoing
Industrial Equipment $120,000 708 To be implemented
Boiler $10,000 166
Insulation $7,000 9 Implemented
Insulation $1,500 2 Under-investigation
Insulation $4,800 21 Not to be implemented
Insulation $6,000 48
Insulation $7,600 32
Insulation $2,000 5 To be implemented
Hot Water System $5,472 105 Not to be implemented
Hot Water System $12,000 1,198 To be implemented
Hot Water System $5,758 1,082 To be implemented
Other $52,800 3,361
Insulation $6,500 53 Not to be implemented
Other $74,830 999 Under-investigation
Insulation $105,000 11,489
Industrial Equipment $15,246 1,520 Not to be implemented
Hot Water System $7,200 171 Implemented
HVAC $4,000 8 Implemented
Refrigeration $760 4
Other $6,000 7 Not to be implemented
Insulation $700 180
Insulation $2,800 280 Under-investigation
Hot Water System $15,000 71
Insulation $30,000 1,220 Ongoing
Insulation $3,000 380 Implemented
Other $50,000 1,220 To be implemented
Building Management Systems $10,000 50 Implemented
Industrial Equipment $30,000 40 Implemented
Other $19,000 6,645 To be implemented
Refrigeration $150,000 469 Not to be implemented
HVAC $1,100 13 Implemented
HVAC $1,000 28
Other $480 2 Not to be implemented
Industrial Equipment $120 0 Not to be implemented
Other $120 6 Not to be implemented
Other $480 21 Implemented
Other $240 66 Not to be implemented
Boiler $1,250 6 Implemented
Lighting $500 0 Implemented
Industrial Equipment NULL 335 Under-investigation
Behaviour/Education $15,000 24 Not to be implemented
Industrial Equipment $18,800 286 Ongoing
Other $37,000 40 Not to be implemented
Industrial equipment $65,000 23,865 Implemented
Industrial Equipment $7,500,000 1,603 Under-investigation
PV $510,460 106 Implemented
Industrial Equipment $9,500 740
Lighting $1,600 10
Lighting $2,500 6
Lighting $1,800 1
Power Factor Correction NULL NULL NULL Implemented
HVAC $5,000 271
Other NULL 3 Under-investigation
Lighting NULL 8 Under-investigation
Other NULL 52 Implemented
Other NULL 12 To be implemented
Other NULL 12 To be implemented
Other NULL 15 To be implemented
Maintenance $1,500 31 Implemented
Other NULL 7
Air compressor NULL 124 Implemented
Sub-metering $500 0 Not to be implemented
Lighting NULL 5 To be implemented
Other $2,200 3 To be implemented
Other $780 2 Ongoing
Industrial Equipment $10,000 55
HVAC NULL 9 Under-investigation
HVAC $5,800 181 Implemented
Refrigeration $39,850 19
HVAC $19,600 302 Under-investigation
Other $2,000 61
Other NULL NULL NULL Ongoing
Insulation $30,000 26 To be implemented
Other $1,500 NULL NULL Under-investigation
Lighting $250 3
Pool Covers/Heating NULL 11 Not to be implemented
Cogeneration $80,000,000 52,000
Industrial Equipment $278,000 957 Ongoing
Lighting $1,200 4
Boiler NULL 1,800
Other NULL 1
Other NULL 57
Other NULL 33
Industrial Equipment NULL 86
Lighting $200 0 To be implemented
Lighting $350 1 To be implemented
Other $720 3 Implemented
Industrial Equipment $0 2 Implemented
Other NULL 203
Air compressor $180,000 897
Pool Covers/Heating $0 437 Not to be implemented
Other $5,000,000 3,000 Implemented
Lighting $10,000 14
Lighting $1,500 3
Lighting $450 1
Lighting $37,000 88
HVAC $15,000 0 Ongoing
Air compressor NULL 250
Industrial Equipment $4,000 20 Not to be implemented
Other NULL 61 Ongoing
Computers & Printers NULL 292 Ongoing
HVAC $40,000 0
Industrial Equipment $150,000 320 Under-investigation
Industrial Equipment $38,000 375 Ongoing
Industrial Equipment NULL NULL NULL Under-investigation
Other NULL NULL NULL To be implemented
Lighting $18,757 134 Implemented
Lighting $186,411 254 Implemented
Lighting $10,062 41 Implemented
Lighting $5,875 16 Implemented
HVAC $39,000 81
HVAC $6,000 17
Building Management Systems $2,000 16
HVAC $3,000 4
Computers & Printers $5,000 19
Industrial Equipment $2,000 140 Implemented
Industrial Equipment $30,000 131
Other NULL 60 Not to be implemented
Lighting $6,670 8
Lighting $2,040 2
Lighting $2,040 1
Lighting $19,000 NULL NULL Implemented
Lighting $19,058 15
HVAC $10,000 41 Implemented
Air compressor $150,000 1,802 Implemented
Chiller $10,000 100
HVAC $25,000 93
HVAC $5,000 37
HVAC $1,380 20 Implemented
Chiller NULL 3
Lighting $9,000 70
Lighting $9,000 70
Lighting $9,000 70
Lighting $9,000 70
Lighting $3,250 18
Lighting $61,160 254
Lighting $7,645 18
Lighting NULL 350 To be implemented
Lighting $7,500 54 To be implemented
Lighting $16,313 29
Lighting $4,097 12
Lighting $1,220 2
Lighting $5,017 1
Lighting $5,531 11
Lighting $11,432 8
Lighting $2,927 4
Lighting $3,653 4
Lighting $89,570 175
Lighting $84,371 321
Lighting $23,119 12
Lighting $5,189 6
Lighting $4,883 8
Lighting $6,987 9
Lighting $25,412 22
Lighting NULL 870
Lighting $18,400 76
Lighting $9,500 411 Implemented
Lighting $14,000 85 Implemented
Lighting $35,000 159
Lighting $2,000 214
Lighting $900 5 Under-investigation
Lighting $540 5
Lighting $180 3 Implemented
Lighting $28,800 11 Ongoing
Lighting $29,700 109 Ongoing
Lighting $139,440 585 Ongoing
Lighting $1,563 10 To be implemented
Lighting NULL 14 Under-investigation
Lighting $7,355 21
Lighting NULL 493
Mixed $8,682 7
Lighting $20,502 33
Lighting $2,175 13 To be implemented
Lighting $5,000 11 Not to be implemented
Lighting $1,500 7
Lighting $750 5
Lighting $1,000 45 Implemented
Lighting $30,500 152 To be implemented
Lighting $33,000 306
Lighting $66,000 538 Implemented
Lighting $2,300 63 Implemented
Lighting $16,486 14
Lighting $61,756 65
Lighting $98,479 139
Lighting $30,896 26
Lighting $19,977 16
Lighting $16,718 13
Lighting $7,179 4
Lighting $15,000 40
Lighting $12,000 107 Not to be implemented
Lighting $95,000 716 Implemented
Lighting $20,000 400 Implemented
Lighting $140,000 463 Implemented
Lighting $28,000 56
Lighting $8,140 17
Lighting $28,400 174 Implemented
Lighting $3,000 7
Lighting $45,000 28 To be implemented
Lighting $500 1 Implemented
Lighting $10,000 5 Under-investigation
Lighting $1,000 1 To be implemented
Lighting $108,000 53 Under-investigation
Lighting $166,727 303 Implemented
Lighting $5,300 18 Implemented
Lighting $228 1 Implemented
Lighting $10,000 250 Implemented
Lighting $4,387 27 Implemented
Lighting NULL 68 To be implemented
Lighting $140,400 303
Lighting $70,200 212
Lighting $150,364 660
Lighting $155,400 269 Not to be implemented
Lighting $12,160 40 Implemented
Lighting $5,335 7
Lighting $1,050 8 To be implemented
Lighting $1,263 9 To be implemented
Lighting $23,000 132 To be implemented
Lighting $531,226 600 Implemented
Lighting NULL 85 Implemented
Lighting $32,415 30
Lighting $15,010 14
Lighting $2,826 1
Lighting $12,371 1 To be implemented
Lighting $21,521 3 To be implemented
Lighting $2,507 4 Implemented
Lighting $14,465 13
Lighting $24,150 110 Not to be implemented
Lighting $860,000 520
Lighting $600,000 600 Not to be implemented
Mixed $135,429 135
Lighting $5,240 5
Mixed $850,000 300
Mixed $8,151 7
Lighting $690 4 Implemented
Lighting $644 6 Implemented
Lighting $7,475 112 Implemented
Lighting $230 0.56 Implemented
Mixed $900 8 Not to be implemented
Mixed $225 1 Not to be implemented
Air compressor $50,000 44 Implemented
Mixed $2,025 7 Not to be implemented
Other $5,000 72 Under-investigation
Industrial Equipment $1,000 18
Lighting $2,300 51
HVAC $120,000 190 Not to be implemented
Hot Water System $118,800 4,628
Industrial Equipment NULL NULL NULL Ongoing
Lighting $150,000 NULL NULL Implemented
Industrial Equipment $12,714 2,531
Boiler NULL 7,600 Ongoing
Air compressor NULL 116 To be implemented
Hot Water System $150 5
Other NULL 9
Hot Water System $600 8 Implemented
Lighting $128,480 143
Other $4,000 28 Not to be implemented
Lighting $2,000 25 Not to be implemented
Industrial Equipment $90,000 1,226 To be implemented
Industrial Equipment $6,000 64 Not to be implemented
Industrial Equipment $20,000 938
Industrial Equipment $24,000 446 Implemented
Air compressor $1,599,190 533 Implemented
Lighting $690 8 Under-investigation
Lighting $4,899 20 Under-investigation
Lighting $1,041,100 2,928
Lighting $502,600 1,554
Industrial Equipment $20,000 108 Implemented
HVAC $500 4
Industrial Equipment $2,000 2 1,200
Lighting $1,300 22
Industrial Equipment NULL 264 Implemented
Industrial Equipment NULL 4 0
Maintenance $140,000 476 Not to be implemented
Maintenance $0 7 To be implemented
Maintenance $4,380 28
Building Management Systems $900,000 80 56 To be implemented
Lighting $2,500,000 500 To be implemented
HVAC $120,000 100
Industrial Equipment $15,000 64
Lighting $575 8 Implemented
Lighting $2,300 4 Implemented
Lighting $4,255 8 To be implemented
Lighting NULL 15 Implemented
Lighting $6,000 131
HVAC $10,000 260
HVAC $7,500 45 Ongoing
Industrial Equipment $50,000 4,802 Ongoing
Industrial Equipment $885,000 5,390 Implemented
Lighting $250 1
Boiler $9,000 35 Implemented
Industrial Equipment $7,000,000 5,734 Implemented
Alternative power generation $3,550,000 8,000 Implemented
Other $140,000 238 Not to be implemented
Other $30,000 1,441 Implemented
Lighting $1,500 8
Lighting $1,500 18 Implemented
Lighting $2,000 43 Implemented
Industrial Equipment $100,000 393 Not to be implemented
Industrial Equipment $448,014 291
Other $5,000 250
ventilation $100,000 NULL NULL Under-investigation
Industrial Equipment NULL 1,680 Implemented
Air compressor $500 44 Implemented
Other $150,000 144
HVAC NULL 68
Lighting NULL 8 To be implemented
Lighting $4,485 52
Other $114,000 339 Implemented
HVAC $1,000 66
Industrial Equipment $11,500 36 To be implemented
HVAC $10,000 31
Industrial Equipment NULL 1,300 To be implemented
Other $24,000 164 Implemented
Lighting $450,720 83 Ongoing
HVAC $10,000 10
Monitoring $0 2 231 Not to be implemented
Air compressor $70,000 740 Implemented
Monitoring $400,000 3,306 Ongoing
Monitoring $400,000 2,503 Ongoing
Air compressor $5,000 88
Pool Covers/Heating $0 7
Lighting $750 1
Lighting $27,030 37
Industrial Equipment $12,776 91 Ongoing
Industrial Equipment NULL 30 Ongoing
Industrial Equipment $23,137 137
Industrial Equipment $43,562 258 To be implemented
Industrial Equipment $40,483 138 Implemented
Other $200,000 701
Industrial Equipment $7,000 48
Maintenance NULL 80
Industrial Equipment $19,983 77 To be implemented
Industrial Equipment $4,000 30 Ongoing
Industrial Equipment $30,000 165 Implemented
Industrial Equipment NULL 1,290 To be implemented
Other NULL 437
Other NULL 1,114
Industrial Equipment $23,000 1,029
Industrial Equipment $20,000 3,419
Industrial Equipment NULL 1,360 Ongoing
Other $200,000 713
Other $300,000 1,091
Other $200,000 242
Industrial Equipment NULL 525 To be implemented
Industrial Equipment $20,000 234 Implemented
Industrial Equipment $2,000 18 Ongoing
Lighting $4,000 199
Building Management Systems $9,000 21 Implemented
Lighting $3,400 11 Implemented
HVAC $850 2 Implemented
HVAC $1,800 6 Implemented
Lighting $18,960 8
Cogeneration $205,000 43
Cogeneration $2,080,000 -2,963
Alternative power generation $150,000 1,291
HVAC $200,000 150 Under-investigation
Air compressor $175,260 606
Air compressor NULL 97 Implemented
Pool Covers/Heating $6,900 18 To be implemented
Monitoring $400,000 1,301 10,200
Lighting $75,000 163
Industrial Equipment NULL 200 Implemented
Industrial Equipment $50,000 250
Air compressor $40,000 99 To be implemented
Lighting $240,000 719 Ongoing
Waste heat recovery $70,000 11,465 Not to be implemented
Industrial Equipment $1,300,000 11,588 Implemented
Boiler NULL 139 Implemented
Insulation $7,450 1,734
Industrial Equipment $20,000 237 Not to be implemented
Other $2,000 1,368 Ongoing
Insulation $13,200 6,617
HVAC $10,000 2,226 To be implemented
Insulation $10,920 1,475 Not to be implemented
Industrial Equipment $20,000 237 Not to be implemented
Industrial Equipment $10,000 20,693 To be implemented
Other $15,000 669 To be implemented
Other $3,000 1,632 Ongoing
Insulation $12,430 4,165
Other NULL 592 Ongoing
Industrial Equipment $5,000 1,343 Not to be implemented
Industrial Equipment $5,000 63
Industrial Equipment $8,000 50
Industrial Equipment $10,000 50
Waste heat recovery $50,000 3,550
Air compressor $10,000 166
Industrial Equipment $5,000 840
Industrial Equipment $22,000 148
Waste heat recovery $300,000 22,960
Industrial Equipment $60,000 840
Lighting $5,000 109
Air compressor NULL 857
Waste heat recovery $50,000 2,800
Lighting $5,000 663
Air compressor NULL 134
HVAC $5,000 138
Industrial Equipment $5,000 111
Air compressor $15,000 748
Industrial Equipment $8,000 68
Industrial Equipment $16,000 59 Under-investigation
Air compressor $5,000 24 Implemented
Industrial Equipment $4,000 20 Under-investigation
Other NULL 23,200 Not to be implemented
Air compressor NULL NULL NULL Under-investigation
Industrial Equipment $26,000 131 Under-investigation
Other NULL 12,280 Under-investigation
Waste heat recovery NULL 13,714 Not to be implemented
Waste heat recovery NULL 8,571 Not to be implemented
Other NULL 2,400 Under-investigation
Other NULL 8,868 Not to be implemented
Industrial Equipment NULL NULL NULL Under-investigation
Industrial Equipment NULL NULL NULL Under-investigation
Sub-metering NULL NULL NULL Under-investigation
Air compressor NULL 303 Not to be implemented
Other NULL 1,840 Not to be implemented
Air compressor NULL NULL NULL Under-investigation
Industrial Equipment NULL 48 Under-investigation
Waste heat recovery NULL NULL NULL Under-investigation
Other $16,000 59 Under-investigation
HVAC $20,000 400 To be implemented
Industrial Equipment $25,000 1,402
Mixed $10,000 20
Lighting $5,000 5
Building Management Systems $1,200 13
Lighting $2,400 27
Lighting $500 3
Lighting $2,000 25 To be implemented
HVAC $4,140 17 Implemented
HVAC $10,000 32 Implemented
Computers & Printers NULL 133 Implemented
Lighting $1,950 3
Mixed $4,800 26 86 Implemented
HVAC $12,000 89
Lighting $88,335 469 Not to be implemented
Lighting $500 35
Lighting $8,000 18
Lighting $15,060 21 Under-investigation
Lighting $425 0.83 Implemented
Lighting $2,300 8 Implemented
Other $1,800 10
Industrial Equipment $10,000 117 Implemented
Industrial Equipment $500,000 5,500 Implemented
Industrial Equipment $48,000 1,512 Implemented
Other $750 31 Not to be implemented
HVAC $2,180 30 Not to be implemented
HVAC NULL 1 5 Not to be implemented
Industrial Equipment NULL 4 Not to be implemented
Industrial Equipment NULL 275 Implemented
Industrial Equipment NULL 275 Ongoing
Industrial Equipment NULL 642
Ventilation NULL 295 Ongoing
Industrial Equipment $1,000 709 Implemented
Industrial Equipment NULL 1,298
Industrial Equipment $1 86 Implemented
Other $6,000 246 Implemented
Industrial Equipment $3,000 286 Implemented
Industrial Equipment $1,000 299 Not to be implemented
Industrial Equipment $1,000 71 Implemented
Industrial Equipment $25,000 201 Implemented
Industrial Equipment $10,000 1,244 To be implemented
Air compressor NULL 517 To be implemented
Air compressor NULL 307 To be implemented
Behaviour/Education $100 51 Implemented
Industrial Equipment $1,200 41 Not to be implemented
Industrial Equipment NULL 11
Industrial Equipment $32,000 444
Industrial Equipment $18,600 200 Implemented
Lighting $2,900 47
Lighting $3,000 18
Lighting $2,000 28
Sub-metering $23,000 141 Implemented
Sub-metering $20,600 88 Implemented
Lighting $220 2 Ongoing
Lighting $4,580 57 Not to be implemented
Air compressor $56,000 299
Chiller $89,500 813
Industrial Equipment $56,500 284
Industrial Equipment $36,000 640 Under-investigation
Industrial Equipment $15,000 490 Implemented
HVAC $4,800 26 Implemented
HVAC $25,065 14
Other $240 4 Implemented
Building Management Systems $89,000 336 Implemented
Other NULL 52 Implemented
Industrial Equipment $5,750 32 To be implemented
Chiller $78,000 749 To be implemented
HVAC $2,700 8 Implemented
HVAC $5,000 15 Implemented
Lighting NULL 49 Ongoing
Industrial Equipment $220,000 710 Under-investigation
Industrial Equipment $220,000 911
Industrial Equipment $55,000 375 Implemented
Industrial Equipment NULL 1,111 Under-investigation
Industrial Equipment $20,000 440 Implemented
Other $4,025 20 Implemented
Industrial Equipment $20,000 1,273 To be implemented
Air compressor NULL 417 Implemented
Building Management Systems $2,550 30 Implemented
Industrial Equipment $600 77
Industrial Equipment $800 106
HVAC $50,000 4,700
Lighting $1,000 5 To be implemented
HVAC $2,500 6 Implemented
HVAC $3,725 53
Industrial Equipment NULL NULL NULL Ongoing
HVAC $500 5 Not to be implemented
HVAC $32,000 36 To be implemented
Industrial Equipment NULL 130 Implemented
Boiler $750,000 29,903 Implemented
HVAC $3,077 31 Implemented
HVAC $3,077 31 Implemented
Industrial Equipment $16,922 43 Implemented
Pool Covers/Heating $4,615 78 Implemented
Pool Covers/Heating $4,615 78 Implemented
Industrial Equipment $6,154 42 Implemented
Industrial Equipment $7,000 39 Not to be implemented
Industrial Equipment $7,000 39 Not to be implemented
Other $1 2,136 Implemented
Other $2,000 49 Ongoing
Industrial Equipment $16,000 162 Under-investigation
Pool Covers/Heating $68,918 778 Implemented
Industrial Equipment $480 82 Implemented
Other $240 129 763 Implemented
HVAC $3,725 78
Industrial Equipment $12,800 18
HVAC NULL 60 To be implemented
Industrial Equipment $6,000 184
Industrial Equipment $24,000 126 To be implemented
Industrial Equipment NULL 2,150 To be implemented
Lighting $2,520 15 Implemented
Other NULL 526 Implemented
Other $4,500,000 1,528 Implemented
Lighting $100 0.27 Implemented
Building Management Systems $700 16 Implemented
Building Management Systems $400 2 Implemented
Lighting $10,000 25
Lighting $26,000 276 Implemented
Lighting $10,000 200 Implemented
Refrigeration $2,000 21
Power Factor Correction $11,267 56 Implemented
Power Factor Correction $26,249 NULL NULL Implemented
Other $20,000 168
Air compressor $10,000 70 Implemented
Industrial Equipment $300,000 2,000 Implemented
Lighting $10,000 50 Ongoing
Lighting $21,950 40
Lighting $1,500 3 Implemented
HVAC NULL 10
Insulation $20,820 5,988
Insulation $28,500 6,297 To be implemented
Insulation $20,860 4,879 To be implemented
Lighting $1,500 4 Implemented
Other $100 2 Implemented
Lighting $1,500 7 Implemented
HVAC $350,000 NULL NULL Ongoing
Industrial Equipment $400,000,000 60,478 Under-investigation
Other $4,117,000 400 Not to be implemented
Industrial Equipment $19,000 100 Not to be implemented
Pool Covers/Heating $32,000 26
Pool Covers/Heating $2,049 352
Boiler $53,000 3,798
Pool Covers/Heating $120,000 1,260
Pool Covers/Heating $120,000 1,260
Other $26,301 130
Industrial Equipment $2,000 3
Power Factor Correction $46,000 NULL NULL Ongoing
Power Factor Correction $395,000 NULL NULL Implemented
Power Factor Correction $20,000 NULL NULL Implemented
Power Factor Correction $161,950 0
Power Factor Correction $12,000 NULL NULL Implemented
Power Factor Correction $12,000 NULL NULL Under-investigation
Power Factor Correction $12,000 NULL NULL Implemented
Power Factor Correction $110,000 0 Not to be implemented
Power Factor Correction $148,886 1,450
Power Factor Correction $180,192 NULL NULL Implemented
Power Factor Correction $30,000 NULL NULL Implemented
Power Factor Correction $250,000 NULL NULL Implemented
Power Factor Correction $250,000 NULL NULL Implemented
Power Factor Correction $145,000 0
Power Factor Correction $257,000 300 To be implemented
Power Factor Correction $35,000 300 Implemented
Alternative power generation $3,600,000 13,140 Not to be implemented
Waste heat recovery $7,900 376
Waste heat recovery $18,500 1,254
Chiller $1,400,000 109 Implemented
Boiler $105,000 2,721 To be implemented
HVAC $1,500 48
Industrial Equipment $7,000,000 30,820
Boiler $80,000 1,350 Not to be implemented
Other NULL 142 Implemented
Other $20,000 78 Not to be implemented
HVAC $0 198 Implemented
Industrial Equipment $300,000 488
HVAC $3,725 48
Hot Water System $200,000 18,330
Other $1,500,000 NULL NULL Implemented
Industrial Equipment $18,000 156 Not to be implemented
Industrial Equipment $33,000 184 Not to be implemented
Industrial Equipment $22,000 228 Under-investigation
Industrial Equipment $22,000 222 Under-investigation
Industrial Equipment $22,000 216 Not to be implemented
Other $93,000 1,463 To be implemented
Boiler $5,800 1,410 Ongoing
Boiler $4,600 594 Implemented
Lighting $100 6 Implemented
Behaviour/Education NULL 155
Chiller $80,000 1,290 Under-investigation
Hot Water System $300 1 13
HVAC $800 22 Implemented
Chiller $265,000 370
Lighting $10,700 63
Industrial Equipment $4,000 12
Industrial Equipment $4,000 6
Lighting $1,000 13
Lighting $46,000 90
Lighting $18,200 36
Behaviour/Education NULL 7 Not to be implemented
Behaviour/Education NULL 1 Not to be implemented
Behaviour/Education $0 0.56 Implemented
Behaviour/Education $0 0 Not to be implemented
Chiller $100,000 694
Industrial Equipment $4,640 6 Not to be implemented
Pool Covers/Heating $54,400 1,543
Pool Covers/Heating $100,000 336
HVAC $10,200 9
Industrial Equipment $4,000 5
Industrial Equipment $4,000 5
Chiller $15,200 149 To be implemented
Chiller $15,200 103 To be implemented
Industrial Equipment $14,000 78
HVAC $36,000 79
HVAC $55,000 46 Not to be implemented
Other $10,000 1,977 11,760 Implemented
Industrial Equipment $125,000 65
Industrial Equipment NULL 42
Air compressor $311,096 601 Implemented
Air compressor $20,000 75 Implemented
Industrial Equipment $474,047 734 Not to be implemented
Industrial Equipment $4,600 1,100 Not to be implemented
HVAC $4,100 9 Implemented
HVAC $750 4 Implemented
HVAC $200 3 Not to be implemented
Computers & Printers $500 84
Industrial Equipment $300,000 1,200
Industrial Equipment $450,000 1,200
PV $256,133 25
Lighting $712 2 To be implemented
Computers & Printers $60 2
HVAC NULL 39
Refrigeration $30,000 263 Implemented
Refrigeration $75,000 596 Implemented
Air compressor $20,000 110
Other $1,500,000 NULL NULL Implemented
Other $3,000 NULL NULL Implemented
Industrial Equipment $26,000 105
Other NULL 148
Other $8,000 74
Industrial Equipment NULL 30
Lighting $1,100 6 Implemented
Lighting $2,000 8 Ongoing
Lighting $1,800 166
HVAC $2,920 11 28 Ongoing
Other $1,500 378 Implemented
HVAC $13,800 75 Under-investigation
HVAC $30,000 294 Implemented
Lighting $5,800 13
Boiler $11,500 326 Implemented
Building Management Systems $31,200 846
Hot Water System $2,300 6 Implemented
Lighting $2,000 49 Ongoing
Industrial Equipment $10,000 1,733 42,983 Implemented
HVAC $5,750 47 Implemented
Lighting $12,500 300 Ongoing
Chiller $3,738 6 Implemented
HVAC $219,419 544 2,194
HVAC $72,272 345 1,365
HVAC $17,940 75 234
Industrial Equipment $500,000 3,787 Not to be implemented
Industrial Equipment $45,000 1 Not to be implemented
Waste heat recovery $3,750 178 To be implemented
Waste heat recovery $9,500 3,600 Implemented
Waste heat recovery $15,000 1,530
Waste heat recovery $19,000 1,888
Waste heat recovery $112,800 1,995 Implemented
Pool Covers/Heating $85,000 2,667 Not to be implemented
Waste heat recovery $15,000 427 Not to be implemented
Pool Covers/Heating $85,000 2,667 Not to be implemented
Waste heat recovery $15,000 427 Not to be implemented
Waste heat recovery $4,000 2,778 To be implemented
Other $25,000 0 Implemented
HVAC $0 95
Hot Water System $500 2 Implemented
Industrial Equipment $20,000 350 Under-investigation
Industrial Equipment $30,000 700 Not to be implemented
Industrial Equipment $50,000 1,400 Under-investigation
Other $160,000 24 13,600 To be implemented
Industrial Equipment $100,000 2,544 63,067 Implemented
Industrial Equipment $100,000 4,564 113,169 Implemented
Behaviour/Education NULL NULL NULL Implemented
HVAC NULL 25 Ongoing
HVAC $0 27 Implemented
Air compressor $15,000 336 Implemented
Air compressor NULL 90 Implemented
Hot Water System $110,000 1
Other $16,000 7,300 Implemented
Other $200,000 7,971 Not to be implemented
Air compressor NULL 10 Implemented
Air compressor $100 7 Under-investigation
Hot Water System $150 2 Implemented
Lighting $30,000 300 Implemented
Industrial Equipment NULL 2,000 Under-investigation
Hot Water System $60 1
Other NULL 241 To be implemented
Industrial Equipment $50,000 2,500 Implemented
Industrial Equipment $100,000 2,478 Under-investigation
Chiller $1 166 To be implemented
Industrial Equipment $10,000 570 Implemented
Air compressor $30,000 1,000 Implemented
Lighting $750 22
Industrial Equipment NULL 722 To be implemented
Other $660 67 Implemented
Industrial Equipment $3,000 17 Not to be implemented
Other NULL 242 Not to be implemented
Industrial Equipment NULL 77 Implemented
Boiler NULL 63 Under-investigation
Hot Water System NULL 4 To be implemented
HVAC NULL NULL NULL Implemented
Other $20,000 10,412 Ongoing
Air compressor $3,600 114 Implemented
Other NULL 160
Pool Covers/Heating NULL 50 250 Implemented
Pool Covers/Heating $0 539 Implemented
Pool Covers/Heating NULL 485 Not to be implemented
Pool Covers/Heating NULL 48 Not to be implemented
Other NULL 973
Refrigeration $8,500 53 To be implemented
Refrigeration $15,000 52 To be implemented
Refrigeration $300 1 To be implemented
Refrigeration $50 1 Implemented
Other NULL 3,904 To be implemented
Behaviour/Education $0 6
Other $50,000 1,041 Not to be implemented
Hot Water System $70 0.65 Implemented
Hot Water System $60 0
Chiller $5,988 25 Not to be implemented
Industrial Equipment $1,500 2
Lighting $500 4
Hot Water System NULL 40
Ventilation $2,500 4 Implemented
Hot Water System $300 1
Lighting $300 2
Hot Water System NULL 2 Implemented
Hot Water System NULL 24 Implemented
Industrial Equipment $500 3 To be implemented
Hot Water System $160 1
Hot Water System $60 0
Hot Water System $70 0.23 Implemented
Hot Water System $70 0.25 Implemented
Hot Water System $70 1 Implemented
Lighting $1,000 4
Lighting $500 1
Other $25,000 1,993 Implemented
Industrial Equipment $600 11 Implemented
Other $24,000 2,375 Implemented
Industrial Equipment $1 62 To be implemented
Lighting $7,320 63 Implemented
Industrial Equipment $1,000 108
Industrial Equipment $1,000 89
Air compressor $50,000 233 To be implemented
Industrial Equipment NULL 722 To be implemented
Lighting NULL 175
Lighting $4,000 9 Not to be implemented
Lighting $18,400 33 To be implemented
Air compressor $500 47
Industrial Equipment $1,000 99
Pool Covers/Heating $1,000 340 Implemented
Industrial Equipment $23,600 356 Implemented
Computers & Printers NULL 68
Lighting NULL 75
HVAC NULL 79
Industrial Equipment $575,000 763 Ongoing
Lighting $405 0
Lighting $536 1
Lighting $700 1
Lighting $2,524 4
Lighting $850 0.60 Implemented
Lighting $4,050 4
Lighting $5,400 3
Lighting $1,700 2 Implemented
Lighting $1,941 2
Lighting $810 1
Lighting $327 1
Lighting $1,215 1
Lighting $1,215 1
Lighting $1,170 5 To be implemented
Lighting $1,400 3 Implemented
Lighting $8,500 7
Lighting $15,900 13 Implemented
Lighting $36,450 50 Implemented
Lighting $9,600 8 Implemented
Lighting $1,130 3 Implemented
Lighting $1,989 5
Lighting $28,125 398
Other $5,000 12 Implemented
Lighting $675 2 To be implemented
Lighting $7,200 6
Lighting $675 0
Lighting $5,400 4 Implemented
Lighting $1,620 1 Implemented
Lighting $6,200 9 Implemented
Lighting $9,000 21 Implemented
HVAC $2,500,000 230 Implemented
Industrial Equipment $150,000 390
Industrial Equipment $100,000 7,044
Industrial Equipment $3,000,000 150,400
Industrial Equipment $1,000,000 87,766 Under-investigation
Industrial Equipment $5,000 1,174
Industrial Equipment NULL 1,498 Not to be implemented
Industrial Equipment $15,000 77 Implemented
Industrial Equipment $20,000 7,490 Implemented
Industrial Equipment $100,000 7,490 Implemented
Industrial Equipment $5,447,305 192,640 Not to be implemented
Industrial Equipment $4,500,000 85,000 Under-investigation
Industrial Equipment $7,255,000 250,000 Under-investigation
Industrial Equipment $20,000 2,935
Industrial Equipment NULL 1,026
Industrial Equipment $3,000 816 Implemented
Industrial Equipment $5,000 1,498 Implemented
Industrial Equipment $20,000 1,360
Industrial Equipment $140,000 864 Implemented
Industrial Equipment $260,000 34,000 Implemented
HVAC $1,620 65
HVAC $1,620 1,039
Lighting $2,310 14 Not to be implemented
HVAC $9,750 19 Not to be implemented
Industrial Equipment $345 4 Implemented
Lighting $627 1
Lighting $27,500 32 Implemented
Lighting $1,250 13 Implemented
Lighting $200 1 To be implemented
Building Management Systems $50,000 166 Not to be implemented
Lighting $350 2 Not to be implemented
Industrial Equipment $70,000 1,095 To be implemented
Industrial Equipment $8,140,000 611 Not to be implemented
Lighting $41,810 7 Ongoing
Other $32,500 1,357
Air compressor $10,000 319
Hot Water System $100 0.83 Implemented
Chiller $150,000 841
Industrial Equipment NULL 4 To be implemented
Industrial Equipment $2,000 26 Implemented
Industrial Equipment $5,000 6 3,000
PV $1,800,000 800 Not to be implemented
Chiller $150,000 524
Lighting $115,000 41
Air compressor $10,000 307 Implemented
Cogeneration $110,000 22,000 Implemented
Air compressor $2,420 61 Not to be implemented
HVAC NULL 529
Maintenance $2,480 61 23 Implemented
Maintenance $26,000 1,746
Maintenance NULL 5,405
Maintenance $3,000 140 Implemented
Air compressor $10,000 1,000 Implemented
HVAC $5,400 75 Ongoing
Air compressor $23,000 847 To be implemented
Lighting $500 21 Implemented
HVAC $1,700 21 Implemented
Maintenance $500 103 Implemented
Industrial Equipment $1,360 59 Implemented
Maintenance $500 129
Maintenance $6,100 1,926 Implemented
Maintenance NULL 25,902
Maintenance NULL 9,811
Other $760 65
Other $40,000 547 Not to be implemented
Other $5,800 35 Implemented
Lighting $1,142 2
Lighting $1,420 1
Lighting $1,420 1
Lighting $2,500 2 Not to be implemented
Lighting $1,100 3 Implemented
Lighting $1,486 2
Lighting $4,167 4
Lighting $40,000 3 Under-investigation
Lighting $228 0
Lighting $1,485 2
Lighting $7,216 10
Lighting $2,964 2
Lighting $4,060 13
Lighting $2,117 3
Lighting $2,557 2
Lighting $946 0
Lighting $228 0
Lighting $270 0
Industrial Equipment $5,000 2
Lighting $2,702 2
Lighting $4,928 19 Not to be implemented
Lighting $3,409 3
Lighting $4,000 18 Implemented
Lighting $1,902 3
Lighting $14,394 10
Lighting $1,556 0
Lighting $242 1
Lighting $8,483 10
Lighting $811 3
Lighting $426 0
Lighting $6,600 5 Not to be implemented
Lighting $8,050 5 Implemented
Lighting $30,000 34
Lighting $646,350 1,416 To be implemented
Lighting $430,900 1,287 To be implemented
Lighting $22,500 55
Lighting $5,139 14 To be implemented
Lighting $806 2
Lighting $457 1
Lighting $457 1
Lighting $946 2
Lighting $6,385 40 To be implemented
Lighting NULL 0 Not to be implemented
Lighting $2,310 65 Implemented
Other $10,200 68
Lighting $4,500 19 Ongoing
Lighting $6,500 9 Implemented
Lighting $3,000 110 Ongoing
Lighting $35 0.28 Implemented
Lighting $7,500 21 To be implemented
Lighting $11,000 70
Lighting $571 1
Lighting $675 1
Lighting $1,339 2
Lighting $276 1 Not to be implemented
Lighting $345 1 Not to be implemented
Lighting $90 0
Lighting $194,400 887 Ongoing
Lighting $108 1 To be implemented
Lighting $2,000 11
Lighting $1,500 12
Lighting $560 10
Lighting NULL 4 Implemented
Lighting $165 0.83 Implemented
Lighting $20 0
Lighting $197,590 991
Lighting $100 2
Lighting $32,000 88 To be implemented
Other $14,500 11 Implemented
Lighting $120,000 289
Hot Water System $21,500 26
Lighting $811 1
Lighting $727 1
Lighting $946 2
Lighting $9,526 18
Lighting $9,572 14
Lighting $96 0.23 Implemented
HVAC $50,000 70
HVAC $228,000 434 To be implemented
HVAC $100,000 20
HVAC $300,000 50
Chiller $15,000 2
HVAC $100,000 20
Industrial Equipment $24,000 174
Lighting $400,000 368
Hot Water System $60,000 111 To be implemented
Lighting $22,120 28 Ongoing
Other $800 1
Lighting $17,500 41 Implemented
Lighting $15,000 35 To be implemented
Lighting NULL 7 Not to be implemented
Industrial Equipment $2,500,000 1,970 Implemented
HVAC $19,800 191
Lighting $100 0.82 Implemented
Chiller $400,000 442 Implemented
Other $10,784 256
Lighting $5,200 7
Air compressor $300,000 155 Implemented
Other $1,600 117 Not to be implemented
Chiller $265,000 434
Chiller $136,000 186 Implemented
Chiller $700,000 740 Implemented
Air compressor $4,000 17
Computers & Printers $52,500 41
Boiler $13,000 69 Implemented
HVAC $42,000 671 Implemented
Computers & Printers $9,000 11
Computers & Printers $162,000 117
Computers & Printers $30,000 18
Computers & Printers $30,000 29
Computers & Printers $19,200 14
Computers & Printers $5,400 5
Computers & Printers $7,500 7
Computers & Printers $3,300 2
Computers & Printers $10,750 8
Computers & Printers $1,000 1
Computers & Printers $3,300 1
Computers & Printers $2,700 1
Other $69,600 58
Boiler $120,000 5,124 Implemented
Pool Covers/Heating $5,000 26 Implemented
Industrial Equipment $1,300,000 41,667 Implemented
HVAC $30,000 104 Not to be implemented
Lighting $2,600 3 Implemented
Lighting NULL 3 Implemented
Industrial Equipment $612,500 -19 To be implemented
Hot Water System $9,000 14
HVAC $60,000 20
Hot Water System $36,320 172
HVAC $80,000 10
HVAC $300,000 200
HVAC $45,000 10
HVAC $20,000 5
Boiler $87,000 480
Boiler $55,000 224 -4,642
HVAC $25,000 5
HVAC $30,000 20
Hot Water System $3,000 13 -52
Hot Water System $5,000 5
Hot Water System $8,000 2
Hot Water System $15,000 10
Hot Water System $8,000 20
Hot Water System $8,000 10
Hot Water System $8,000 10
Hot Water System $5,000 1
Hot Water System $5,000 5
Hot Water System $5,000 5
Hot Water System $5,000 5
Hot Water System $8,000 10
Hot Water System $20,000 15
Hot Water System $5,000 1
Hot Water System $10,000 3
Hot Water System $5,000 5
Hot Water System $6,000 5
Hot Water System $5,000 5
Hot Water System $5,000 2
HVAC $20,000 5
Chiller $15,000 129
Lighting $1,300 6 Implemented
Lighting $8,050 23 Implemented
Lighting $5,684 10 To be implemented
HVAC $100,000 5
HVAC $236,366 194 Not to be implemented
Lighting $2,240 1
Hot Water System $6,000 51 Implemented
Hot Water System $1,000,000 100
Hot Water System $3,000 5 Under-investigation
Hot Water System $18,000 45 Implemented
Lighting $1,895,080 371 Ongoing
HVAC $44,000 906 Not to be implemented
Lighting $18,040 11 Ongoing
Lighting $1,400 2 Implemented
Lighting $39,520 35
Lighting $14,690 5
Lighting $10,530 1
Lighting $25,870 14
Industrial Equipment $30,000 77
Lighting $700,000 70
Industrial Equipment $688,000 24 4,333 Not to be implemented
Lighting $3,366,880 2,224 Ongoing
Pool Covers/Heating $9,620 58 To be implemented
Lighting $25,000 14
Lighting $13,246 30 To be implemented
Lighting $24,500 28 To be implemented
Lighting $3,200 3
Lighting $61,210 181 To be implemented
Industrial Equipment $234,000 1,349
Building Management Systems $400,000 50 100
Lighting $409,950 482 Ongoing
Lighting $250 0
Lighting $1,200 1
Lighting $9,700 17
Lighting $30,000 93
Lighting $32,300 89 Implemented
Lighting $31,000 99
Lighting $32,800 28
Lighting $34,440 16
Lighting $10,000 30
Lighting $125 0
Lighting $1,275 2
Lighting $325 1
Lighting $1,000 0
Lighting $1,275 2
Lighting $2,700 2 To be implemented
Lighting $240 0 To be implemented
Lighting $30,000 21
Lighting $106,500 424 To be implemented
Lighting $109,620 219 Implemented
Lighting $3,000 6 Under-investigation
Other $150,000 10
Other $150,000 5
Other $150,000 10
Other $150,000 10
Other $150,000 10
Other $150,000 10
Other $150,000 5
Industrial Equipment $2,000,000 1,846 Not to be implemented
Other $11,190 11
Lighting $950 6
Lighting $1,520 1 Implemented
Lighting $12 0
Lighting $200 1
Lighting $24 0 To be implemented
Lighting $925 5
Lighting $24 0
Lighting $850 5
Lighting $375 2
Lighting $4,050 11
Lighting $6,000 14
Lighting $875 2
Lighting $125 1
Lighting $2,500 9
Lighting $4,225 14
Lighting $125 1
Lighting $2,250 5
Lighting $2,000 7 Under-investigation
Lighting $50 1
Lighting $180 1 Implemented
Lighting $48 0.46 Implemented
HVAC $500,000 5
Lighting $100 2 Implemented
Hot Water System $2,850 3 Implemented
Other NULL 1,727
Hot Water System $3,000 13 -52
Lighting $20,665 20
Lighting $60,000 100
Lighting $2,000 1
Lighting $25,000 5
Lighting $5,000 5
Lighting $15,000 20
Lighting $15,000 20
Lighting $20,000 10
Lighting $10,000 10
Lighting $10,000 20
Lighting $10,000 20
Lighting $40,000 70
Lighting $150,000 150
Lighting $20,000 20
Lighting $1,000 1
Lighting $25,000 20
Lighting $15,000 10
Lighting $5,000 2
Lighting $20,000 50
Lighting $30,000 20
Lighting $45,000 30
Lighting $100,000 166
Lighting $30,000 50
Industrial Equipment $21,000 55 To be implemented
Lighting $1,280 5
Lighting $3,335 5
Lighting $2,100 4 Not to be implemented
Lighting $1,925 2 Implemented
Lighting $200 4 To be implemented
Lighting $5,000 6 Implemented
Lighting $2,000 0 To be implemented
Lighting $7,000 9 Implemented
Lighting $7,000 2
Lighting $6,900 21 Implemented
Lighting $5,000 66
HVAC NULL 698
HVAC $60,000 10
Lighting $10,500 3
Industrial Equipment $5,000,000 228,571 Implemented
Boiler $3,500,000 119,622 Under-investigation
Lighting $4,499 6 Implemented
Air compressor $160,000 1,056
HVAC $6,338 58
Industrial Equipment $20,000 41 Implemented
Chiller $196,800 285 To be implemented
Industrial Equipment $782,880 452
Air compressor $311,000 630
Lighting $350 4
Lighting $300 2 Implemented
Lighting NULL 65 Implemented
HVAC $40,000 43
Lighting NULL 10
Lighting $800 13 Implemented
HVAC $100,000 10
Chiller $140,000 200
HVAC $100,000 4
Other $30,000 5
Industrial Equipment NULL 495 To be implemented
HVAC $480,000 173
Industrial Equipment $88,700 230 Ongoing
Industrial Equipment $87,724 181 Ongoing
Industrial Equipment $342,280 8,644 Ongoing
Industrial Equipment $5,735,100 500 Implemented
HVAC $8,000,000 500
Industrial Equipment $1,100,000 788 Implemented
Industrial Equipment $9,500 152
Lighting $25,000 113
Lighting NULL 53 Implemented
Lighting $500,000 500
Lighting $675 5
Industrial Equipment $90,000 130
Lighting $14,241 11 Not to be implemented
Industrial Equipment $15,000 8 Implemented
Lighting $28 0
Lighting $12 0.09 Implemented
Lighting $12 0 Implemented
Hot Water System $16,040 0 Not to be implemented
HVAC $300,000 157
Industrial Equipment $3,470 5 Not to be implemented
Lighting $161 1 Not to be implemented
HVAC $49,529 496 Implemented
Lighting $2,380 4 Not to be implemented
HVAC $4,800 54
Lighting $500 4 Under-investigation
Lighting $550 2
Other $5,000 19 Implemented
Other $3,200 1
Lighting $2,750 2 Implemented
Lighting $800 1
Lighting $500 0.44 Implemented
Lighting $30,900 9
Lighting $19,000 10 Implemented
Lighting $1,880 4
Chiller $230,000 458 Ongoing
Industrial Equipment $5,000 38
HVAC $500,000 50
HVAC $200,000 20
Industrial Equipment NULL NULL NULL Under-investigation
Industrial Equipment $1,000,000 345 Implemented
Lighting $12,720 127 Implemented
Industrial Equipment $400,000 545
HVAC $500,000 500
HVAC $40,000 10
Air compressor $180,000 230 Implemented
HVAC $286,848 50
HVAC $95,817 28
Chiller $20,000 50
HVAC $500,000 10
Hot Water System NULL 3 Not to be implemented
Hot Water System NULL 7 Not to be implemented
Hot Water System NULL 30 Not to be implemented
Air compressor $550,000 761 Not to be implemented
Industrial Equipment $350,000 210 Not to be implemented
HVAC $390,000 120 Not to be implemented
HVAC $30,000 1
Industrial Equipment $7,000 7 Ongoing
Computers & Printers NULL 205 Implemented
HVAC $40,000 50
HVAC $1,200,000 60
HVAC $10,000 5
HVAC $40,000 20
Hot Water System $5,000 10
Hot Water System $15,000 20
Hot Water System $5,000 10
Hot Water System $8,000 30
Hot Water System $5,000 2
Hot Water System $5,000 1
Hot Water System $5,000 1
Industrial Equipment $652,625 1,358 Ongoing
HVAC $69,718 8
Hot Water System $106,196 755 Not to be implemented
Lighting $15,220 29
Lighting $269,800 288
Lighting $169,950 211
Industrial Equipment $6,000 99
Lighting $60,000 0
Lighting $53,320 38
Lighting $10,900 3
Lighting $21,990 12
Lighting $27,900 11
Industrial Equipment $125,580 629 Not to be implemented
Lighting $546 1 Implemented
Lighting $2,418 5 Implemented
Lighting $11,400 129
Lighting $346,000 600 Under-investigation
Other $150,000 5
Other $130,000 2
Other $250,000 20
Lighting $160 7 Implemented
Lighting $2,000 8 Implemented
Lighting $200 2 Implemented
Lighting $2,400 4 Implemented
Lighting $20,000 5
Lighting $10,000 2
Lighting $20,000 30
Lighting $10,000 10
Lighting $10,000 5
Lighting $5,000 5
Lighting $15,000 25
HVAC $30,000 92 Implemented
Lighting $5,250 5 Implemented
Lighting $550 1
Lighting $1,500 1
Other $2,100 3
Lighting $6,000 3
Industrial Equipment $540,000 80
Chiller $150,000 68
Chiller $100,000 50
Chiller $145,000 185
Insulation $250,000 100 300
Industrial Equipment NULL 10
Industrial Equipment NULL 158
HVAC $130,200 565
Other $9,225 31 Implemented
Chiller $400,000 153 Not to be implemented
Industrial Equipment $146,946 1,003 Under-investigation
Other $30,000 6,700 Under-investigation
Lighting $305,820 223
Lighting $3,612,000 513 Ongoing
Other $500 5 Implemented
Lighting $9,500 352 Implemented
Lighting $10,800 36 Implemented
HVAC $17,250 154 Implemented
HVAC $0 15 Implemented
Lighting NULL 27
Industrial Equipment NULL 12
HVAC NULL 38
HVAC NULL 14
HVAC NULL 1
HVAC $0 6 Implemented
HVAC $0 3 To be implemented
Other $0 3 7
Other $15,000 2,390
HVAC $10,000 2,953 6,407
HVAC $25,000 1,762 3,592
HVAC $1,000 397 2,189
Lighting $10,270 14
Other $2,000,000 667 Not to be implemented
Lighting $31,710 83
Lighting $10,030 4 To be implemented
Lighting $13,940 5
Lighting $4,080 2
Chiller $188,000 440 Not to be implemented
Lighting $900 1 Not to be implemented
Lighting $3,600 23 Under-investigation
Lighting $2,550 14
Lighting $2,700 6
Lighting $2,550 20
Lighting $2,700 11
Lighting $124,583 345
Lighting $2,850 16
HVAC $43,000 375
Lighting $10,357 5
Lighting $2,600 5 Implemented
Lighting $15,500 15 To be implemented
Lighting $2,500 4 Implemented
Lighting $650 0.68 Implemented
Lighting $1,500 1
Lighting $3,700 8
Lighting $4,200 6
Lighting $2,000 3
Lighting $11,649 10 To be implemented
Lighting $1,309 1 Ongoing
Lighting $2,541 16 Ongoing
Lighting $20,988 52 Ongoing
Lighting $1,315 2 Ongoing
Lighting $2,948 3 Ongoing
Lighting $1,117 1 Ongoing
Lighting $1,623 3 Ongoing
Lighting $919 2 Ongoing
Lighting $4,422 5 Ongoing
Lighting $70,000 99 Ongoing
Lighting $1,620 0
Lighting $7,020 2
Lighting $29,400 19 To be implemented
Lighting $33,184 13
Chiller $94,000 22 Not to be implemented
Lighting $6,210 4 Implemented
Lighting $167,475 208 Implemented
Lighting $113,245 142 Implemented
Lighting $16,240 20 To be implemented
Lighting $12,760 16 To be implemented
Lighting $23,345 20 To be implemented
Lighting $1,620 1 To be implemented
Lighting $1,890 1 To be implemented
Lighting $4,320 2 To be implemented
Lighting $1,450 6 Implemented
Lighting $6,960 9 Implemented
Lighting $23,925 25 Implemented
Lighting $22,910 19 Implemented
Lighting $2,240 1 Implemented
Lighting $1,680 3
Lighting $6,380 10
Lighting $580 1
Lighting $23,925 37
Other $1,000 6 To be implemented
Other NULL 6,903
Other $84,000 253 5,680 Not to be implemented
Building Management Systems $5,000 12
HVAC $4,000 22 132
HVAC $3,200 54 Implemented
HVAC $3,200 25
Other $20,000 98 To be implemented
HVAC $70,000 200
Building Management Systems $10,000 45 Implemented
Lighting $10,000 421 Implemented
Lighting $5,000 49 Implemented
HVAC $1,500 20 Ongoing
Boiler $6,000 2,376 Implemented
Chiller $5,000 38 Implemented
Maintenance $1,500 13 Not to be implemented
Lighting $500 6 To be implemented
Lighting $500 6 To be implemented
Air compressor $25,000 1,480 Implemented
HVAC $600 6 Implemented
HVAC $1,000 3 Implemented
Building Management Systems $7,500 161 To be implemented
Sub-metering $143,000 78
Cogeneration NULL NULL NULL Implemented
Waste heat recovery NULL 1,320
Cogeneration $1,200,000 6,204
Cogeneration $21,240,000 69,135
Cogeneration $10,200,000 33,660
Boiler $152,000 1,470 To be implemented
Industrial Equipment NULL 8,877
Industrial Equipment $410,250 1,470 To be implemented
Industrial Equipment NULL 468 To be implemented
Waste heat recovery NULL 1,782 To be implemented
Industrial Equipment $31,000 145 To be implemented
Waste heat recovery $1,920,000 28,650 To be implemented
Waste heat recovery $150,000 8,800 To be implemented
Air compressor NULL 173
Air compressor $12,892 490
Air compressor NULL 103 To be implemented
Air compressor NULL 137 To be implemented
Boiler $1,727,295 26,369 To be implemented
Air compressor $114,000 1,470
Waste heat recovery NULL 1,320 To be implemented
Industrial Equipment $700,000 3,632
Industrial Equipment $3,000 107 Implemented
Hot Water System $3,150 3 Not to be implemented
Industrial Equipment $399,000 5,000 To be implemented
Industrial Equipment $156,000 1,817 To be implemented
Industrial Equipment $156,000 3,919 To be implemented
Other $6,000 271
Lighting $1,000 28
Lighting $500 8 Implemented
Lighting $500 2 Implemented
Lighting $2,500 7 Implemented
Lighting $2,000 9
Behaviour/Education $300 116 Ongoing
Air compressor $70,000 576 Ongoing
Air compressor NULL NULL NULL Ongoing
Mixed $2,500 22 Ongoing
Lighting NULL NULL NULL Implemented
Industrial Equipment NULL 374 Implemented
Air compressor $15,280 32
HVAC $3,000 3
Industrial Equipment $3,600 35 Not to be implemented
Industrial Equipment $3,000 22 Implemented
Refrigeration $44,400 67 Not to be implemented
Other NULL 820 To be implemented
HVAC NULL 300 Ongoing
Lighting NULL 200 Ongoing
HVAC $8,775 28 Not to be implemented
Chiller $5,000 374 To be implemented
Lighting $3,000 13 Not to be implemented
Lighting $12,000 13 Not to be implemented
Lighting $1,840 20 Implemented
Lighting $12,000 14 Not to be implemented
Lighting $9,000 8 Not to be implemented
Industrial Equipment NULL 200 To be implemented
Lighting $4,500 57
Lighting $2,100 8
Hot Water System $20,500 274 To be implemented
Hot Water System $20,500 274 To be implemented
Mixed NULL NULL NULL Implemented
Air compressor $30,000 289
Boiler $2,000 722
HVAC NULL 4 Not to be implemented
HVAC NULL 3 Not to be implemented
HVAC NULL 1 Not to be implemented
Industrial Equipment $17,000 90 Not to be implemented
Industrial Equipment $360,000 1,659
Industrial Equipment $85,000 400 Not to be implemented
Monitoring NULL NULL NULL Under-investigation
Industrial Equipment $20,000 4,081
Industrial Equipment $150,000 900
Behaviour/Education NULL 7 Implemented
Tariffs NULL 3,120 Ongoing
Other $1,000 33
Refrigeration $127,680 966 Implemented
ventilation $3,500 26
Other NULL 29,710
HVAC $5,000 23 16 Implemented
Industrial Equipment $17,000 115 Implemented
Industrial Equipment $900,000 687 Implemented
Chiller $27,000 114 Implemented
Behaviour/Education $30,000 166
Lighting $675 2 Implemented
Lighting $675 3 Implemented
Other $480 4
Other $480 2 Not to be implemented
Other $120 110 Implemented
Other $360 67 Not to be implemented
Other $120 6 Not to be implemented
Lighting $4,200 53
Lighting $50,693 72 Implemented
Other $1,100 5
Lighting $500 3
Mixed $1,000 147 Implemented
Hot Water System $60,000 113 Under-investigation
HVAC NULL 2 Implemented
HVAC NULL 50 Implemented
Building Management Systems $0 20 Implemented
HVAC $1,600 7 Implemented
Maintenance $8,000 945
Industrial Equipment $150,000 2,046
Building Management Systems $16,000 123 To be implemented
Industrial Equipment $20,000 203 Not to be implemented
Industrial Equipment $600 26 Implemented
Lighting $1,600 62 Under-investigation
Lighting $7,513 8 Implemented
Lighting $7,513 7 Implemented
Sub-metering $19,500 NULL NULL Under-investigation
Other NULL NULL NULL Under-investigation
Lighting $3,000 66 Under-investigation
Lighting $2,000 22 Under-investigation
Lighting NULL 88
Lighting $1,500 17 Not to be implemented
Industrial Equipment $100,000 36 Not to be implemented
Lighting $8,000 7 Not to be implemented
Lighting $1,500 2
Hot Water System $8,430 13 Implemented
Hot Water System NULL 273 -191
Pool Covers/Heating $29,500 95 To be implemented
Hot Water System $47,980 106
Hot Water System $18,000 162 To be implemented
Pool Covers/Heating $181,403 3,606
Pool Covers/Heating $143,428 1,669
PV $38,174 2
PV $38,735 2
PV $34,436 2
PV $37,966 2 0
PV $37,457 2 0
Hot Water System $19,602 154 Not to be implemented
Other $10,000 1,068 Implemented
HVAC $15,000 735 Implemented
Industrial Equipment $100,000 286 Implemented
Industrial Equipment $25,000 23 Under-investigation
Industrial Equipment $25,000 21 Under-investigation
Industrial Equipment $50,000 283 Under-investigation
Other NULL NULL NULL Implemented
Industrial Equipment $1,300 131 Under-investigation
Behaviour/Education $110,000 109 1,668 Ongoing
Building Management Systems $1,000 112
Other NULL 3 Implemented
Boiler NULL 6,243
Cogeneration $688,600 1,674
Industrial Equipment $10,000 3 To be implemented
Industrial Equipment $10,000 5 Not to be implemented
Maintenance $2,300 1,176 Ongoing
Maintenance $1,800 1,176 To be implemented
Boiler $10,000 314 Not to be implemented
Boiler NULL -238 8,333
Industrial Equipment $250,000 20,000 Ongoing
Other $50,000 9,470 To be implemented
Industrial Equipment $5,000 661 Implemented
Industrial Equipment $12,000 700
Monitoring $4,000 147 To be implemented
insulation $33,174 6,481
Industrial Equipment $3,040 635
Boiler $1,200,000 300 4,900
Waste heat recovery $100,000 1,796 Not to be implemented
Waste heat recovery $200,000 3,240 Under-investigation
Industrial Equipment $5,000 2 1,000
Industrial Equipment $30,000 588 To be implemented
Industrial Equipment NULL 420 To be implemented
Other $20,000 293 Not to be implemented
Lighting $3,250 10
Lighting $47,970 108 Implemented
Industrial Equipment NULL 313
HVAC NULL 114
Industrial Equipment NULL 35,000 Under-investigation
Industrial Equipment NULL 14,000 Under-investigation
Air compressor $1,500 10 Implemented
Sub-Metering $15,834 107
Industrial Equipment NULL 1,015 -2,451
Other $2,000 342
Industrial Equipment $30,000 728 Ongoing
Lighting $41,000 10 Ongoing
Air compressor $23,000 83 Implemented
Lighting $2,795 5
Lighting $500 2
Industrial Equipment $100 33
Industrial Equipment NULL 120
Hot Water System $600 1
Lighting $250 0
Lighting $8,700 338
Lighting $750 1
Industrial Equipment NULL 130
Pool Covers/Heating NULL 62 Implemented
HVAC $300 1
Industrial Equipment $1 194 Implemented
HVAC $450 1
Industrial Equipment NULL 169
Lighting NULL 1 Not to be implemented
Lighting $6,000 33
HVAC $4,000 11
Lighting $350 1
HVAC $300 3
Lighting $500 1
Lighting $500 1
Lighting $150 0
Lighting $150 0
Lighting $600 1
Lighting $350 2
Lighting $750 3
Refrigeration $1,000 6
Lighting $500 1
Boiler NULL 9 3,971 Implemented
Behaviour/Education $15,000 800 Under-investigation
Hot Water System $50 5 Implemented
Behaviour/Education $5,000 124 To be implemented
Lighting $900 11 Not to be implemented
Behaviour/Education $87,000 650
Other $100,000 948 Under-investigation
Lighting $129,208 41 Implemented
Lighting $2,990 2
Lighting $5,200 4
Lighting $65,910 48
Lighting $88,000 377
Other $3,000 18 Implemented
Other $10,000 876 Implemented
HVAC $37,590 112 Not to be implemented
HVAC $38,500 164
insulation $35,000 210
Industrial Equipment $30,000 77
HVAC $20,000 210 To be implemented
Lighting $39,600 87 Ongoing
Other $50 0 To be implemented
Lighting $700 2
Lighting $3,600 24
Hot Water System $1,000 40 To be implemented
Hot Water System $80 29 Implemented
HVAC $4,000 8 Not to be implemented
HVAC $5,000 5
Hot Water System $180 3 Not to be implemented
HVAC $1,000 31
Other $300 8
Other $800 3
Lighting $55,688 231
Industrial Equipment $20,000,000 0
Lighting $282,000 530
Other $30,000 195
Maintenance $100,000 7,024 Implemented
Behaviour/Education $6,981 556
Air compressor NULL 150
Lighting $5,000 58
Behaviour/Education $10,000 313
Chiller $50,000 400 To be implemented
Industrial Equipment $13,500 157
Industrial Equipment $18,000 151 Not to be implemented
Lighting $2,500 9 To be implemented
Waste heat recovery $100,000 3,425 Not to be implemented
Waste heat recovery $140,000 4,355 Under-investigation
Lighting $831 0.55 Implemented
Lighting $3,086 NULL NULL Implemented
Boiler $200,000 6,175
Industrial Equipment $20 1
HVAC $17,000 100
Computers & Printers $8,000 235
Industrial Equipment NULL 14 Under-investigation
HVAC $500 39 To be implemented
Industrial Equipment $4,000 63 Implemented
Industrial Equipment NULL 7 Not to be implemented
HVAC $10,000 110
Lighting $0 3 Implemented
Lighting $355 3
Lighting NULL 77 To be implemented
HVAC $0 12 Implemented
Other NULL 27 Implemented
Computers & Printers $0 3 Ongoing
Boiler NULL 113,641 Ongoing
Industrial Equipment NULL 117 Implemented
Lighting $1,450 1 Implemented
Hot Water System NULL 0
Industrial Equipment $20,000 795 Not to be implemented
Power Factor Correction $20,000 581 Under-investigation
Hot Water System NULL 19 To be implemented
Industrial Equipment $10,000 1,993 Not to be implemented
Lighting $1,096 0.55 Implemented
Lighting $8,139 3 Under-investigation
Lighting $1,187 1 Implemented
Lighting $783 1 To be implemented
Lighting $2,817 2 Implemented
Lighting $313 0.42 Implemented
Lighting $939 1 Implemented
Lighting $2,817 5 Implemented
Lighting $1,565 2 Implemented
Lighting $4,070 9 Implemented
Lighting $1,409 2 Implemented
Lighting $4,696 3 Implemented
Lighting $1,096 0.81 Implemented
Lighting $2,974 3 Implemented
Industrial Equipment $1,000 187
Lighting $19,440 44 Implemented
Industrial Equipment $30,000 1,200
Industrial Equipment $100,000 760
Other $170,000 468 Implemented
Other $84,500 315
Cogeneration $200,000 972
Air compressor NULL 549
HVAC $12,000 22
HVAC NULL 3
HVAC NULL 44
Industrial Equipment $100,000 3,000 Implemented
HVAC $4,686 8 Under-investigation
HVAC $25,000 20
Chiller $36,000 421 To be implemented
HVAC $390,000 116 Implemented
Air compressor $192,000 591
Lighting $4,000 0.97 Implemented
Building Management Systems $45,000 100 50 To be implemented
Building Management Systems $35,000 204 Ongoing
Boiler $2,300 4 Not to be implemented
Boiler $3,240 5 Implemented
Boiler $2,060 3 Not to be implemented
Boiler $50,000 10 50
Chiller $300,000 500
Lighting $14,170 17
Lighting $12,000 189 To be implemented
Industrial Equipment $2,100,000 2,040
Other $280,000 293 To be implemented
HVAC $30,000 7 33 To be implemented
Lighting $7,500 15 Implemented
Lighting $10,500 15 Implemented
Building Management Systems $1,200,000 1,899 2,230
Chiller $256,543 84
Lighting $100,000 111
Lighting $12,700 5 Not to be implemented
Lighting $300,000 280
Lighting $16,000 10 Not to be implemented
Industrial Equipment $1,200,000 3,751 Implemented
Hot Water System $21,000 26
HVAC $46,800 35
Air compressor $35,700 333 Implemented
HVAC $67,700 85 20 Under-investigation
HVAC $17,303 26 Under-investigation
Lighting $28,000 131 Under-investigation
Lighting $15,100 18
Other $520,000 30 To be implemented
Lighting $100,000 100
Lighting $1,050 13
Lighting $135 0
Lighting $28,980 62 Implemented
Lighting $2,500 20 Implemented
Lighting $4,000 4
Lighting $1,227,243 2,728 Implemented
Lighting $15,000 20
Lighting $20,000 30
Lighting $9,200 21
Lighting $1,050 2
Air compressor $50,700 81 Not to be implemented
Industrial Equipment $5,000 17 Implemented
HVAC $1,091 3 Implemented
HVAC $2,184 10 Implemented
HVAC $250,000 1,243 Under-investigation
Lighting $8,818 1 Under-investigation
Lighting $163 0 Not to be implemented
Lighting $44,275 128 Implemented
Lighting $57,300 18 Under-investigation
Mixed $190,000 445
Boiler $2,357 6 Implemented
Building Management Systems $140,000 56
Air compressor NULL 43
Lighting $388,800 516 To be implemented
Lighting $32,415 30
Lighting $12,735 20 Implemented
Lighting $84,430 111 Implemented
Lighting $44,970 47 Implemented
Lighting $24,285 36 Implemented
Lighting $19,090 18 Implemented
Lighting $11,580 20 Implemented
Lighting $13,245 NULL NULL Implemented
Other $125,000 452 Not to be implemented
Other $19,200 1,051 Implemented
Boiler $170,000 13,192
Waste heat recovery $175,000 400
HVAC $15,000 174
Industrial Equipment $30,000 48
Industrial Equipment NULL 319 Not to be implemented
Industrial Equipment $150,000 106,301 To be implemented
Industrial Equipment NULL 165 Ongoing
Boiler $750,000 113,641 To be implemented
Industrial Equipment $32,000 207
Industrial Equipment NULL 7
Air compressor $140,000 467
Industrial Equipment $600,000 2,228 Implemented
Industrial Equipment $600,000 2,228 Implemented
Waste heat recovery NULL 239,345
Air compressor $75,000 3,103 Under-investigation
Industrial Equipment $64,000 142
Industrial Equipment $9,900 84
Other $700 30 To be implemented
Industrial Equipment $150,000 1,152
Industrial Equipment $35,000 NULL NULL Implemented
Other $85,883 296 Implemented
Air compressor $74,800 609
Air compressor NULL 876 Under-investigation
Air compressor $695,000 1,149
Hot Water System $7,000 74 Not to be implemented
Hot Water System $15,000 26 Ongoing
Hot Water System $8,510 120 Not to be implemented
Industrial Equipment $15,000 56 Ongoing
Hot Water System $15,000 36 To be implemented
Industrial Equipment $9,585 19
Industrial Equipment $10,000 74 Under-investigation
Industrial Equipment $40,400 115
Industrial Equipment $46,000 91
Industrial Equipment $6,200 10
Industrial Equipment $74,500 349
Industrial Equipment $2,000 13 To be implemented
HVAC $49,500 215 Implemented
Industrial Equipment $100,000 800 Ongoing
Industrial Equipment $98,000 478 Implemented
Industrial Equipment $14,000 48 Implemented
Lighting $6,000 33
HVAC $83,700 234 Ongoing
Behaviour/Education NULL 38 To be implemented
ventilation $250,000 2,400
Ventilation $150,000 720
ventilation $205,000 603 To be implemented
Industrial Equipment NULL 500 Not to be implemented
Chiller $14,000 433 Ongoing
Chiller $17,200 863 Implemented
Insulation $10,800 26 Implemented
Industrial Equipment $3,300,000 6,000 Under-investigation
Lighting $28,420 63
Lighting $39,000 187
Lighting $35,100 142
Lighting $920 2 Implemented
Lighting $920 0.32 Implemented
Lighting $320 1 Under-investigation
Lighting $920 3 Implemented
Lighting $920 3 Under-investigation
Lighting $10,235 39 Implemented
Other $7,910 3
Other $9,301 11
Other $13,166 12
Industrial Equipment $5,800 8
HVAC $6,700 10 Implemented
Industrial Equipment $7,500 28
Industrial Equipment $5,700 19
Industrial Equipment $5,000 10
Industrial Equipment $800,000 2,692 Implemented
Mixed $328,000 956
Industrial Equipment $15,000 105
Industrial Equipment $18,900 34
Industrial Equipment $200,000 587 Ongoing
Industrial Equipment NULL 10,000 Not to be implemented
Industrial Equipment $4,200 2 Implemented
Industrial Equipment $100,000 260
Industrial Equipment $40,000 98 Ongoing
Industrial Equipment $30,800 12
Industrial Equipment $11,200 34 To be implemented
Industrial Equipment $8,600 52
Industrial Equipment $5,400 27
Industrial Equipment $5,400 35
Industrial Equipment $5,000 24 To be implemented
Industrial Equipment NULL 231 Not to be implemented
Industrial Equipment $63,060 501 Implemented
Industrial Equipment $42,000 42 Not to be implemented
Industrial Equipment $11,200 28
Industrial Equipment $30,100 127
Industrial Equipment $500,000 800 Implemented
Industrial Equipment NULL 231 Not to be implemented
Industrial Equipment $6,000 18 To be implemented
Industrial Equipment $22,000 123 To be implemented
Industrial Equipment $21,500 89 Not to be implemented
Industrial Equipment $2,500 22 Not to be implemented
Industrial Equipment $18,000 57 Not to be implemented
Industrial Equipment $19,000 221 Not to be implemented
Industrial Equipment $27,000 193 Not to be implemented
Industrial Equipment $16,000 203 Not to be implemented
Industrial Equipment $14,500 85 Not to be implemented
Industrial Equipment $19,000 157 Not to be implemented
Industrial Equipment $17,000 137 Not to be implemented
Industrial Equipment $14,500 73 Not to be implemented
Industrial Equipment $10,000 NULL NULL Implemented
Industrial Equipment $60,000 161 Implemented
Industrial Equipment $24,000 187 Under-investigation
Air compressor $20,000 38 Under-investigation
HVAC $120,000 138
HVAC $8,000 41
Industrial Equipment $19,000 230 Implemented
Industrial Equipment $13,792 140 Not to be implemented
Industrial Equipment $32,000 104 To be implemented
Chiller $3,000 7
Industrial Equipment $118,500 476 Under-investigation
Industrial Equipment $5,000 39 To be implemented
Industrial Equipment $7,000 32 Under-investigation
Industrial Equipment $46,000 68 Ongoing
Industrial Equipment $20,000 87 To be implemented
Industrial Equipment $3,500 4
Industrial Equipment $6,500 66 Under-investigation
Industrial Equipment $4,000 23 Under-investigation
Industrial Equipment $50,000 75 To be implemented
HVAC $3,000 4
Industrial Equipment $6,210 26 To be implemented
Industrial Equipment $15,000 26 Not to be implemented
Industrial Equipment $5,000 15 Under-investigation
Industrial Equipment $15,000 19 Under-investigation
Hot Water System $7,000 22 Under-investigation
HVAC $190,000 150 Implemented
HVAC $190,000 224 Not to be implemented
Industrial Equipment $10,300 23
Industrial Equipment $30,000 290 Not to be implemented
Industrial Equipment $79,000 165 Implemented
Industrial Equipment $79,000 165 Implemented
Industrial Equipment $79,000 165 Under-investigation
Air compressor $100,000 1,667 Under-investigation
Industrial Equipment $10,000 31 Not to be implemented
Industrial Equipment $6,500 14 Under-investigation
Industrial Equipment $6,500 19 Under-investigation
Air compressor $80,000 344 Ongoing
Air compressor $200,000 634 Under-investigation
Industrial Equipment $8,600 62
Industrial Equipment $15,000 18 Implemented
Industrial Equipment $240 22 Implemented
HVAC $26,000 195 Not to be implemented
HVAC $6,000 21 To be implemented
HVAC $6,000 55 To be implemented
HVAC $18,000 175 To be implemented
Industrial Equipment $19,000 330 Not to be implemented
Industrial Equipment $198,000 1,200 Not to be implemented
Other $18,000 24 To be implemented
Industrial Equipment $5,830 9 Implemented
Industrial Equipment $54,000 244
Industrial Equipment $204,000 1,691 To be implemented
HVAC $81,846 97
HVAC $39,000 79 Implemented
Industrial Equipment NULL 400
Chiller $23,274 193
Air compressor $170,000 317
Industrial Equipment $220,000 743 Implemented
Industrial Equipment $100,000 181 Under-investigation
Industrial Equipment $300,000 151
Industrial Equipment $10,000 317 Not to be implemented
Industrial Equipment $77,000 153 Implemented
Other $304,500 36 Implemented
Lighting $6,960 104
Refrigeration $180,000 1,100 3,707 Implemented
Cogeneration $331,000 NULL NULL Ongoing
Waste heat recovery $75,000 18,100 Under-investigation
Waste heat recovery $26,000 1,769 Under-investigation
Waste heat recovery $180,000 8,640 Implemented
Waste heat recovery $26,240 2,131 Not to be implemented
Waste heat recovery $80,000 2,100 Under-investigation
Lighting $200 11
Waste heat recovery $1,300 1,258
Other NULL 830
Other $15,000 100
Industrial Equipment $10,500 47
Industrial Equipment $21,000 155 Implemented
Other $300 39 Implemented
Computers & Printers $400,000 1,550 5,450 Ongoing
Lighting $172,422 1,453 Implemented
Power Factor Correction $500,000 NULL NULL Implemented
Alternative power generation $8,000,000 43,800 Implemented
Industrial Equipment $3,000,000 760
Other $2,400 4 To be implemented
ventilation $7,200 66
ventilation $3,240 30
Lighting $3,050 49 Implemented
Lighting $3,800 25
Behaviour/Education NULL 367 Ongoing
Other $20,000 496 To be implemented
Industrial Equipment $20,000 349 Not to be implemented
Other $30,000 101 Not to be implemented
Industrial Equipment $22,000 248 Not to be implemented
Other NULL 2,735 To be implemented
Industrial Equipment $30,000 448 Not to be implemented
Industrial Equipment $16,000 95 Not to be implemented
Industrial Equipment $27,000 247 Not to be implemented
Industrial Equipment $27,000 221 Not to be implemented
OrgID OppID Measure description Measure Type
378 16 Air Conditioning – Install timer control to office air conditioning units. Cost-Effective
378 17 Die Change Shutdown Procedure Cost-Effective
378 18 Refiner – Improve the pre-steaming of the chip which inturn will reduc Cost-Effective
378 19 Motor Replacement Program – Cost-Effective
378 20 Lighting – Install zone control of the high bay lighting and install timer Cost-Effective
378 21 Compressor Management Cost-Effective
286 60 Steam and condensate leaks Cost-Effective
286 61 Steam and Condensate Leaks Cost-Effective
454 100 Lighting control modifications to three sheds Cost-Effective
454 101 Consider installation of replacement capacitors in PFC equipment Potentially Cost-Effective
481 111 De-lamping Cost-Effective
481 112 WIP area control lighting Cost-Effective
481 113 Paper store control lighting Cost-Effective
481 118 VSD on Baler hydrolics Potentially Cost-Effective
479 157 Ball Plant 3kHz Inverter Upgrade Cost-Effective
486 209 Replace Sniff unit on VDC 1 with an ACD Unit which uses no electricalCost-Effective
486 210 Upgrade Homogenising Furnace PLC and Burner Management system. (ExiCost-Effective
486 211 Replace Bake Oven 1 Ringmain - reduce air leakage and gas flow Cost-Effective
486 212 Installation of U Main balancing dampers Cost-Effective
486 213 Increase shift manning - place Process Technicians on shift to react moreCost-Effective
486 214 Improve current efficiency of ALPYSYS Pot Regulation System Cost-Effective
486 215 Riser Bolted Joints (reduced voltage drop) Cost-Effective
486 218 Air Compressors: Investigate potential savings through: 1) elimination Potentially Cost-Effective
486 223 Improve Anode Stem Machine reliability Potentially Cost-Effective
486 224 Improve anodic voltage drop Potentially Cost-Effective
328 238 Review procedures for U/G conveyor operation Cost-Effective
328 239 Main ventilation fan optimisation Cost-Effective
328 240 Overland conveyor delivery optimisation Cost-Effective
328 241 Housekeeping practices on overland conveyor supply Cost-Effective
328 242 Compressed air leak reduction Cost-Effective
328 243 Power Factor Correction Shaft 3 Potentially Cost-Effective
328 244 Power Factor Correction Sub0 Potentially Cost-Effective
328 245 Other Pump Control Opportunities - eg VSD / Variable Displacement pPotentially Cost-Effective
328 246 VSD (VVVF) for PS26 Pumps Potentially Cost-Effective
328 247 Power factor correction on overland conveyor supply Potentially Cost-Effective
328 248 Level control of compressed air pumps (subject to 10% trial to confirm viPotentially Cost-Effective
328 249 Bore Pumps 3xVVVF & Power Factor Correction Potentially Cost-Effective
341 276 Reduce idle time of mills, associated blowers and vent units via impro Cost-Effective
341 280 New technology & controls for office and plant lighting Potentially Cost-Effective
341 283 VSD Control for Cyclone Fans Potentially Cost-Effective
321 289 Ongoing motor replacement (HEM). Example of 5 x 150 kW units. MarCost-Effective
321 290 Compressed air use reduction (e.g. solenoid, blowers) Cost-Effective
321 296 Lighting control systems (e.g. timers, sensors and dimmers) Potentially Cost-Effective
321 299 Install modulation for second boiler. Cost-Effective
322 300 Ongoing optimisation of Refiners including enhanced operational contrCost-Effective
322 302 HGG Gas Burner Improvement Cost-Effective
322 303 Enhanced Process Control in the Heat Plant Cost-Effective
322 304 Motor Upgrades - Example presented for selecting 10 x 150 kw high efCost-Effective
355 309 Compressed Air Leaks Cost-Effective
355 310 Install oil cooler on compressor drive (C-06) Cost-Effective
363 323 Review compressed air leakage and establish repair program Cost-Effective
363 324 Monitoring air compressor operations, to ensure miniumum number of aCost-Effective
363 327 Fine Tuning of the holding furnace to reduce excess air levels over firi Cost-Effective
363 331 Install Lighting System upgrades to pot line and replace metal halide li Cost-Effective
371 350 Turn off one boiler Cost-Effective
371 357 Link compressed air systems Cost-Effective
371 358 Speed control - AN1 CDC pusher fan Cost-Effective
371 361 Lighting improvement - demin plant Cost-Effective
371 365 Replace NAP1 Expander Potentially Cost-Effective
371 366 High efficiency fans ammonia cooling tower Potentially Cost-Effective
371 367 Ammonia storage refrigeration plant efficiency Potentially Cost-Effective
371 372 Fire water sustaining pumps Potentially Cost-Effective
436 382 Increase Boiler deaerator pressure Cost-Effective
416 408 Install and repair non-return valves in the mine dewatering system. Cost-Effective
416 409 Replace older motors with high efficiency motors. Cost-Effective
416 410 Install upgraded compressor controller modules to manage loads. Cost-Effective
416 411 Install automatic timers, motion sensorsor photo-electric cells on the suCost-Effective
416 412 Variable speed motor drives. Cost-Effective
482 415 Implement Motor System Efficiency Cost-Effective
482 416 Install Factory Lighting Control Cost-Effective
482 417 Implement an Energy Awareness Program Cost-Effective
482 418 Air Compressor Inlet Air Supply (Heat Exhaust) Potentially Cost-Effective
482 419 VSD on Compactor Hydraulics (Replaced only as required) Potentially Cost-Effective
482 420 Stores Lighting Replacement (Replaced only as required) Potentially Cost-Effective
482 421 Chilled Water Pump Replacement (Further investigation required bas Potentially Cost-Effective
330 431 Monitoring and Management SCADA - Electricity Cost-Effective
330 432 Include Review of Higher Efficiency Motors in Purchasing Procedures Cost-Effective
330 435 Reduce Idle Load on Conveyors and Plant Cost-Effective
330 438 VSD for Process Pumps Potentially Cost-Effective
330 439 Spirals Upgrade Potentially Cost-Effective
330 440 Dragline Digital Drive & Tritronics Installation and Optimisation of OperPotentially Cost-Effective
336 443 Motor Control Measures Cost-Effective
327 446 Reduce leaks in underground compressed air piping Cost-Effective
327 447 Repair leaks in compressed air piping on surface Cost-Effective
327 449 investigate the installation of additional underground tunnels and roadsPotentially Cost-Effective
327 450 Phase out utilisation of air operated diaphragm pumps for mine dewaterPotentially Cost-Effective
359 460 Motor Upgrades - Example presented for selecting a 150 kw high efficiCost-Effective
359 461 Compressor Control Upgrade Cost-Effective
359 464 Steam circuit integration Potentially Cost-Effective
469 469 Drfit conveyor operation control Cost-Effective
469 472 Compressed air leak reduction Cost-Effective
469 473 Compressed air staging controls Cost-Effective
469 474 Surface coal haulage energy efficiency Cost-Effective
469 476 Power Factor Correction for new main ventilation system Cost-Effective
503 490 Improve Control of Lighting Plants Cost-Effective
500 507 Improve plant power factor correction Cost-Effective
500 508 Reduce plant air leaks Cost-Effective
500 509 Clean up wash line water Cost-Effective
500 510 Improve insulation on tanks and pipe work for pelletiser water system Cost-Effective
500 512 Reduce warehouse lighting Potentially Cost-Effective
477 520 Demand Control Review (load duration curve characteristics for electricCost-Effective
477 522 Install automated high bay lighting contro system Cost-Effective
477 524 Compressed Air leak repair initiative Cost-Effective
344 529 Chilled Water System Initiatives Cost-Effective
344 530 Building Management System, Metering & HVAC plant initiatives Potentially Cost-Effective
344 532 Lighting System Initiative - Refer Section 9.1 of DFS Report dated 7/ Potentially Cost-Effective
344 533 Compressed Air and Vacuum System lnitiaitves Potentially Cost-Effective
504 579 Compressed Air System Comprehensive upgrade - compressor replacemenCost-Effective
504 580 Replacement induction furnace for No.3 Heat Recovery Cost-Effective
504 596 Induction Furnaces fit VSDs to cooling tower fans and pumps - 2 proje Potentially Cost-Effective
504 598 Schedule melting times at times of low cost electricity Potentially Cost-Effective
504 599 Fluorescent Light Controllers - various areas Potentially Cost-Effective
311 610 Implement programmed compressed air system leak detection regime, iCost-Effective
311 611 Install level control to header tank supplied by 150mm water pump (ie Cost-Effective
311 614 Shut down pump 4 and screen 3 when transfer is complete and controCost-Effective
311 615 Fit ultrasonic or radar sensor to control the overflow crusher to avoid Cost-Effective
311 616 Reduce lost time by 12% to improve Plant throughput and avoid energy lCost-Effective
311 617 Reduce lost time (eg from meal breaks, stockpile full, lack of stone, Cost-Effective
311 618 Change plant regime to operate Crushing Plant at full capacity Cost-Effective
396 622 Auto shut-down when idle running timer exceeded Cost-Effective
396 624 Sequenced shutdown for Extruder 3 (feed bin to PEC) based on extrudeCost-Effective
396 625 Dampers for Scrubbers to prevent short circuiting Cost-Effective
396 626 Auto - shutdown for milling operations based on duty requirement Cost-Effective
396 627 Drier auto shut-down when idle time exceeded Cost-Effective
396 628 Connect packaging area 'Climate-master' system to Citect to facilitat Cost-Effective
396 631 Reduce mixing of Dye colour tanks Cost-Effective
396 632 Citect control of Air Handling units (roof & rear factory inlets / roof exhaCost-Effective
396 633 Cease use of P4 cyclone fan Cost-Effective
396 635 VSD optimisation of extruder drives Cost-Effective
396 636 Interlock rotary valve associated with re-seed system Cost-Effective
396 637 auto-sequence shut-down based on drier status Cost-Effective
396 638 Automated oxygen trim for Steambloc boiler Cost-Effective
396 639 Citect Control of dust collectors Cost-Effective
396 643 Optimise auto shutdown on major truck dump Cost-Effective
396 645 Auto shutdown for minor road dump elevator Cost-Effective
396 646 VSD control of coater atomising fan Cost-Effective
396 647 Switch off boiler when Process 1/2 not in use Cost-Effective
381 667 Replace two reciprocating chillers with a single high efficiency chiller. Potentially Cost-Effective
381 669 Converting areas air conditioning olants temperature control set points Cost-Effective
381 671 Investigate compressed air pressure reduction of up to 50 kPa. Cost-Effective
381 672 Investigate Replacement of Large motors with high energy efficient moPotentially Cost-Effective
401 697 Crusher optimisation - Improve primary crusher and conveyor energy pPotentially Cost-Effective
471 707 Install a yearly timer to automatically switch AC units Cost-Effective
422 721 Introduce water injection to enhance regenerator performance Cost-Effective
491 741 Continue connection of non-networked HVAC systems (progressive) Cost-Effective
491 744 Investigate/monitor operation of Heating/Cooling plant Cost-Effective
478 753 Compressed air leak repair initiative. Cost-Effective
325 761 Operate one duty ventilation fan at mine Cost-Effective
325 762 Replace bath house space heating with heat pumps Cost-Effective
325 763 Replace bath house 5000L boiler with Heat pumps and 2x340L hot watPotentially Cost-Effective
325 766 Compressed Air Review and Ongong 10% Leakage Reduction Potentially Cost-Effective
306 774 MCL3 Electric Launder Cost-Effective
306 775 MG Set replacement Cost-Effective
312 793 Corporate air conditioning return air system. Change 100% outside air Potentially Cost-Effective
312 796 Secondary Manufacturing Department air cooled chiller rationalisation.Potentially Cost-Effective
312 797 Replace boilerhouse chiller number 3 with larger high efficiency chiller. CCost-Effective
570 799 Recommission domestic hot water (DHW) controls Cost-Effective
570 801 Upgrade lighting control and provide after-hour switches Cost-Effective
570 802 Upgrade single T8 lamps with T5 retrofit kits to levels that have alrea Cost-Effective
570 806 Recommission outside economy air-cycles Cost-Effective
570 807 Reschedule all after-hour fans and misc. A/C loads to limit use to 7am Cost-Effective
570 808 Recommission boiler controls and heating valves Cost-Effective
570 809 Install occupancy sensors to main office and staff room lights Cost-Effective
570 810 Install occupancy sensors to office, common room and store lights of buCost-Effective
570 811 Install occupancy sensors to the office, common room and corridor lighCost-Effective
570 812 Install light switches Cost-Effective
570 814 Install push-button timer switch to bar radiators. Cost-Effective
570 815 Survey of site and installation of new air compressor Cost-Effective
570 816 Rewire lighting in building and install occupancy sensors to the lamps Cost-Effective
570 817 Install PE cell control to car park fluorescent and halogen flood lamps Cost-Effective
570 819 Lighting control: Install switches in the car park store room, main stor Cost-Effective
570 820 Lighting: Occupancy sensor control in tea room Cost-Effective
570 822 Lighting: Exterior PE cell control Cost-Effective
570 823 HVAC: Function Rooms - Occupancy Sensor control + Reassignment oCost-Effective
570 824 HVAC: Adjust temperature set- points to widen dead-band Cost-Effective
570 825 Lighting: Levels 1&2 circuits separation + control Cost-Effective
570 826 HVAC controls tuning: time of use Cost-Effective
570 827 Lighting: Incandescent to CFLs upgrade Cost-Effective
570 828 HVAC: Optimum start and stop Cost-Effective
570 830 Recommissioning of chiller control strategy Cost-Effective
570 831 CO Sensors and On/Off controls for car park ventilation fan Cost-Effective
570 832 Install voltage reduction unit to fluorescent lamps in main hall and two lCost-Effective
570 833 Lighting upgrade from T8 to T5 lamps using retrofit kits - two seminar Cost-Effective
570 834 Replace metal halide lamps in car park to T5 fluorescent lamps Cost-Effective
570 837 Masonry Store Lighting: turn off some lighting Cost-Effective
570 838 Domestic hot water: Electric heat pump to replace electric storage typeCost-Effective
570 839 24 hours fluorescent lighting: convert to T5 lamps Cost-Effective
570 841 Masonry Store lighting: occupancy sensor control Cost-Effective
570 842 Improve garage lighting & associated control Cost-Effective
570 843 Bar radiator time delay switches. Cost-Effective
570 844 HVAC: install push-button timers and contactors for 8 units Cost-Effective
570 845 Cleansing Bay lighting: change to 250W metal halide Cost-Effective
570 847 Car park lighting: dimming control system Cost-Effective
570 848 Car park lighting: separate store area circuits Cost-Effective
570 849 Masonry Store external lighting: Install PE cell control Cost-Effective
570 851 Reinstate time switch control of ventilation fans Cost-Effective
570 852 Domestic Hot Water-solar heat pump system with remote evaporators Cost-Effective
570 853 HVAC 365 day time-switch Cost-Effective
570 854 Offices/Reception areas lighting - voltage reduction Cost-Effective
570 855 Lighting - voltage reduction Cost-Effective
570 856 Lighting controls Cost-Effective
570 857 Community Room - HVAC time control Cost-Effective
570 858 Install boiling hot-water time switch. Cost-Effective
570 861 Off control of manually switched HVAC plant Cost-Effective
570 863 HVAC: 365 day time switch Cost-Effective
337 881 Optimise scheduling of compressors Cost-Effective
337 882 Reduce air leakage throughout site. Cost-Effective
337 883 Install daylight control on external lights Cost-Effective
337 885 Reduce air supply pressure. Potentially Cost-Effective
503 886 Dragline Optimisation/Tritonics Cost-Effective
503 887 variable Speed Drives for Process Pumps Cost-Effective
503 888 Monitoring and Management Cost-Effective
503 889 Include Review of Higher Efficiency Motors in Purchasing Procedures. Cost-Effective
337 1041 Compressed Air Production Cost-Effective
337 1042 Compressed Air Leakage Cost-Effective
337 1044 Compressed air pressure reduction Potentially Cost-Effective
337 1045 Factory Lighting Control System Potentially Cost-Effective
337 1046 Boardline Oven Energy options Potentially Cost-Effective
337 1047 Installed notched type vee belts on drives when belts are due for repla Potentially Cost-Effective
337 1048 Introduce energy efficient electric motors. Potentially Cost-Effective
337 1050 Install energy efficient motors on a replacement basis. Potentially Cost-Effective
453 1065 Program automatic boiler cut-off when ambient temperature high in B Cost-Effective
453 1066 Verify integration of TRANE chiller controls with BMCS is optimised Cost-Effective
453 1068 Ensure regular boiler tuning is included in boiler maintenance program.Cost-Effective
453 1069 Investigate leaving CHW temperature rise (once controls upgrade compCost-Effective
453 1070 Document and implement replacement program (including target dates) Cost-Effective
453 1071 Optimise air conditioning operating times in Bus Bays Cost-Effective
453 1072 Optimise lighting operating times in Bus Bays Cost-Effective
453 1075 Document and implement replacement program (including target dates) Cost-Effective
453 1078 Recommission system and evaluate upgrade options. Cost-Effective
453 1079 Install voltage control units in selected areas. Cost-Effective
453 1080 Photelectric cell control of lights near skylights and windows. Cost-Effective
453 1083 Seasonal adjustment of HVAC Set points in selected areas. Cost-Effective
453 1111 Review boiler tuning strategy and schedule Cost-Effective
453 1112 Program automatic boiler cut-off when ambient temperature high in B Cost-Effective
453 1113 Verify integration of TRANE chiller controls with BMCS is optimised. Cost-Effective
453 1114 Re-commission existing T2 voltage control sytems Cost-Effective
453 1115 Document and implement replacement program (including target dates) Cost-Effective
453 1116 Document and implement replacement program (including target dates)Cost-Effective
453 1118 Recalibrate space temperature sensors Cost-Effective
453 1129 Repair corroded HHW 3-way control valve Cost-Effective
453 1134 Repair Leaking HHW 2-way control valves Cost-Effective
408 1160 Main compressors - Replace as operational risk Cost-Effective
374 1162 Undertake manufacturing excellence project to reduce electricity con Cost-Effective
374 1163 Replace 400W to the new 300W Pulse start lamps Cost-Effective
379 1166 Motor system efficiency program. Cost-Effective
379 1168 Discontinue steam injection to Hotwell tank Cost-Effective
379 1169 Office boiler and chiller supervisory control Cost-Effective
379 1170 Boiler precision combustion control Cost-Effective
379 1171 Economiser and heat recovery for boilers Cost-Effective
379 1175 Secondary chilled water pump VSD Cost-Effective
379 1176 Water supply pump VSD Cost-Effective
379 1177 Air compressor cooling tower recirculation pump VSD Cost-Effective
379 1184 Energy awareness and management program Cost-Effective
379 1185 General office and canteen lighting Potentially Cost-Effective
379 1187 Economy cycle for office AHU's Potentially Cost-Effective
379 1189 Air compressor and chiller energy management control system. Potentially Cost-Effective
379 1193 Office AHU suppy fan VSD Potentially Cost-Effective
379 1194 Medium Pressure Lead Boiler Feedwater Pump VSD Potentially Cost-Effective
379 1195 Conference Room Occupancy Sensors Potentially Cost-Effective
408 1210 Replace Champion air compressor (Energy Savings and Operational SecuriCost-Effective
408 1213 Main Mill - Shut down NTM/stelmor fans when not used Cost-Effective
408 1214 Reheat Furnace - increase recuperators operating temperature Cost-Effective
408 1215 Reheat furnace - reduce furnace push-out door pen times Cost-Effective
408 1217 Reheat furnace - install continuous excess oxygen monitoring Cost-Effective
408 1219 Motor rooms - interlock operation of motor room fans to Drive Motor opPotentially Cost-Effective
408 1225 Ensure zinc bath is covered with vermiculite (not covered during inspecCost-Effective
408 1229 Some fans left on that don't need to be while plant is down, eg entry a Cost-Effective
408 1230 Baking furnaces in cleaning house tend to all be left on, but can make Cost-Effective
408 1235 FPP - Shut down FPP scrubber fans and pump (2x37kW + 11kW) when nCost-Effective
408 1236 FPP - Chiller - shut down when plating not operating. Cost-Effective
408 1244 Air tower 19(12 kW) compressor runs unloaded much of the time when sPotentially Cost-Effective
387 1272 Insulation of unlagged valves and fittings in the steam system. Cost-Effective
387 1274 Replacement of electric motors with high efficiency units. Potentially Cost-Effective
592 1371 Install 24hr timer on zip boiles. Cost-Effective
592 1381 Convert mercury vapour lamps to metal halide lamps Cost-Effective
592 1383 Install daylight sensor and separate circuits near exterier of carpark. Cost-Effective
592 1398 Convert MV lamps to CFL Potentially Cost-Effective
592 1410 Convert 90 fittings with 50W downlights to 35W LV downlight. Cost-Effective
592 1412 Convert 18 fittings with two 26W Pl-C lamps to single 13W PL-C lampsCost-Effective
592 1416 Convert two 18W PL-C lamps to one 13W PL-C lamp. Potentially Cost-Effective
592 1433 Install temperature reset, time scheduling and demand savings on ac unPotentially Cost-Effective
368 1445 Operating and Maintenance Procedures: Optimise ON/OFF Control of Cost-Effective
368 1448 Operating and Maintenance Procedures: review Ventilation Run Hours aPotentially Cost-Effective
368 1449 Operating and Maintenance Procedures: Optimise ON/OFF Control of MPotentially Cost-Effective
370 1456 Whole site: Embedded Generation - WestVAMP Cost-Effective
370 1457 Mine: Optimisation of underground conveyors operating procedures. Cost-Effective
370 1459 Washdown water use and sump pump water level management Cost-Effective
370 1460 Repair cell compressor line leak Cost-Effective
370 1461 Address Vacuum Pump V-belt slippage Cost-Effective
370 1462 Whole site Power Factor Correction Potentially Cost-Effective
370 1465 Shut down Shale Belt Potentially Cost-Effective
575 1504 Install 1 voltage reduction unit for Basement car park Lighting Cost-Effective
575 1512 Derate hot water heater in the Centre and lower the top thermostat set Cost-Effective
575 1513 Review air conditioning plant operating schedules to match occupancy Cost-Effective
575 1516 Install 2 Voltage reduction units for Basement car park Lighting Cost-Effective
575 1526 Replace low efficiency shower heads with high efficiency low flow heaCost-Effective
575 1528 Provide 7-day time switch to switch off air conditioning unit overnight. Cost-Effective
575 1529 Install voltage reduction unit for car park lighting Cost-Effective
442 1572 Devise and implement a program to routinely monitor steam trap operatiCost-Effective
442 1573 Devise and implement a program to routinely monitor compressed air syCost-Effective
442 1574 Compressed air system reduction from 7.4 bar to 7.0 bar. Cost-Effective
442 1575 Install electronic condensate drains on the instrument air compressor anCost-Effective
442 1576 Replace standard fluorescent tubes with Tn- phosphor tubes for general Cost-Effective
442 1578 Replacement of main office air conditioning unit and installation of PLC Potentially Cost-Effective
461 1584 Modification of secondary aeration controls Cost-Effective
461 1585 Further optimisation of UV lamps Cost-Effective
461 1586 Reduce operation of RE pumps Cost-Effective
461 1587 Increase operation of cogen unit on nat gas Potentially Cost-Effective
461 1591 Reduce compressed air leaks Potentially Cost-Effective
465 1598 Modify secondary aeration blower controls Cost-Effective
465 1602 Auto bleeders on RAS pumps Potentially Cost-Effective
462 1614 Optimisation of sewage pump selection Cost-Effective
462 1615 Optimise Operation of VSD speed setpoints on Odour Scrubber Fans Cost-Effective
462 1617 Recovery of benefit for cogen exports Cost-Effective
463 1623 Ti 2 to T8 Lighting upgrade - Ongoing replacement Cost-Effective
463 1624 Micro-Hydro Power generation - Feasibility study Potentially Cost-Effective
463 1625 PAR Project: Treating screenings below ground Potentially Cost-Effective
463 1627 New air compressors. Note that this project is linked to a management Potentially Cost-Effective
464 1637 Assess the Feasibility of Implementing a Hydro-Turbine Potentially Cost-Effective
324 1655 underground water management review Cost-Effective
324 1657 audit and repair of the compressed air network Cost-Effective
324 1658 power factor correction Cost-Effective
329 1661 Cultural Change Cost-Effective
329 1678 Building Cost-Effective
329 1679 Building Cost-Effective
329 1680 Tlectronic bar heaters Cost-Effective
400 1735 Low Energy Refiner Plates.Improved design of refiner plates enable highPotentially Cost-Effective
564 1755 Adjust HVAC control, introduce economy cycle and replace A/C unit withCost-Effective
564 1759 installation of a solar pool heating system to replace the exisitng heat Cost-Effective
335 1762 VAV AHU Systems Cost-Effective
335 1763 Variable Flow Chilled Water plant Cost-Effective
335 1764 High Efficiency Chiller Cost-Effective
335 1765 Economy Cycle Cost-Effective
335 1766 Compressed Air System Cost-Effective
447 1866 Replacement of 1060 room standing lamp incandescant 100 watt lamps Cost-Effective
458 1878 evaporative fluid cooler refurbishment Cost-Effective
458 1882 BMS time clock control building 3 air handling and fan coil units Cost-Effective
455 1917 Appoint an energy Manager Cost-Effective
455 1919 Incorporation of energy efficient motors Potentially Cost-Effective
455 1922 incorporation of variable speed drives to pumps Potentially Cost-Effective
455 1923 Ultrasound sensors installation for back of house area toilets using proPotentially Cost-Effective
566 1998 Disable plant from operating during public holidays Cost-Effective
566 1999 Review and revise BMS control strategies Cost-Effective
566 2000 Installation of power factor correction units Cost-Effective
566 2002 Replace and De-Lamp Cost-Effective
566 2015 Installation of solar hot water to replace current storage tank setup Cost-Effective
576 2029 Retrofit Lighting Cost-Effective
576 2034 Retrofit Lighting Cost-Effective
576 2036 Retrofit Lighting Cost-Effective
562 2059 Install lux sensors to control external lights. Cost-Effective
576 2078 Retrofit of Lighting -Install electronic ballasts and convert twin 36 wa Cost-Effective
576 2079 Retrofit Lighting -install voltage reduction unit, upgrade lamp fittings,ouCost-Effective
576 2080 Retrofit Lighting Cost-Effective
576 2084 Retrofit Lighting Cost-Effective
576 2085 Retrofit Lighting Cost-Effective
576 2086 Retrofit Lighting Cost-Effective
576 2087 Retrofit Lighting Cost-Effective
562 2089 Install two inverter air conditioners, which draw a variable amount of cuCost-Effective
419 2117 Upgrade Lighting Controls in Flavours Restaurant Potentially Cost-Effective
431 2123 Power Factor Correction Cost-Effective
434 2178 Screw Refrigeration Compressor VFD Control Cost-Effective
434 2180 Minimise compressed air delivery pressure Cost-Effective
434 2181 Adjust Suction Pressure on Ammonia Refrigeration Cost-Effective
434 2192 Condenser Fan VFD Control Potentially Cost-Effective
434 2214 Replacement of air Atlas Copco with new compressor Potentially Cost-Effective
604 2234 Refurbishment of water cooled packaged air conditioners with a new chCost-Effective
604 2235 Install a dedicated air cooled system for the printing area air conditioni Cost-Effective
604 2237 Implement optimum start/stop control in conjunction with a morning warCost-Effective
604 2238 Install a photosensor control of lights in the staff dining area Cost-Effective
604 2239 Setback space temperatures in the Function Room when it is unoccupiCost-Effective
604 2240 Installation of Verosol Blinds on the Eastern, Northern and Western e Cost-Effective
604 2242 Schedule cleaning operations to reduce energy consumption Cost-Effective
604 2246 Repair potable hot water circulating pump Cost-Effective
604 2247 Reduce the plant room domestic hot water temperature to 60°C Cost-Effective
604 2249 Install separate controls for hall & 2 and set back the temperature in t Cost-Effective
604 2250 Control the outside air dampers on the air handling units based on C02Cost-Effective
604 2254 Review heat pump staging Cost-Effective
604 2255 Complete commissioning of the ammonia stripping system and fine tuneCost-Effective
604 2258 Reduce the plant room domestic hot water temperature to 60°C Cost-Effective
604 2260 Install variable speed control of the pool filter pump Cost-Effective
604 2262 Review the heat pump control strategy to utilize all eight stages Cost-Effective
604 2263 Install variable speed control of the heat pump circulating system Cost-Effective
604 2271 Reposition the Block PE cell Cost-Effective
604 2274 Replace pole top 250 watt mercury vapour lamps with 150 watt metal Cost-Effective
604 2279 Provide more specific instructions to staff on office equipment manage Cost-Effective
604 2285 Set the BMCS time of day schedules to core occupancy times Cost-Effective
604 2287 Control the outside air dampers on the air conditioner based on C02 leCost-Effective
604 2288 Convert the outside air economy cycle air conditioner to fully modulatinCost-Effective
604 2295 Convert the air handling systems with bypass damper control to variablPotentially Cost-Effective
604 2296 Install movement sensors to control lights in intermittently occupied ar Potentially Cost-Effective
604 2297 Control the outside air dampers on the air conditioners based on CO2 Potentially Cost-Effective
604 2298 Extend boiling water time clock control to kitchen boiling water units Potentially Cost-Effective
604 2299 Retrofit twin 36 watt fluorescent light fittings with single 28 watt T5 light Potentially Cost-Effective
604 2323 Replace the glasshouse gas heating with solar Potentially Cost-Effective
352 2338 Purchase and install smaller compressor as determined by review Cost-Effective
352 2339 Installation of 900kVAr of PFCE Cost-Effective
352 2340 200kVAr Power Factor Correction Duralie - demand reduction 83kVA Cost-Effective
352 2341 Lighting Management Potentially Cost-Effective
352 2342 Installation of demand management on remote pumping whilst train unloPotentially Cost-Effective
405 2347 Install Daylight Compensation Control in warehouse Cost-Effective
405 2349 Install a VSD on Blower 26 Potentially Cost-Effective
319 2412 Heat recovery from 180kW air compressor Cost-Effective
319 2413 Energy Recovery from Flash Steam Cost-Effective
319 2416 Installation of variable speed control for BAC cooling tower fans Cost-Effective
319 2417 Improve power factor from 0.92 to 0.98 Cost-Effective
319 2418 Variable speed control of Combustion Air Fan for 10MW Boiler Cost-Effective
319 2421 Combustion control for 10MW Boiler Potentially Cost-Effective
319 2423 Biogas Collection from Anaerobic ponds Potentially Cost-Effective
319 2425 Variable speed control hot water pump transfer Potentially Cost-Effective
319 2429 Waste heat recovery from Condenser Potentially Cost-Effective
319 2432 Insulation of tallow storage tanks Potentially Cost-Effective
319 2434 Hot water reduction - Viscera Table Potentially Cost-Effective
357 2481 Compresses Air reciever installation Cost-Effective
357 2488 Compressed air review and ongoing 10% leakage reduction Potentially Cost-Effective
357 2495 Surface Lighting Optimisation Potentially Cost-Effective
423 2559 Optimise chilled water supply temperature Potentially Cost-Effective
600 2566 Lighting technology review Potentially Cost-Effective
600 2569 Installation of pool blankets Potentially Cost-Effective
600 2570 Install T5 retrofit to plant rooms Potentially Cost-Effective
600 2573 Review of lighting opportunities Cost-Effective
600 2574 Replace ladies HWS Potentially Cost-Effective
600 2576 Replace Mercury Vapor high bays Potentially Cost-Effective
600 2577 Development of public lighting strategy Potentially Cost-Effective
508 2645 Lighting - Replace 70W exterior bollard lights with 26W compact fluorescCost-Effective
508 2646 Lighting - Install motion sensors in 38 rooms to switch off 85% of ligh Cost-Effective
508 2647 HVAC - Install Variable Speed Drives on pumps and fans in the HVAC Cost-Effective
508 2649 Lighting - Replace single 40W fluorescent lamps in offices and computePotentially Cost-Effective
508 2650 Lighting - Replace twin 65W fluorescent lamps used in corridors, officePotentially Cost-Effective
508 2651 Lighting - Replace twin 40W fluorescent lights in plant rooms with a sinPotentially Cost-Effective
508 2652 Computers - Replace CRT computer monitors with TFT monitors. Potentially Cost-Effective
339 2655 Carpark Lighting replace 150 Watt ligh with lower wattage flurorescent Cost-Effective
309 2659 TPM Maintenance Program TRACC Cost-Effective
309 2660 Reduce time to do a size change (1Hr to 0.5Hr) Cost-Effective
309 2661 Reduce board grammage Cost-Effective
601 2671 upgrading of lighting Cost-Effective
601 2672 upgrading of lighting Cost-Effective
601 2673 upgrading of lighting Cost-Effective
601 2674 upgrading of lighting Cost-Effective
601 2675 upgrading of lighting Cost-Effective
601 2676 upgrading of lighting Cost-Effective
601 2677 upgrading of lighting Cost-Effective
601 2678 HVAC upgrade including VSD on the HVAC pump and Heat reclaim. Cost-Effective
601 2681 Heat reclaim and temperature reset controls and timing rescheduling Cost-Effective
601 2684 Solar absorbers at the WAC to produce hot water Cost-Effective
561 2712 Install a movement detector to control the light fittings Cost-Effective
561 2713 Install PE cell to control the lights under the roof eave near the male baCost-Effective
561 2714 Reduce temperature of the hot water system Cost-Effective
561 2715 Install movement detectors to control male staff bathroom light fittings. Potentially Cost-Effective
561 2716 Install a run down timer in each of the six storage bays to control the ligPotentially Cost-Effective
561 2717 Install a movement detector to control the lighting in the Crib Room. Potentially Cost-Effective
561 2718 Install a movement detector to control the opertaion of light fittings in thPotentially Cost-Effective
561 2729 Install auto-transformers to control the car park fluorescent lights. Cost-Effective
561 2730 Turn off the continuosly operating roof pole light when there is adequatePotentially Cost-Effective
561 2731 Install a one hour electro-mechanical timer to turn off the meeting roomPotentially Cost-Effective
561 2732 Reduce the temperature of the hot water system in the Women's Rest Cost-Effective
561 2733 Reduce the temperature of the hot water system Cost-Effective
561 2734 Install a movement detector to control the waiting room lights. Potentially Cost-Effective
561 2735 Install auto-transformer to control the fluorescent light circuits Potentially Cost-Effective
561 2736 Install a movement detector to turn off lighting in the Study/Meeting R Potentially Cost-Effective
561 2737 Install run down timer to control electric heaters in the distribution area.Cost-Effective
561 2738 Reduce the temperature of the residential laundry's hot water system. Cost-Effective
561 2740 Replace incandescent globes with compact fluorescent lamps. Potentially Cost-Effective
561 2741 Install movement detector in the distribution area. Potentially Cost-Effective
293 2760 Boiler Insulation Cost-Effective
293 2762 Compressed Air Leaks Cost-Effective
293 2763 Steam and condensate leaks Cost-Effective
293 2767 Rapid shut doors cold room Potentially Cost-Effective
602 2775 Disable HVAC from operating during public holidays Cost-Effective
602 2776 Power factor correction Cost-Effective
602 2779 Install time motion sensors Cost-Effective
602 2780 Disable HVAC from operating during public holidays Cost-Effective
354 2891 Basement carpark lighting control — motion sensors Cost-Effective
354 2894 Installation high efficiency motors Cost-Effective
354 2897 Replacing tenancy light fittings Potentially Cost-Effective
354 2898 Modify tenancty lighting controls Potentially Cost-Effective
354 2901 introducing photo voltaic cells Potentially Cost-Effective
583 2915 Review of cleaning times (savings based on 6 am start) Cost-Effective
583 2918 installation of sub-metering to raise energy usage awareness Cost-Effective
583 2919 Retrofit Twin 40 watts Fluro with Single Quad 28 Watt, elect ballast andPotentially Cost-Effective
583 2930 install submetering to promote energy awareness Cost-Effective
583 2949 install submetering to promote energy awareness Cost-Effective
583 2950 Review of lighting and air-conditioning requirements Cost-Effective
583 2960 Close pool in June, July and August Cost-Effective
583 3000 Air Con System Review Cost-Effective
583 3001 Review Lighting Operation Cost-Effective
583 3002 Hot Water Boiling Units Cost-Effective
583 3013 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiCost-Effective
583 3015 Review Lighting Operation Cost-Effective
583 3017 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective
583 3018 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective
583 3019 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective
583 3020 Retrofit Twin 20Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective
583 3021 Retrofit Twin 40Watt Fluro with Single Quad 28Watt,elect ballast and hiPotentially Cost-Effective
583 3025 Hot Water Boiling Units Cost-Effective
583 3026 Review Lighting Operation Cost-Effective
466 3148 Replace SER drives with VVVF controllers on units 14, 3, 4, 5, 6 and 7Cost-Effective
466 3149 Add stiffening bracings on units Cost-Effective
466 3151 Upgrade air-conditioning of building Cost-Effective
466 3154 Install differential pressure and real-time monitoring of pump efficiency Potentially Cost-Effective
282 3156 Replace chiller with energy efficient chiller Potentially Cost-Effective
282 3159 VSD – Cooling tower fan Potentially Cost-Effective
282 3176 VSD for jacking pump & Saltwater pump instrumentation & control sys Cost-Effective
282 3183 Reprogram C-Bus for lights and AHU Cost-Effective
282 3204 Energy Awareness Program Cost-Effective
599 3208 Variable Speed Drives - installation of VSD on some of the Air Conditi Cost-Effective
599 3214 Time Clocks on Urns - installation of time clocks on the zippy Cost-Effective
599 3215 Water wise showers - water saver valves on shower roses Cost-Effective
599 3225 Installation of Variable Speed Drive Potentially Cost-Effective
571 3245 Replace existing electric storage hot water system with heat pumps Potentially Cost-Effective
571 3246 Install Economy Cycle on the building air conditioning Potentially Cost-Effective
571 3247 Insulate the pool hall return air ductwork Potentially Cost-Effective
571 3248 Reduce the infriltration through the ceiling vents Potentially Cost-Effective
571 3249 Replace the 50m pool pump's motors with high efficiency motors Potentially Cost-Effective
571 3261 Install push button timer control of the aerobics room air conditioning anCost-Effective
439 3290 Variable speed drives on the condensor fans and head pressure controlCost-Effective
439 3291 Economiser and variable speed drive on one RM compressor, serving Cost-Effective
439 3293 Phase out use of compressed air in aligning tins to filling machine Cost-Effective
439 3294 Compressed air leak survey/zoning Cost-Effective
439 3298 Waste cooking oil cogeneration Plant Potentially Cost-Effective
439 3301 Cogeneration Potentially Cost-Effective
290 3378 Migrate production of respules and PE processes from Altis to Nova to Cost-Effective
290 3405 Re-calibrate the automatic TDS senors Cost-Effective
290 3407 Replace existing 400W metal halide lamps with UPS 320W Cost-Effective
290 3409 AHU temperature Set-point setback Cost-Effective
290 3410 VSDs on all 3 cooling tower fans Cost-Effective
418 3415 Dextrin reactors cooling vessels Cost-Effective
418 3418 Compressed Air Leaks Cost-Effective
573 3422 Review electricity contract pricing (once co-gen equipment operation isCost-Effective
573 3423 Place the central up-lights on a light-sensor override (so thay are alwaysPotentially Cost-Effective
573 3424 Completed automatic doors installed to minimise heat loss Potentially Cost-Effective
573 3425 Reduce pool temperature set points by 1c (26-27C) Potentially Cost-Effective
573 3426 Install solar water heating system on available roof space Potentially Cost-Effective
573 3427 Install power factor correction equipment at this site Cost-Effective
573 3428 Install VSD's on main circulation pumps (eg 80% of usual flow rate overPotentially Cost-Effective
573 3429 Install lighting occupancy sensors in the aerobics room (note: additionaPotentially Cost-Effective
573 3431 Replace kiosk halogen lighting with 20W IRC halogens Potentially Cost-Effective
573 3434 Completed - Soft starters installed on key equipment Potentially Cost-Effective
573 3438 Install power factor correction equipment at this site Potentially Cost-Effective
573 3439 Set air conditioning in control room to minimum 24C-21C Potentially Cost-Effective
573 3443 Install Variable Speed Drives on other key variable-demand equipmentPotentially Cost-Effective
573 3444 Planned - Upgrade of building's HVAC systems (8-12 reverse cycle unitsPotentially Cost-Effective
573 3446 Targeted 4kW reduction in building standby (after-hours audit, install ti Potentially Cost-Effective
573 3447 Investigate and address strange operation of power factor correction Potentially Cost-Effective
573 3450 Completed - Upgrade to more efficient units (some pump stations) Potentially Cost-Effective
573 3451 Investigate opportunities for further saving (including Variable Speed DPotentially Cost-Effective
573 3452 Ensure all pump stations are upgraded, as required to more efficient unPotentially Cost-Effective
573 3453 Install Variable Speed Drives on irrigation pumps and aim to reduce opPotentially Cost-Effective
573 3457 Insulate ceiling (minimum R3.5) and under floor (where accessible) Potentially Cost-Effective
573 3458 Install domestic heat pump hot water system for building Potentially Cost-Effective
573 3459 Install energy efficient hi-bay replacements(~100 fittings) Potentially Cost-Effective
573 3461 Place non-perishable drinks fridges and vending machines on timer swPotentially Cost-Effective
573 3462 Carry out a lighting refit to all T5 LL MT Adaptor System Potentially Cost-Effective
573 3464 Carry out a lighting refit to a T5 LL MT adaptor System Potentially Cost-Effective
360 3472 Switch off redundant vacuum pump for plastics area Cost-Effective
360 3474 Install VSD to control chilled water supply pump - lid line chilled water Cost-Effective
360 3479 Purchase a smaller air compressor and install a more efficient rimmer Potentially Cost-Effective
360 3493 Conduct an air leak survey and instigate a regular repair program Potentially Cost-Effective
338 3522 Repair outdoor lighting contorl Cost-Effective
338 3523 Compressed Air leak repair initiative Cost-Effective
338 3526 Pressure settings for 6 Bar system is currently 7 Bar. Review to asce Potentially Cost-Effective
338 3527 Motive Drives - where cost effective intent to use efficient motors Potentially Cost-Effective
338 3528 Motive drives - where cost effective, intend to use notched type vee bePotentially Cost-Effective
338 3532 consider VSDs on water pumps Potentially Cost-Effective
484 3533 Replacement of CRT monitors with TFT Cost-Effective
484 3534 Revised lighting schedules Cost-Effective
484 3535 Revised Air Conditioning schedules Cost-Effective
484 3536 Energy Star Activation Cost-Effective
425 3545 Review control and temperature settings for air conditioning units in o Cost-Effective
425 3546 Review automatic control of lighting Cost-Effective
425 3550 Review control and temperature settings for air conditioning units in o Cost-Effective
425 3552 Review automatic control of lighting Cost-Effective
302 3559 Upgrade cement milling capacity by installing a new cement mill #7 Cost-Effective
303 3583 Cement mill diaphragm allowing media escape - repair and replace Cost-Effective
350 3600 Improve Compressed Air Performance Cost-Effective
569 3613 Reduce air conditioner hours- change winter start-up from 4am to 7am Cost-Effective
569 3614 Turn off major appliances at night and weekends (photocopiers etc.). BCost-Effective
569 3615 Staff education and training- this should assist in reducing energy c Cost-Effective
569 3623 Demand based ventilation system Cost-Effective
569 3624 VRUs for car park lighting Cost-Effective
569 3625 Refurbish light fittings Cost-Effective
569 3627 Install TX Valve Potentially Cost-Effective
569 3629 VSDs for chilled water pumps Potentially Cost-Effective
569 3630 Replacement of T-bar with high efficiency type Potentially Cost-Effective
569 3632 Installation of energy efficient shower heads in all villas and amenities Cost-Effective
569 3633 Replacement of incandescent globes with CFL. This should only occur wiCost-Effective
394 3634 Upgrade BMS interface and reprogramme the chillers staging control loCost-Effective
394 3636 Replace 50W Dichroic lamps with 35W units Cost-Effective
569 3640 Hot water system insulation- based on insulation leading to a 10% red Cost-Effective
569 3641 Villa insulation. Based on insulation leading to a 10% reduction in spacCost-Effective
569 3644 Optimise reclaim water pump operation Cost-Effective
382 3665 Cooling tower fans & CW pump VFD control Potentially Cost-Effective
569 3669 Install motion sensors at car park & toilets Cost-Effective
569 3671 Install controls to external lighting & selected circuits Cost-Effective
569 3677 Office lighting upgrade Potentially Cost-Effective
569 3678 Replace all twin 36w fittings Potentially Cost-Effective
407 3713 Reheat furnace - Warm Charging of billets Cost-Effective
407 3715 Reheat furnace - VSD on Combustion Air Fan Cost-Effective
407 3719 Reheat furnace - reduce discharge door open time - observed to be opePotentially Cost-Effective
407 3720 Reheat furnace - improve operation of tempering air fan. Fan runs contiPotentially Cost-Effective
448 3755 Re-commissioning existing lighting controls (time settings, holidays setCost-Effective
448 3757 Install voltage control and re-lamp general office lighting Cost-Effective
448 3758 Install timer delay switches in all store rooms Cost-Effective
448 3759 Install PE cell lighting control in selected areas, eg Café Cost-Effective
448 3760 Delamp selected fittings, eg corridors, breakout areas and café Cost-Effective
448 3761 Upgrade ELV lamps to 35W Cost-Effective
448 3762 Install time clocks on general power equipment to prevent operation a Cost-Effective
448 3765 Implement comprehensive sub-metering system Cost-Effective
448 3766 Decomission existing computer centre supplementary HVAC and assosiCost-Effective
448 3767 Set new computer centre supplementary air conditioning units setpoi Cost-Effective
448 3768 Install advanced chiller controls (eg electronic expansion valves, VSDsCost-Effective
448 3769 Install VSD's on cooling tower fans Cost-Effective
448 3771 Review chiller sequencing to match chiller capacity to load Cost-Effective
448 3772 Implement ambient temperature boiler cutoff in BMS Cost-Effective
448 3775 Review BMS economy cycle setpoints and operation Cost-Effective
448 3777 Implement night purge in BMS Cost-Effective
448 3778 Match HVAC operating times to staff requirements and consolidate AHCost-Effective
448 3779 Implement optimised start strategy for BMS Cost-Effective
448 3783 Install motion activated lighting control in all offices, meeting rooms, u Potentially Cost-Effective
448 3784 Upgrade ELV transformers to electronic Potentially Cost-Effective
334 3803 Air compressor leak reduction Cost-Effective
334 3806 High efficiency motors as motors reach end of life: 49 motors from 1.5 Potentially Cost-Effective
346 3811 opportunistic installation of high efficiency motors Potentially Cost-Effective
346 3817 Subject to Op5, ductwork on D60 air compressor Cost-Effective
402 3832 Upgrade HS5 Compressor Motor Cost-Effective
402 3835 Upgrade the boiler ID fan to high efficiency Cost-Effective
402 3838 Upgrade boiler FD fan motor to high efficiency Potentially Cost-Effective
433 3851 Repair co-generator Cost-Effective
433 3853 Implement a leak reduction program and compressor control Cost-Effective
433 3854 Power Factor upgrade from 0.91 to 0.96 Potentially Cost-Effective
340 3891 Compressed air system - comprehensive review Cost-Effective
343 3952 Replace selected underground motors with super high efficient motors Potentially Cost-Effective
343 3956 Replace selected mill motors with super high efficient motors Potentially Cost-Effective
343 3957 Replace high-bay lights with special fluroescents Potentially Cost-Effective
343 3958 Replace selected surface motors with super high efficient motors Potentially Cost-Effective
579 3966 Single 50W dichroic fitting replaced with single 11W compact fluoro lampCost-Effective
579 3971 Twin 36W fluorescent fitting replaced by new single 37W quad lamp with rCost-Effective
579 3972 Twin 36W fluorescent fitting replaced by new single 37W quad lamp with Cost-Effective
579 3980 Single 50W dichroic fitting replaced with single 11W compact fluoro lampCost-Effective
579 3982 Twin 36W fluorescent fitting replaced by new single 37W quad lamp with Cost-Effective
579 3983 Twin 36W fluorescent fitting refurbished to single 37W quad lamp with reCost-Effective
579 3987 Voltage reduction unit (for 26 lamps) Cost-Effective
579 3988 Twin 36W fluroescent fitting replace by new single 37W quad lamp with rCost-Effective
579 3991 Install lighting control PIR sensor in meeting room Cost-Effective
579 3992 Voltage Reduction Unit (for 85 lamps for administration block) Cost-Effective
579 3993 Install lighting control PIR sensor in toilets Cost-Effective
579 3994 Installation of Solar Hot Water System to replace current Electric SystemCost-Effective
397 3995 Reduce electricity consumption of external lights Cost-Effective
579 3996 Triple 36W fluorescent fitting refurbished to twin 37W quad lamp with refCost-Effective
579 3997 Twin 36W IND fluorescent fitting replaced by new single 37W quad lamp wCost-Effective
579 3998 Triple 18W fluroescent fitting refurbished to twin 18W quad lamp with refCost-Effective
579 3999 Twin 36W flurorescent fitting replaced by new single 37W quad lamp withCost-Effective
579 4000 Twin 36W fluroescent fitting replaced by new single 37W quad lamp with Cost-Effective
579 4001 Voltage Reduction Unit (for 30 lamps in amenities block) Cost-Effective
579 4005 Twin 18W fluorescent fitting replaced by new single 18W quad lamp with Cost-Effective
579 4006 Twin 36W fluroescent fitting replaced by new single 37W quad lamp with Cost-Effective
579 4007 Twin 36W fluorescent fitting replaced by new single 37W quad lamp with Cost-Effective
579 4010 Twin 36W fluorescent fitting replaced by new single 37W quad lamp with Cost-Effective
397 4017 Assess all site electric motor operation for operating efficiency – inclu Cost-Effective
284 4028 Change from continuous operation to 3 out of 4 shifts Cost-Effective
284 4029 Close production areas Cost-Effective
284 4036 Oxygen enrichment to reduce gas consumption Cost-Effective
284 4048 Reduce pit cycle time, soak time Cost-Effective
284 4049 Drossing off, melter practices, sequencing of product - standardisation Cost-Effective
284 4050 Maximise hot charging Cost-Effective
284 4051 Reduce time doors are open (work practices) Cost-Effective
284 4052 Improve burner efficiency by tuning Cost-Effective
284 4053 Improve burner efficiency by tuning Cost-Effective
386 4064 Web Energy Management Cost-Effective
386 4066 Precinct Central Chiller Cost-Effective
386 4070 W5C – Building Upgrade Potentially Cost-Effective
494 4219 HVAC - control improvements Cost-Effective
494 4221 HVAC - chiller and condensor water systems Cost-Effective
494 4222 HVAC - Holiday scheduling and time of day Cost-Effective
494 4223 HVAC - economy cycle, CO2, outside air and night purge Cost-Effective
494 4224 HVAC - control of personal equipment and general awareness Cost-Effective
494 4225 HVAC - new or refurbished plant Cost-Effective
494 4229 Lighting initiatives Cost-Effective
494 4230 Office and other equipment initiatives Cost-Effective
280 4236 Improve O2 balance on SP2 and SP4 Cost-Effective
280 4237 Air rinse on elevators Cost-Effective
280 4240 Turn off soda ash dust collector Cost-Effective
424 4244 Optimise rail delivery conveyors and stackers. Automate and OptimiseCost-Effective
424 4245 Compressed air. Replace and relocate site air compressors. Replace eCost-Effective
424 4248 Improved power factor correction. Improve Site Power Factor. Supply,Cost-Effective
501 4249 A compressor scheduling system on the high pressure compressors has Cost-Effective
501 4250 Heat relaim on pellet driers on four IMM - as per set-up of new IMM Potentially Cost-Effective
280 4255 Batch house vacuum system Cost-Effective
280 4256 Pulse bubblers SP4 Cost-Effective
280 4257 Use air knives instead of air sweeps Cost-Effective
280 4258 Repair air leaks Cost-Effective
280 4266 Operation of Dessicant dryer. Investigate further Potentially Cost-Effective
280 4268 Improved ventilation compressed air building Potentially Cost-Effective
280 4269 SP3 Air Fuel ration control. Can only be done with control upgrade Potentially Cost-Effective
499 4277 Compressor scheduling package- control both high and low pressure Cost-Effective
506 4279 Car Park Shutdown - Centre security to isolate access to Car Park at 8:Cost-Effective
506 4280 PE Lighting Controls - PE control of selected interior mall and perimeterCost-Effective
472 4282 Install voltage reduction units to the lighting circuits on plantroom. Cost-Effective
506 4284 Lighting Controls Mall & Car Park Areas - Review current zone control, Cost-Effective
506 4285 Domestic Hot Water - Review and adjust temperature control setpoints Cost-Effective
291 4287 Repair steam and condensate leaks Cost-Effective
291 4288 Repair passing steam traps Cost-Effective
291 4289 Recover evaporator condensate to boiler feedwater Cost-Effective
291 4291 Reduce refrigeration load-loss of chilled water for cheese Cost-Effective
291 4295 Milk intake lighting Cost-Effective
506 4322 Escalators - Raise awarness to ensure escalators and travellators are nCost-Effective
280 4323 Temperature Comp. SP2 Comb. Air (investigation needed) Potentially Cost-Effective
472 4328 Install Lighting Controls to nominated areas Cost-Effective
506 4334 Reduce Outside Air - Investigate the reduction of O/A requirement throuPotentially Cost-Effective
473 4336 Install VSDs to AHUs Cost-Effective
292 4339 Building lighting Cost-Effective
292 4343 Milk intake lighting Cost-Effective
292 4345 Effluent plant hot water Cost-Effective
473 4346 Refurbish fluorescent light fittings in the corridors, offices and foyer. Cost-Effective
473 4348 Replace fluorescent light fittings in the plant rooms and MDF. Cost-Effective
473 4350 Install Lighting Controls to nominated areas. Cost-Effective
473 4354 Install voltage reduction units to the lighting circuits in the chiller plant Potentially Cost-Effective
292 4356 Rapid shut doors cold room Potentially Cost-Effective
506 4361 Lighting Lamp Replacement Dichroic 50w to 35w - Replace mall dichroicPotentially Cost-Effective
474 4365 Refurbish fluorescent light fittings in the corridors and lift lobbies. Cost-Effective
474 4367 Install voltage reduction units to the lighting circuits on plantroom. Cost-Effective
474 4368 Install Lighting Controls to nominated areas Cost-Effective
474 4370 Replace chillers Cost-Effective
505 4374 Lighting Controls Mall & Car Park Areas - Review current zone control, Cost-Effective
475 4375 Refurbish fluorescent light fittings in the corridors and MDF. Cost-Effective
505 4376 PE Lighting Controls - PE control of selected interior mall and perimeterCost-Effective
505 4377 Escalators - Raise awareness to ensure escalators and travellators are Cost-Effective
505 4378 Power Factor Correction - Install PFC equipment (160KVAR) at main swPotentially Cost-Effective
505 4379 Car Park and House Flourescent Lighting - T5 kit lamp conversion of houPotentially Cost-Effective
505 4383 VSD on HVAC Pumps - VSD control on Chill water pumps, Condensor WatPotentially Cost-Effective
505 4390 Lighting Controls Malll & Car Park Areas - Review current zone, cleaninPotentially Cost-Effective
505 4391 Lighting Replacement MV to MH Car Park and Loading Docks - Replace 6Potentially Cost-Effective
505 4393 Lighting Lamp Replacement Dichroic 50W to 35W - Replace mall dichroiPotentially Cost-Effective
475 4398 Install voltage reduction units to the lighting circuits in equipment roomsCost-Effective
475 4399 Install lighting controls to the Office, carpark and equipment room. Cost-Effective
320 4409 Install Hull Diverter Valve Cost-Effective
320 4410 Installation of timed switches on Seed Shed lighting Cost-Effective
320 4415 Change from Pneumatic to Mechanical Meal Conveying Potentially Cost-Effective
320 4417 Dehulling Upgrade Cost-Effective
318 4423 Compressed Air leakages awarness programme Cost-Effective
318 4425 Increasing the power factor from an average of 0.96 to 0.98. Cost-Effective
318 4426 Steam Leaks-steam traps monitoring Cost-Effective
318 4427 Flash steam recovery from faulty traps Cost-Effective
318 4430 VSD on screw compressor 320kw Cost-Effective
318 4431 Lagging hot water steam & condensate pipes, costings & paybacks basCost-Effective
318 4432 Flash steam recovery for Boiler feed water heating Cost-Effective
318 4434 Combustion control to control oxygen to fuel ratio to the boiler Cost-Effective
318 4435 Biofilter Cost-Effective
318 4436 Ammonia pipe lagging Cost-Effective
318 4438 Application fo lumitrols Cost-Effective
318 4439 VSD for all chillers fans Cost-Effective
318 4444 Increasing Boiler drum TDS levels Potentially Cost-Effective
318 4446 VSD of combustion fan of the boilers Cost-Effective
318 4449 Recover heat from the flue gases and utilise for heating the feed water tPotentially Cost-Effective
318 4450 VSD on 150kw screw compressor Potentially Cost-Effective
318 4451 Power Demand Improvement Cost-Effective
318 4452 VSD on water pumps Potentially Cost-Effective
318 4453 Application of occupancy sensors (50 units) Potentially Cost-Effective
318 4454 Fluorescent change to Tri phosphor tubes Potentially Cost-Effective
318 4457 Refrigeration system optimisation Potentially Cost-Effective
318 4462 After Burner gas reduction Potentially Cost-Effective
318 4465 Compressed Air removal for water removal on packages isolation valv Potentially Cost-Effective
317 4471 Install dearator on boiler Cost-Effective
317 4476 Install variable speed drive on boiler combustion fan Cost-Effective
317 4478 Replace desolventiser toaster with new. Potentially Cost-Effective
510 4490 Conveyor Upgrade Cost-Effective
510 4492 Compressor Leak Review Cost-Effective
510 4493 Hydraulic Circuits Cost-Effective
510 4496 Conveyor Sequencing Potentially Cost-Effective
332 4507 Air Compressors Cost-Effective
332 4508 Warm filling with ultrasonic defoaming Potentially Cost-Effective
427 4509 Upgrade lighting installations Cost-Effective
502 4513 VSDs on Maingate Conveyor 1 Tripper 1 Cost-Effective
502 4517 VSDs on two Thickener underflow pumps Cost-Effective
502 4518 VSD on Module 1 desliming cyclone feed pump Cost-Effective
502 4519 VSD on Module 1 dense medium cyclone feed pump Cost-Effective
502 4521 Use of HEM for motors in the new CH&PP Cost-Effective
502 4523 Use of VSDs on Maingate 2 conveyor Potentially Cost-Effective
502 4525 Use of VSDs on Maingate 3 conveyor Potentially Cost-Effective
470 4527 Install demand management controller for ac units Cost-Effective
470 4529 Offices refurb 50W to 35W downlights Cost-Effective
470 4530 Install VSD fitted compressors on all three circuits Cost-Effective
470 4531 Factory refurb 250W to 200W highbay Cost-Effective
470 4532 Factory refurb/replace flourescent lamps to 1x36W+kw2+E ballast Cost-Effective
470 4533 Factory - refurb 400W to 320W highbay Cost-Effective
511 4551 Raw Coal Feed Upgrade Cost-Effective
511 4552 Product Centrifuge Cost-Effective
511 4553 Paste Thickener Cost-Effective
511 4560 Conveyor Automation. Potentially Cost-Effective
511 4562 Compressed Air system review Potentially Cost-Effective
446 4564 HVAC - Office reschedule controls to switch off the system when not reCost-Effective
446 4565 Lighting factory - lower luminaires and reduce wattage Cost-Effective
446 4566 Lighting Office Technology upgrade Cost-Effective
446 4568 Machines running when not required Cost-Effective
446 4569 Furnaces - rescheduling in line with production levels, resulting reduc Cost-Effective
446 4570 Compressed air - leaks - identify and fix Cost-Effective
446 4572 Furnace area ventilation - requires further investigation Potentially Cost-Effective
446 4573 Cooling Towers control - improved control of cooling towers. Turn off whPotentially Cost-Effective
512 4583 Citect Warning on train loading belts running empty Cost-Effective
512 4586 Raw coal shutdown on no coal Cost-Effective
512 4591 Compressor review Potentially Cost-Effective
513 4599 Reduce time taken to shut down crusher at end of shift Cost-Effective
513 4600 Dewatering pumping system Cost-Effective
513 4601 Shut down crusher over crib Potentially Cost-Effective
514 4612 20 Minute rule on the dragline. Cost-Effective
514 4613 Crusher start and shutdown Cost-Effective
514 4614 Compressor Leak Review Cost-Effective
515 4650 Compressor system review Potentially Cost-Effective
515 4657 Audit of the Compressed Air System Cost-Effective
515 4661 Variable Displacement pumps on the longwall Cost-Effective
582 4690 Refurbish twin light fittings to single fittings – in one building. Potentially Cost-Effective
582 4692 Install a lux sensor in lunchroom Potentially Cost-Effective
582 4693 Install occ sensors in offices Potentially Cost-Effective
582 4696 Install occ sensors in the office & lunchroom Potentially Cost-Effective
582 4715 Install an occupancy sensor in the kitchen to control the 15 x 36W singCost-Effective
582 4717 Delamp fluorescent light fittings in the office, rear administration area Potentially Cost-Effective
582 4718 Replace the 60W incandescent lamp in the cleaners store with an 11WPotentially Cost-Effective
582 4727 Install an occupancy sensor to control the lighting in the staff lunchroo Potentially Cost-Effective
582 4734 Refurbish twin fluorescent light fittings from twin fittings to single fittingsPotentially Cost-Effective
582 4736 Refurbish twin fluorescent light fittings from twin fittings to single fittingsPotentially Cost-Effective
582 4755 Replace 8 x 60W incandescent lamps in the infant’s playroom (Rear BuiCost-Effective
582 4766 Replace the 60W incandescent lamp at entry to a compact fluorescent Cost-Effective
304 4787 Re-commission fuzzy logic Cost-Effective
304 4793 Recycle kiln dust into finished product Potentially Cost-Effective
582 4798 Replace incandescent lamps with CFLs in staff bathrooms, back of housCost-Effective
304 4799 Recycle spillage from pre-heater Potentially Cost-Effective
582 4804 Replace incandescent lamps with CFLs. Cost-Effective
304 4807 Secondary Crusher replacement Cost-Effective
304 4808 Install photo-detectors on remaining lights Potentially Cost-Effective
390 4858 Turn off three hydraulic pumps if not used Potentially Cost-Effective
390 4859 Review of compressed air system Potentially Cost-Effective
593 4871 Reduce pool temperature to 26C Cost-Effective
593 4876 Install Pool cover & timer on boilers Cost-Effective
598 4886 Improvement to air conditioning control system Cost-Effective
598 4888 Push button time delay switches to control AC unit Cost-Effective
593 4890 Disable plant from operating during public holidays Cost-Effective
593 4891 Reschedule HVAC start time Cost-Effective
593 4892 Install timers to ZIP water boiler units Cost-Effective
593 4893 Replace existing 125W MV foyer lighting with 28W Compact Fluoresc Cost-Effective
593 4894 Install power Factor Correction Cost-Effective
593 4895 Re-lamp existing twin fluorescent 36W fittings with 28W T5 Save It EasPotentially Cost-Effective
593 4896 Replace 50W LVDL with 13W RCF Potentially Cost-Effective
593 4898 Reset HVAC timer to disable plant on Public Holidays Cost-Effective
593 4905 Relamp incandescent lamps with compact fluorescent lamps Cost-Effective
593 4912 Retrofit existing 36W fluoro lights with T5 Save It Easy® kits Potentially Cost-Effective
593 4913 Installation of skytube Potentially Cost-Effective
593 4923 Turn off office equipment when not in use Cost-Effective
593 4925 Install timers to ZIP water boiler units Cost-Effective
593 4926 Replace 400W mercury vapour with 250W metal halide lamps Potentially Cost-Effective
593 4927 Retrofit existing 36W fluoro lights with T5 Save It Easy® kits Potentially Cost-Effective
593 4929 Retrofit existing 36W fluoro lights with T5 Save It Easy® kits Cost-Effective
598 4936 HVAC control, economy cycle and VSD application Cost-Effective
598 4937 T5 lighting upgrade Cost-Effective
596 4940 Installation of Energy Save Units Potentially Cost-Effective
596 4941 Installation of Occupancy Sensors Potentially Cost-Effective
596 4942 Integration of Pumps with SCADA system Potentially Cost-Effective
596 4945 Installation of Energy Save Units to Control Lights in the Car Park Potentially Cost-Effective
596 4950 Replacement of CRT Monitors Potentially Cost-Effective
587 4957 Install 4 timers (30%) Cost-Effective
587 4963 Install 6 x movement sensors in amenities and storerooms, etc (30%) Cost-Effective
596 4965 Installation of external door Potentially Cost-Effective
587 4969 Install inverter type reverse cycle air conditioners Potentially Cost-Effective
587 4971 Install 16 x movement sensors (30%) Cost-Effective
596 4972 Replacement of incandescent lamps Cost-Effective
596 4973 Commercial refrigerator control Cost-Effective
596 4974 Installation of light sensors to control external lighting Potentially Cost-Effective
587 4986 Install 365 day hot water timer to control 3 x HWHs (30%) Cost-Effective
587 4987 Install 15 x movement sensors (30%) Cost-Effective
587 4993 Install 365 day hot water timers to control 2 x HWSs (30%) Cost-Effective
587 4994 Install 12 x movement sensors Cost-Effective
587 5000 Install 4 x timers for hot water heaters & water coolers (30%) Cost-Effective
587 5001 Install 9 x movement sensors (30%) Cost-Effective
587 5002 Install window tinting (10%) Cost-Effective
587 5008 Implement HVAC Controls - 365 days (50%) Cost-Effective
587 5009 Install 5 x hot water timers (40%) Cost-Effective
587 5010 Install 30 x movement sensors (30%) Cost-Effective
587 5011 Implement staff education program - including appropriate signage. Cost-Effective
587 5017 Lower thermostat temperature of hot water heaters & install timers (30 Cost-Effective
587 5019 Implement staff education program - including appropriate signage Cost-Effective
587 5022 Implement education program - including appropriate signage Cost-Effective
587 5023 Interrogate where the floodlights are being billed. Supposed to be off Cost-Effective
587 5027 Compare bills. We appear to be significantly overcharged Cost-Effective
587 5028 Check time clock program and analyse time use Cost-Effective
594 5055 Install movement sensors on lighting circuits. Cost-Effective
594 5057 Install ECO-Save on remainder of lighting circuits Cost-Effective
594 5062 Integrate Zane solar system into BMS Cost-Effective
594 5063 Replace current gas boilers with Rotex/Rinnai gas package for main poCost-Effective
594 5064 Spa heating using Rotex system Cost-Effective
594 5065 Install VSD's on Circulation Pumps Cost-Effective
594 5069 Replace 400W Mercury Vapour lamps with more efficient 250W HPI P Cost-Effective
594 5073 Install Power Factor Equipment to raise PF from an average.78 to.98 Cost-Effective
594 5077 Alter the control system to increase the aeration delay time Cost-Effective
594 5081 Installation of a Compressor control system to shut down the second Potentially Cost-Effective
594 5085 Install Variable Speed Drive on Outdoor Circulation Pump Cost-Effective
594 5086 Install Metered Power Heads on Storage Van sites Cost-Effective
594 5090 Replace 17 X 80W MV Sphere lights in with more efficient fittings an Cost-Effective
594 5092 Complete the change out of 250W & 400W MV & 310 HPS S/L fittings Cost-Effective
594 5095 Develop and implement procedures to confirm that individual street lighPotentially Cost-Effective
594 5097 Convert system 4 Public Lighting Systems to one of the other systems Potentially Cost-Effective
574 5126 Installation of non return dampers on pool room vents Cost-Effective
574 5131 Prevent unnecessary operation of air conditioning Cost-Effective
574 5139 Upgrade of AC2.1 controls Potentially Cost-Effective
574 5140 Replacement of halogen lighting with IRC or Megaman equipment Potentially Cost-Effective
574 5141 Reduce air conditioning operating times Cost-Effective
574 5142 Upgrade of air conditioning controls Cost-Effective
574 5156 Replacement of halogen with IRC or Megaman equipment Potentially Cost-Effective
574 5159 Installation of a hood Potentially Cost-Effective
574 5166 Replacement of incandescent lighting Potentially Cost-Effective
574 5172 Replacement of Mercury Vapour High Bays Potentially Cost-Effective
580 5181 Carpark - Delamp fluorescent lighting with triphosphor tubes and modifyCost-Effective
580 5231 Investigate the feasibility of consolidating refrigeration in the off-seasonCost-Effective
580 5232 Turn off kitchen lights and fans in off-season Cost-Effective
580 5233 Turn off main office air conditioner at night Cost-Effective
580 5237 Switch off urn in staff room during winter and use a timer on the urn d Cost-Effective
580 5249 Identify and reduce idle equipment operation baseload Cost-Effective
580 5250 Install voltage reduction units on fluorescent lighting Cost-Effective
580 5280 Repair outside air damper - activate ECO cycle Cost-Effective
580 5283 Investigate and reduce baseload Cost-Effective
580 5301 Install 365 day timer to switch off HVAC during holidays and optimise sCost-Effective
580 5305 Include within the existing air condition maintenance contract a trial Cost-Effective
580 5306 Activate Energy Star on computers Cost-Effective
580 5310 Investigate current circuit setup and potential to install motion detectorsPotentially Cost-Effective
580 5313 Install 7-day timers on the hydro-boil units Potentially Cost-Effective
580 5324 Investigate the current circuit setup and the potential to install motion Cost-Effective
580 5346 Include within the air conditioning maintenance contract a trial to opt Cost-Effective
580 5386 Install 365-day timer to switch off HVAC during holidays and optimise sCost-Effective
580 5389 Include within existing air conditioning maintenance contract a trial t Cost-Effective
580 5396 Install 7-day timers on the hydro-boil units Potentially Cost-Effective
580 5402 Continue retrofitting of twin lamps with single Cost-Effective
315 5426 Focused maintenance campaigns on steam traps and leaks Cost-Effective
315 5427 Long-term replacement of electrical motors (several hundred) with EX-veCost-Effective
315 5428 Long-term upgrade of plant lighting with better quality, higher efficien Cost-Effective
315 5429 Suite (~80) of minor improvement projects, some with energy improvemCost-Effective
595 5451 Installation of Energy Reduction Controllers Cost-Effective
372 5469 Nonworking days energy management Cost-Effective
372 5476 Fluorescent tubes change to triphosphor Cost-Effective
372 5477 Change Mercury Vapour to Metal Halide lamps Cost-Effective
367 5495 IT refresh for client providing energy saving at data centre Cost-Effective
367 5496 IT refresh - It technology refresh for IBM Lotus Notes Applications provCost-Effective
367 5497 CRAC Unit load balance Cost-Effective
367 5500 Exist lighting upgrade to LEDs. Replace 10W fluorescent lighting with Potentially Cost-Effective
367 5501 Service Corridor Lighting Modifications. Rewire corridor lighting to creaPotentially Cost-Effective
373 5511 Change to mercury halide lamps Cost-Effective
563 5516 Variable speed drive to 2 of the 3 Air Handling Units for pool heating Cost-Effective
563 5517 Motion sensors to 4 ventilation fans in sporting hall with a fan cutting i Cost-Effective
563 5518 Replace CF fittings with triphosphor lamps, install 5 light save transfor Cost-Effective
563 5519 Turn off 1 HW circulation pump when 1 boiler runs, and run 1 filtratio Cost-Effective
563 5521 PF- Install 250kVAr power factor correction equipment Cost-Effective
563 5525 MLS using occupancy/daylight sensors Cost-Effective
563 5526 Control modification on space temperature set points Cost-Effective
563 5527 Variable speed drives for 6 condenser water pumps Cost-Effective
563 5533 Voltage controller Cost-Effective
563 5536 VSDs for 2 filtration pumps Cost-Effective
563 5538 Pool covers for indoor and outdoor pools Cost-Effective
563 5539 Time delay switches for 17 electric radiant heaters Cost-Effective
563 5540 PF- Inspect and test existing power factor correction equipment, upgraCost-Effective
563 5541 VSDs for 3 chilled water pumps (1.2 and 3) controlled by CHW differenCost-Effective
563 5542 VSDs for AHU1 fan with a sliding scale signal on O/A temperature: fu Cost-Effective
563 5543 Modify control strategy: reheat set poit to 20+-0.5 degC, space tempe Cost-Effective
563 5544 Light save transformers Cost-Effective
563 5547 Install new thermostat with accuracy to +-0.5 degC Cost-Effective
563 5548 Install several pool covers on the smallest pool, and regular use of the Cost-Effective
563 5549 Install new thermostat with accuracy to +-0.5 degC Cost-Effective
563 5550 Install several pool covers on the smallest pool, and regular use of pooCost-Effective
563 5551 Replace existing thermostatic expansion valve with electronic expansioCost-Effective
563 5552 Modify control strategy: reheat set point to 20+-0.5 degC, space tem Cost-Effective
584 5564 Install motion sensor Cost-Effective
584 5565 Install variable speed drive to recirculating pump Cost-Effective
584 5578 Implementation of lighting policy with the cleaning contact Cost-Effective
584 5580 Replace low voltage light fittings Cost-Effective
563 5586 Redefine operating hours - Control and AC modification Cost-Effective
584 5613 Install ESM 4000 Abbotly chiller controls Cost-Effective
584 5620 Refurbish 400W MV fittings with 250W MH fittings Cost-Effective
584 5621 Refurbish 250 MH fittings with 150W MH fittings Cost-Effective
584 5622 Replace triple 36W fittings with twin 37W quadphosphor fittings Cost-Effective
584 5623 Replace twin 58W fittings with single 58W triphosphor fittings Cost-Effective
584 5624 Install lighting controls Cost-Effective
584 5628 Install occupancy sensors to administration office to control lighting Cost-Effective
584 5630 Upgrade bathroom light fittings in grandstands Cost-Effective
584 5631 Delamp CFL fittings in function room Cost-Effective
584 5632 Install lighting controls to the function room bathrooms Cost-Effective
584 5633 Replace twin fluorescent fittings with single fittings including new reflecCost-Effective
584 5639 Refurbish carpark office light fittings from twin to single fittings Cost-Effective
584 5640 Replace bathroom lamps from incandescent to compact fluorescent Cost-Effective
584 5643 Refurbish metal halide fittings Cost-Effective
584 5648 Replacement of incandescent lamps with compact fluorescent lamps in Cost-Effective
584 5656 Replace 250W metal halide light fittings with 37W twin quadphosphor ligCost-Effective
584 5660 Refurbishment fluorescent light fittings in carpark Cost-Effective
366 5678 Cafeteria and Corridors Lamp Replacement - Replace 490 100W incandesCost-Effective
366 5679 Refurbishment with new lighting. Replace 203 36W T8 fluorescent lamCost-Effective
366 5681 Office Lighting Upgrade 2. Automatic lighting control through the IntegrCost-Effective
366 5682 Cooling Towers replacement - replace Shinwa Cooling Towers with new Cost-Effective
366 5683 Chillers replacement - 6 chillers will be replaced by 4 Centrifugal Chi Cost-Effective
366 5684 Circulating pumps for HVAC replaced with VSDs Cost-Effective
366 5687 Workstation Power Management. Employee enable ENERGY STAR and TCost-Effective
597 5692 Refine pool temp operation with aim to reduce set points by average 1 Cost-Effective
597 5693 Replace degraded training pool cover with higher quality/high R-value aPotentially Cost-Effective
597 5695 Replace old 36W batten luminaires with energy efficient 36W fittings at vaPotentially Cost-Effective
597 5697 Replace PAR38 spotlights in foyer of theatre paviliion with CFL alternatCost-Effective
597 5698 Install active roof air extraction system for theatre pavilion to minimis Cost-Effective
366 5700 LEDs for Emergency Exit Lighting - all exit lighting is conventional 10WPotentially Cost-Effective
597 5716 Install occupancy sensor on lighting in the access corridor on the bottoCost-Effective
597 5717 Place day-light sensor or timer controls on the up-lighting in the front a Cost-Effective
597 5720 Program the BMS to turn off lighting at the front of the building. CurrentCost-Effective
315 5725 installation of Power Factor capacitance(5 MVAr) with new site substatCost-Effective
485 5727 Electro-mechanical timers for air conditioners Cost-Effective
485 5739 Rectify operation of the heating hot water pump Cost-Effective
485 5740 Interlock the boiler with the associated air handling plant Cost-Effective
485 5742 Install outside air compensation on levels 2,3 and 4 fan coils' chilled w Cost-Effective
485 5754 Movement detector in rooms Cost-Effective
485 5755 Replace Dichroics with CF and install MDs Cost-Effective
485 5756 Replace Dichroics with IRC types Cost-Effective
485 5757 Replace 36W lamps with T5s Cost-Effective
485 5760 Replace 40W lamps with 36W Cost-Effective
485 5766 Install push button timer control of the mail room Cost-Effective
485 5767 Disable local setpoint adjustments on temperature sensors Cost-Effective
485 5771 Reduce domestic hot water from 70C to 60C Cost-Effective
485 5784 Replace 40 watt rapid start tubes with 32 watt rapid start tubes Cost-Effective
485 5785 Install push button timer control of lights in selected intermittently occ Cost-Effective
485 5793 Replace reading lamps with compact fluorescents Cost-Effective
485 5799 Control HHW pump and boiler to heating demands Cost-Effective
485 5804 Install Movement Detectors in selected rooms Cost-Effective
485 5805 Reprogram Cbus system Cost-Effective
485 5815 Alter the controls on the level 2 common/staff room air conditioners Cost-Effective
485 5816 Alter the controls on the laboratory console air conditioners Cost-Effective
485 5817 Alter the controls on Mechanical SW/BD Cost-Effective
485 5840 Level 4 Research lab Cost-Effective
485 5843 Install movement control of the lights in selected intermittently occupie Cost-Effective
485 5844 Photo-sensor lighting control to select perimeter aeras Cost-Effective
485 5856 Optimise Lecture threatre economy cycle Cost-Effective
485 5857 Optimise Lecture theatre duct heater ops Cost-Effective
485 5858 Movement sensor control to four labs Cost-Effective
485 5859 Movement sensor in room for split a/c Cost-Effective
485 5860 Movement sensor in two rooms split a/cs Cost-Effective
485 5866 Install MDs in four labs Cost-Effective
485 5876 PBT control on the staff room 727 lights Cost-Effective
485 5878 Optimise BMS control functions Cost-Effective
485 5880 Push button timer control of twp training room air conditioners Cost-Effective
485 5885 Install movement control of the lights in selected intermittently occupie Cost-Effective
485 5892 Check all control systems and schedules of HVAC systems Cost-Effective
485 5893 Optimise the operation of the rundown timers Cost-Effective
485 5894 Disable fresh air fan and zone duct heaters when the outside air tempeCost-Effective
485 5908 Repair odour problem and install push button timers with movement seCost-Effective
485 5911 Install movement control of the lights in selected intermittently occupie Cost-Effective
485 5919 PBT for two rooms Cost-Effective
485 5921 PBT for Tutorial Room Cost-Effective
485 5923 Optimum start/stop and scheduling of A/c Cost-Effective
485 5925 Install movement control of the lights in selected intermittently occupie Cost-Effective
485 5926 Selectively de-lamp museum Cost-Effective
485 5932 Install push button timer control on the air conditioner serving laborato Cost-Effective
485 5934 Insulate the flow and return pipework from the potable and non potable Cost-Effective
322 5947 New press plattern. This produces smoother boards hence less sandingCost-Effective
322 5957 Core and Flake Drier Optimisation of gas use and possible fitting of VSPotentially Cost-Effective
586 5966 Switch off pool heat pumps during summer to avoid high monthly dem Cost-Effective
586 5975 Upgrade main pumps with energy efficient motors and improve the systPotentially Cost-Effective
586 5976 Replace existing indoor T8 fluorescent light fittings with T5 fittings Potentially Cost-Effective
586 5977 Replace low voltage Halogens with more efficient lamps and upgrade witPotentially Cost-Effective
586 5981 Install timers on small hot water services/zip boilers Potentially Cost-Effective
586 5983 Install 275L heat pump hot water system to be used in place of larger unPotentially Cost-Effective
586 5990 Replace existing conventional storage hot water systems with heat pumpPotentially Cost-Effective
586 5992 Replace existing Small MV Lights with 2X14W and 2X24W T5 StreetlightPotentially Cost-Effective
586 5993 Replace existing Fluorescent lights with 2X14W T5 Streetlights or otherPotentially Cost-Effective
586 5994 Replace existing incandescent lights with 2X14W T5 Streetlights or othPotentially Cost-Effective
586 5995 Replace exisying Large MV lights with HP Sodium Streetlights or other Potentially Cost-Effective
329 6032 install new meters Cost-Effective
453 6039 Document and implement replacement program (including target dates) Potentially Cost-Effective
570 6485 Improved HVAC efficiency through improved maintenance -production oCost-Effective
570 6488 Fit timer to ZIP water heater in staff kitchenette Cost-Effective
570 6489 Get the A/C controls recommissioned form a Carrier technician + instalCost-Effective
570 6490 Investigate and resolve high 'base power' issues. Cost-Effective
570 6491 Replace 50W Low voltage down lights with 35W IRC lamps Cost-Effective
570 6493 Remove leaking 50 litre hot water heater and connect piping to existin Cost-Effective
570 6494 Fit timer to ZIP water heater in staff kitchenette Cost-Effective
570 6495 Install voltage reduction unit to the fluorescent lamps in ground floor t Cost-Effective
570 6496 Replace 100W halogen wall lamps with 23W CFLs in the foyers Cost-Effective
570 6497 Install timer to the large refrigerator plug such that the fridge only op Cost-Effective
570 6498 Fit timer to large ZIP water heater in main kitchen area Cost-Effective
570 6499 Replace 50W Low voltage down lights with 35W IRC lamps Cost-Effective
509 6501 Remove/Isolate SMC Desiccant Dryer Cost-Effective
509 6503 General Air Leaks Cost-Effective
509 6504 Install Photocell control and over-ride switch - High mast Cost-Effective
509 6505 Install Photocell control and over-ride switch - Exterior lighting Cost-Effective
509 6506 Install lighting controls Cost-Effective
509 6507 Kilns - correctly apply edge baffles Cost-Effective
509 6511 Replace Timer Valves (Drains) Potentially Cost-Effective
509 6513 Improve lighting efficiency - replace dichroic lamps with UCFLs; pilot d Potentially Cost-Effective
509 6515 High efficiency 150 kW motor Potentially Cost-Effective
509 6516 High efficiency 110 kW motor Potentially Cost-Effective
509 6517 High efficiency 15 kW motor Potentially Cost-Effective
509 6520 Improved Compressor Efficiency & Control Methods Potentially Cost-Effective
440 6527 Discontinue use of Compressed Air Guns Cost-Effective
440 6532 Ammonia Back pressure valves for Spirals Potentially Cost-Effective
578 6543 Installation of shower duration timers Cost-Effective
578 6544 Rearrangement of lighting circuits Cost-Effective
578 6545 Hot water pipe insulation Cost-Effective
578 6546 Opportunistic metering of unmetered sites Potentially Cost-Effective
578 6549 Removal and replacement of existing light fittings as per ECS specificaPotentially Cost-Effective
578 6551 Opportunistic metering of unmetered sites Potentially Cost-Effective
578 6553 Opportunistic replacement of fluorescent lamps with T5 fittings Cost-Effective
511 6599 Compressed air leak review Cost-Effective
511 6603 High efficiency motor review Potentially Cost-Effective
511 6604 Review of compressed air system and usage Cost-Effective
485 6609 Interface tempered air systems to the BMS to provide time of day schedCost-Effective
485 6611 Selectively relamp triple 40 W rapid start light fittings in a room Cost-Effective
485 6612 Rearrange light switching in the Levels 2 and 3 foyers so that only acceCost-Effective
Equipment Type Actual cost ($) Actual electricit Actual natural gaStart Date
HVAC $410 57 NULL
Industrial Equipment $1,045 57 NULL
Industrial Equipment $14,700 395 NULL
Industrial Equipment $2,698 30 NULL
Lighting $7,800 165 NULL
Air compressor $15,000 452 NULL
Other $2,000 1,368 NULL
Other $3,000 1,632 NULL
Lighting $1,000 45 30/06/06
Power Factor Correction $45,000 20,000 1/07/07
Lighting $0 48 NULL
Lighting $3,050 49 NULL
Lighting $2,520 54 NULL
Industrial Equipment $19,000 230 NULL
Industrial Equipment $1,300,000 0 1/07/06
Industrial Equipment $1,100,000 788 1/10/05
Industrial Equipment $1,200,000 1,042 1/12/05
Industrial Equipment $2,500,000 1,970 1/11/05
Industrial Equipment $500,000 400 1/11/05
Behaviour/Education $1,878,000 2,612 1/04/05
Industrial Equipment $4,500,000 5,935 1/03/06
Other $391,000 475 1/05/06
Air compressor $440,000 2,800 1/02/07
Industrial Equipment $0 3,300 NULL
Industrial Equipment $0 37,000 NULL
Industrial Equipment $24,375 374 1/07/06
Industrial Equipment $18,500 264 1/07/06
Industrial Equipment $30,000 130 1/07/06
Industrial Equipment $20,000 231 1/07/06
Air compressor $13,000 821 1/07/06
Power Factor Correction $250,000 891 1/03/06
Power Factor Correction $250,000 3,000 1/07/06
Industrial Equipment $100,000 111 1/07/07
Industrial Equipment $800,000 2,692 1/07/06
Power Factor Correction $30,000 28 1/07/06
Air compressor $150,000 1,802 1/07/06
Power Factor Correction $260,000 538 1/08/06
Industrial Equipment $33,000 584 NULL
Lighting $240,000 719 NULL
Industrial Equipment $200,000 587 NULL
Industrial Equipment $10,000 117 1/01/06
Air compressor $33,000 400 1/01/07
Lighting $7,500 40 NULL
Boiler $10,000 2,000 1/03/06
Industrial Equipment $500,000 5,500 1/01/06
Industrial Equipment $42,500 10,000 1/06/06
Other $75,000 12,500 1/05/06
Industrial Equipment $20,000 0 1/01/06
Air compressor $3,520 42 30/09/06
Air compressor $23,500 83 30/09/06
Air compressor $25,000 1,480 1/01/07
Air compressor $70,000 740 1/01/07
Industrial Equipment $60,000 31,870 1/10/07
Lighting $30,000 400 1/01/07
Boiler $0 113,641 NULL
Air compressor $649,000 692 NULL
Industrial Equipment $100,000 286 NULL
Lighting $500 3 NULL
Industrial Equipment $4,980,000 116,000 NULL
HVAC $150,000 276 NULL
Industrial Equipment $2,000 35 NULL
Industrial Equipment $80,000 28 NULL
Boiler $50,000 200,000 NULL
Industrial Equipment $4,000 8 1/06/06
Industrial Equipment $20,000 41 1/08/06
Air compressor $24,000 70 1/10/06
Lighting $15,000 29 1/06/06
Industrial Equipment $90,000 48 1/12/06
Industrial Equipment $49,000 720 NULL
Lighting $46,350 236 NULL
Behaviour/Education $12,000 1,108 NULL
Air compressor $18,100 26 NULL
Industrial Equipment $46,000 68 NULL
Lighting $47,970 108 NULL
Industrial Equipment $36,000 116 NULL
Monitoring $400,000 2,503 1/10/06
Industrial Equipment $100,000 750 1/07/06
Industrial Equipment $50,000 0 30/11/07
Industrial Equipment $784,698 664 1/07/06
Other $1,215,130 137 1/07/06
Industrial Equipment $1,000,000 1,438 1/07/06
Industrial Equipment $40,483 138 1/07/09
Air compressor $30,000 1,051 30/06/06
Air compressor $10,000 417 1/05/06
Other $5,000,000 553 1/01/07
Industrial Equipment $300,000 263 30/06/06
Industrial Equipment $2,000 63 1/01/07
Air compressor $50,000 600 1/01/07
Industrial Equipment $250,000 20,000 NULL
Industrial Equipment $5,000 285 1/07/06
Air compressor $13,000 196 1/07/06
Air compressor $25,000 250 1/07/06
Industrial Equipment $77,000 728 NULL
Power Factor Correction $180,192 1,200 1/04/06
Lighting $100,000 967 1/07/06
Power Factor Correction $16,000 176 NULL
Air compressor $3,600 82 NULL
Other $3,500 63 NULL
Insulation $2,000 82 NULL
Lighting $7,320 63 NULL
Other $1,000 9 NULL
Lighting $600 39 NULL
Air compressor $15,000 215 NULL
HVAC $59,599 336 1/12/07
Building Management Systems $207,822 258 1/12/07
Lighting $531,226 600 1/12/07
Air compressor $144,621 668 1/12/07
Air compressor $220,000 1,400 NULL
Industrial Equipment $1,000,000 345 NULL
HVAC $5,000 8 NULL
Tariffs $0 3,120 NULL
Lighting $14,500 68 NULL
Mixed $1,000 147 15/10/06
Industrial Equipment $1,000 71 15/10/06
Industrial Equipment $3,000 286 15/10/06
other $6,000 246 15/01/07
Industrial Equipment $1 86 1/11/06
Behaviour/Education $100 51 NULL
Industrial Equipment $1,000 709 1/11/06
Other $240 129 1/03/07
Other $120 110 1/03/07
Industrial Equipment $4,400 11 NULL
Industrial Equipment $1,440 98 1/07/07
Industrial Equipment $480 82 NULL
Other $1,450 36 1,382 1/09/07
Other $660 67 NULL
HVAC $600 96 NULL
Other $120 56 NULL
Industrial Equipment $240 22 1/09/07
Other $480 21 1/12/07
Other $480 11 NULL
Boiler $29,670 1,551 NULL
Ventilation $1,200 16 NULL
Other $240 4 1/01/07
Other $120 3 1/06/07
Industrial Equipment $4,200 2 NULL
Boiler $0 9 NULL
Chiller $230,000 0 NULL
HVAC $0 8 2,700 1/03/06
Air compressor $0 75 1/07/06
Industrial Equipment $278,000 0 NULL
Industrial Equipment $15,000 136 NULL
HVAC $800 115 NULL
Industrial equipment $65,000 23,865 NULL
HVAC $20,000 500 NULL
HVAC $15,000 0 NULL
Air compressor $4,800 118 NULL
Industrial Equipment $48,000 1,512 1/01/07
HVAC $42,000 671 NULL
Boiler $13,000 69 NULL
Air compressor $26,000 578 NULL
Industrial Equipment $885,000 5,390 NULL
Industrial Equipment $7,000,000 5,734 NULL
HVAC $42,000 166 NULL
Chiller $27,000 114 1/08/06
Chiller $400,000 442 1/10/05
Hot Water System $4,230 6 NULL
Lighting $28,980 0 1/07/07
Lighting $44,275 0 1/07/07
HVAC $5,750 47 NULL
HVAC $17,250 0 1/07/06
Boiler $9,150 326 NULL
Lighting $2,300 3 NULL
Lighting $2,300 5 NULL
Lighting $2,300 7 NULL
Lighting $3,450 0 1/06/07
Industrial Equipment $4,160 9 NULL
Air compressor $23,000 83 NULL
Lighting $1,840 0 1/06/07
Lighting $3,150 34 NULL
Lighting $9,250 63 NULL
Lighting $450 1 NULL
Lighting $4,640 4 NULL
HVAC $3,850 12 NULL
HVAC $1,200 7 NULL
Lighting $7,100 112 NULL
HVAC $1,500 74 NULL
Lighting $1,185 6 NULL
HVAC $230 0 1/07/06
Chiller $3,738 0 1/07/06
Ventilation $11,574 6 NULL
Lighting $12,205 11 NULL
Lighting $2,755 4 NULL
Lighting $11,976 21 NULL
Lighting $1,725 0 1/07/06
Hot Water System $6,840 14 NULL
Lighting $4,275 10 NULL
Lighting $4,905 4 NULL
Lighting $11,685 39 NULL
Ventilation $8,100 10 NULL
HVAC $3,600 6 NULL
Lighting $7,400 11 NULL
Lighting $6,575 11 NULL
Lighting $2,940 10 NULL
Lighting $3,070 8 NULL
Industrial Equipment $345 0 1/07/06
Hot Water System $22,510 25 NULL
HVAC $1,725 0 1/07/06
Lighting $5,735 8 NULL
Lighting $5,975 4 NULL
Lighting $12,071 35 NULL
HVAC $472 0 1/07/06
Hot Water System $58 0 1/07/06
HVAC $4,140 0 1/07/06
HVAC $1,380 0 1/07/06
Air compressor $0 417 NULL
Air compressor $15,000 336 NULL
Lighting $4,000 45 NULL
Air compressor $0 90 NULL
Industrial Equipment $300,000 1,983 1/07/06
Industrial Equipment $0 0 1/01/07
Monitoring $400,000 3,306 1/10/06
Industrial Equipment $100,000 992 1/10/06
Air compressor $160,000 392 NULL
Air compressor $10,000 120 NULL
Air compressor $0 24 NULL
Lighting $23,000 313 NULL
other $0 32,000 NULL
other $0 131 NULL
Industrial Equipment $18,800 286 NULL
Industrial Equipment $26,120 155 NULL
Boiler $12,500 1,806 NULL
Chiller $17,200 863 31/07/06
Boiler $5,000 350 1/01/07
HVAC $5,800 181 1/09/06
HVAC $23,040 151 141 1/07/06
HVAC $8,000 60 NULL
Lighting $5,000 31 NULL
Industrial Equipment $23,040 42 141 1/10/06
HVAC $15,000 117 NULL
Lighting $17,000 32 NULL
Lighting $10,000 49 31/12/09
HVAC $5,000 6 16 NULL
Boiler $6,000 2,376 30/06/06
Boiler $12,500 1,808 NULL
Chiller $14,000 260 30/06/09
Lighting $2,000 49 NULL
Industrial Equipment $13,440 25 143 1/10/06
HVAC $11,700 21 59 NULL
HVAC $2,920 8 NULL
Maintenance $2,460 61 23 1/07/06
Maintenance $3,000 140 1/07/06
Air compressor $1,599,190 1,175 NULL
Industrial Equipment $100,000 3,000 NULL
Lighting $3,000 110 NULL
Industrial Equipment $0 1,360 NULL
Boiler $0 1,898 1/10/06
Mixed $4,800 0 0 NULL
Boiler $98,000 0 1/01/08
Waste heat recovery $90,000 9,785 NULL
Industrial Equipment $17,000 0 NULL
Industrial Equipment $21,000 1 NULL
Air compressor $9,500 0 NULL
Behaviour/Education $23,000 0 NULL
Lighting $49,500 59 NULL
HVAC $12,000 0 NULL
Mixed $138,700 0 NULL
HVAC $10,000 0 NULL
Boiler $9,000 3 NULL
Lighting $1,600 5 NULL
Air compressor $300,000 155 NULL
Industrial Equipment $20,000 108 NULL
Industrial Equipment $20,000 7,490 NULL
Industrial Equipment $5,000 1,000 1/11/08
Industrial Equipment $100,000 22,500 1/10/05
Industrial Equipment $30,000 165 NULL
Other $1 2,136 1/03/06
Other $2,000 49 NULL
Industrial Equipment $5,000 680 1/12/06
Industrial Equipment $5,000 170 1/02/10
Chiller $1 207 NULL
Air compressor $1,000 24 NULL
Insulation $10,880 380 NULL
Industrial Equipment $652,625 1,358 NULL
Hot Water System $850 1 8/11/06
Lighting $9,070 13 8/11/06
Lighting $3,272 6 8/11/06
Lighting $340 1 NULL
Lighting $270 6 8/11/06
Lighting $1,242 2 NULL
Lighting $10,108 11 NULL
HVAC $8,500 53 NULL
Industrial Equipment $0 275 NULL
Ventilation $0 703 NULL
Industrial Equipment $0 275 NULL
Alternative power generation $30,000,000 43,800 NULL
Industrial Equipment $0 1,680 NULL
Industrial Equipment $4,000 66 NULL
Maintenance $2,000 71 NULL
Industrial Equipment $10,000 208 NULL
Power Factor Correction $0 2,226 NULL
Other $2,000 174 NULL
Lighting $1,608 4 NULL
Hot Water System $0 4 NULL
HVAC $3,200 5 NULL
Lighting $1,608 7 NULL
other $5,800 351 NULL
HVAC $1,643 22 NULL
Lighting $1,779 44 NULL
Industrial Equipment $4,000 500 NULL
Air compressor $5,000 44 NULL
Air compressor $200 3 NULL
Air compressor $1,200 8 NULL
Lighting $0 17 NULL
HVAC $30,000 93 NULL
other $10,000 1,000 1/01/07
Industrial Equipment $0 133 1/01/07
Industrial Equipment $0 77 1/01/07
Cogeneration $30,000 14 NULL
Air compressor $0 10 NULL
other $24,000 164 1/01/07
Industrial Equipment $12,000 0 NULL
Industrial Equipment $15,000 490 1/01/07
Industrial Equipment $55,000 375 1/01/07
Other $100,000 2,220 NULL
Lighting $300,000 588 NULL
Alternative power generation $3,550,000 8,000 NULL
Other $200,000 526 NULL
Air compressor $50,000 0 NULL
Alternative power generation $10,505,575 14,100 NULL
Other $170,000 468 1/07/07
Air compressor $64,000 846 1/01/07
Power Factor Correction $395,000 11 1/07/07
Behaviour/Education $110,000 0 0 NULL
HVAC $120,000 50 29/06/09
HVAC $160,000 30 23/11/09
HVAC $1,000 10 23/11/09
Boiler $200,000 0 1/01/07
Mixed $13,643 29 19/07/05
Pool Covers/Heating $73,645 176 NULL
HVAC $83,700 0 NULL
Other $85,883 0 NULL
Chiller $580,000 237 NULL
HVAC $250,000 0 NULL
Air compressor $20,000 0 NULL
Lighting $12,720 127 1/04/08
Other $25,000 0 NULL
HVAC $10,000 100 NULL
Behaviour/Education $100,000 1 1/07/08
HVAC $30,954 70 1/07/08
HVAC $87,000 263 1/07/08
Lighting $19,440 44 1/07/08
HVAC $0 0 NULL
Building Management Systems $20,000 179 NULL
Power Factor Correction $21,000 -44 NULL
Lighting $17,500 29 NULL
Hot Water System $19,000 1,691 NULL
Lighting $2,541 16 NULL
Lighting $1,117 1 NULL
Lighting $919 1 NULL
Lighting $1,500 4 NULL
Lighting $70,000 99 NULL
Lighting $1,309 1 NULL
Lighting $1,315 2 NULL
Lighting $20,988 52 NULL
Lighting $4,422 5 NULL
Lighting $2,948 3 NULL
Lighting $1,623 3 NULL
HVAC $5,600 1 1/04/06
Lighting $2,500 20 1/07/07
Power Factor Correction $20,000 598 1/07/07
Refrigeration $127,680 966 1/07/07
Air compressor $500 44 1/07/07
Refrigeration $1,000 163 1/06/07
Industrial Equipment $19,000 38 NULL
Air compressor $180,000 230 1/09/06
HVAC $2,500,000 230 NULL
HVAC $0 12 NULL
HVAC $3,600 51 NULL
Lighting $500 3 NULL
HVAC $1,600 7 NULL
Other $206,000 1 NULL
Behaviour/Education $0 7 NULL
Industrial Equipment $1,360 59 NULL
Hot Water System $0 2 NULL
Industrial Equipment $3,500 29 NULL
HVAC $4,800 38 NULL
Industrial Equipment $3,000 107 NULL
Industrial Equipment $0 426 NULL
Hot Water System $0 24 NULL
Industrial Equipment $4,000 32 NULL
Industrial Equipment $3,000 22 NULL
Industrial Equipment $4,000 11 NULL
Other $500 6 NULL
Lighting $17,000 133 10/11/08
Behaviour/Education $0 1 NULL
Building Management Systems $0 20 NULL
HVAC $2,400 17 NULL
HVAC $4,800 13 NULL
HVAC $66,513 179 NULL
Lighting $17,400 36 NULL
HVAC $4,800 8 NULL
other $700 1 NULL
Lighting $163,324 330 NULL
HVAC $49,529 496 NULL
Air compressor $20,000 75 NULL
Power Factor Correction $67,500 1 NULL
Power Factor Correction $17,000 1 NULL
Lighting $10,000 5,000 NULL
Industrial Equipment $18,000 1,000 NULL
Building Management Systems $16,000 8 NULL
Industrial Equipment $45,000 284 NULL
Waste heat recovery $30,000 780 NULL
Other $212,000 13,531 1/09/08
Industrial Equipment $15,000 42 NULL
Power Factor Correction $30,000 0 NULL
Industrial Equipment $15,000 56 NULL
Boiler $15,000 743 NULL
Other $4,000,000 0 38,280 NULL
Hot Water System $15,000 26 NULL
Waste heat recovery $180,000 8,640 NULL
Insulation $30,000 1,220 NULL
Other $50,000 1,420 NULL
Air compressor $10,000 100 1/01/07
Air compressor $13,500 285 1/01/07
Lighting $41,000 10 1/07/06
Other $0 52 1/11/06
Lighting $14,100 246 1/03/09
Pool Covers/Heating $37,200 1,584 1/07/08
Lighting $3,198 4 1/07/07
Lighting $47,877 39 1/07/08
Hot Water System $2,850 3 1/07/07
Lighting $4,823 9 1/07/07
Lighting $1,433,000 381 1/07/07
Lighting $180 3 NULL
Lighting $9,500 411 15/06/10
HVAC $75,958 594 NULL
Lighting $28,800 11 1/01/08
Lighting $139,440 585 1/01/08
Lighting $29,700 109 1/07/08
Computers & Printers $12,000 24 1/01/08
Lighting $104,000 520 31/12/06
Maintenance $100,000 7,024 NULL
Other $24,000 2,375 NULL
Other $16,000 7,300 NULL
Lighting $12,735 21 31/03/08
Lighting $84,430 117 31/03/08
Lighting $44,970 50 31/03/08
Lighting $24,285 36 31/03/08
Lighting $19,090 19 31/03/08
Lighting $11,580 21 31/03/08
Lighting $13,245 19 31/03/08
HVAC $197,955 440 31/03/08
HVAC $32,100 54 31/03/08
Hot Water System $8,430 9 31/03/08
Lighting $355 1 1/01/10
Lighting $308 1 1/01/10
Hot Water System $70 1 1/06/10
Lighting $1,992 1 1/01/10
Lighting $5,000 4 1/01/10
Lighting $635 1 1/01/10
Lighting $355 1 1/01/10
Lighting $6,587 26 1/01/10
Lighting $1,450 1 1/01/10
Lighting $335 0 1/01/10
Hot Water System $70 0 1/01/10
Hot Water System $70 0 1/01/10
Lighting $355 0 1/01/10
Lighting $2,195 2 1/01/10
Lighting $355 1 1/01/10
HVAC $455 2 1/01/10
Hot Water System $70 1 1/01/10
Lighting $1,520 1 1/01/10
Other $355 1 1/01/10
Boiler $0 139 NULL
Air compressor $200 20 NULL
Maintenance $2,300 1,176 NULL
Refrigeration $30,000 263 NULL
HVAC $0 26 NULL
Power Factor Correction $12,000 1 NULL
Lighting $9,000 2 NULL
HVAC $0 3 NULL
Lighting $12,500 181 30/06/07
Industrial Equipment $200,000 176 NULL
Lighting $3,612,000 513 NULL
Lighting $450,720 83 NULL
PV $510,460 106 NULL
Behaviour/Education $0 0 1/01/09
Sub-metering $10,000 22 NULL
Lighting $145,000 96 NULL
Sub-metering $6,000 0 1/01/09
Sub-metering $1,500 22 NULL
Mixed $2,500 22 NULL
Pool Covers/Heating $1,500 246 NULL
HVAC $1,500 33 NULL
Lighting $500 9 NULL
Hot Water System $200 2 NULL
Lighting $1,450 6 NULL
Lighting $0 0 1/10/09
Lighting $6,960 9 NULL
Lighting $23,925 25 NULL
Lighting $22,910 19 NULL
Lighting $6,210 4 NULL
Lighting $2,240 1 NULL
Hot Water System $250 2 NULL
Lighting $500 2 NULL
Industrial Equipment $5,735,100 500 1/07/04
Other $50,900 165 1/07/04
HVAC $390,000 116 1/11/06
Monitoring $66,636 0 1/09/06
Chiller $176,000 70 NULL
HVAC $6,000 3 NULL
Industrial Equipment $80,000 200 NULL
Lighting $7,000 60 NULL
Behaviour/Education $35,000 2,000 1/07/07
HVAC $49,500 215 NULL
Hot Water System $80 29 NULL
other $300 39 NULL
other $33,000 114 NULL
Hot Water System $18,000 46 NULL
HVAC $16,000 39 NULL
HVAC $4,000 8 NULL
Ventilation $2,500 4 NULL
Industrial Equipment $15,000 8 NULL
Mixed $600 6 NULL
Industrial Equipment $98,000 478 NULL
Air compressor $180,000 1,135 NULL
Air compressor $10,000 70 NULL
Air compressor $5,520 64 1/03/09
Cogeneration $331,000 194 NULL
Cogeneration $1,135,000 -3,064 NULL
Other $15,500 27 1/04/07
Other $1,500 105 NULL
Lighting $8,050 23 1/01/07
HVAC $5,000 8 1/10/06
HVAC $39,000 79 1/01/07
Industrial Equipment $10,000 262 NULL
Air compressor $4,950 111 NULL
Cogeneration $0 33 NULL
Lighting $1,000 487 NULL
Other $51,000 0 NULL
Pool Covers/Heating $90 50 250 NULL
Hot Water System $90,000 239 NULL
Power Factor Correction $14,000 53 NULL
Industrial Equipment $10,000 33 NULL
Lighting $1,000 0 NULL
Lighting $100 2 NULL
Other $200 6 NULL
Power Factor Correction $14,000 0 NULL
HVAC $0 2 NULL
other $0 0 NULL
HVAC $350,000 0 NULL
Other $3,000 18 NULL
Power Factor Correction $0 0 NULL
Industrial Equipment $15,000 0 NULL
other $0 0 NULL
Industrial Equipment $0 0 NULL
Industrial Equipment $10,000 26 NULL
Insulation $7,000 0 NULL
Hot Water System $2,500 3 NULL
Lighting $25,000 46 NULL
other $100 1 NULL
Lighting $35,806 61 NULL
Lighting $12,500 188 NULL
Industrial Equipment $1 194 7/01/07
Industrial Equipment $8,000 55 7/05/07
Air compressor $311,096 601 8/02/07
Air compressor $2,500 207 7/10/07
Lighting $500 21 NULL
Air compressor $15,000 100 NULL
Other $0 143 NULL
Industrial Equipment $0 0 NULL
Industrial Equipment $0 30 NULL
Industrial Equipment $80,000 555 NULL
Computers & Printers $0 205 NULL
Lighting $0 200 NULL
HVAC $0 300 NULL
other $0 293 NULL
HVAC $600 6 1/01/07
Lighting $10,000 421 1/07/06
HVAC $1,000 3 1/01/08
Lighting $5,000 0 1/07/06
Industrial Equipment $25,500,000 9,010 1/05/07
Other $150,000 1,550 NULL
Air compressor $10,000 2,200 1/02/07
HVAC $0 25 30/04/07
other $0 27 1/06/07
other $0 3 1/06/07
Ventilation $7,560 14 1/01/08
Lighting $10,235 39 1/01/08
Lighting $1,130 3 1/01/08
Other $33,750 28 NULL
Industrial Equipment $5,830 9 NULL
Other $9,225 31 NULL
other $2,280 57 1/06/07
Lighting $160 7 1/06/07
Building Management Systems $35,000 204 1/07/07
Lighting $194,400 887 1/12/06
Hot Water System $2,000 23 1/07/07
Insulation $10,800 26 1/10/07
Other $4,025 20 1/01/08
HVAC $35,000 157 12/03/07
Lighting $3,945 21 1/01/08
Lighting $785 0 1/01/08
Lighting $36,860 34 NULL
Lighting $70,000 28 NULL
Industrial Equipment $260,000 34,000 1/06/05
Industrial Equipment $140,000 500 1/12/06
Industrial Equipment $3,000 1,744 1/04/08
Industrial Equipment $15,000 77 NULL
Lighting $12,500 300 1/01/07
Lighting $219,079 113 1/01/07
Building Management Systems $6,000 13 1/01/07
Lighting $5,500 16 1/01/07
Lighting $3,000 10 1/01/07
Lighting $7,500 0 1/01/07
Building Management Systems $9,800 0 1/01/07
Sub-metering $50,000 146 1/01/07
HVAC $500,000 1,499 1/01/07
HVAC $0 0 1/01/07
Chiller $153,574 490 1/01/07
HVAC $30,000 0 1/01/07
Chiller $5,000 0 1/01/07
Boiler $5,000 0 1/01/07
HVAC $1,500 20 1/01/07
HVAC $2,500 0 1/01/07
HVAC $7,500 45 1/01/07
Building Management Systems $5,000 0 1/01/07
Lighting $30,000 36 1/01/07
Lighting $10,500 15 1/01/07
Air compressor $6,365 126 NULL
Industrial Equipment $78,144 133 NULL
Industrial Equipment $2,600 28 NULL
Air compressor $1,500 10 NULL
Air compressor $35,700 333 NULL
Boiler $2,357 6 1/02/07
Boiler $2,357 6 NULL
Cogeneration $250,000 6,111 NULL
Maintenance $10,000 502 NULL
Power Factor Correction $120,890 300 NULL
Air compressor $15,000 163 NULL
Industrial Equipment $342,280 8,644 NULL
Industrial Equipment $88,700 230 NULL
Lighting $109,620 219 1/12/06
Industrial Equipment $87,724 181 NULL
Lighting $7,513 8 1/01/07
Lighting $2,817 5 1/01/07
Lighting $2,817 2 1/01/07
Lighting $7,513 7 1/01/07
Lighting $1,565 2 1/07/07
Lighting $1,187 1 1/07/07
Lighting $920 3 1/01/07
Lighting $4,070 9 1/01/07
Lighting $250 1 1/01/07
Lighting $920 3 1/01/07
Lighting $250 1 1/01/07
Hot Water System $500 6 1/01/07
Lighting $30,000 300 NULL
Lighting $3,086 3 1/01/07
Lighting $2,974 3 1/01/07
Lighting $831 1 1/01/07
Lighting $1,096 1 1/01/07
Lighting $4,696 3 1/01/07
Lighting $920 0 10/01/07
Lighting $1,096 0 1/01/07
Lighting $1,409 2 1/01/07
Lighting $939 1 1/01/07
Lighting $313 1 1/01/07
Industrial Equipment $170,000 0 NULL
Maintenance $50,000 5,126 1/09/07
Behaviour/Education $500,000 9,604 1/09/07
Boiler $750,000 29,903 1/07/07
Other $20,000 10,412 1/01/12
Other $50,000 7,971 1/01/12
Industrial Equipment $50,000 4,802 1/06/11
Other $25,000 1,993 1/01/12
Industrial Equipment $10,000 1,041 1/01/11
Industrial Equipment $10,000 1,921 1/01/11
Computers & Printers $400,000 3,064 1/01/09
Chiller $1,400,000 109 1/01/10
Other $304,500 36 1/04/09
HVAC $62,945 982 NULL
HVAC $30,761 151 NULL
HVAC $23,622 1,134 NULL
HVAC $14,227 423 NULL
HVAC $1,798 8 NULL
HVAC $53 237 NULL
Lighting $22,017 117 NULL
Computers & Printers $244 581 NULL
Other $0 8,906 NULL
Other $0 823 NULL
Industrial Equipment $0 104 NULL
Industrial Equipment $20,000 440 NULL
Air compressor $30,500 0 NULL
Power Factor Correction $52,200 790 NULL
Air compressor $25,000 205 NULL
Waste heat recovery $139,920 3,760 NULL
Industrial Equipment $0 84 NULL
Other $10,000 1,977 11,760 NULL
Other $19,200 594 NULL
Air compressor $10,000 307 NULL
Industrial Equipment $20,000 201 NULL
Ventilation $25,000 333 NULL
Other $234,000 1,068 NULL
Air compressor $160,600 2,053 10/07/06
Lighting $0 51 NULL
Lighting $18,000 77 10/08/08
Lighting $18,277 5 NULL
Lighting $15,000 358 NULL
Hot Water System $0 11 NULL
Maintenance $5,000 1,926 NULL
Maintenance $500 103 NULL
Waste heat recovery $11,000 3,600 14/09/07
Refrigeration $50 1 NULL
Lighting $1,500 18 NULL
Behaviour/Education $0 51 NULL
Other $10,000 31 NULL
Lighting $18,277 42 NULL
HVAC $0 684 NULL
HVAC $45,000 225 NULL
Lighting $0 15 NULL
Lighting $2,000 43 NULL
Hot Water System $2,000 588 NULL
Lighting $18,260 42 NULL
Lighting $18,260 42 NULL
Lighting $10,956 15 NULL
Lighting $18,260 42 NULL
Refrigeration $75,000 175 NULL
Lighting $38,525 81 10/12/09
Lighting $30,295 14 NULL
Lighting $30,295 44 NULL
Lighting $30,295 58 NULL
Chiller $2,100,000 1,480 NULL
Lighting $48,000 200 NULL
Lighting $34,499 93 NULL
Lighting $10,000 116 1/07/08
Behaviour/Education $0 51 NULL
Power Factor Correction $120,000 125 10/08/09
Lighting $135,000 197 NULL
HVAC $260,000 150 NULL
Lighting $95,755 250 20/09/08
Lighting $56,000 53 NULL
Lighting $10,810 23 20/10/09
Lighting $34,499 92 NULL
Lighting $34,499 48 NULL
Other $83,500 264 1/04/07
Lighting $5,400 28 30/10/06
Other $84,500 320 1/03/07
Industrial Equipment $2,600,000 5,000 1/06/05
Air compressor $6,000 27 NULL
Power Factor Correction $18,630 1 NULL
Industrial Equipment $5,000 661 NULL
Other $12,000 660 NULL
Air compressor $80,000 344 NULL
Industrial Equipment $2,000 140 NULL
Waste heat recovery $128,000 4,029 NULL
Boiler $34,500 1,995 NULL
Other $547,684 749 NULL
Industrial Equipment $17,269 245 NULL
Other $20,000 13 NULL
Industrial Equipment $72,352 49 NULL
Boiler $5,000 122 NULL
Industrial Equipment $10,000 1 NULL
Waste heat recovery $115,200 1,995 NULL
Industrial Equipment $60,000 161 NULL
Power Factor Correction $46,000 1 NULL
Industrial Equipment $15,000 18 NULL
Lighting $30,000 20 NULL
Lighting $7,000 22 NULL
Industrial Equipment $575,000 763 NULL
Industrial Equipment $6,500 17,000 NULL
Air compressor $3,450 13 NULL
Boiler $195,000 2,624 NULL
Boiler $8,800 0 184 15/05/08
Industrial Equipment $1,300,000 45,000 1/05/08
Industrial Equipment $160,000 250 NULL
Air compressor $3,000 26 NULL
Industrial Equipment $2,000 4 NULL
Industrial Equipment $90,000 159 NULL
Air compressor $258,421 0 1/01/07
Refrigeration $180,000 2,130 1/01/10
Lighting $1,227,243 0 1/01/07
Industrial Equipment $220,000 743 NULL
Industrial Equipment $77,000 153 NULL
Industrial Equipment $79,000 181 NULL
Industrial Equipment $79,000 165 NULL
Industrial Equipment $0 10 NULL
Industrial Equipment $660,000 2,228 31/10/08
Industrial Equipment $660,000 2,228 1/01/08
HVAC $5,670 9 NULL
Lighting $425 1 NULL
Air compressor $342,270 914 NULL
Lighting $1,175 3 NULL
Lighting $9,045 30 NULL
Lighting $28,770 106 NULL
Other $1,500,000 134 NULL
Other $1,500,000 1 NULL
Other $4,500,000 0 NULL
Industrial Equipment $140,000 563 NULL
Air compressor $74,000 670 NULL
HVAC $1,450 8 20/08/07
Lighting $28,400 174 20/08/07
Lighting $2,000 27 1/07/07
Industrial Equipment $24,000 446 1/07/07
Industrial Equipment $2,000 10,277 20/08/07
Air compressor $3,600 105 20/08/07
Ventilation $2,500 8 20/08/07
HVAC $14,640 118 20/08/07
Other $360 2 NULL
Other $3,000 80 NULL
Air compressor $1,500 14 NULL
Industrial Equipment $600 11 NULL
Industrial Equipment $50,000 0 NULL
Industrial Equipment $600 26 NULL
Other $0 81 NULL
Industrial Equipment $25,000 861 NULL
Air compressor $150 1 NULL
Air compressor $58,000 527 NULL
Air compressor $58,000 527 NULL
Industrial Equipment $35,000 477 NULL
Lighting $4,000 12 NULL
Lighting $106 1 NULL
Lighting $212 5 NULL
Lighting $412 0 NULL
Lighting $500 1 NULL
Lighting $4,400 3 NULL
Lighting $300 0 NULL
Lighting $109 0 NULL
Lighting $1,950 3 NULL
Lighting $1,315 1 NULL
Lighting $96 0 NULL
Lighting $12 0 NULL
Industrial Equipment $10,000 0 49,221 30/09/06
Industrial Equipment $400,000 20,063 1/07/07
Lighting $180 1 NULL
Industrial Equipment $100,000 36,000 1/09/06
Lighting $48 1 NULL
Industrial Equipment $900,000 687 30/06/07
Lighting $5,000 5 1/01/07
Industrial Equipment $4,000 63 NULL
Air compressor $70,000 576 NULL
Pool Covers/Heating $0 539 NULL
Pool Covers/Heating $5,500 0 NULL
HVAC $2,954 9 NULL
HVAC $5,107 9 NULL
HVAC $0 6 NULL
HVAC $0 6 NULL
Hot Water System $294 10 NULL
Lighting $13,232 8 NULL
Power Factor Correction $8,638 0 NULL
Lighting $40,106 36 NULL
Other $14,500 18 NULL
HVAC $1,223 4 NULL
Lighting $1,250 23 NULL
Lighting $2,600 3 NULL
Other $3,849 0 NULL
Computers & Printers $0 3 NULL
Hot Water System $294 2 NULL
Lighting $12,207 14 NULL
Lighting $910 1 NULL
Lighting $840 0 NULL
HVAC $23,286 41 NULL
Lighting $129,208 41 NULL
Other $5,600 3 1/11/06
Lighting $1,600 2 1/03/07
Industrial Equipment $30,000 40 1/07/07
Lighting $8,000 3 1/01/07
Industrial Equipment $7,000 7 1/11/06
HVAC $1,100 8 NULL
Building Management Systems $1,200 3 NULL
Other $5,000 2 1/05/07
HVAC $60,000 97 NULL
Lighting $3,050 25 NULL
Lighting $2,000 8 1/11/06
Industrial Equipment $20 0 1/11/06
Lighting $4,000 2 1/11/06
Hot Water System $1,200 11 NULL
Lighting $3,170 11 NULL
Hot Water System $1,250 11 NULL
Lighting $2,200 25 NULL
Hot Water System $1,100 8 NULL
Lighting $1,800 4 NULL
Ventilation $1,500 3 NULL
HVAC $4,000 14 NULL
Hot Water System $900 3 NULL
Lighting $6,100 13 NULL
Behaviour/Education $2,000 8 NULL
Hot Water System $600 8 NULL
Behaviour/Education $500 2 NULL
Other $2,000 8 NULL
Lighting $500 0 NULL
Other $500 0 NULL
HVAC $500 3 NULL
Lighting $8,000 50 1/12/07
Lighting $12,000 35 1/12/07
Building Management Systems $10,000 50 1/01/08
Boiler $120,000 5,124 1/01/08
HVAC $15,000 735 30/06/08
Industrial Equipment $40,000 101 1/01/08
Lighting $4,500 19 1/01/08
Power Factor Correction $11,600 3 1/01/08
HVAC $15,000 98 1/10/07
Air compressor $10,300 8 1/01/08
Industrial Equipment $10,000 40 1/01/08
Sub-metering $135,000 333 1/07/08
Lighting $10,000 4 1/07/08
Lighting $0 94 1/01/08
Lighting $1 1 1/10/07
Lighting $1 1 1/10/07
Industrial Equipment $2,540 102 1/01/07
HVAC $0 198 1/01/07
HVAC $1,400 3 1/01/07
Lighting $475 1 1/01/07
HVAC $0 27 1/01/07
HVAC $2,184 10 1/01/07
Lighting $2,418 5 1/01/07
Other $4,700 0 1/07/07
Lighting $2,400 4 1/01/07
Lighting $5,250 9 1/07/07
Lighting $400 3 NULL
Industrial Equipment $0 2 NULL
Lighting $0 3 NULL
HVAC $0 12 NULL
Hot Water System $50 5 NULL
Other $0 19 NULL
Lighting $1,500 4 NULL
HVAC $1,700 21 NULL
Other $0 52 NULL
HVAC $1,000 5 NULL
HVAC $0 1 NULL
Computers & Printers $0 1 NULL
Other $2,012 2 NULL
Hot Water System $150 0 NULL
Other $1,811 3 NULL
HVAC $0 1 NULL
HVAC $1,000 5 NULL
HVAC $0 1 NULL
Hot Water System $150 1 NULL
Lighting $0 35 NULL
Industrial Equipment $500,000 267,000 1/01/02
Industrial Equipment $8,490,000 2,575 1/01/02
Lighting $750,000 876 NULL
Mixed $500,000 0 40,000 NULL
other $11,500 18 NULL
other $0 296 NULL
Lighting $0 86 NULL
Lighting $22,000 126 NULL
Computers & Printers $0 1,371 NULL
other $0 61 NULL
Other $0 168 NULL
Lighting $16,000 27 NULL
Lighting $10,000 72 NULL
Lighting $8,000 22 NULL
HVAC $38,460 171 NULL
Industrial Equipment $6,154 14 NULL
Lighting $10,062 16 NULL
Industrial Equipment $6,154 0 760 NULL
Power Factor Correction $26,249 252 NULL
Lighting $186,411 304 NULL
HVAC $3,077 11 NULL
Industrial Equipment $49,229 14 NULL
Lighting $5,875 16 NULL
Industrial Equipment $16,922 45 NULL
Pool Covers/Heating $68,918 0 2,415 NULL
HVAC $2,403 13 NULL
Power Factor Correction $157 56 NULL
Industrial Equipment $19,999 58 NULL
HVAC $12,307 65 NULL
Other $3,077 30 NULL
Lighting $18,757 42 NULL
HVAC $3,077 0 154 NULL
Pool Covers/Heating $4,615 0 381 NULL
HVAC $3,077 0 152 NULL
Pool Covers/Heating $4,615 0 377 NULL
Other $14,615 46 NULL
Other $2,308 16 NULL
Lighting $375 0 NULL
Industrial Equipment $15,000 34 NULL
Lighting $200 7 NULL
Lighting $5,000 6 NULL
Behaviour/Education $0 17 1/07/08
Chiller $46,480 30 NULL
Lighting $1,700 2 NULL
Lighting $850 1 NULL
Lighting $2,750 2 NULL
Lighting $500 0 NULL
Lighting $1,200 2 NULL
Lighting $375 1 NULL
Lighting $4,000 1 NULL
Lighting $200 1 NULL
Lighting $2,400 0 NULL
Lighting $19,000 10 NULL
Lighting $1,400 3 NULL
Lighting $100 1 NULL
Other $5,000 12 NULL
Lighting $200 2 NULL
Lighting $4,000 18 NULL
Lighting $9,000 21 NULL
Lighting $330,000 214 NULL
Lighting $30,000 52 NULL
Lighting $270,000 827 NULL
HVAC $0 14 NULL
Chiller $850,000 1,385 NULL
HVAC $77,000 363 NULL
Behaviour/Education $0 367 NULL
Pool Covers/Heating $1,000 340 1/01/09
Pool Covers/Heating $5,000 26 NULL
Lighting $4,499 6 NULL
Lighting $300 2 1/01/09
HVAC $2,000 3 NULL
Lighting $488,000 31 NULL
Lighting $1,000 7 1/01/09
Lighting $1,500 4 1/01/09
Lighting $100 6 1/01/09
Power Factor Correction $250,000 2,447 NULL
HVAC $6,760 36 NULL
Hot Water System $500 2 NULL
Boiler $1,250 6 NULL
HVAC $2,000 6 NULL
Building Management Systems $9,000 21 NULL
Lighting $2,600 3 NULL
Lighting $1,000 3 NULL
Lighting $8,050 5 NULL
Lighting $35 0 NULL
Building Management Systems $850 4 NULL
Building Management Systems $1,100 13 NULL
Hot Water System $150 2 NULL
Lighting $2,310 65 NULL
Lighting $125 3 NULL
Lighting $800 13 NULL
Boiler $1,000 8 NULL
Building Management Systems $3,900 10 NULL
Lighting $10,800 36 NULL
HVAC $2,175 6 NULL
HVAC $7,500 21 NULL
Building Management Systems $1,500 8 NULL
HVAC $10,000 41 NULL
Lighting $900 2 NULL
Lighting $1,500 3 NULL
HVAC $5,000 15 NULL
HVAC $2,700 8 NULL
Lighting $3,400 11 NULL
HVAC $850 2 NULL
HVAC $1,800 6 NULL
Building Management Systems $1,600 8 NULL
Lighting $100 0 NULL
Building Management Systems $89,000 336 NULL
HVAC $750 4 NULL
Lighting $4,500 11 NULL
HVAC $0 22 NULL
Building Management Systems $2,550 30 NULL
HVAC $2,200 9 NULL
HVAC $5,400 75 NULL
Lighting $5,100 12 NULL
Building Management Systems $700 16 NULL
Building Management Systems $400 2 NULL
HVAC $2,500 6 NULL
Lighting $3,000 10 NULL
Lighting $675 2 NULL
HVAC $2,600 8 NULL
Hot Water System $7,200 171 NULL
Industrial Equipment $0 200 1/03/07
Industrial Equipment $80,000 3,922 NULL
Pool Covers/Heating $0 62 NULL
Industrial Equipment $5,000 17 NULL
Lighting $1,400 2 NULL
Lighting $1,925 10 NULL
Hot Water System $300 1 NULL
Hot Water System $4,000 10 NULL
Hot Water System $6,000 51 NULL
Lighting $3,366,880 2,224 NULL
Lighting $1,895,080 371 NULL
Lighting $18,040 11 NULL
Lighting $409,950 482 NULL
Sub-metering $105,000 239 950 NULL
HVAC $2,100 2 7 31/07/06
HVAC $7,000 0 1/07/06
Hot Water System $250 0 NULL
HVAC $5,000 0 1/07/06
Maintenance $1,500 0 1/07/06
Lighting $1,250 4 NULL
Hot Water System $100 1 NULL
Hot Water System $250 2 NULL
Lighting $3,820 1 NULL
Lighting $2,550 3 NULL
Industrial Equipment $1,450 1 NULL
Hot Water System $350 0 1/07/06
Lighting $1,500 1 NULL
Industrial Equipment $2,000 26 NULL
Air compressor $8,000 75 NULL
Lighting $3,200 36 NULL
Lighting $15,800 93 NULL
Lighting $26,050 246 NULL
Industrial Equipment $38,000 375 NULL
other $5,000 19 NULL
Lighting $9,700 18 NULL
Industrial Equipment $8,200 13 NULL
Industrial Equipment $6,300 17 NULL
Industrial Equipment $900 4 NULL
Air compressor $255,000 276 NULL
Air compressor $10,000 60 NULL
Other $25,000 50 NULL
other $25,000 23 7/03/06
Lighting $2,000 8 7/03/06
Hot Water System $300 0 7/03/06
Sub-metering $90,000 141 NULL
Lighting $41,810 7 NULL
Sub-metering $20,600 88 NULL
Lighting $220 2 NULL
Air compressor $28,000 255 NULL
Industrial Equipment $100,000 84 NULL
Air compressor $28,100 256 NULL
HVAC $1,100 13 NULL
Lighting $675 3 NULL
Lighting $1,100 6 NULL
Completion DateStatus
31/03/07 Implemented
31/01/08 Implemented
31/07/07 Implemented
NULL Ongoing
30/03/08 Implemented
30/06/10 Implemented
NULL Ongoing
NULL Ongoing
31/12/06 Implemented
1/04/10 Ongoing
1/09/06 Implemented
29/09/06 Implemented
29/09/06 Implemented
7/07/10 Implemented
30/06/07 Implemented
31/01/06 Implemented
28/02/06 Implemented
31/03/06 Implemented
31/05/06 Implemented
NULL Ongoing
31/12/06 Implemented
NULL Ongoing
31/12/08 Implemented
NULL Implemented
NULL Ongoing
30/06/07 Implemented
31/12/06 Implemented
30/06/08 Implemented
30/06/08 Implemented
31/12/06 Implemented
NULL Implemented
30/06/07 Implemented
30/06/09 Ongoing
30/06/08 Implemented
30/06/08 Implemented
30/06/07 Implemented
NULL Implemented
31/03/08 Implemented
31/12/08 Ongoing
30/06/09 Ongoing
31/12/09 Implemented
31/01/08 Implemented
30/06/08 Implemented
30/04/06 Implemented
31/12/09 Implemented
30/09/08 Implemented
31/12/07 Ongoing
31/12/09 Implemented
1/01/10 Ongoing
31/10/06 Implemented
31/12/07 Implemented
31/12/08 Implemented
30/09/08 Implemented
31/12/08 Implemented
NULL Ongoing
1/01/08 Implemented
31/12/07 Implemented
31/12/07 Implemented
30/04/08 Implemented
31/05/09 Implemented
31/12/08 Implemented
1/01/08 Implemented
NULL Implemented
30/06/06 Implemented
31/08/06 Implemented
31/10/06 Implemented
30/06/06 Implemented
1/01/10 Implemented
31/12/08 Implemented
31/12/07 Implemented
31/12/06 Implemented
31/03/07 Implemented
31/12/10 Ongoing
31/12/07 Implemented
31/12/09 Ongoing
31/12/09 Ongoing
31/12/08 Implemented
31/12/09 Implemented
30/04/07 Implemented
31/01/08 Implemented
31/12/09 Ongoing
30/06/10 Implemented
31/12/08 Implemented
30/06/08 Implemented
24/10/07 Implemented
31/12/07 Implemented
31/12/10 Ongoing
31/12/08 Implemented
NULL Ongoing
30/06/07 Implemented
30/06/07 Implemented
30/06/07 Implemented
31/12/08 Ongoing
31/12/06 Implemented
1/09/07 Implemented
NULL Implemented
NULL Implemented
NULL Implemented
NULL Implemented
NULL Implemented
NULL Implemented
NULL Implemented
31/07/09 Ongoing
30/06/10 Implemented
NULL Ongoing
31/10/09 Implemented
21/12/10 Implemented
31/01/08 Ongoing
31/01/08 Implemented
NULL Ongoing
NULL Ongoing
NULL Ongoing
17/02/07 Implemented
1/11/06 Implemented
30/11/06 Implemented
28/02/07 Implemented
15/12/06 Implemented
NULL Implemented
15/12/06 Implemented
24/04/07 Implemented
31/12/08 Implemented
14/12/07 Implemented
31/12/08 Implemented
24/04/07 Implemented
30/11/07 Implemented
1/03/07 Implemented
31/07/07 Implemented
1/10/06 Implemented
31/12/08 Implemented
31/12/08 Implemented
24/04/07 Implemented
14/02/07 Implemented
30/01/08 Implemented
7/04/09 Implemented
7/04/09 Implemented
3/01/07 Implemented
30/01/08 Implemented
NULL Ongoing
1/03/06 Implemented
1/03/07 Implemented
NULL Ongoing
NULL Implemented
28/02/07 Implemented
NULL Implemented
NULL Ongoing
NULL Ongoing
31/07/09 Ongoing
30/06/07 Implemented
30/04/09 Implemented
30/04/09 Implemented
30/06/11 Ongoing
30/06/07 Implemented
31/12/06 Implemented
30/09/09 Implemented
1/12/07 Implemented
30/07/06 Implemented
31/08/07 Implemented
30/01/09 Implemented
30/06/08 Implemented
6/07/07 Implemented
30/06/09 Implemented
31/08/07 Implemented
29/06/07 Implemented
29/06/07 Implemented
29/06/07 Implemented
30/01/09 Implemented
29/06/07 Implemented
25/07/07 Implemented
30/12/09 Implemented
10/06/07 Implemented
30/06/08 Implemented
31/08/09 Implemented
31/10/07 Implemented
2/07/07 Implemented
2/07/07 Implemented
3/08/07 Implemented
2/07/07 Implemented
3/08/07 Implemented
30/06/09 Implemented
30/06/07 Implemented
10/08/07 Implemented
23/07/07 Implemented
2/07/07 Implemented
15/08/07 Implemented
30/01/09 Implemented
23/07/07 Implemented
3/07/07 Implemented
6/07/07 Implemented
6/07/07 Implemented
3/07/07 Implemented
6/07/07 Implemented
30/06/07 Implemented
15/06/07 Implemented
13/07/07 Implemented
6/07/07 Implemented
30/06/07 Implemented
23/07/07 Implemented
30/01/09 Implemented
27/07/07 Implemented
3/08/07 Implemented
21/09/07 Implemented
30/06/09 Implemented
30/06/07 Implemented
30/06/09 Implemented
30/06/09 Implemented
NULL Implemented
NULL Implemented
NULL Implemented
31/03/09 Implemented
31/12/10 Ongoing
31/12/10 Ongoing
31/12/09 Ongoing
31/12/08 Implemented
NULL Implemented
NULL Ongoing
NULL Ongoing
NULL Ongoing
NULL Ongoing
NULL Ongoing
NULL Ongoing
NULL Ongoing
30/06/09 Ongoing
30/06/07 Implemented
30/06/07 Implemented
30/06/07 Implemented
30/06/07 Implemented
31/07/08 Implemented
30/06/09 Ongoing
30/06/07 Implemented
30/11/08 Implemented
30/06/09 Implemented
NULL Ongoing
30/06/07 Implemented
30/06/07 Implemented
31/07/08 Implemented
NULL Ongoing
30/06/09 Ongoing
30/06/07 Implemented
30/06/07 Implemented
31/12/09 Ongoing
31/10/06 Implemented
30/06/07 Implemented
1/12/08 Implemented
1/01/08 Implemented
NULL Ongoing
NULL Ongoing
1/11/06 Implemented
31/12/09 Implemented
1/12/09 Implemented
1/01/11 Ongoing
31/12/09 Implemented
31/12/08 Implemented
31/12/08 Implemented
31/12/09 Implemented
31/12/08 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
30/12/09 Implemented
31/12/08 Implemented
1/01/09 Implemented
1/02/09 Implemented
30/11/06 Implemented
1/12/09 Implemented
31/12/08 Implemented
31/01/07 Implemented
30/06/06 Implemented
1/12/06 Ongoing
25/12/07 Implemented
1/03/10 Implemented
1/10/08 Implemented
30/03/10 Implemented
31/05/07 Implemented
31/07/10 Ongoing
30/06/07 Implemented
30/06/07 Implemented
30/06/07 Implemented
30/06/07 Implemented
30/06/07 Implemented
30/06/07 Implemented
30/06/07 Implemented
30/06/07 Implemented
31/03/07 Implemented
31/07/09 Ongoing
31/12/07 Ongoing
28/02/07 Implemented
30/06/07 Implemented
31/10/07 Implemented
31/12/06 Implemented
31/07/07 Implemented
31/08/08 Implemented
31/12/07 Implemented
30/09/07 Implemented
30/09/07 Implemented
28/02/07 Implemented
30/09/07 Implemented
31/10/07 Implemented
30/11/08 Implemented
30/09/07 Implemented
NULL Implemented
30/03/08 Implemented
NULL Implemented
NULL Implemented
NULL Implemented
NULL Implemented
30/06/07 Implemented
30/06/07 Implemented
30/06/07 Implemented
1/05/10 Implemented
NULL Implemented
1/05/09 Implemented
31/07/07 Implemented
1/12/09 Implemented
31/07/07 Implemented
1/11/07 Implemented
31/12/11 Ongoing
1/02/10 Implemented
1/11/09 Implemented
31/07/09 Implemented
19/05/11 Implemented
31/12/07 Implemented
31/12/07 Implemented
1/04/10 Implemented
NULL Ongoing
15/07/09 Implemented
7/12/09 Implemented
7/12/09 Implemented
NULL Ongoing
30/09/05 Implemented
31/07/08 Implemented
30/06/09 Ongoing
30/06/09 Implemented
30/01/08 Implemented
30/06/11 Ongoing
30/06/09 Implemented
7/04/08 Implemented
31/01/08 Implemented
31/05/08 Implemented
30/11/08 Implemented
30/03/09 Implemented
30/10/09 Implemented
30/03/09 Implemented
30/06/07 Implemented
21/04/06 Implemented
18/09/07 Implemented
17/07/10 Implemented
26/11/07 Implemented
31/12/10 Ongoing
31/12/11 Ongoing
31/12/11 Ongoing
30/06/08 Implemented
1/08/09 Ongoing
31/12/09 Ongoing
31/12/09 Ongoing
30/06/10 Ongoing
30/06/11 Ongoing
30/06/11 Ongoing
31/12/11 Ongoing
30/06/08 Implemented
30/09/07 Implemented
30/04/09 Implemented
30/06/08 Implemented
31/12/07 Implemented
30/06/08 Implemented
30/11/08 Implemented
30/06/07 Implemented
30/06/10 Implemented
30/06/10 Implemented
30/06/10 Implemented
31/12/09 Implemented
30/06/10 Implemented
30/06/08 Implemented
31/12/09 Implemented
30/06/09 Implemented
30/06/09 Implemented
14/09/10 Implemented
14/09/10 Implemented
30/06/10 Implemented
30/06/09 Implemented
30/06/09 Implemented
30/06/10 Implemented
30/06/10 Implemented
30/06/10 Implemented
30/06/09 Implemented
30/06/10 Implemented
30/06/10 Implemented
30/06/10 Implemented
30/06/10 Implemented
30/06/10 Implemented
30/06/10 Implemented
30/06/09 Implemented
30/06/10 Implemented
30/06/10 Implemented
1/07/09 Implemented
30/06/09 Implemented
1/02/11 Implemented
1/12/10 Implemented
1/06/09 Implemented
1/03/10 Implemented
1/01/10 Implemented
NULL Implemented
NULL Implemented
NULL Ongoing
31/05/09 Implemented
NULL Ongoing
NULL Ongoing
NULL Ongoing
NULL Ongoing
NULL Ongoing
NULL Ongoing
1/05/11 Implemented
NULL Ongoing
NULL Implemented
30/06/07 Implemented
30/06/07 Implemented
NULL Ongoing
1/01/07 Implemented
30/06/11 Implemented
20/02/10 Implemented
30/06/11 Implemented
30/06/11 Implemented
30/06/08 Implemented
14/05/10 Implemented
31/12/09 Ongoing
NULL Implemented
24/09/10 Implemented
NULL Implemented
NULL Ongoing
NULL Ongoing
NULL Ongoing
1/09/09 Implemented
31/01/07 Implemented
30/06/09 Implemented
30/06/08 Implemented
30/06/08 Implemented
31/03/09 Implemented
31/03/09 Implemented
31/03/09 Implemented
31/03/09 Implemented
31/07/09 Implemented
31/03/09 Implemented
31/03/09 Implemented
31/03/09 Implemented
31/07/09 Implemented
31/03/09 Implemented
31/12/10 Implemented
31/12/10 Implemented
31/12/10 Implemented
31/12/10 Implemented
31/12/10 Implemented
31/12/10 Implemented
31/12/10 Implemented
31/12/10 Implemented
31/12/10 Implemented
31/12/10 Implemented
31/12/10 Implemented
31/12/10 Implemented
31/12/10 Implemented
31/12/10 Implemented
31/12/10 Implemented
31/12/10 Implemented
31/12/10 Implemented
31/12/10 Implemented
31/12/10 Implemented
31/01/08 Implemented
31/08/07 Ongoing
NULL Ongoing
NULL Implemented
31/12/07 Implemented
31/12/09 Implemented
30/06/08 Implemented
31/12/07 Implemented
31/05/08 Implemented
NULL Ongoing
NULL Ongoing
NULL Ongoing
31/12/10 Implemented
NULL Ongoing
30/06/12 Ongoing
30/06/11 Implemented
30/06/09 Implemented
30/06/12 Ongoing
30/06/12 Ongoing
30/06/10 Implemented
30/06/12 Ongoing
30/06/10 Implemented
30/06/10 Implemented
30/12/11 Implemented
12/11/09 Implemented
30/12/11 Implemented
30/12/11 Implemented
30/12/11 Implemented
30/12/11 Implemented
30/12/11 Implemented
30/06/10 Implemented
30/06/10 Implemented
30/06/08 Implemented
30/06/08 Implemented
30/06/07 Implemented
1/04/09 Implemented
30/09/06 Implemented
31/05/06 Implemented
30/09/08 Implemented
30/09/07 Implemented
NULL Ongoing
28/02/08 Implemented
31/03/07 Implemented
31/03/07 Implemented
NULL Implemented
30/11/08 Implemented
30/06/09 Implemented
30/11/08 Implemented
31/03/09 Implemented
30/06/09 Implemented
31/12/08 Implemented
31/12/08 Implemented
31/12/08 Implemented
31/12/08 Implemented
1/03/09 Implemented
NULL Ongoing
NULL Ongoing
30/04/07 Implemented
NULL Implemented
1/06/07 Implemented
31/12/06 Implemented
1/07/07 Implemented
31/12/07 Implemented
31/03/08 Ongoing
1/07/09 Implemented
1/07/09 Implemented
31/12/08 Implemented
31/12/08 Implemented
31/12/12 Ongoing
1/07/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/08 Implemented
30/06/10 Implemented
31/12/09 Implemented
31/12/08 Implemented
30/06/10 Ongoing
NULL Ongoing
1/07/09 Implemented
31/12/08 Implemented
NULL Ongoing
NULL Ongoing
NULL Ongoing
1/07/09 Implemented
30/06/10 Implemented
31/12/09 Implemented
NULL Ongoing
30/06/10 Implemented
NULL Ongoing
30/08/09 Implemented
7/02/07 Implemented
7/10/07 Implemented
31/12/08 Implemented
8/10/07 Implemented
NULL Implemented
31/03/08 Ongoing
NULL Implemented
NULL Ongoing
NULL Ongoing
NULL Implemented
1/06/06 Implemented
NULL Ongoing
NULL Ongoing
31/12/07 Implemented
1/11/08 Implemented
31/12/06 Implemented
1/11/08 Implemented
31/12/06 Implemented
1/10/07 Implemented
NULL Implemented
31/12/07 Ongoing
7/09/07 Ongoing
1/10/07 Implemented
1/06/08 Implemented
20/06/09 Implemented
20/06/09 Implemented
20/06/09 Implemented
NULL Implemented
NULL Implemented
NULL Implemented
1/06/08 Implemented
1/06/08 Implemented
1/06/08 Ongoing
1/12/10 Ongoing
1/01/08 Implemented
1/10/08 Implemented
1/06/09 Implemented
22/02/08 Implemented
30/06/09 Ongoing
1/01/08 Implemented
13/08/08 Implemented
1/08/09 Ongoing
1/06/08 Implemented
1/03/09 Implemented
1/07/08 Implemented
13/01/07 Implemented
1/11/07 Ongoing
30/04/09 Implemented
1/12/11 Ongoing
1/12/11 Ongoing
30/07/10 Implemented
1/12/09 Implemented
1/12/09 Implemented
1/12/11 Ongoing
1/03/10 Implemented
1/12/09 Implemented
30/04/09 Implemented
1/12/09 Implemented
1/12/09 Implemented
1/12/09 Implemented
1/12/11 Ongoing
1/12/09 Implemented
1/12/11 Ongoing
1/12/09 Implemented
1/12/11 Ongoing
1/11/08 Implemented
1/08/10 Ongoing
NULL Ongoing
31/07/08 Implemented
1/05/07 Implemented
28/02/07 Implemented
31/07/07 Implemented
31/07/07 Implemented
2/03/08 Implemented
1/12/09 Implemented
1/06/09 Implemented
31/01/08 Implemented
NULL Ongoing
NULL Ongoing
30/06/07 Implemented
NULL Ongoing
26/11/07 Implemented
5/02/08 Implemented
5/02/08 Implemented
26/11/07 Implemented
23/11/07 Implemented
5/02/08 Implemented
12/02/08 Implemented
5/02/08 Implemented
10/12/07 Implemented
12/08/08 Implemented
10/12/07 Implemented
30/06/08 Implemented
1/08/07 Implemented
10/12/07 Implemented
10/12/07 Implemented
10/12/07 Implemented
10/12/07 Implemented
10/12/07 Implemented
12/02/08 Implemented
10/12/07 Implemented
26/11/07 Implemented
5/02/08 Implemented
30/06/08 Implemented
1/08/07 Implemented
1/01/08 Implemented
1/01/10 Implemented
1/01/08 Implemented
NULL Ongoing
NULL Ongoing
NULL Ongoing
30/08/12 Implemented
NULL Ongoing
1/04/11 Implemented
1/12/11 Ongoing
30/08/10 Implemented
5/01/10 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/10 Implemented
31/12/08 Implemented
31/12/10 Implemented
31/03/07 Implemented
31/03/07 Implemented
1/01/08 Implemented
1/05/08 Implemented
1/06/09 Implemented
1/07/07 Implemented
30/06/07 Implemented
30/11/06 Implemented
30/04/07 Implemented
31/12/07 Implemented
30/08/07 Implemented
30/06/07 Implemented
30/06/08 Implemented
30/06/08 Implemented
31/01/08 Implemented
10/01/07 Implemented
30/11/07 Implemented
26/06/09 Implemented
31/03/07 Implemented
15/02/08 Implemented
15/02/07 Implemented
1/11/07 Implemented
1/07/07 Implemented
NULL Implemented
31/10/07 Implemented
31/01/08 Implemented
18/06/07 Implemented
31/01/08 Implemented
31/03/07 Implemented
6/08/08 Implemented
31/05/07 Implemented
30/06/07 Implemented
31/07/07 Implemented
31/12/07 Implemented
31/05/07 Implemented
31/05/07 Implemented
31/05/07 Implemented
31/05/07 Implemented
31/01/08 Implemented
30/04/10 Implemented
31/03/07 Implemented
31/03/07 Implemented
31/03/07 Implemented
31/12/08 Implemented
15/11/08 Implemented
31/03/07 Implemented
30/06/09 Implemented
20/06/08 Implemented
20/05/10 Implemented
2/11/08 Implemented
20/02/11 Implemented
20/12/09 Implemented
28/06/08 Implemented
30/01/10 Implemented
31/03/07 Implemented
31/03/07 Implemented
15/05/07 Implemented
5/12/06 Implemented
15/08/07 Implemented
31/05/08 Implemented
1/12/08 Implemented
1/12/10 Implemented
1/12/07 Implemented
1/12/07 Implemented
1/12/11 Ongoing
1/12/08 Implemented
1/12/06 Implemented
1/12/08 Implemented
31/05/07 Implemented
31/05/07 Implemented
1/12/08 Implemented
1/12/11 Ongoing
1/12/10 Implemented
1/07/07 Implemented
31/05/07 Implemented
1/12/10 Implemented
1/12/11 Ongoing
1/07/09 Implemented
1/12/10 Ongoing
1/12/11 Ongoing
1/12/11 Ongoing
1/12/07 Implemented
1/12/08 Implemented
1/06/07 Implemented
1/06/08 Implemented
31/05/08 Implemented
30/06/06 Implemented
31/12/08 Ongoing
30/06/07 Implemented
31/12/09 Implemented
1/03/07 Implemented
31/08/10 Implemented
30/06/07 Implemented
30/11/07 Implemented
31/03/08 Implemented
30/09/07 Implemented
31/01/08 Implemented
NULL Ongoing
28/02/09 Implemented
30/11/08 Implemented
NULL Implemented
NULL Implemented
NULL Implemented
NULL Ongoing
NULL Ongoing
NULL Ongoing
30/06/09 Implemented
31/07/10 Implemented
31/12/08 Implemented
31/12/07 Implemented
31/12/08 Implemented
1/06/09 Implemented
29/02/08 Implemented
26/05/08 Implemented
20/05/08 Implemented
10/01/08 Implemented
31/12/07 Implemented
31/12/07 Implemented
31/10/07 Implemented
31/07/07 Implemented
31/07/07 Implemented
NULL Ongoing
31/07/07 Implemented
30/09/07 Implemented
31/03/06 Implemented
30/06/07 Ongoing
31/07/10 Implemented
31/07/08 Implemented
1/03/10 Implemented
NULL Ongoing
1/06/09 Implemented
30/06/08 Implemented
30/06/10 Implemented
30/06/10 Implemented
30/06/10 Implemented
30/06/08 Implemented
30/06/08 Implemented
30/06/08 Implemented
30/06/10 Implemented
30/06/08 Implemented
30/06/08 Implemented
30/06/09 Implemented
30/06/09 Implemented
30/06/07 Implemented
30/06/08 Implemented
30/06/09 Implemented
30/06/08 Implemented
30/06/09 Implemented
NULL Implemented
NULL Implemented
31/12/08 Implemented
NULL Ongoing
16/01/07 Implemented
16/01/07 Implemented
30/12/07 Implemented
30/12/07 Implemented
28/09/07 Implemented
28/09/07 Implemented
17/07/07 Implemented
24/06/08 Implemented
26/06/07 Implemented
25/10/07 Implemented
24/06/08 Implemented
17/10/07 Implemented
16/10/07 Implemented
25/10/07 Implemented
13/06/07 Implemented
NULL Ongoing
14/09/07 Implemented
18/05/10 Implemented
1/03/09 Implemented
1/03/09 Implemented
30/03/08 Implemented
30/03/08 Implemented
28/02/07 Implemented
30/06/07 Implemented
31/10/07 Implemented
31/05/07 Implemented
28/02/07 Ongoing
31/03/07 Implemented
30/12/07 Implemented
30/06/07 Implemented
31/12/09 Implemented
30/09/07 Implemented
31/12/06 Implemented
30/11/06 Implemented
28/08/07 Implemented
30/09/07 Implemented
30/09/07 Implemented
30/09/07 Implemented
30/09/07 Implemented
30/09/07 Implemented
30/09/07 Implemented
31/12/07 Implemented
30/09/07 Implemented
30/09/07 Implemented
30/12/07 Implemented
NULL Ongoing
30/09/07 Implemented
NULL Ongoing
NULL Ongoing
30/09/07 Implemented
30/09/07 Implemented
31/12/07 Implemented
1/06/11 Implemented
30/06/12 Ongoing
25/06/08 Implemented
25/06/08 Implemented
30/06/09 Implemented
30/06/09 Implemented
30/06/12 Ongoing
1/07/08 Implemented
1/07/08 Implemented
30/08/09 Implemented
7/05/10 Implemented
31/01/10 Implemented
30/09/09 Implemented
30/06/10 Ongoing
30/06/10 Implemented
30/06/10 Implemented
30/06/08 Implemented
30/06/08 Implemented
30/06/08 Implemented
30/06/08 Implemented
30/06/08 Implemented
30/06/08 Implemented
30/06/08 Implemented
30/06/08 Implemented
30/06/08 Implemented
30/06/08 Implemented
31/12/07 Implemented
31/12/07 Implemented
31/12/07 Implemented
31/12/07 Implemented
31/12/07 Implemented
31/12/07 Implemented
NULL Implemented
NULL Implemented
1/01/08 Implemented
NULL Implemented
NULL Implemented
31/12/07 Implemented
NULL Ongoing
NULL Implemented
15/07/08 Implemented
1/01/08 Implemented
NULL Implemented
NULL Implemented
NULL Implemented
1/07/07 Implemented
30/06/06 Implemented
NULL Ongoing
31/12/06 Implemented
31/12/07 Implemented
15/05/09 Implemented
NULL Ongoing
NULL Implemented
NULL Ongoing
NULL Ongoing
NULL Ongoing
NULL Ongoing
NULL Ongoing
1/09/10 Implemented
31/05/08 Implemented
31/12/07 Implemented
31/12/07 Implemented
31/12/07 Implemented
31/12/07 Implemented
31/12/07 Implemented
31/12/07 Implemented
31/12/07 Implemented
31/12/07 Implemented
31/12/07 Implemented
31/12/07 Implemented
31/12/07 Implemented
31/12/07 Implemented
30/04/07 Implemented
31/12/07 Implemented
31/12/07 Implemented
31/12/07 Implemented
31/12/07 Implemented
31/12/07 Implemented
31/12/07 Implemented
31/12/07 Implemented
31/12/07 Implemented
31/12/07 Implemented
31/12/07 Implemented
31/12/07 Implemented
30/05/08 Implemented
31/12/07 Implemented
2/02/08 Implemented
31/07/08 Implemented
31/10/07 Implemented
31/05/08 Implemented
31/05/08 Implemented
31/03/08 Implemented
31/03/08 Implemented
31/03/08 Implemented
31/03/08 Implemented
31/03/08 Implemented
31/03/08 Implemented
31/03/08 Implemented
31/03/08 Implemented
28/02/08 Implemented
30/09/07 Implemented
31/03/08 Implemented
31/03/08 Implemented
31/03/08 Implemented
31/03/08 Implemented
31/12/08 Implemented
30/06/08 Implemented
31/12/08 Implemented
30/09/08 Implemented
30/09/08 Implemented
30/08/08 Implemented
30/09/08 Ongoing
31/12/09 Implemented
30/07/09 Implemented
30/06/09 Implemented
31/12/09 Implemented
30/06/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
12/09/06 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/10 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/10 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/10 Implemented
31/12/10 Implemented
31/12/10 Implemented
31/12/10 Implemented
31/12/10 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Ongoing
31/12/10 Implemented
31/12/09 Implemented
31/12/11 Ongoing
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/10 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
31/12/11 Implemented
1/07/07 Implemented
NULL Ongoing
31/07/07 Implemented
31/07/07 Implemented
31/07/08 Implemented
28/02/09 Implemented
31/08/09 Implemented
NULL Implemented
NULL Implemented
NULL Ongoing
NULL Ongoing
NULL Ongoing
NULL Ongoing
NULL Ongoing
30/06/07 Implemented
30/10/09 Implemented
13/07/07 Implemented
30/06/09 Implemented
30/06/08 Implemented
30/07/07 Implemented
12/07/07 Implemented
27/07/07 Implemented
27/07/07 Implemented
27/07/07 Implemented
13/07/07 Implemented
30/06/07 Implemented
20/07/07 Implemented
30/09/08 Implemented
30/09/08 Implemented
1/12/08 Implemented
31/01/09 Implemented
31/01/09 Implemented
NULL Ongoing
30/09/08 Implemented
NULL Ongoing
NULL Ongoing
NULL Ongoing
NULL Ongoing
NULL Implemented
1/10/09 Implemented
1/11/09 Implemented
31/12/09 Implemented
7/06/06 Ongoing
1/09/09 Implemented
1/04/09 Implemented
NULL Ongoing
1/04/09 Implemented
1/01/12 Ongoing
31/12/07 Ongoing
31/12/08 Implemented
31/12/08 Ongoing
31/12/09 Implemented
31/12/09 Implemented
31/12/09 Implemented
Recommended