Advanced Industrial SystemsWestinghouseElectric CorporationBP-WP-CD-88-030May 12, 1988

Director, Waste Management DivisionUnited States Environmental Protection AgencyRegion V230 South Dearborn St.Chicago, IL 60604

Environmental Technology Division

I! U^ JFlyluniil 5963-0tU.S. c r A , t^LArl.^ \ V

WASTE r . 'A \AGE: , . ._ . , • ^ . . ;£!OOFFICE OF THE DiRECTOR

RE: Data Transmittal, Winston Thomas Facility and Bennett' Dump, May 1988

Dear Sir or Madam:

Enclosed you will find the above -referenced document. This documentfulfills the requirements set forth in Task 2.3 of the SupplementalHydrogeologic Investigation Plans, Winston Thomas Facility and Bennett'sDump, August 1986. The requirements for each site were to provide:

A. A plot plan showing the locations of core holes and monitoring wells;B. Coring and drilling logs;C. Geophysical logs;D. Water level elevations;E. A ground-water quality sampling schedule; andF. A description of any changes made to the Supplemental Hydrogeologic

Investigation Plan.

The Data Transmittal provided is divided into two sections, one for eachof the two sites. These sections are further subdivided into thefollowing sections to address each requirement of Task 2.3:

I. Site Plan;II. Soil Boring, Rock Coring, Monitoring Well Installation Data;III. Geophysical Data;IV. Hydrogeologic Data;V. Ground-water Sampling Schedule; andVI. Changes/Additions to Supplemental Hydrogeologic Investigation

Plan.*

Should you have any questions regarding this document or the datacontained therein, please contact Dan Switalski at 412-722-5708.

Sincerely,

Carl A. AndersonBloomington Project Manager

EnclosureCC: D. Switalski, J. Narkurias

en

ro

BLASLAND & BOUCK ENGINEERS, P.C.BLASLAND, BOUCK & LEE

Data Transmittal

Winston Thomas Facility and Bennett's Dump

Westinghouse Environmental Services

Waltz Mill Site, Pennsylvania

May 1988

DATA TRANSMITTAL

WINSTON THOMAS FACILITY AND BENNETT'S DUMP

WESTINCHOUSE ENVIRONMENTAL SERVICESWALTZ MILL SITE, PENNSYLVANIA

MAY 1988

BLASLAND & BOUCK ENGINEERS, P.C.5793 WIDEWATERS PARKWAYSYRACUSE, NEW YORK 13214

Winston Thomas

DATA TRANSMITTAL

WINSTON THOMAS FACILITY

WESTINCHOUSE ENVIRONMENTAL SERVICESWALTZ MILL SITE, PENNSYLVANIA

MAY 1988

BLASLAND 5 BOUCK ENGINEERS, P.C.5793 WIDEWATERS PARKWAYSYRACUSE, NEW YORK 13214

TABLE OF CONTENTS

I. SITE PLAN

II. SOIL BORING, ROCK CORING, MONITORINGWELL INSTALLATION DATA

A. Boring/Coring LogsB. Monitoring Well Specifications Table

III. GEOPHYSICAL DATA

A. Gamma Ray LogsB. Caliper Logs

IV. HYDROGEOLOGIC DATA

A. Packer Test Logs and Configuration FormsB. In-Situ Permeability Test LogsC. Water Level Records

V. GROUND-WATER SAMPLING SCHEDULE

VI. CHANGES/ADDITIONS TO SUPPLEMENTAL HYDROGEOLOGICINVESTIGATION PLAN

1. SITE PLAN

,"- " _"- ** n* - "1"* .—-—*"" " - ^"* * . *****

MW-6

WINSTON THOM^ FACILITY

LEGEND

GROUND-WATER MONITORING WELL

STREAM GAUGE

File Numbef

dote

HORIZONTAL SCALE8O' O' 80'

1 I 1l ^UJ ^^^^^

2 Of THE NEW YORK STATE EDUCATION LAW

No

.. .

Dot* RevMons

~

.

i

Inrt 1

Drawn by

Checked by

BORING, CORING AND MONITORING WELL NOMENCLATUREWINSTON THOMAS FACILITY

SUPPLEMENTAL HYDROGEOLOGIC INVESTIGATION PLAN

The locations of the monitoring wells installed during the Phase 2, Site

Investigations are presented on the proceeding figure depicting the Winston

Thomas Facility. All monitoring wells are designated by the prefix "MW-"

followed by a number designating a location. The location numbers may be

followed by one of the letters listed below:

D - Indicating a deep cased bedrock well.

i - Indicating an intermediate in depth cased bedrock well.

^- S - Indicating a shallow PVC-cased overburden well.

If no letter follows the location number, then the well is an open-hole

bedrock well.

/•->. The prefix "B-" followed by a number indicates a soil test boring at the

^ location designated by the number. The prefix "C-" followed by a number

indicates a rock coring at the location designated by the number. At most

locations the sequence of drilling activities began with a soil boring. A rock

coring was drilled next and finally the corehole was reamed to construct an

^ open-hole or deep-cased bedrock monitoring well. Therefore, for example at

Location 1, the soil test boring would be designated as B-1, the rock coring

as C-1 and the open-hole monitoring well MW-1. Continuing with this

example, if casing was installed at Location 1 to construct a monitoring well,

it would be designated as MW-1D. Any intermediate bedrock and shallow

overburden wells, if installed would be drilled at adjacent locations and

designated as MW-1i and MW-1S. If no soil test boring or rock coring was

installed, the well at Location 1 would be designated as MW-1 if open-hole or

MW-1D, if cased. In this instance, no reference to B-1 or C-1 would occur.• ^

1 of 2 5 /9 /88

Throughout this Data Transmittal, locations designated by a number have

different prefixes attached to them. In summary, with respect to the Winston

Thomas Facility:

1. B-1. C-l and MW-1 refer to the same location.

2. B-2, C-2 and MW-2 refer to the same location.

3. B-3. C-3 and MW-3D refer to the same location,

fl. MW-3i is located immediately adjacent to MW-3D.

5. MW-3S is located immediately adjacent to MW-3D.

6. B-4, C-fl and MW-a refer to the same location.

7. B-5, C-5 and MW-5D refer to the same location.

8. MW-51 is located immediately adjacent to MW-5D.

9. B-6. C-6 and MW-6 refer to the same location

10. MW-7 refers to open-hole bedrock well where no soil test boring or

rock coring was installed.

11. MW-8 refers to open-hole bedrock well where no soil test boring or

rock coring was installed.

2 of 2 5 /9 /88

SOIL BORING, ROCK CORING, MONITORING WELLINSTALLATION DATA

/-dy—~7 MASLAND ft tOUCK*—yp~~T INOINIMS. i».c.

SOIL DATA

Pu.

I»-a.UJo

SI

TC

SA

MP

LES

/\ /

SA

MP

LE

N

O.

- — S

RE

CO

VE

RY

(F

T)

pill s

u3_l

5Z

. -

h

x»on

ROCK OAT*

6z

z3a:

MumII It

=lN/A

soil i

IUL

>er otthet

FNot

1ampli

g

%

RE

CO

VE

RY

00K

S?

ij

RA

TE W

IN./F

T)

— R

-

SUBSURFACE LOG KEY

SOIL /ROCK DESCRIPTION

SOIL /ROCK CLASSIFICATION

OD Rock Quality Degre* - Iht•urn of the lengths of piecesfour Inches lonq or greaterdivided by the length ofthe core.

1' blow counts from C Inches toof splltspoon penetration.

applk

.

• Air rotary drilled sample!obtained at the surfacenear the annulus with a s

> —

—"FACE ELEVATION

>P Or CASING ELEV«

Creale thai

able.

eve.

i.

"

Soil/Rock Classifications

(SYR 1/1) Color of >olli using Munsell ColorChart(5GY (/I) Color of rock uslnq GrnloglcalSociety of Amerkan Rock Color Chart!

riAir,

TIOM ,

HO

CK

F

EA

TU

RE

S

#•

/1

\iitSTJ;

Ul»>

\ \

Ct

GE

OLO

GIC

CO

LUM

N

Rock

— MH-rI7MF

— f -— Irf -— laf -

— If -— vf -— h»f— BRl

Wlw -o -Ir -1 -« -P -m -gmgl -C -he -nt -

— Mir

— Sty

olog<c Co

ilhJ _l> 0

U

Foture Symbol* C Abbreviations

n»ch»ntc»l brp»k) - ntintber of MB In a runractureIrregti ar fracturelow anc|l« fr net lirehnrlrnntBl fr*c1ure

Inclined fracturevprlkfil fracture

- high angle (rnrturc4 - broken ToneVw«»,,r,rl ion. Condition of Fr.clore Surface•*»lh«ed , _ . 'o.ldlied \ "'" .

ron ,l.lned ? - Im"° h

.mmr. J - ""'#'

solution enUrQpm^ntsolution vnljtrqrmenl with patln*mud In opening

green mud In openingglauconlllc

cak Itehoneycomb weatheringnot recovered

- healrd fracturettrlngert- slylollle

1lumn Symbols

£V^A* J i

1 1

—Oi

to

ilM

Dolomite

Limestone

Shale

Slllslone

Ceodes

Crlnoldi

fllofragments

MAY 19B8Silt

WT-II-A 1 of 27

X ~3&—r KASLAHO ft BOUCK& ~T tMCiNOTt, I».C

SML T.-TA RQO CiiA

r : - j \ -•' w 9 ;; ! i ;, • ~ t O . u -v.

P •-: i \ = 1 | 0 § g |

^ « -f • ^ Z ll " 2• i c • ' t ^

i i '. . .. : !._ 5

; V ft-S 33^1^7 851! 1 • 1 ' i/

.JJO »._ , - • „ - . '*~ 1 i i I

• __: i : y1 i : ' !

fr ' ' ! '*1 ' ' ;

i J ' i 7. f : • f ': 1 s- - i- i J ! ' '5• ? •js' f Is."i ! :

1 - , , 1 .- j ^ 1 . . . . . . 7

i I 1 I : '•

i • ' i 5f ( i i .v ' • i ;

i > ' | ! 7-1 ! • . ' • r

• 1 ' ' , _ . . .,' ._. '

j \~ i : """ i '^

/^\ : ._. | f • , ""* :U. i~— i ' ' *\ ' s . i ; i ' " <• ~" 1 ~~" T"~* " "" *' — — -p— — |

r • — — — •— - ._,—..M. _ , _ _ . . - . i» • ; • t

i " ' ! ] ' ^ !

I " ~ !" •' : !"i i : 1 : i ; 3

. | i _._.: ..7_L._|._4._. __|_.i i : • ( • i

i ! ! ii

| > i • : ( :

. ^ ....._J.._.__.__: /— ?X

ejcr.'-c f r •.•-.-. - V\.-> n:--

V- =ft.-...-- ^ r*T,i" '31^1

SUBSURFACE LOC

so-L'-jc- 3E:w;r -

SOIL /ROCK CLASSiF 'tATICN

/W-/<.55 tlAlffSroUE •"«<Ju~.er»x C,'.«

Cr *(. || ' ''•It 1^ 1 'y « -i—, 5iy

l^-H • 3^,t| tf,XLT iTOWt <JuiV 4. tj. s«.vla«.,'»4<i da la*, ile s.~u- ^«ol»»s*~.e *i»s»r «.A ?;ll itfclj'-ti.

Lji'i H-O1! j'tjME'SraUC', ^ti^~ li'At- cr«.yV ^

^ . . . . ..J1!. -Jl^ LIMt^TbWt wedv*^- li^v ^r*^

C^re.n.i.4 ^M »«..cn^c U«>*«6.l«?o.-,^tf -sivol^^^.tS'.

' t/

^7.'5-ai.l' LT/'leSTonlir, f,^< arttirtej . 5^*'r

» • V *a").*? -a^.i s^*Le, siiu ij«i<uw.«iui~. &„

oCo^r A*\ o i \\ ^f&4uf v \

i«"*t Si\,aeok w>*4rri«il .

^i.l-300' LTwEST fOE A 'C • ° Lil^*^ IUVI rfLV/f

• ,Cr/S^'''~* "^T^ f4t«f ^*"x^* 3j»*C.s.

1

fc/2t^T' ' ••.»••; i .

%

lw

1

.A/U

-

N i

•!MM

^

JO

EO

LOC

IC

jC

OLU

MN

(\ {

1

i &,

.

. .-$>

'

•••—$— . •—. .

1 1

]

: i

i 1

i i" I— _-_ -__

i |. __i i~ ~

-. ' .

.^

- -

-

, .1

;.H

1

1

•. ' :

v.

" 'I...

,:.

iv

\f!-

4ir

WT-II-A 2 of 27

*.c. SUBSURFACE LOG

_ - i

• i7-

lJ!F:

[

I I I

t

II.I

Y -.'

\— .. :

^.vTer «<«i.>*.»eo

WT-II-A 3 of 27

MJULAMO ft POOCX SUBSURFACE LOG

SOIL DATA ROCK DATA SOIL/ROCK DESCRIPTION

SOIL /ROCK CLASSIFICATION

GE

OL

OG

ICC

OL

UM

N

/.t W

1.9 17

Iff

\00.7 IOO

12 15

0-1,1

Gl<?AvEL,al \0.3', moist.

ar^u-s^cvkJ

, d6ri<

/o

3T 118 10: H.W

7SURFACE PI FVATinn \bQ.Q DATE_£

TOP OF CASING ELEVATION _iO_X_lJL_ DATE

WT-II-A 4 of 27

SUBSURFACE LOG

Sdt DATA •OCX DATA SOIL/HOCK DESCRIPTION

SOIL /ROCK CLASSIFICATION

GE

OL

OG

ICC

OL

UM

N

30

4 -M

35

gray

/

2*3. oV,

at

3171-41.75

r1"/>fi

SURFACE ELEVATION JJ DAT;.? 3? CflT-

WT-II-A 5 of 27

»t»OOC« SUBSURFACE LOG

SOIL DATA ROCK DATA SOIL/ROCK DESCRIPTION

SO

T1

%

SOIL /ROCK CLASSIFICATION

>Q

8

I!Is

SURFACE ELEVATION

TOP OF CASING

\ O Q . O

10 3.

.DATE.

.DATE.

WT-II-A 6 of 21

ULSULMO A>-C. SUBSURFACE LOG

SOU. DATA ROCK DATA son. /ROCK DESCRIPTION

SOIL /ROCK CLASSIFICATION

CC

OO

IC

CO

LU

MN

LO

•0

>O

.5 Vfl

l ELEVA.TIO«I. CtTt.

WT-II-A 7 of 27

t

I^ T& ""y KAttAMVft ffVfflf

..- .

SON. DATA

P

X

St

. 0

10

|

SA

MP

LES

V

\

f

r

1 S

AM

PL

E N

O.

»;'&'

1 R

EC

OV

ER

Y (

FT)

Hk-'

SURFACE ELEVAT

TOP OF CASING El

5fX

l\l/fi

ROCK DATA

X

V/&.'

I

>/1

V

J/

1I

i/

g

wA

|%

RE

CO

VE

RY

AJ/fl.J

r>u -3L..S

FuaTinw io6_-lS"

Ooc

/J/A'

DATE

P

£

iu

SUBSURFACE LOG ^~ \

SO»L/ROCK DESCRIPTION

SOIL /ROCK CLASSIFICATION

6-7 .5" ^*V, »'IH /«iU-lr^^ ^a/r t VVJ

^ '

.T e . (". o<^ ^-TTuT "^^^c da«-\ c^^/AjS^1 ' . " . ' / ^ i / 1 - ' '

/ V '

^r*y-

-T9o?vcc.«.^^"^^33^i

ROCK

FEA

TURE

S!

OE

OLO

OIC

CO

LUM

N

(

\. _..

. _ . .

^^

\ \

\\ s

\v ^

1\

\L I

\

1 I:*.;

WT-II-A 8 of 27

2

^SOL DATA

Z

&o

5

SA

MP

LE

S

V

V

1 S

AM

PL

E

NO

UJ)

AU

9A

03

9M

!i!rt.£. EL~^'

55X

KAILAMO ft IMOMOM.r.4

iQ g[K•»

MOCK

0

zaI

O

i

2

t,

-J

<ft-S

0-5

,3-5

•S »T-i

DATA

%

RE

CO

VE

RY

oO

|RAT

E (M

IN/F

T)

5w ' '-*i*

•i»

•9

1

/£>0

O V J'f -

.£.;-:-. ^ -'«-— • -

SUBSURFACE LOG ^

SOIL/ROCK DESCRIPTION

SOIL /ROCK CLASSIFICATION

1 / »/ \

•^ll'-c-i-.

*- I. f '

($3

^ ^ - ' * . w ^ T ^ r i " * ' - ^ . " * ^ - " ' * ' * """ '*

-,.,-r- c .-^. cr- c "-5?

RO

CK

FE

AT

UR

ES

— IT-;

— r~

V.-

-*->_

1 ill

Jk

j.

GE

OL

OG

IC

1C

OL

UM

N

1

U

11 t -\ T~

^^

^~\~

\ '\

\

\

— j

WT-II-A 9 of 27

MJkSLAMD ft »OOCXmoiMtus, P.C. RSUBSURFACE LOG

SOIL DATA ROCK DATA SOIL /ROCK DESCRIPTION

SOIL /ROCK CLASSIFICATION

GE

OLO

GIC

CO

LUM

N

.10

[00 16

^ - > ^ -IV9 '

9'- 35 «(n

r^c.v

- 2 L.

-3J.

<»i<rt-

a) ,5-3.5. W

rT^^j :>rt

7ff/s 7 i

\

SURFACE ELEVATION. .DATE.

WT-II-A 10 of 27

^

&

Z

O.s

^7SOU. DATA

SA

MP

LE

S

SA

MP

LE

N

O

(REC

OVER

Y (r

n

SURFACE ELEVATTOP OF CASING E

hi3_J

Z

• Att AND ft If^vfy

t

ROCK

0

zK

5

h.

«/:.«

O

•*»•:?

DATA

%

RE

CO

VE

RY

•OO

mw -« _. f

Fwt-lOW *VG- '

ooK

8?

DATE

[RAT

E (M

IN/F

T)

SUBSURFACE LOG ^

SOL/ROCK DESCRIPTION

SOIL /ROCK CLASSTICATION

/^L-

"*"*>

i - 11 • \",,,< <"c -__ c.e qS-<-

RO

CK

F

EA

TU

RE

S

OE

OLO

OIC

CO

LU

MN

|

" "\ *.'

'"' €6^

i 00 5 ^.->^o °

-

WT-II-A of 2;

Z

^7SOIL DATA

zQ.bJO

5

/O

•15

SA

MP

LES

/

/

f1

/

//

/

/

//

//

_^f~f

SA

MP

LE

N

O

1

2

^

Y

5

RE

CO

VE

RY (F

T)

'•8

3 -fl

/•fr

/ • /

O

SURFACE ELEVAT

TOP OF CASING E

bJ

Z

3

4

/ /

>too

S/dO

ogac»»•

ROCK

0

Z3I

/

7,

<-j

u.

7.5«.l

(I

H

».

f.l

1 1

/•/

^3^

DATA

%

RE

CO

VE

RY

(fo

IV,

Isl

S.r1

inM to<J • 2

aoK

a1>O

5,5

"H

CAT

nwTV

RA

TE

(M

IN/F

T)

ia

1

^

.5

^

5-

</

V

5

<

7

SUBSURFACE LOG

SOIL/ROCK DESCRIPTION

SOIL /ROCK CLASSIFICATION

- - j . _ ' ^ i * . / .• i , • / - j \LJ*5.^ W i»^ ' S i - w . c f i ' V yCvlb.^ ora-jrt^ ' J ^ - J** " . ' ,

^~_ *ia«>* »••"* ftnvtl . J

</,0-«.-0 CLAY V.Hy, dart <ci^4W ^»y ^/z)

^

•50m< <^

^:l< i.,>-tT*r^,;.&L.A-Jr 70 '

75-//W'^IsTc^;i^^.^:;.^|.^ Crt«B

tt:^-r'a'^-,

/f/5:/*--S S^ALE , J-,l'tcr»y I<«'.~M j^T

(»j v / J

F S-J^-XT

r^ ^.^

RO

CK

FE

AT

UR

ES

^

GE

OLO

GIC

CO

LU

MN

I

(/

\• V

•H-ri

-Y--r-T

r

®"

• " •

WT-II-A 12 of 27

SUBSURFACE LOG

SO*. DATA HOCK DATA SC*L/ROCK DESCRIPTION

SOtL/ROCK (XASSIFICATICN

E CO

7 TPS-U.S

/i

~-~*<~"L"i ••»•«%, i ' lyj -*W-\ fjt

v« -»««•

Oray jOr.^o-o ^ „

S''«<eouS ». /i *.

-Vs,

<»o-

\ \

SURFACE ELEVATIONTCP 3* CAS KG EuEV! -i •*

WT-II-A 13 of 27

z' r-i•/f

y KASIAMO ft »OOCKMOINBK, P.O.

SOIL DATA

^-u.

Ih-aUJo

•fS

.50

SAM

PLES

1 S

AM

PL

E

NO P

it

>KUJ

OuUJCE

SURFACE ELEVAT

TOP OF CASING E

UJ3-1

§

Z

ROCK DATA

O

z3(T

0eru. s.

%

RE

CO

VE

RY

inw '00.2

F NATION /0?.f

OO<r

OAT

DAT

h-u.>vZ

iUJh-<K

fe

5

i

i•

9

£

SUBSURFACE LOG3-^(3 ^w^

SOIL/ROCK DESCRIPTION

SOIL /ROCK CLASSIFICATION

55 58 - V/-5' 5^^1-t •"••••• <*yrree w-« Lj/iesron/ir

V/-5-15.5' 5H/»LE. «<«fiey»Y .u^,^-^ ^ /

4l'U-y • /}

^o..^"r«c..^-iL4 -A =/5.6 .

F <|-^6-'ii''c

RO

CK

FE

AT

UR

ES

GE

OLO

GIC

CO

LU

MN

11

"~l :

- -

- -

WT-II-A 14 of 27

I

%§d£rr.•. *^—J '•»*••

KAStANO ft »OUOKkM%^M^H^ R B tf*

KM. DATA ~ -

X

a.o

0

5

wg41

f

i

1

V\

\

ihi

2

/Vit'

REC

OVC

MV (f

t)]

W/A7

5

X

/V/A

'

NOCK DATA

0

z3a

\j/

I

1

^s

\s

h.

•''»

'

e

• /»

1%

R

EC

OV

ER

Y

W+

oo

S*

A*/*

u.

5

SUBSURFACE LOG ,KW x *

son. /ROCK DESCRIPTION

SOIL /ROCK CLASSIFICATION

;:-'--,—

WT-

£? li, ist-s cc ' -—• - - ' t la-« rw T

ROCK

FEA

TURE

S!

f* A

OE

OLO

OIC

CO

LUM

N

I-~-

\

1

WT-II-A 15 Of 27

'< ''••'- .1»'

v!g^Kri¥»2£p^M1 _L«BH>«Ji<t <gV" ^

.-\i;s6iC:"oATA; :;

zauO

20

SA

MP

LE

S-,

SA

MP

LE

NO

:i

[REC

OVER

Y (F

T)

SUfirACi ELEVAT

TO? Or CASiNG EL

bJ_)

Z

ULANO ft tOUOCOIMEBH, P.C.

•*vr ' •••'

SUBSURFACE *LOG \

ROCK DATA

O'

Z

e

>

ON 1

Iu.

1

e

1%

R

EC

OV

ER

Y

1

15. T.

F NATION H9.O%

ooK

DATE

T

IRAT

E (M

IN/F

TJ

SOIL /ROCK DESCRIPTION

SOIL /ROCK CLASSIFICATION

_ .[Dor'n- 1 -*^««i«A.T«A aJt- ZO '„

1

o:. of */C ccV.«* "•)••««•

RO

CK

F

EA

TU

RE

S

GE

OL

OG

IC

CO

LU

MN

1

i\

I \__L 1

WT-II-A 16 of 27

SUBSURFACE LOG

SO*. DATA HOCK DATA SOH./ROCK OeSCPlPTlON

SOIL /ROCK CLASSIFICATIONsfi!>" L>

1 I.R

'0

.7

-« -o— »--

• 1-2.0 JtAy^iii. '«•.* «'•" o A/- W*4.

!l*.« 30

i.., res; or

^* * *•«—»

» . » » -^ — •Tr^«i •«•

£..7- 7. J «

""K OviT

'0* '.'. » '

i

S4JRF4CE ELEVATKJN

TCP Of CAS-KG

rtrc - » - 3 f c - % 7

nAT^ 5 t- --T

WT-II-A 17 of 27

2 jy^J' M>ILAHD ft ICUCX~ r -7 INOINIIM, F.C.

3CiL :A

pIt

z-

0.UJ

Q

•70

25

,30

•3*

SA

MP

LE

S

SA

MP

LE

N

O

TA

RE

CO

VE

RY (

FT

)

SURFACE ELEVAT

TOP OF CASING E

lu_l§

Z

SOCK CATA

ozzoI

t4

1au.

3*.S

&

<|3.5

%

RE

CO

VE

RY

1

l»l

inn HS.l

1 PUATIOM '^'J'3!

aoac

laV

DAT

PAT

RA

TE

(MIN

/FT

)

<f>

1

5

5

i?

II

?

^7

0

<n

*?

yo

f"

IQ

1

LI

1

(o

5

5

: ' £^,SUBSURFACE LOG

nwf1)SCIL/9CCK CESCRlPTlCN

SOIL/ROCK CLASSIFICATION

/(,. 1-27-0 LltCSMif, -'."-•- «^«-'«/' UT

^ . - / . i ^<[,.ic.a<*tf / -intf ^iu(.^-i"< ^pfci i

*~ J 0 i / * /-ain-'L l<^,«« '^ct . M.tn<.«. rt Molt 7 •

sti«i«ly lo»<<. Ui^k Hi«\ VjeilA>«». — «1

4-r.c, ^L«-.-J« 15-T ^If.S'^J

70. s' ioro.'iS ; i'ner.t.t " 21 .35 '

Kb J?.'3Oi-'''^l'-'''J-'* C r . n o . d i"'-- ' Sty

»"'ifr'.i.t la..',.,a^ .'2.^ '-^ r*.^? '

^'^K i ^ » ^ < Pr iwtJ i J ^ r « c ^ * * i ^ (

IM""'-1" /«-,*.* V o 2 6 . / ' .

J.f 1* Cjr*^ 'a^.,^ ^,^s:0irve

CrinoiJ ^ r«v~.«^%j6.| +» 11 -O-•<i

27.O-iJ'^ SrtALf j iarle. ,f^y U^. ie

.Jolo^U.t -,ik »^«- ^*ocl«i1 • 1 •• »l • «

»«<i Co«r4« *«l\C«ao* 'GrbiHS1 J

(fa&

3e>.$-Z).el Llwebiarot > W <J,^ ^^CTi.it <^6rW c,r»y ^.^V ^,'IJ, gitef>

. ^ . 1 /15 <v-. na£ -«.<^ ^<0"i«i' Sill£f3J» J4y

Cr',«J ~f<.^«^l4 5a.^-h,^0^^-

6-tva\;UJ3l.o' »-d T»\.S./ s+y

U37.? - SS- * "SHALt^ dat K. <^>»Y v

fiiU^, \t-'-a-Ui ; ^j.f

A*(i V.'ll CU.J -"«'- , f'"1*-

ovr. ^ r *.»i Al«if3"l''"«*«p x ---i - x 7

F n-^.si -T^^-POC to*'-.-.., -.°3

RO

CK

F

EA

TU

RE

S

^

AA

GE

OLO

GIC

CO

LUM

N

•s^TT— r*

^-r1-r r

/i |i

7 *f

J7 /

^

f

b

1.

WT-II-A 18 of 27

a

,5

'O'

;c

f •»•

^

•*•

ST

lHW

VS

BFAC

?

L .-

O

I

i/l

r c,_

CiS

A

HtC

ovt

wr

(Mi

«v»

"7 '

«j4>

Z

'XT4

HASMOM

o

z

5

TCN

UNO«^

o

k*-^

.< .j

>ft »

'-*•*

a

«<

t

17

OUCIkPta

-^ • "

X

O

UJr

3?

<y

(

*

oX

CAT

CAT

Z

I

4X

3,

V

7

7

'+

3

;L

y/^?q

V

-

r

SUBSURFACE LOG..

i.i.. "^c< _E3v..''?r,CN

SGlL/°OCK CUiS3;F!CAT,CN

a"? 1-SS.s ^-r.Ai.E <••«• CT*./ «-'>-,

la—.^-d, ica^- «-i ».il

^•^«^ , -fkt. fy"'« IT)

a.i cl4Ufc.".4«. ' "B

" ~T ^ -^ T- 'L 3f »v«x * • fe t^H^a- ^ w .3

•-St>-^

- .« . n T .* ? M^ --^ MI

%r. \%f^\ \

RU

CK

FE

AT

UH

6-J

01.

1GE

OLO

GIC

CO

LUM

N

_ — _-

.

- .

.

-_

- .

- .- ..

w^% .

- -~

- -

-

.

-*

~

- •

•**?

WT-II-A 19 of 27

/.^7

SOIL DATA

Pit

X^-0.UJo

, »

it

SA

MP

LE

S

' /

/

//

//

/

/

1

1

1t

1

1

/

1

1

1

1

11

i

(

(1

/

//

1

/

<S

^

du_lQ.Z<V)

1

Z

3

n

$

U

1

«

9

/oII12

RE

CO

VE

RY (

FT

)

(•3

M

p

1.3

&

• i5

J.O

/.«s

5.0

.1.5•)

SURFACE ELEVAT

TOP Of CASING E

UlD-1

Z

4

-

W

(<•

a

V

9

^

ft

>/»3

>/*>/oo

HAII AHO ft •I ^ ^ WBHBf ™ •*

ouaci

ROCK DATA

0

z

<r

iu. &.

%

RE

CO

VE

RY

ION 133.0

PVATION '-22.V

00It

OAT

DAT

[RAT

E (M

IN/F

TI

- • - • • • < - . • - -•-• -., 1^5SUBSURFACE LOG .

. ^SOIL/ROCK DESCRIPTION

SOIL /ROCK CLASSIFICATION

O-»a»eL*.Y, <*r«v<A a->i «4^ ^""J r^oisf .

IDA- 10.1. CLA-y^ y,il0uo rei 6/t") j'.U^j 4,^ .

10.4- l«f* 5TLT, c|«-«k Y*X ^/'^ cUYYi""a1*^-

H-S '- 17.5 C?L fV , vlk ^«ll«MV,. rei /»\

luilk \>\».Cv. a^i rtt1 »*jiM<^ u/fV*-^'

|S.1,S*^w^Ut,ti Wou^sklc.*•.-, *• • • « 1 "

11. 6- ITS e>r»0«i v\oi6T. , ,

Se-U^or,:..- lprw.',-Jj0T/7.^ ' *"r « . . .v

RO

CK

F

EA

TU

RE

S

GE

OL

OG

IC

CO

LU

MN

7 t-o^ s'i V\ /\ \'} <( \} '( i

/' 1

1

( <1 (

".'

-'<••£.- -7" J~

1

WT-II-A 20 of 27

SUBSURFACE UOG

SO*. DATA MOCK DATA SOL/ROCK DESCRIPTION

SOIL /ROCK CLASSFCATlON

t J

•to

3S

M^fcH

fl.S'- 1* <» SHALE, Oaf* am.y eo»««.i.c, //O\*ifl.LA . U . / L '

, luiTV \<r«« ecooo^*

STOfl«i 3»r«A«-«d-.~

• ra-Y , aKne «rm«—J I* • ^- • i^ .«i•ro-O i» t «•«•»« Of n»l j«

m S

SURFACE ELEVATIONTOP OF CAS M>

.DAT£.

-DATi.

WT-II-A 21 of 2?

2 ~^2r ^F HAtLANO A •MttMBS, P.t

ftitfti*^^^*^%»>

.SOIL DATA

it

zQ.UJ0

«

V

1

SA

MP

LE

S

I S

AM

PL

E N

O

1 R

EC

OV

ER

Y (

FT

)

SURFACE ELEVAT

TOP OF CASING E

UJ3_J

Z

ROCK DATA

OZ

z3K

O

u. ?.

1 °

/ 0

RE

CO

VE

RY

inw i '•> *Fv/ATinu '1 ?.-""'

00a

DAT

DAT

IRAT

E (M

IN/F

T)

•5-

5

*i

vyg

v

3

^j

5"

SUBSURFACE LO&

SOIL/ROCK DESCRIPTION

SOIL /ROCK CLASSIFICATION

'• 1 < * i^ /

i > ar '"•y - i'ltu,r& WAI r\ * •* v ^co«r akv& ^'»1|

^Trucrur^i •

l_ m^

t

• ^

IROC

K FE

ATUR

ES

GE

OL

OG

ICC

OL

UM

N

:&

- -

WT-II-A of 27

KASULNO ft tOMCK SUBSURFACE LOG

SO*. DATA MOCK DATA S04./ROCK DESCRIPTION

Xawo

SOIL /ROCK CLASSIFICATION

n/f.t.

"" " 'LS '•' E-t-i- C'.

WT-II-A 23 of 27

ILASLANO ft »OOC«

SOIL DATA

70

no

ROCK DATA

\y

S'JKFAC- ELEVATION'-

SIN" ELE/iT

I-S

c^^X^

URFSUBSUFACE LOG

SOIL /ROCK DESCRIPTION

SOIL /ROCK CLASSIFICATION

n.o'-^.o'

ilo'- 20.0'

'wr/^,y^^y^J..

-iKgmurr,

-bi

. ftt e»r«.i

"SZ-O

to**,

(W8) ^vr! -*, !

S~-^V

ntTF u-fi-H

WT-II-A 24 of 27

GE

OLO

GIC

CO

LUM

N

\ \\ \

\

\

\ \

\ \

\ V

1-L

A£_Ty ^ KJ~£* m

SO*. DATA

X

as

o

fO

i5

| S

AM

PLE

S

•>!

^

^

\ S

AM

PL

E

NO

fiA7

RE

CO

VE

RY (

FT

)

K/A

3

1

Z

W^

SURFACE ElEVA"

TCP Of CAS KG E

IStAMOftMMWKMMM.P.C

POCK DATA

O

Z3K

^ ^

|o

1%

R

EC

OV

ER

V

ooK

.1

u.

ZI

a:

^Yff.t

i1

i

1

\y ' • :

l

i

1 ;

1 !

\yt

l>>

iCN .; l •»•

)H -3 .5

CAT

SUBSURFACE LOG ttW{"

SOJ./ROCIC DESCRIPTION

SOIL/ROCK CLASSIFICATION

0 - 1 5 &rm*«l $ »-»^««.T

/ \

r v

^)3 5'- (<J»^

5-55 ' -i.i ST LTS-iUf . ~^^_ t> -,. ^U^ . UHI?.-r- >-y u ^»

, • • *•"•!/ : •

i 3 - 0-0 til- f 'X -- . ~-*^ -^^ .-- -i yj,.

v *•' ( T

'-* \j '

r • , _ o „ ^ *

RO

CK

F

EA

TU

RE

S

A/A

,

GE

OLO

GIC

CO

LU

MN

|

0.0

T~i

i jni

i ini

W T - I I - A 25 of 27

>*»OOCK

SOIL DATA

20

3o

33

Va

ROCK DATA

\ /

j_

iu.

SUBSURFACE LOG

SOIL/ROCK DESCRIPTION

SOIL /ROCK CLASSIFICATION

ULTiTaiJe . 1'tk.t e,ro^.J. Q « ,' i "

s liWo Ji. ( < A»^ a 2oul,. i«VMwJ—t.

/u^—< ,

/5«r

23.6 '-Vi.0'

EO

LO

GI

CO

LUM

N

\ \\ \\ \

SURFACE ELEVATION uOi .DATE.

TOP OF CASING ELEVATION '02

WT-II-A 26 of 27

^_3r J **

SOU. DATA

£

X

O.

s

fs

1 S

AM

PL

ES

1 SA

MPL

E NO

.

RE

CO

VE

R r (

FT

)

hia

5z

SURFACE ELEVAT

TCP OF CASIKG E

ISLAND AtOUCXWMBHLrX:

NOCK DATA

0

Z

K

\

h.

•i

/

Y

8

"5

I

ION

1%

R

EC

OV

ER

Y

M/A

0Oet

f'/A'

IRAT

E (M

IN/F

T)

Ijr

\.t»

> 1JU . J^ ?• '

DAT(

SUBSURFACE LOG w.

SOL/ROCK DESCRIPTION

SOIL /ROCK CLASSIFICATION

r - "• - S^

ROCK

FEA

TURE

S]

fj/A

\.

Ccc0UJ(3

- •

_/-

-

WT-II-A 27 of 27

B. Monitoring Well Specifications Table

I ABU •!•'

NONIIMINC Mil OCTAIIS•INSION IHUNAS IACILI1V. M-OOMINCIOM, INDIANA

lop ofProtective

••II CftlngMe, l

Oeplli ofProtect iveCatlne, In Baring «•!) Borehole Veil

•2 102.96'

r«-is too. n1

HW-ll 100. I

rm-10 9B.64'

Ground Subiurftco Depth Depth DlMMter DleewterIl«v4llon«

W.S' II.S'

jj » • I <"•!

41.11* 41.11' V4/I"

(tnche>| (Inctietl

S-S/I"

ProtectiveCetlnf Type of

OloMtor Conttruc-t<en

ScreenIntervel

4-1/2" Open N/A

100.00* 16.0' S-J/I" N/A

»«>• i. >i' *./»' t.o1 j i/i," i.o" t.O" Screened 9l.*'-<IO.<t'

Cr.vtlPack

N/A

CroulInlervel

Bent (in I toIlevtiIon

See I _

N/A

N/A lOO.O'-BJ.O1 N/A

Cener t\

90.*' 94.1.' 9). ">'

»*.i' 7.4'

9«.ii' D.O'

!/.»' !>•>/«" 2.0" t.O" Screened B«.0'-79.0' BB.r> ' - /9 .0 ' 9(I.*>'-90.V V0.4 ' -88.4 '

)».«' i Vb" 2.0" 4-1/1" Streennd kb.fcB' -!>(..!>' Ot.ii' -SS . )' '((.."i • • /(..*

HW-4 102.91' 100.2' 14.0' 45.i' «.i.l' b-b/b" i-5/8" 6-1/2" Open N/A N/A IOO.?'-86.?'

0 7 . / ' Ned C i ty/ . / ' -10.0 1 Inl.r-l«,«f»d SIlAlt «nd1 iMtlanc, JO.0'-41.11' SI1AU

0.0-1.1* III!I.I'-IO.I' Sl l ty (.!•10,r-4l./!i' Inter-l<y«rcd Shtle <ndI l*«»tun«4I . /S ' -49 .0 ' bllAU

0.0-4.B' Si l ly r i«y

Sic.d

0.0-6.0' C l«y , Sti.d

ii.o'-i;.!)' i i•layered 'jli«l» «ndI l«i«titont

I I . 0 - / , * > ' ( l < y , bdinl

Icyund M.«l» oiUI mot one

0.0-7.0' f lA»7.0'-»I.S' Inter-layered britle <ndI tmet lone, 41.S-HS.5' SIMLE

WT-II -B 1 of 7I -

1*1

TAIILE XT- (Continued)

HeM

No.

K-51

lop of

ProtectiveCasing

(Elevation)

118.08*

GroundElevation*

115. 21

Depth ofProtectiveCasing InSubsurface

«t.)

BoringDepth(H.)

20.0' 20.0' 5-5/6"

WellDiameter(Inches)

2.0"

ProtectiveCasing

Diameter(jnches)

6.0"

Type ofConstruc-

tion

GroutIntervdI(Elev.)

BentonlteElevation

Seal

Screened 105.2'-95.2' 107.2'-95.2' 11S.2'-108.2' 108.2'-105.2' 0-8.5' CLAY8.5'-20.0' lnl.r-layereil Sh.ilf .-udL iniL'Munt;

-5D 118.13' 1IS.1' 16.5' 55. S' 30.0' 5-5/8" 2.0"

MW-6 122.9".' 120.0- 23.5' 51.5' 51.5' 5-5/8" 5-5/8"

6-1/2" Screenud

7-1/8" Open

95.1'-85.1' 97.1'-8S.1'AND

82.1'-60.1'

N/A N/A 170.0-96.5'

99.1'-97.1'AND

85.1'-82.1'

N/A

o-e.s1 CLAY8.5'-37.9' Intel

layered Shalu andLimestone

37.9'-55.5' Sham

O.O'-IO.O' ClAY, *i,I0.0'-I7.b' ( Uy undSilt

H-7

HW-6

96.12'

103.51'

9*.*'

101. 11

13.0'

10.0'

39.0'

ii5.0%

39. O1 5-5/b"

5-5/b"

5-5/8"

5-5/8"

7-1/8" Open

7-1/8" Open

N/A

N/A

N/A

N/A 101.3'-91.3'

layered SHALE artLimestone*2.0'-5I.5' £IIAIE

N/A 0.8-B.O' CLAV, Ml:8.0'-3*.0' Inter-layered SHALE andL i me stone3<t.05'-39.0' SHALE

N/A 0.0-<i.O' CLAY*.0'-"iO.O' Inter-layered SHALE andLimestone'iO.O'-<i5.01 SHALE

•All eleva Ions based upon datum established by bUL Survey Crex, August 1987.

WT-II-B 2 of 2- 2 -

A. Gamma Ray Logs

•LMLAMOt MUCK»e

GAMMA RAY LOGGING

PROJECT SITE.

PROJECT NO

WELL /BC«ING NO 8-' ALJ-I

FLU*> LEVEL '* 7*~ "<•

c. nn >/.. cj

CASING HEIGHT ABOVE GROUND __:L£Z_!

EQUIPMENT DESCRIPTION

BACKGROUND

BACKGROUND

TIME CONSTANT

RANGE

PAGE .OF.

TiME DEPTH COUNTS TIME DEPTH COUNTS TIME DEPTH (COUNTS TIME DEPTH

1

//-J7

// J1 •/' 00 /Z-45

// •*>. <X)

//- vv yr.ooS3 30 /V* O // /vo tzo

/vv o /; 3*~ fio

J7 II. O

//r? fZ JS

J3 P 0 730

J' 0 // - 7.0

/l-of L.O

/I 06

fZ 03 9-0

/Z I? 0 S J

rl.il

11 /J

Ji 0

// V/

/? VJ

WT-III-A

t^-^. I vCh O •hL3. i«\^ .

1 of 8

•LASLANO t (OUCXXQIN1MI. f.C.

GAMMA RAY LOGGING

PROJECT

PROJECT NO.

DATE 9 /'Q

WELL /BORING NO O-ijHu-

FLUID LEVEL /J /? roe.

FLUID MiO

CASING HEIGHT ABOVE GROUND.

SITF I/J.PERSONNEL.

EQUIPMENT DESCRIPTION /fc-g^-Xi..^..

OJBACKGROUND START_£2I

BACKGROUND END__2L_

TIME CONSTANT

RANGE /<? X

••: 1

TIME

J-'/O

3-V2.

3-VJ

J.W

3.Y6

J-V7

5-V?

J-V6

3:27

3 - 2 S

Note :

PAGE

DEPTH

JT7.0

(SL.O

VJ.o

38 O

r?.oJt.O

JiTO

33.0

J2-O

S'.O

So.o

COUNTS

/«//.£?

PSS.O

33.0

J7. 0

. o

63- C?

J/.O

TIME

J J3

3 \

3 <-fo

3-V/

J.V7

J-V?

3-5T?

3--.TZ

DEPTH

26.0

2STC7

£•3.0

ito

i.f.0

Lo-O

rt.o

/?£>

X5TO

12.0

f/.O

9.0

.O

7.0

COUNTS

79-0

L1.0

5-7.0

7/..T

-

iCft-O

fff.O

TIME DEPTH COUNTS TIME DEPTH COUNTS

irt<

WT-III-A 2 of 8

•LASIANO » MUCKf.C

GAMMA RAY LOGGING

PROJECT 5HVT

PROJECT NO //*-/*-?

PATE tO/y/KT

WELL /BORING NO

FLUID LEVEl

FLUID _

rating HTIIJIIT ABOVE GROUND .

PERSONNEL.

EQUIPMENT np<srRiPTmN fret.*- -

£-5-1 L;,U.,,-il £r....— t L -.L '... - t-•*•& * I

BACKGROUND «=TART 3S~ 9 Z-iO T

BACKGROUND PMn -'^ £

TIME CONSTANT _ IP

RANGE _ ISO.

*< • Jl

PAGE .OF.

TIME DEPTH COUNTS TIME DEPTH COUNTS TIME DEPTH COUNTS TIME DEPTH

/Joo w. r 2-i-f i/.o 37. e?

37.0

•A.o fje.o V.'OO

J'Vfc Jt.Q //r fif.O

vzr 22-f 9-0

fl-0 60 -

«/.//.no.f ZffO

3V? 05 atr•/To 32. ~ Jf.o 7/.J

5 ^. o 7a

•HO

#0 £0-0

/£.*

r?.r9. r 63

a/.r ^T.O /oo u.r/ J Z/o fff

j->vrJ-VTT

3fi.r jy.r 320 3 >irr" -27w/vr y/-r

r J3 o *S-/f \~ il-0

vv //.r +H

WT-III-A 3 of 8

KASLANO » •OUCKMOINKM. P.C

GAMMA RAY LOGGING

PROJECT %(s*Cr*J S K I \

PROJECT

PATE fr/<r/K~t

WELL /BORING NO

FLUID LEVEL

FLUID

ffl.-te.-TI

C!ITF

CASING HEIGHT ABOVE GROUND.

PERSONNEL.

EQUIPMENT DESCRIPTION KeSLK -T-V^n.,. .

BACKGROUND 9TART C1?

BACKGROUND END Zfl.

TIME CONSTANT

RANGE /O*

O:

PAGE _! OF.

TIME

z.w2-'&

2-TT

2;*~L

TCO

3.01

3-tZ

DEPTH

swV6.<7

«#To

V«*.t7

«O-O

«/Z.O

^/.O

'/O.c?

3<f.C?

3R«

57.0

2TO

J5T(3

&.0

J30

Ji.(7

•Sf.0

SQc>

Zff.o

ze-o27.0

Z(.0

Z^c-

£•>(«?

COUNTS

/JO

ftfO

/3f

trif&>&

*rjr38

20

30

&r60

«.r72

23,

30

/e23

2&

l

9S-

12.

TIME

3- If

3:22

3-2^

3-17

DEPTH

Cj + \izo•Ho

Z.f.0

10. O

/f.o

ttt.o

no&o

ttf<*O

(2.0

It-O

fl.o

fO-0

9.o

ff&

7.o

6.O

•fro

</.o5.0

z.o

COUNTS

f(,

S3

>#~

<ff

/ootr

<A>

2a

/6

H

&

30

/r*&?rft'<sv5b

/oo

r-r8*

•fX"

TIME DEPTH COUNTS TIME DEPTH COUNTS

WT-III-A H of 8

KASlANOft BOIICS»c

GAMMA RAY LOGGING

PROJECT 1

WELL/BCFLUID LE>ft tun

lift /^j-v*-r/

/«/y

>R«NG NO

>Ti

...

CASING HEIGHT ABOVE GROU

TIME

/0:*7~

JC:/O

/o://

a>/2/<*:>*

/o./f

DEPTH

^vr.5-7.0rroiX*;i-V-17

no

ra*7fr-o

fO-O

•/to4,-)•S7J

I

»fc-O

10 iO

-H.Q

+10•ftff•/'•tS

*>0

J*0

^eo

COUNTS

/Tb

/JT

/3fl

TVS'

f*0

*ff

1*0

/vr-/^fro

/vr/VJ7

/toA<TM>/O'

/7J-

^5-

JO

£7

z,

Z1-& JO

3Lo sr<0i7 ST.* 3f

Ml*i~ ^

ND 3.C/

TIME DEPTH

&0

JJO

/03~f

S2.0

s/.o

JOO

Zf-«7

«i».i.7.0

t+.o

COUNTS

•40

40

«/!-

40

V/

72.

J<7

/O

'8

JfTO i jO

i-S-i? •/€?

^To 32-

*i<7 -3Oi

£s& Z®

£0.£7 ^O

/f-C» ^7

/ft^ 22,

,7.0 </r/ff-¥2 /'£. O 5T>

;C0 *0

f**O 77

,•20 (,rH.O 70

tr.^ rZO

EQUIPMENT DESCRIPT

BAC

BAC

TIM

RAH

PAG

KGROUNO

JCGROUND

E CONSTJ

ICF

ION / T-r - JcU,

* * - /•STABT 7^7

Fwn ^r"

INT //9<<r,

E ^ np /

TIME DEPTH (COUNTS

IO-O

?.o

8.J

Z0

(-.0

fTo

•A*

io

/'ff-r» 2^y

fof

/Of

ffO

/oo

foe

K-

91.

(3

*0

T;ME DEPTH

1

couf^^

^^

Aiu. i ...-, ;«w«v

WT-III-A 5 of 8

KASLAND i »OUCCMOtMIIK. P.C.

GAMMA RAY LOGGING

PRQJECT '*'* ' ^nlt „ .u SITF Wi*jsr-aiL/ f*(a'»A.s PF

PROJECT

DATF /

WELL /BC

FLUID LE\

Fi.mp

MO Ha-lk-3-l

l/ft/rrr

>RING NO.

/Fl '/*

2?-^

?.•?*< TbC

CASING HEIGHT ABOVE GROU

TIME

7W

f:io

?.-2->

?'3<J

7:3+for"

DEPTH

£°<L TCC

JTtO

^5.0

i-/.*

jT&O

49.0

¥6.0

•0.0

¥f.o

>&0

U.O

«?.*

"Z.O

wo

tfrj31.0

33.9

J7.0

X.3

3f:o&.0

S£*

;z.o3f.O

COUNTS

/ff

137

f&~

/3i

f&

i-fi

rf>

/vO"

/Z*

38

2T

52

32.

+r113S"

31

VJ

.-*

r-otf3,

38

is

Miv-4,

NO "J. '

TIME

9/VZ

f^-vr

f:j">

DEPTH

*"•») ~a-• J&.y

Z?.0

MJ

17.0

Z&.0

JXO

2*0

£3.0

£Z.J

S.f.0

2&-O

st.o

f&O

/20

,4.0

/fT<J

/vTo

/3.0

/y j^3

// v

fO.O

9.0

3. a

7.o

COUNTS

?r~36.

30

SI

/A

zr2o

2*

JO

6J

rt>76

ff<r10

ar09

1*to

K~

?t>,00

tn.Sf

*$

TIME

EO

BAG

BAC

TIM

RAh

PAC

DEPTH

(C^joo

£0

</.<>

T &

y_^ *y

1.0

RSONNEL

JIPMENT

KGROUND

:KGROUND

E CONST

JRF

C.X-XDFSCRIPTION KeX< - Tel.

^ Lg^ _ c , ^Jj -> /

5TART (aO

FNn 5 °(

INT /^SCO

/^? y

E 1 OF_1

COUNTS

rT6ff

70

s-8ro

JO

TIME DEPTH COUNTS

WT-III-A 6 of 8

GAMMA RAY LOGGING

PROJECT

PflOJCCT

WELL /B(

FLUtt LEi

"3^»v»> r>-j i-//- 5iTF *y«/jr»" i«t~*i prp<:nNNFi <^*/

MO //f"f- LI

'l/1t

ytiNG NO

/Tl '<t r»c.

CASING HEIGHT ABOVE GROU

TIME

IMO ».

OEPTH

0

•<O-l8

•Alt*

Jf.O

35.

J^«'

Jtfc,

Jr.*'

**0

COUNTS

,-rxn>/3-»

/jy.»/j«ty-

^/

/r

EQUIPMENT DESCRIPT

kin '-4

TIME DEPTH

.-rv

,TO'

,<.«'

,r»"

COUNTS

7C7

-/f

ft

,4

~f.' /f

^a»',„•

.-ro'

Off

v&

^^^ >-3

II

32V zo *, ?r

v.s st ''+' rf

OmJ "37 *-o' f>

tf.o «/7 rr*>" 70

s& *' *tv .-.*

/7* Va ao" «J

^^ Vu

.-r- jV

,-3

;L w-

^v ^o

r^r .<«' />t* »• 7«

• ' -« ' -^

7:JO *o- vr

TIME

BAC

BAC

TIM

RAH

PAG

OEPTH

KGROUND

KGROUND

E CONSTJ

IGF

ION A?"c/c •C~sTJ/J/

-t ^/tf <V.T>-»

5TART rr

INT (Hii-c

E * OF \

COUNTS

;

T.M£ DEPTH COUN' '

^

WT-l i l -A 7 of 8

MASLANO ft iOUCKMOH4IMS.P.C

GAMMA RAY LOGGING

PROJECT J2U3S - SITE.

PROJECT Kin //2-/6-Z./

DATE ^/T/rf-7

WELL /BORING

FLUID

FLUID.

CASING HEIGHT ABOVE caniiMn 2- 33

PERSONNEL. _

EQUIPMENT DESCRIPTION TLw.. ..- V~, \t

*uA«J^..

BACKGROUND START

BACKGROUND END :

TIME CONSTANT i

RANGE 'O *

32. ( | ;

PAGE OF.

T I M E

/••</&

/••*n/••*w/:*?-

/:•/*,':*/7

f;*/a/:*<>

f;<T*

t:<Ti

I.-'TT.

ATT

'•TV

/.rr^••^5/•1"7

'•>7

f-'TT

Z O&

1_-Of

I Ol

KeyZ-o/

Z csT-

D E P T H

rt)y .TO*^f

yfc"44-0</*£>

*r.o•tt.0

<//v1/0.0

39,0

TfiO

77 f?

JSt?

J3TO

jvTi>TZO

3Z-0

3f.o

JO.O

z?.<S

Zg.j

2.10

Z£.o

Z^O

Ztj

COUNTS

,vy~/J<3

//^

/Z<»

/Z7

f3t

J2

L1

zrZ£

/j?t<T

38

•ff

-S3</?

tf?

frri'?/&vanIG.

f&

T I M E

•2-'o(>

2: 0-7

2--*8

Z "f

i:/0

Z.YSl:/Z

2"fl

VS</

z-./rz-./t.t-n£.:>&

Z-1/?

*--£o

?-'Z./

i'2.^2 ;2?

lit*/

z-zri-.Lt

2:2.7j:i?

D E P T H

.7*&<?3'.0

20. 0

rt.°fffj/r.e/£.S

fi.70fifO

f"3.O

t?.O

//.0

fO.y

to

Sto

7.6

6.0

ro<+•(>

3-°

Z.<3

1. 1>

COUNTS

^^*i5

IS

*T

It,

|VA3.

(*8ft$1,6

20

LI

?>»

a6!' 16

i?.IfAS

P8

57

.31

T I M E D E P T H COUNTS T I M E D E P T H C O U N T S

WT-III-A 8 of 8

KJIIIAMO « ftOOCXIMOINIUK. P.C.

CALIPER LOGGING

PROJECT D<.vo»"fllCT~i)rl SITE.

EQUIPMENT DESCRIPTION.

DATE IL/f/e'f

/ BORING NO

CASING **"

CALIBRATION START_ki

CALIBRATION " ~ 4-v

PAGF OF_\_

DEPTH

•/>7y

WJ o

NZ.-C?

fl.J

-<e.o

H.o

.«J37^)

OC-0

ar.o

7y,«?

7l-0

JZ-c»

7/. 0

Jtf.ylf-0

izo

n-o

Zt<3

H'.f

1,1 '•"

il 0

ZL-O

is. o

Z.o u

ft 0

if 7r

rl. ;'

HOLEDIAMETER

to "

-

-

>•

««

»•

s

•*

••

(>.!

t-C>

•t

ll

•*

..

*«•«*« 6-O

«>«.« g.J

<(

..

,

.

,.

~?.u

i.-f

DEPTH

fC-J

it.O

/t-to

^t-v"

^. °

fr.(.rfi'.r

sr.zr

iT.o

,-Y.n'

w.rs*/.i.\"

f*0

;J.O

f?-f l~

/Z.(J

/'. l"

il-O

fO. b

?. 0

i'.o

?. u

;•"

-.TO

0

HOLEDIAMETER

fc.c;»

G./

<i <•'

«

fr-3

6-2

.,.3.

c.. ~)t*

,.

i*

.,

U-«-

6./r6./0

t. £7

6-';(• 0

i. -i..

••,.

/•

(,'t.

DEPTH HOLEDIAMETER DEPTH HOLE

DIAMETER

WT-III-B 1 of 9

•LASLAMOtCALIPER LOGGING

Si PERSONNEL.

PROJECT NO EQUIPMENT DESCRIPTION.

DATE /' /,-/tn

WELL/BORING NO >*•>

J r_1BRAT<ON STAR'

CAS:*iG HEIGHT iSCvE

PAGE 0^

DEPTH

nrj

nonv.-0..,

-4t.o

•WY7.0

wt-a

*T tf

*ff-^

«1.0

•IIVWf.^

VO J

,;.o

HOLEDIAMETER

6 - f

-

--

^

<

.

-

•-

.

,

t

-^^

t/.4>

"to

->-»

•S.°

>1<t>

Zl-°

~, ^

*

.

-

-f

,

JO J

z fo

i»--»

3EPTH

2**-

C 4 c -

t.-i»if.J23 *"

22.7r

2Z-C

2ii>"

zz-.o

i'.u

io.^-r

taf

tc/-Cr

2t/.^

.fc^

_ t J

.->*/ t o

r«.-.0

^J.*-

HOLEDIAMETER

6.'

-

cr£ -

t-'%

.

,

&• J c^»***

-•-•

M

.•••.

,

,

...c/

.u...?.o

DEPTH HOuEDIAMETER

i

DEPTH HOLEDIAMETER

*v

^

1:

i

!• 1

!'-*» M

.,-J^ fc.f 1

•.-./••»$ '.ft**.' e^ <. Of"v

WT-III-B 2 of 9

HASLAMO t »OUCKCALIPER LOGGING

PRn.lPT.T H|p ff%-/£'l/

DAT£ fO/l/S"'

WELL / BORIN

casm«-wej«H^>"'"5 *°'

DEPTH

tt.r?'sz.o'

^9.0'<#„'w«/<:.«?'^a'

4/V (J

t/^

V2.</

^.c/'

*£(}• Q

3<i.o'

S9.*'

37.47'

St. 6

V~0'

3+tf

3^o'

3-Z.o'

Sl.o'

ly.o'

2*^'

2.&.U

L7.J

2JL*

zrsvr.o

-, Nn

r ABOVE GROl

HOLEDIAMETER

srr?"r?*

&'f?4

&'sT"

,rf/?'^f'/rr-•rr*<7f

s rrr*pvm *

^T?'

rv*>-v*r7'7wP

•3t.i>

sTCcr^jc-c

r-f6. o f A^ .i.

sT7

2uP^ 24.;

^.r*i-77'

wn 5"S"3/

DEPTH

£f.^'

TJJ'

£,£,•

i2.£>'

.r'^•r'

2J.O'

2,0

,1.0'

ie.*'n*'fa"'

<r.°'M.o'

13.0'

n.r-

HOLEDIAMETER

^7-

•u^

XVf*'

C*'

&.ZT'

W

ft'

?'&

^0'

WiTf

jTT-

*-?'

CA.,,,C

C^v,^

DEPTH

EQUIPMENT

CALIBRATION

CALIBRATIOI

PAGE _. \

HOLEDIAMETER

DESCRIPTION ~~5«-Vw^

J START C.^ ^-r-"-, ,-f f

M FMH ^>.C\U '~5TC-. J1 r

OF \

DE»TH HOLEDIAMETER

**••

i-;z

ii. cf £ • Of

WT-III-B 3 of 9

CALIPER LOGGING

PROJECT^*.— - &« .

PROJECT NO "I-'<'*•'

PATE

PERSONNEL.

EQUIPMENT OESC S"X>^,..-\^.

WELL/BORING NO

CASING HEIGHT ABOVE GROUND

CALIBRATION START C.. 5

CALIBRATION END 9

PAGE. OF.

DEPTH HOLEDIAME-ER DEPTH MOLE

DIAMETERDEPTH HOLE DEPTH HOLE

DIAMETER

il-0'

•sc o' fft.r"

6.ZS"

Vfctf'

r?.ff7.0"

S7-0

2*0

Jit?' 6 •-'

22,0

31.0' I2.O'

if.O

WT-III-B of 9

•LASIANO » frOOCX1M04NHH, f.C.

CALIPER LOGGING

PROJECT ~&Ltx>.t*.'*tCTyJ

PROJECT Kin /f>-'t-it

DATE a/rig*

WELL /BORING NO

SITF iHt^ PERSONNEL.

EQUIPMENT DESCRIPTION.

CASING HEIGHT ABOVE GROUND

"•——** ' -f "• *

CALIBRATION START.

CALIBRATION END_!i

PAGE OF

DEPTH

•7!J"J-

<*>•?. <J

•/fc.u

</j".o

•/V o

<ft.o

Y?.O

ift.O

•/o- u

?Eo

jj».

^7.0

Jt-0

ir,vjt.i)

J~T-

jr-y3/->^

3o v

tf.o

£?. J

Z7.<?

Z£.&

zf.<s

:r.7

z-f.f

i*.3

Z*.o

HOLEDIAMETER

6-ec'.•

Jt

1*

It

.

rf

.'

f

»

.

.

If

**•

«::CH

fcc<

1

.•

*•

*

(f

*

4-7T

£ v"

(,-ZV

••

DEPTH

it. J

ze c?

?/-o

Stf-O

tf.ttfS- 7f

/%.->'

/zzf

,8-z

I7.f

I7.t>

a.*

>r.??

ft:*'

/r.o

,-vV

/3-J

/l.o

//.i?

/•«* ^

HOLEDIAMETER

^r

«

AI«SH

-

c-^r

u.'t.-*

fc«<1 d

«.-rfc.Z<

(..'•

w

.--

-

*.

Ol>i«£

- -

--

DEPTH HOLEDIAMETER

DEPTH HOLEDIAMETER

WT-III-B 5 of 9

CALIPER LOGGING

PROJECT, CW v-t«- CVAV^ SITF WtMrof/ ~7~f~v't prp<:nMN?i III

PRQJFCT NO //f.-'f-U

OATF (f/tf/*-*

"f.". / BOR'fcG N3 _ ..

CASING HEIGHT ABOVE GROL

QFPTH MOLEDEPTH QtAMETR

to.* (,.*"

10£> Cf"

&.0- 6.S"

s-r.-o t. r '

£~?4>' t.r '

ft*' ^r*j-ro- i.r~jv.o 6r'sit* tr"i2«^" 64-""

ry<7 «A--

•LUJ-Surs 2.-/' '

DEPTH M°L£

DtPiH O,AMETER

S3 o' t-i"3io *.C'

3/v ' 6-1""

Jtt.'' £..<"

&.' e. r-Z^*> 4i-*

^«7' «.r~

*^i?' 6-v—f

*^£ 43 ^ , ™

£3.8 to*

i-oo" /ii" ji -^J" 6.?r'«/?*?' 6r" n.i? t r~j.0- <-r- ^ljt> Cf

~r?.o- A.r' n.<? £*••<st* f.f M' 7.0'

*~t> £T* £/-2T' <f

y*/tf tf-r' 2JJ>' 6-1?-_ - _ ' — " »«-•t/^jy & .» //» ^j C -7

v^»' < i""* to.?" (f*

*/r.V t-l~~ L&-&' c, ?~

i&o f-f /£?>-' f.9"

3*..<J 6..C' /ft"' C.T

ZP.O if /rzr £*'

EQUIPMENT

CALiBRATiQK

P4GF \

J«R,PT,ON ^S~V

-^i. _ X_.W4 <^^,^T ^ ** t

u

i fwr. ^-^ "TH^T^ rJ c«xx*

T».-,\-t ^ C-^" "

np V

nFPTw HOLEDt^'H DIAMETER

/.«.«>' *:r--/^^*" £ .!"•

^r' i.r-/^-«-' ^-*/7t f ' • f. fstrr-- i_r.-

SL.S-' tf-/«.zr' *fK.O' t-ft^O t-f'

,*o' 6.f-,3u' £f-

ff-O' £.f-

if.O' f.f

rtf.a' . .»*

?.e <..?'

&<?-

?.0' £«-

(.*' £* '

j~o' 6.f-

J.O' e.*~

10' 6-?'

Z.J {..*-

,.o t.?-

J'"O L.~ ' rfO tf~ 0 (..»*

2L.O < > - ' /«:•-' 6ft !

z+o (,.- 'y~-' *?'

QCPTH HOI-ED-PTH DIAMETER

^

WT-III-B 6 of 9

BOUCXtNomitn, >.c.

CALIPER LOGGING

PROJECT ?to.^ SITE.

MD l 't-H-*<

WELL/

CASING AHrwF fispimn CALIBRATION,END

PAGF \ OF

I END_3_i3__EIS_£L- iir^«,£U-<i> \ \ . \ " 3

DEPTH

J~V ^ r»,c

1-Ve;

i-7.0

^2-<?

i-T. 0

iV. i?

•ff.O

•S8-0

rt.o•sr.oV3-C7

V2-0

<//.o

c/O.t'

J?.«?

«!. i>

??«P

7<-0

rro

JV. 0

-7.-1

32-«

JC.O

5V. o

2t.»

2&.lf-

l& r>~

HOLEDIAMETER

r-e'"

4~O

4

It

m

#

-

tt

i

«

..

-

,

*«•*•< *^

s

..

••W

-

'•

»T "

r«r-r.f

DEPTH

IS -~

Zff lt~

i'i.-O

•2.70

U.O

tf,0

ift.o

i3. yZZ.O

IS. »

lao

rt.o

fS-3

/?.o

-<-J

T.v

t + O

/O.o

fZ.O

ff.O

/a. 9

?.o

33

r.o

f..i>

f.0

•s.o

Lit

HOLEDIAMETER

>-*>'*

i~.U '

•r.i '-»«M llf f.{'

f-ir.4

4

c.f•••

ctf*

c.o••

t'T*•

*

i*

*

-

*•

-

..

f

.

DEPTH

i-0

1-0

HOLEDIAMETER

r.-if

DEPTH HOLEDIAMETER

Krin ,»{>•'tufa

WT-III-B^t7 of 9

•JUlAMOtre

CALIPER LOGGING

PROJECT.

PROJECT NO ft-'t-l

DATE

WELL

DESCRIPTION

vi V****•;-/•" r*- "

d .,^.

CASING HEIGHT ABOVE GROUND CALIBRATION END £J?*% _S"0 -^ e

PAGE * OF *

:r <. C5"

DEPTH

«AiC

*y/o

'/O u

15. e>

y *>

?>.•

?<-<»

?rro

^*. •J7. O

HOLEDIAMETER

( X"r

«

4

-

•(•rot '

Jii. -•

IX «* fc.i-

x-<?. . «vx» 4.«rvO -?

DEPTH

'?2

if.'

n.J

H.-0

tt-r

/r.>>

/v.u

!>«?

f7v

.r.O

HOLETIAMETER

t.zr(. -3

"I

,

t-r-

t-1

'

f»rui fc 1

-

/OL<?

9.0

^- t^^0 t ~ 7.3 U-t

r*» "-«• • e«.-2?.o —»*•« " :7o fc-^"

2-t-o ' V.«

rro

;<o t '

^7.6 *PI" ^r1"*"tzo

!• »

Xw i» "

/* 0 i ->

'.* -

.--- t.r,7^ fr -i.

077 f - < "

DEPTH HOLEDIAMETER DEPTH HOLE

DIAMETER

i

^^

WT-lll-8 8 Of 9

•LASLANO » tOUCXiMa4Mifn, re.

CALIPER LOGGING

PROJECT o\««-~'v^M»"t.ow« *^3

PROJECT NO ItZ ft-il

DATF (tfofa-T

WELL/BORIN

CASING HEIGH'

i

DEPTH

«7.7-4'

•47.0-

~H.o-

^-0"

W.o'

•/*.<?'

flo'

<#.0"

<4oo'

Tr.O'

3»o'

57. 7'

36.0-

SsTO1

3+-O

33.0'

22.. 0'

3*.o'

sao'

^f.o-

£6.0-

ii.o'

2A.3^ f

Z.-4-0

zi.o

ZZ.O

^.u'

•; wn

r ABOVE GROL

HOLEDIAMETER

£.iS~"

&.IZ*

4./Z"

6./Z'

6-/2*

b.i-L"

C..I2'

6./2*

£./2*

6./Z'

6.(Z~

t.tt~

&f2*

*./z--*_,P

6/2"

6-/2"

e..n-£.r2."6./2*

6./2"

U2"

(..12*

k->2*

(,.fZ'

fo./z'

c-. /Z'

•St.//*

iun i?-i^

• iMAjrrwJ faasnAS PFB^nuNPi L1_L// /OJJ

DEPTH

^£7f»'

(?•<>•

fa.fi'

Sfl.0

f7.7f~

t7.0'

/6.0-

frtf

fiTt'

fS-.O-

tW

f3&-

I2.o'

11.0

iO.o'

7.0'

HOLEDIAMETER

A.Z5-'

i.Zi"4

(..r-6.r'6.5-*

t.r*c.r~7.0'

C.7S"

£.*—£.2*-'

a ,.

6.2S"

6.er'&.*'"<,.i

' DEPTH

EQUIPMENT

CALIBRATIOr

CALIBRATIOI

PAGF /

DESCRIPTION ~T;\ *. <

g START C..S

M FND C. "^•

OF /

HOLEDIAMETER

DEPTH

i»—

U \ x-k ~T->a „} Cw,

S'Sr ^J"c

C-t"^ 0-15

HOLEDIAMETER

-N

WT-III-B 9 of 9

A. Packer Test Logs and Configuration Forms

SINGLE PACKER TEST DETAILS

PROJECT NJUBER

LOCAT.C

/I <.- !(o-

COR »JG / BCRiNG

rcrPERSONNEL

DATE

M£(GMT O

STICK UP

I -f O

\\ Q c \i-cCEPTH TC H

Q.O JTgj-Ea TA3_E|

\

PACKER

PIPE

\

C i » « E T £ R

tiHEIGHT oc GAJGE

\

\•STEEL CAS-«*G 3FPTH /2>-5

DEPTH TOPACKER .

\

\ \

-fV.

\

/\ \

•LASLAND k IOUCKBtCMEEK. f.C.

WT-IV-A 1 of 57

SINGLE PACKER TEST DETAILS

PROJECT NAME 5 H 1

fcjn^

CORiNG / SORING _.,

PERSONNEL T<LT

DATE !

*«—

THE'GHT OF GAUGE

HEIGHT OF CASING ,STICK DP L.^t-e].

O - \ - X o

\

V

H TO

\ / \

N ' \

\ \ /1C."

HOLE ni^uFTFR ".^

OFPTH H I-?:- a 1

-I

%

O

O

oo

o

oo

0

0

o

7)

.

DEP-

PAC

TEST

1

o . \ •'""} & x

/ \

•H TO-L-1./ XKFR n la I .

0 .

\

\ / X

^- BEDROCK -v

\ J \/

INTERVAL ^J'\~-

/

NOTES ^ (*<

•LASLAND » IOUCKENGINEERS, f.f

WT-1V-A 2 of 57

psc-ecr N.

DOUBLE PACKER TEST DETAILS

ilW^V -..'i-. ":H)p CO":*G / 8CR SG L

O //^ ''/ - ~r^'

/ ^~--*»«-6

£>G I*T ce c*s so •S'lfit uP *<

x o

\\

ME-GHT OP GA^GC •>•p/ / 1

•>•• *° * '

\

EEL CAS.SG

\

SFPTM '-'3 S.\

TO ./

\

\ \

/

^~ BE^OCK -v

£ST

s»£'» = C a A ' ' £a f PE

°ACr£9 •

OcC& •\aV X

xx

fir rVr-J

9<9t.t:itt. * C.

WT-IV-A 3 of 57

SINGLE PACKER TEST DETAILS

P R O J E C T SJ«* 5H

PROJECT N'JMBER

LOCATION \fJin*jyn

/ / £ • '«> ^- '

CORING / B" 1

nrPERSONNEL

7-/Z//0*DATE

HEIGHT OF CASING fSTICK UP .. £ .f 2-1.

\TO

TA3i_E

\ \

/ & C K E R -

\\

PERFORATED PIPE

\HOLE DIAMETER

DEPTH_Z±

THEIGHT Or GAUGE

\-STEEL CASING DEPTH. - 5 a

TOPACKER .

\

^-

\BEDROCK

TEST

\

NOTES:

. 5,

10c -=

/~?J/ •LASLANO t BOUCKENG1NEEK, f.C.

WT-IV-A 4 of 57

PACKER TEST LOG

1111

.1

Taet Ma.

Vx,

•5b

Project Tit

>roject No.ocatlon

Soring No.

'ersonnel

i« «\- — -._<*., 5»nr.p.j

v^i.-ot^- - - ^

T^-\ C-d -, <: /-r-^-s-

Oapth Manral

Totn) Frow(ft)

H\% l3

HX^^

5 A.^ol

3

:££i^

1

Depth to.WaterTable

3

J

Height °'

6.V,

^J

Test DateBoring Oil

Casing Hi

Gauge Hi

Oaug*

U ;

^^

•*>?«

^^\

-*c-T,;

\~ J C — > ~V

tm«t«K2r) H-V

• Ight ^^"i'^Q

i?ht a. 6 ' , J

Malar Reading

Start (J Finish

OSbX^X

•a^cA.i

'S^CV'A \

^Se'.SA

OSO«»5

<T.

^vvo

C ,

^S^>.TV

^^c^^

OS^o

^S^c, c

^s^ -^»

"JSilC X

3<^^ \

^•=0^ \

,_cxs^

-JSo^.V

<r^ r

«T* — -

^c-^.-a

^•«.-_---j;.

-35\'v>^

^JSTICT;^

-a^^.0

IS^I

- ^^ . \

^«54.\^.~?

-.Si\

Time

Start Finish

O

^ '00

/c:oo

17 cc

«

S-oc,

0

s;-oc.

0

9-oo

/C:00

/T Co

c

s.-o.

I«OC

^-c,c^

(0: CO

19 oo

3c:oo

S ' C3 O

/c:00

s; 'o ci

\o- o^

S -oo

Ic-oo

15-co

"3o-co

^ C> 0

\e> : o C

//:co

WT-IV-A 5 of 57 IIASULMO » *OWCK INOINICtt. »

-a.

PACKER TEST LOG

Protect Tltl. SMTP

Protect No. \ \-a-\C,— ~i\

Location x^o\s~*.*o»v* ~TX^ — ~ ».

Bor'ng Nfl- ^ — i.Personnel c_<c <i/ ~3" \-T~S

T«.f n.t« <\-^.

Boring Dlameter(2r)

C»«lng Halght "•

Q«uga Height ~

Q. — 'e.^V

H.<

X.-A^' S3

5 . c \ gJj

T««t Na

-TX^o

Otpth Inttrvkl

To(M) From(ft)

H\'.J •^•V.9J

Depth to.W«t«rT«bl»

s.c\vs3

Height °'ft ^..r, •/•<%UBVQVATT/

^L *^>\ w^

^.^Sij

OtuO*PrtMir*

~^0^si

Mtt»r ReadingCV " *>

Stan Finish

^^>G-»,\.t •ascH^.^

. Time

Start Flnlth

/ i : oo i-a-'jo

•LAJLAND 4 »OUCK INOtNKK,

WT-IV-A 6 of 57

PACKER TEST LOG

.1

\ *.

3^1

H^

(

1:

>f

II

Project Tit

Project NoLocation

Boring No.

Personnel

ToOO

XQx I

\*M

'

1,. N5U. -.W*-~ bHlP

\ \ -a- \£- -a\Teat Date r~3 i — OT-

Borina Olameteri2r) H-.V

V^O\*»*»\=r.^- ~"Y~\~.- — «x*». Caalna Halaht "3.." 7i -\_Q_.

^3-\.C-lj

brtvorsl

Fro«(ft)

\ >1A«

J

1 1 Ji

_— i-^^5]J

j

I

^Si£ x-a.Vlj i

Depth t*.WaterTable

i

M

S-oVl

vo>>

Height of

QawoeffU

•^ V

VJ:J |,:

^ .;«,(

-,.c;0

-

Qauge Hi

fntmn

\<>r«

f/talO

\or,»

,;

light "*•- C% *1.j

U«t«r

Start

I3EMC.S

/^•W.o

I-5.HO.O

t^«i.x

mnc

IIWA

13713.1

nmi

I3HE6.0

3^C.1

l^TT.S

3dl£

Jccrc

37-/I.C

, Finish

i^CO.C

IO«l5C.o

i^nui

ViOH-Vc

| T**\ftet ^)' ^^ 1 1

IW3.I

,nru

i^i.-<(

i .i

i^TT.S

;?cn.6

,*cs.c

!?>!•.£

/51-S/S

. Tim*

Start Finish

O

T-o^

O

^00

io- "S"?

IS cjo

JO. OO

S-.oo

ic.- -5

IT OO

HC "TOO

Dc-cc 'as'- ^ 5

^-H5 ^'^

o ^ * oo

^•oo / C - Q O

yo:oo i?:oo

/5"-co 2o: oo

Oo • cxb Q sr c o

^•SXic, •So.-oe,

WT-IV-A 7 of 57

PACKER TEST LOG

Project Title !S\...~-..».ti-~ <*titP Teat Date

Project NO. \\~S-- \d~"^ \ Boring Dlameter(2r) V.-jLocation ^-> \ o^-^c, "~\~V>c.^^fx^, Caalng Height 2.9 H

Boring No. fc>- ^ ;

Personnel ~ r~

C- \ Gauge Height

Teet No.

f

a«.

Depth Interval

To(»t) From(ft)

V4?;sD&TXfi-MA

' i'V^vv

\-x.^G/

^ cCtexs

Depth to

Water

Table

*-°"*qQJ

J^

Height °'Qauge(ft)

^.C iy

7^ u>r

Qaug*Preaaw*

T«3rs\

- ^> A.

rMeter Reading

Start Flnlth

i-sms\-?.<aH-ia

V3^oS.\

r?wa."5

i^o^.e

'•fc?c.-f

/,/-, c.cs

i^S^.S

vs«\e<;.\

V^°\C.5.^

Mcas.S

HQ«?O.I:

H/so.-i

ic - - a*

, Time

Start Flnlth

0

V-oo

JO'-OO

1 S r o o

15O:OO

3 S • oo

^<%. JAJi,/

S*- 00

\0: O <s

jT:o<a

"So:oc

3S100

~^o too

WT-IV-A of 57

DOUBLE PACKER TEST DETAILS

P»OJECT NAME I p C0« NC / BC* SG.

LOCATION £fj> DATE

-T-H£ CM! OF

-v , SSAjGE ^'fa

M£>GHT OP

' • I

O ^

* o

\T&C

\ I3Ef'^ TC M

WATER TA8.EJ

~^ X

sc _- \

\

•STEEL CtS NG DEcT

PACiE"

\

\

\

Ci;<£3

P E * = C ^ A T E C P.PE

O:i

. O ii

O

. c

'EST *i i x

siAC^E1?- \10 fir.

v ••/ "/ ~~7 «A*'-A»«O » so"" y^_^y Ct^^IIBS.»C

SOUC«

WT-IV-A 9 of 57

SINGLE PACKER TEST DETAILS

NAME

PROJECT NUMBER

LOCATION \fJjl "T<».ci [(

COR'NG

PERSONNEL

... DATE

THEIGHT OF GAJGE

IHEIGHT OF CASING *

STICK UP ZnO-g'n

0 - \ . ^ o

\\ *7 ' r>FPTH

_^ltr"^TER TABuE

V

\ / \/

x "- \

\ \ ///r/x

HOLE D 'AMFTER ** '*. /

%v_

]L

0

o

o

oQ

o0

o

0

Q

—\

A

.

• ^

x ^

'^ " ' • / • "

0 .' \ S°-'"^ ^7 X

/ \

STEFL Ci5;NG DFO7H J. J.0 £. j

DEPTH TO ill ~ , XPACKER *tl.UO\ 1

\ ^

\ / X

' y/4^• C X

BEDROCK -v

\ ' \/

TfST iNTFRVi' ^-^

/ '\

\ *

4roV

NOTES ' 20 pi* °~& 20 /Hl=

VLASLANO k BOUCKEHOINtEtS, PC.

WT-IV-A 10 of 57

/ J 7

PACKER TEST LOG

1

.1

lL

«-1 -SI

I

Project Tit

Project NoLocation

Boring No.Personnel

la^\v« - .-.'tj. S*\Ti*4

Test Date *-\ — \ ^ — "* v- .8-* / -yBorlna Dlameter(2r) H-1*

VjO'v^k^Cto^ T-V^x— «»-> Casino H«laht Q-n8 ^1

IS— "£ C -2i

O«plh Marval

To<nj Fro«(fO

HV

•>V.i

^ ' ' ^

^.TLCI

Oaptu la.Waiar

\o-\X?

5

<N.C^

J

Halghl °'Qawoa(ft)

of -b -1

J6',J

Qeuge Hi

Oaue*

/Opsi

>,,.,,

10,,;

/Op^i

il9ht <a/* ^

Matar Raadlng

8larf FlnJah

/t<>/» V3

/'•Jcii-3

i *)r ilO

I?O/J.

i^o\"3

lion

/9CQ

v<voo.^

XS00^nci^

no,-«

;05f5

c f sc. S

ISSH.g

C811./

/«rc/,.^

C" V~J

<r<»~-*

^r— r

.«fev^

l<icn

l - jc ia

wo:*

i-o\^.-^

Hci^-5

ilot^

ICTEC.5

iSfilt^

.'CSV?:/

/«f«.o

Tlma

Start Flniah

^

^:cc

/o.-oo

ir-oo

0

T-OO

/sr-oo

0

q-«o

/C:co

i C"- "» o/ > w ^

o

S:^

/o: too

,T=^f l

5": 00

>C ' OO

i?--oo

i o.-oo

S:o*

;'o •• o O

3o tOO

9 ooM

\0 i OO

,r:co

^jo ; co

«5-.M

JO •" O C?

1 ^" * ^ Q

^0:00

WT-IV-A 11 of 57RAIIAHO » 1OVCK tNCINIItt. P

PACKER TEST LOG

Project Title

Project No._Location

o-\ c —

Boring No..Personnel

Test. Boring Dlameter(2rl__J±VjS.Casing Height

Gauge Height

T««t No.

8 -1-V1

(r.,l

Depth Intcrvtl

To(fl) From(rt)

^HX0Qi

°\ . -* cvo

Depth to

Water

Table

vc!o•j

Height °'Qauoe(ft)

J.L'.OJ

QaugePreeeur*

^o^s'v

~*>OT>$\

Meter Reading

•A.SStirt Flnl»h

/C?QO.O

/C7t'?-o

/TclT*?

/To7-9.S

17-I .S

W -i.

T^e5:c

•^rH.£

;C^C'?.o

ll-o H.7

IT-o^.5

J^WJS.^

1>3&35

\^3C5.G

/T154.C

IT-HK.C

. Time

Start Flnlfh

O

^••\s

yo:oo

)5-:oO

0

T'CXS

yc-.oo

iSooei

*s-.\5

\o: oo

tf* IS

"Jo.- oo

^ • oo

/O- 'OO

IS"' "So

/ ? ' S o

WT-IV-A 12 of 57 ,• iUkSLAND t IOUCK [NOINCEK. ^ C

N i U E

i.«6E" i:~ . '? *•'

DOUBLE PACKER TEST DETAILS

•jy>hr S.U

> / „

1^/7/8?

S'.CK -jP

\\

/

pcp = ;9A-E2 *> PC

9-T-

ME

J

C" GA_"5E C-Co -. V

0 \\

\

\

,J v

^ SE:SOCKK -v

' '

\

.^- r >• \ r r >-i- ^X •» «r».»i. \-»^-»\ <^ ^ „ ^w

^ , "« •* r-'

sovc«D.-OiitaM, » C.

WT-IV-A 13 of 57

DOUBLE PACKER TEST DETAILS

PROJECT NAME 111" S.--U *m?

NJMBE* \l Z-

CORING

PERSONNEL

C A T E

TOF GAJGE

p /£ &

HEIGHT OF CASING ' 'S T I C K UP .215.^

O x • o

\

\ .. DEPTJO-^* WATER

T

\ /

H TOTAB^E

\

/" rfl.,.K_*

N' ^ \

PAryr f? . . fc

HOLE DIMETER Q_liL_

-I

%

^

0

0

o

oo

o0

-N

^4

fy

1

OEP1PAC

1

TEST

^ P ^

/ \

-i

•H TO /p/y «r A /u c a P* i • oi jt

\

\ / X

^ BE3ROCK -v

) \

x - \

'NOTES ^Ji .'-/

^*— ;£=* tx&tK£<n.» c.

WT-IV-A of 57

DOUBLE PACKER TEST DETAILS

PHOJCCT NAMEt "r'a— ^ ^ ^ ' '

COKING 3-3

LOCATION DATE

HEIGHT OF CASING ,STICK y* «3-fSa

\\ DEPTH TO

GAJGE

\ \

,

DCP1PAC

O x

o ; "-o ^ ^/ \

STEEL CAS>*6 DFPTH /3'^

rH T0 , -, ' t /J.F. 10.3 s f '

o /\

\ / \/

PEJORATES P PE

\

HOcE 0V-

*£,__7«_

ROCK -,

, ) \TEST

BE3ROCK

JiP

\

HOTES 0 O, 20 f 20 pi,

.re

WT-IV-A 15 of 57

SINGLE PACKER TEST DETAILS

PROJECT NAME SHIPPROJECT NUMBER lit

J/J.n$fo>1LOCATION ¥

CORING /

PERSONNEL

DATE .

THEIGHT OF GAJGE

1HEIGHT OF CASIJJG '

STICK UP X-'S^

/- - / . ) & ' . • 'O • ^ . ^ o

°" \

\ l/0u<' DEPT

1^^ WATER-rod

V

H TOTABi-E

\ / \

x ' \

\ \ /HOLE DIAMETER _iZf_

pFPTH 76* O a.fi

-

^ 0

0

o

oo

oo

o

o0

7)

i

.

DEP'PAC

TEST

S^ • _ /

X rto'STETL CA5.NG DEBTH /-5. L/-.

•H TO > /-) *- A, Xi/ CD / N*^X ^ aV

\

\ / X

^- BEDROCK -.

\ ^ \

.7 x " \NOTES: ] no

= ___ 8

/~J/y ILASLAND 4 BOUCKtNClHHBS, r.C.

WT-IV-A 16 of 57

SINGLE PACKER TEST DETAILS

li'-er V

Tl TPE*SCV*£L ^'—i

iO£<«tl«

9T

HE'GHT OF GAJGE

OF CAS:S

\\ ' DEPTH TO

«AT£R TA3-EJ

\

DEP'H TC jjn nPACKED ' V- ' •

/

\

\

P.PE -*- or£ST

\

4.3'

\

\ \

C\ r, J_-~M-OJ AJ «^-%i>—

»CK>CK

WT-IV-A 17 of 57

NAME

SINGLE PACKER TEST DETAILS

i ;.-u.. si*£ >MP CORING / P.OPIMK ftuJ-SD Wa.o

>lo~ I KO.V. s ^

PERSONNEL 3" '--

bA A 7DATE

TOF GAUGE

HEIGHT OF CASING«!Tir.K IIP ^-'5V

O. - \ . X o

\\ , DEPT

T

H TOTABLE

\ / \

/ PAftf FR . . fc

x ^ \

\ \ /

HOLE DIAMETER _2 jL

DEPTH , , ll$.-O

-1

0

O

o

oo

o0

o

oo

/{

I

.

DEP-PAC

TEST

'o ' . „ '^

/ \0

•H TO -, ' . /*Ff> <TT

\

\ / ' \

i) /"

^- BEDROCK -s.

\ J \/

X

NOTES:

QD J"( -«-•- .

•UkSLANO & tOUCXmeiNEHs, p.c.

WT-IV-A 18 of 57

.TS--

PACKER TEST LOG

Project Till* ~S\— .-.*-.-

ProMct nLocation

\0-\C--3i\

Boring No..P«r«onn«l

last Date \o-c-_ Boring Dlametar(2r).Gating HmiaM 3• 3

Qauga Halght "^-^

TMtNa.

To<ft) rro«(

0«pfli t

W«t«f Height «' M«t*r Reading

^Start Finish

. Tim*

Start Finish

^ Not oo

|o:oo

1 oo

-. GO

oo

10: C 0 : C o

• S" 00

5"-

/0:oo • o o

JS oo -a 1:

T-.co

OO \ o • o

\ S 0 o

WT-IV-A 19 of 57

PACKER TEST LOG

1

11

.1

Test No.

^

B

Project Tit

Project NoLocation

Soring No.9er«onnel

le ^-V. -•-—•v,.- ^IPU"3 -\C -"2. \

Teet OatiBoring Dl

> /O-t-tt-r-

ameter(2ri ^ "VO'w^-tc,^ ~\ '~Vr.v~«^, Caslrm Hfllaht 3-1H,-, V

"v^,— ~~^> , 0 - 3

"^S-^sV — 5--~V;~>

Depth Interval

To(ft) From(ft)

-*VQ

^ VIy

T^.c^gi)

vo.^,

Depth toWaterTable

«--s?'J.

<S.^q

Height °'Qsuge(n)

I.C'.!)d

^.C*0J

Gauge H^

Qaug*Pressure

,0^,

"a C3-, 5 ;

• ,

\cr*\

• Ight ^ . C ' f j O

1-

Meter Reading

Start Finish

TO6-V

a^cvs

16SC1S

^OS

"SfiCTt.^

»«5o-:i.

^S6T-.l-

^sc%-v

. B85

^•feSSoA

WV.H

^fe^c.H

*%>.?

a^os

awc-v.S

^^c-v.S

1^5 C-V^

•»%>.!•

^S .q-

•atscT-i

"*•«.<=. "\c . 1

3feS«Nc.H

•Jfc Vto . f

•at^o.vy

. Time

Start Finish

\Stoo

O

^•00

lo: OO

V«5-.oo

<b

S"- CO

/ C - 0 C

/S'-oo

0

S '00

/o' oo

I^ 'OO

3c-oc>

«S-.oo

/Or 00

:? -Co

Qo-oo

'C -QQ

lo-oo

1 ? •' OO

QC.-OO

q.-oo

\ Ci •• Q t;

,9:00'tXo : oo

WT-IV-A 20 of 57

PACKER TEST LOG

Projact THIa

Projact No._Location

Boring No.

.Paraormal

last_ Boring DlamatarfcrL

.Casing Haight

Qauga Haight '.

/o-T-01- 4. \0-<a-<ai.

~ !)'* n.-. X

TMtNa. Depth M«rv*l

Te(fO

0«ptt to

W«l«f

TableHeight •' Meter Reading

Start Flnlah

. Time

Start Finish

ic : c o

/Ope, oo

."e jo:oo

io r f>o

-jc-.oo

/c: oo

i T oo

c C C O

il

WT-IV-A 21 of 57•IASVANO » IOUCK INOIHf ItS. P C

x<«^

PACKER TEST LOG

Project Title"?V...~.-.*».. Test Date (0-9-8 T-

Project No. \\~a -\ &-"5i \

Location <-O\v^ \ro-~ T\ ----- »

H-"

Boring No..Personnel

-3

Boring DlameterterlCaalng Height ^,"3HX

Gauge Height "a . C c

T««t No.

Xo-S-ST-

S

c

0«pth Interval

To(ft) From(ft)

^^ .s\3

^^•^.jj

^->>5J

~K.*J

Depth to

WaterTable

"V.\tJ

l-^1..?J

Height °'Qauoe(ft)

^-J

3-C,9

QaueePreaew*

Vo 5 \

Oo-,S'i

'^O,,?*/

/07>si

1 Meter Reading

^Start Flntih

'S'AocIl

"i^oGT)

•S'NoG^

^oC^

^scc-a.\

^^cG-a.N

•3'Act1.\

l^cw;'i.\

1 "So c-7 .7

•3"\aG-3.'a

a-Aoc^:^

7So-V\."a

•5^^s>^.'

OS\£«i.^

y\a<s3:"i

•a -sec. -a

"i^GG"3

l^oCTl

S»A«e

-Y\sGX.:\

"J^cCT.v

•a^oco.i

•a^cfi.i

•^«\cG'sr3

•3--.eC.-3 .

-i cc.-a.'i

'^^\HH-3

^\t^.^

•3 -15-3.1

^•ise.?-

, Time

Start Flnlfh

C>

^ • oo

|O:oo

i 5-oo

C

^

/o:oo

1 STOO

O

9"-'oo

/o -oo

o

C -tso

/O : Co

If, '^0

^".-0 0

\ o ; c>c>

19: oo

acvoo

*5 GO

\ o •. oo

i ? .'co

^o: OQ

^r Go

i O ' C' O

/ 5" .' 0 o

C: oo

1 o : o o

/C' '?o

"2c?:oo

WT-IV-A 22 of 57 ILASULNO i loucr tNOiNtrrs. r.c.

PACKER TEST LOG

Project TitieTSV ^.- <- . r *>

Project MO. \va-\k--3\Location

Boring No.

.Personnel

Teat Date

Boring Dlameter(2rL

.Casing Height

Gauge Height

"*** Srfs T-

i1 Q» a >

TeetMa.

£

Depth Interval

TrflO Fro«(fO

-S.1,'^

Oepttt te.WaterTable

Hel0M ef

Qauge(ft)

^.Cj

'

£=.

^0 sv

^N^^'C o ^\

Meter Reading

Btart Finish

•a-v^ci

3S^^>-\

•3SH*-*.-:

3"» 5 3C. M

-. Yv.S

O^fco.,

^^x-j

^SV.I

3W1.1

^cre.H

. Time

Btart Finish

0

S 00

JC.OO

jr-oo

0

'

Ic. • co

IS", oo

?0:oo

V / T

\(

WT-IV-A 23 of 57IOUCK iMoiNitvt. r

SINGLE PACKER TEST DETAILS

Ol J y l ^ " / <C \_J l"^PROJECT NAUF mSy^lOtTSr/ ^,4-« } H f

J

PROJECT N:JMBER Il2./b.2l

LOCATION U/indcn Ifirmfte TG^ihri*.c/

1HEIGHT OF CASING x ^ '

STICK IJP £. Tl »j>

0. • V . X o

\\ n /,/ ' DEPTH TO

/ -f- 1 WATER TABLE

V

\ / \

. \ /- \

\ \ /HOLE DIAMETER liA-

Q£PTH TJ'-J g^

r~//

\

(i

oo

o

oo

oo

o

oo

^

CORIN

PERSC

DATE

^s

^<

NOTES: p-&>h?vr"jj fafe A<t f^^'i

fV^ "P ^ K\ V. iii i *. '\ " ^VA \ /%<j / pnBiwft M ' -T_E, \^*o . \O-

NMrl A t— J

9//V9?

9"" -T-

f1 •-) , ' r\

HEIGHT OF GAUGE A • P _^^

r

CEP'PAC

TEST

^

^ '^

^-* SQl L "" \

H TO / II -. ft x^

KCR V/^^ ^

\ ^

\ / ^

^~ BEDROCK -,

\ ' ^ \

• NTPPVA, ^ '

/

\

2.0 f>Sl } o~J 30 f*>(VC C= "^~S^- -(j C.vx-^ N-. ..J .

£ ~ ? / / J 8LASLANO 4 1OOCK

WT-IV-A 24 of 57

SINGLE PACKER TEST DETAILS

"" '

f-E«SC*N£t. 3 -*

T&£ [s'fj 9/27S?

H£iGHT OF -aSi»jfi 1

\

\

i»jfi~

\

\ / Oq.' 0£P7n TC rO- D' WATES TAB..E

\

\o|

9ME'GHT OF GAJGE

s

.

1 t

/. ^0,0 . \ ' 0

OEPTH TO '

\

r .

\

.L

\

^ -\ f * » —* « - - - - - W \—XX .^.t

>OWCK

WT-IV-A 25 of 57

PROJECT M A u r

PROJECT NUMBER

LOCATION L

DOUBLE PACKER TEST DETAILS

CORING / BORING _t

313"L^cPpWfr, S',•(«< 5 ' H I P1"

|1Z. lip.

[ K Ow f g_6i I iTV-V

PERSONNEL

DATE

HEIGHT OF GAUGE -i

1HEIGHT OF CAS;NG_ / ..

snr.K UP £. 71 *,V

0 • x - ^ o

\

\ "I 7 1 ' OEPT_Ljtly WATER

H TO

\ / \

/ \

"OLE 0 : A u E T £ a ^T^

r

%

/

/L

oo

oo

o

0

o

%

^v

(

.

a

'DEP1PAC

TEST

w

"^" ' • s • '

o . \ SOIL~) ^ x

/ \/"V /O ,

"H T0 I L/ ' /KfR . I1". V*

\ ^

\ / x

^ /

^~ BEDROCK -s

,„.» Wife' ^ X

/

\

WT-IV-A 26 of 57

PACKER TEST LOG

If1I

.F

TeatMft.

U

•reject Tit

»roject No..ocatlon

lorlng No.•ereormel

Depth

TeCfti

MS.IS,J

la \5\cu— . . . SdrP

/II-IG-'*!

^o,-o,^_ -rx— ~-~ ~

"B--HT f- H

«</ ^rx--^

Manral

From(ft)

Hi'.ov/

I

Depth to,Water

Taftle

•5- Mlox

Height •'Oawg«(rti

••-^

Test Date

Boring Dla

Caving Hi

Gauge H«

Oaug*

^*MW

' psi

^O^$\

^or5r;

T-l^-tsr^-

imet*K2r) H.1^"

tight "a."V\'^9

lyht ^-.S'cO3

Mtl«r Reading

TBtart y Flnlah

\ ^*\>.H

/eis^f

/«M^>.1

/BM'll-.H

/0 4^7.5

lei'iT.s

/ef^.5

/gHl .'S

/»V?K r

ItW.C

IBVJ.C

/£4?>.C

\6^T-.H

/e^nf

»S49^-.4

l flf.1/

IPTJK'S

fe^??.c

/fc^.S

/gff^.S

/e^?.c

/asi^.c:

is-m.c

;8W.€

. Tlma

Start Finish

O

^•-00

/Q-oo

15-00

C

5rOO

S--ooVt

lo:o«.

/<?:oo

QO--CX3

S:oo

;o:0o

iyO:oo 1 5"Oo

iS:oo ^c.-oo^

C7

^ 00

/o .-co

J?;oo

5" 0 C7

i O • o O

15 00

"3Ci:Oo

•IASIAMO ft tOVC« IHOIMIIIt,

WT-IV-A 27 of 57

PACKER TEST LOG

Project Title

Project Mo.Location i

'S^Tf Test Date

Boring No.

.Peraonnel

-H

.Boring Dlameter(2rl_

.Casing Height

Gauge Height

f.S "

Teet No.

^

Depth tnt*rv»l

To(«) From(ft)

??.*'''"<'

V&,!>j

' n.?~-t'<J

-i- <s)

Depth to.W»t«rTable

^•H^»J

Height •'Qauoe(ft)

^-^sJ

Qau0ePreMure

/0P?i

110 5;

" .0 p.«s\

Utter Reeding

^aSBttrt Finish

lfe5\C.O

/e^5>.^

/657^./

/gGSI.ff

ie<=.s<\.o

/se^c.?

/S^3?.?

/e?cc.o

/^Scs.c

/P8SP.S

/e^off.^

/tlSS-B

\SS^V."5

J8«5<}C./

/8£?/.8

^9C?o.5

/pcte.'a

/e?^.?

/e?^co

/e^s.i

/&6?fi.i

/^fc^.e

/fi^T.B

/?oc^J

Time

Start Finish

C

T^oo

/r.-^S

;5"-00

O

«J-.oo

/0.-/S"

/ 5-C"3

O

5 'Jo

/ 0:00

/S.-oO

S OO

io-15

IS 'oo

'Sio-.oo

^:oo

/o:i 5-

/?-:oo

^o .- o o

£"•- /O

/ O*. OO

1 5": oo

"30: oo

SLASL1NO i IOWCK IN«<NIIIt,

WT-IV-A 28 of 57

PACKER TEST LOG

1II1}

ToatMk.

< 0

>ro)oct Tit

»ro)actNo.ocatlon

lorlng No.koraonn«l

D tti

T«Ol>

«W

!• ^I0:<w...e. -^ ^«L ?

1.0- - > v » - 2\

B--/TLT^

-«,

».j«i

*

Dap* to.Watvr

6 8 Toe

Height •'

»-'W

T»»t DateBoring OilCasing Hi

Qauge H«

/

/o

Jo

30

r-jy--?7

im*t«r(9r) 1>

kl0M 2 7 S ' X /

Ight O. TC rt' _

Start

JS7aaa

35U7 *

D< 7

M%*3

J5?O3 O

05^7 fc,

26o?Z.-

a

a.^f<r

at3*b

^5,3V

4«adlng

FMah

J 3 7t7 ?

05^70

^fc 7S 3

^SVffa

a^i2

a/«/i.j>

Jt.J"? -V

•243f? t,.

a^r3^

^^ c

. Tlma

Start Flnlah ^

o

^ '5»*^

/O.e-

J5

&

5

/o

IS

O

^5.20

10

IS

^ lS F»xii-

/O 0^jj— _

/5.

10

5

,0

iS ^

5 -'2.0

/O.

IS

20

WT-IV-A 29 of 57

DOUBLE PACKER TEST DETAILS

PROJECT NAME ^UtS 5HM*

PROJECT NJMBER | l c . ) o - f*->

LOCATION VJ'0^On lf\0^9+* Todi/i'Tj

S"S"

\. Nl. \or«» F«r Ja.

CORiNG /

PERSONNEL J u-i /C95

n.Tr 7//W97

HE'GHT OF GAJGE 5o^1

HEIGHT OF CASINGS T i C K UP <i.TO -/

O \ - ^ o

\

\ O t?? ' DEPTI C. Jt. WAfEa

x

V

H TOTAB.E

\ / \

/ \

HOLE DIAMETER i_^_

npPTw ^So.-S .i

-

^

r^/yAv_

n

oo

0

oo

0

0

Y'

— s%_J

i

• i*

iEPIPAC

TEST

o . \ ~ '""~) c? x

/ \STEEL CAS.NG DEPTH (b.^.J/

•H TO ,/v ' /KPR /C/CJ-TOC

\

\ / X

^- BEDROCK -.

,NTrpVA, . 5 X

,

^ \

NOTESG

.

Q 2A f--SSt>r« §owc«W9IKII8V ^ C.

WT-IV-A 30 of 57

SINGLE PACKER TEST DETAILS

i*^ *E;W "5 H I P

PROJECT HJU8C3 > £ I k

, r. L TV*LOCAT'Cs >-'!r*.r?n ' r1?

rno vr. / ana^r.

PERSONNEL C^

;MT OFSTICK >

1

C? i

\DEPTH TC -

A~E3 TA3.E

\ \

C«£ -^

P.PE

GAMETE^

DEPTH

-T—OF SAJGE

I

-ST££L CAS.1

~H TOPACKER _

\

\: ~EST :f

or rj&i i- -^-

\

\

\

\

MASLAND \ KDWCKBlGlNilK. P C-

WT-IV-A 31 of 57

SINGLE PACKER TEST DETAILS

PROJECT NAME

PROJECT NJMBER

LOCATION

t:^ s,t $ H

r~ 'IM

CORING / BORING

PERSONNEL

DATE _

THEIGHT OF GAUGE

IHEIGHT OF CASING

STICK IIP T\-A. w|y

O • ^ • o

\

\ .-) , £ DEPT1 >£? WATER-roc

T

.fc«

H TOTA3.E

\ / \

x ^ \

\ \ /{' *

HOLE niAMPTFP J/&

^ O

o

o

o0

oo

oo

0

-}

J

.

a

OEPTPAC

i

TEST

o . \ -lu~) <^> x

O

\

\ / X

L X

^- BEDROCK -x

\ ^ \

35 <'

^ x \

NOTES:

•LASLAND t >OUCX

WT-IV-A 32 of 57

DOUBLE PACKER TEST DETAILS

£CT H.wBE* - ' -£ °-~!

fac

MC,GMT

sT CF CAVS3 i ,-.c* OP 2.95 »fi

\\

/

\/

9T

GMT OF GAjGE —

. x

x M-0

•—j ST£EL CASNG iE»TH.

DEPTH TO .,/^X

\

\ \

O( ^ K -s

'Ol ! TEST !f.T£9VAL

7i -0 Tot X

KASULNOk&cs«tj«. r c.

WT-IV-A 33 of 57

DOUBLE PACKER TEST DETAILS

P R O J E C T Dl Wrv.l

NJMBER / '^ /£>.

LOCATION

Jiii£ C O R I N G

PERSONNEL

D A T E

HE.GHT OFUP

\

' OEPTH T0WATER TABLE

\ \X P A C K E R -

\

PACKER »

HOLE

DEPTH a S

THE'CHT OF GAJGE O- Q

cr

•STEEL CAS.NG DFPTH lh-~> •*,-*

DEPTH

\

\

BEDROCK

TEST

^

'

31-o'^X X

SC:ES to

~~

^KJLSLAKO » tOUCXCNOUif £K, f C

WT-IV-A 34 of 57

SINGLE PACKER TEST DETAILS

NAMpn3>>.o<!yT

PRC-ECT NJMBE*

p .PE?SCN*EL

HEIGHT OF C4$IS5Sr.CK UP

0 !

\\ /nrxi' CEPTH TO

Ir.tu WATER-roc

\ \/ PACKt^ -i

\

T-HE'GHT Of GAJSE J'V <*-

TO

\

\

\-v

} \PERFORATED P Pt

wE «

/

\\-I- S5-

-- ». V~^

iO«C«

WT-IV-A 35 of 57

SINGLE PACKER TEST DETAILS

PROJECT _SH | .P

PROJECT NJMBER

LOCATION L

'2. /D-A-'

CORING

PERSONNEL

DATE

THEIGHT OF GAUGE

HEIGHT OF CASING,/ 'STiCK UP 2-T5 **

O • \ o

\

\ (~>£n DEPTl{--3 WATERTOC.

V

\ /

/PAT if ra

\ /\ ^^

\ \

HOLE D'^"FT£R 7;p

H TOTAB^E

\

\

/

-I

/^O

O

o

o0

0

o

o

oo

-)

,_/

.

CEP'PAC

TEST

1

O \ '""^ £? X

J

'H T0 ?4 /O /KFR -'O-^^S

\

\ / X

3^^P \

^- BEDROCK -x

\ ^ \

JNTFRVAI, / r S _

X

\ \_55.«SJ

NOTES'

\— «Si

KASLAND » IOUCKENGINEERS. P.C.

WT-IV-A 36 of 57

Cj-^-^J:-v

Project TH

Projtct No

Location

1.1

TaatNa.

\J~

^u

^<v

H^

S^L

fi

loring No.

'•rsonnol

Oaptti

ToClO

v'-T-c-C >

vV

V^V^c

~^W

^ \%-.cc

•av^*

•x.^>

PACKER '

U ^W v\*— 5riTP4

\\-i- \ 6— -^\

^^-* V>,_-^>S»>V . \ \~X_N_~ -*-^

,-c; . £ - $ -^.-r<-<:s J-S-VT^-

Marval

FraM(ft)

' C-r-oC^

vc,x

NcJ^c

vH'tw

\^Vo.

H^rx

Daptti la.

Watar

TaWa

OVD'-«.r

v-^.s-aW

^-iSX

\-i.^r»=

VS.S^TU

HalgM •'Qaiioa(n)

^c; j

.^.o?J

c S - 0 ' 1

^

S O ' , ?j

s.oytf

TEST

T«tt Dat*

Boring DU

Casing H<

Qaug* Hfl

Oaug*•tvaaura

\O?s»

c ^/*^ O C \

Sp?\

\Cj>^'i

V^pc ,

'LOG^V-XH-'S'Tr

im«urf2r) *i 7/

.ight -a .«\ •*'... a«r

Ipht S^'aQ

0

Malar

•i»Start

•>,.«a.\

^/av

•^."oXv*

*"ac.\-i

V^CA^

\^ii 3e.»

oc-i-% ,

f ^COC ?:

i2£T3. i

-«>.

-^t.s

/7i'/r.i=

vr-Tc -> s

Raadlno

^ FlnUh

"X ^\ P» t i. .^

.. N

~^.e\

V->C\fc."^

\7>C1C. \

OC3V&

OC-2C..^

\UC ?

!^?T..8

SS.S

^.^

•••:.?•

r^ 1

C^.o

. Tlma

Start Flnlth

O

9 cG

/ T - 1 4

O

CD

tE:OCi

>o-oo

•=• oc

O

e 9y

JO: 1^

O

5 "3H

»• ^,0

-./ •5 . - /T

/8.-S-3

0\S*t

q-.oo

\c~t o-—

I r oo

r?c -• co

s.-s-^

/o- /"2

/ ; -oo

5~:3M

• D' ot

i S r oo

WT- iV -A 37 of 5? »oucv iHoiNrirs. r c

PACKER TEST LOG

J11I,f

Teat No.

•j^tSJ-

f Sx

• rr

h* LU

Uou

U-v,

'reject Tit

>roject No

.ocatlon

Jorlng No.

»ersonnel

Depth

To(ft)

^XW

-a\V*

^

•M j

j

^^ \

j

U >^Wv~VV^\T,~ ^WTP

^

^ov ^ -^-x ^

K-^ iC-Sc; S,S l^TV.-^

Interval

From(ft)

V^c

\VTCC

7)HV^j

^Hk4

^ \4'^j

NC.S.JJ

Depth to.WaterTable

Toe

0-->W

<=\-^Xl!J

c^.^\

^

J : lii

°< 11 \J

Height »'Qauge(n)

«;.0.,

J

S.o>.

J

^-o^J

J

Teat Date

Boring Dlf

Casing H

Gauge Hi

Preaetre

~SO-2>«r\

T "

^ -

Vo V

\ C>ij» C" \

Co p i

*

^ — \H-vd> VV -^ / > ~ f c V

imeter(2r) 'i'?

»lpht ^.°vV.^

,|0ht ^-Ov ^'

Meter Reading

Start Flnlih

0^>s

Q^

>l

\"^c.^<a~V

/W8.-?

x^cct>

I^CCC

/ - v c c e

occs

i^cs^

^0— <

oc.->c ^

i^?,as

P,ff-

CM.T-

>L5

78.3

\-^O^;T-

1^7579

«ccc

ncce

i ^ C G S

occe

'^CCB

r~-? a*-*-**^

0«/*5

|3C=f ^

PC.H.7

. Time

Start Finish

O

"5-00

/o,oo

0

S-.-c-o

o

^•oo

/Oreo

O

q-oo

/o.-oo

O

5"' CO

/O.'CO

S-oo

/0:C0

IS: 00

^:oo

/0:OC

^ 0 0

/ c • o o

I S " ? oo

^••oo

»c. -co

isr.-oe

^•oo

/ => : o c

(S-oo

WT-IV-A 38 of 57 iULJULXD » »OUC( IHOmllBL f

\

PACKER TEST LOG

1f11.f

Teat Ma.

Xv ,w

Oo,

f*uu

\ ^X *\

^

»roj*ct Tit

»roje>ct No..ocatlon

loring No.

'•r»onn»l

Depth

To<fO

sc.;;.

SC'J)J

SCo0

J

^o.;iw

!• v^w -<. *<x-^ -i**r?

vv-5 \ t 4v^:.»_-*c«.- TX-! -. •J*

v» ^ (* - b

t^I^X=5

Interval

\C.^,

xc.V!]

\c ^o53

-^^^

i

Depth H.Water

Table

"S

-V.1<c

^.-as*«

^ s;;

Height •'0*wge(ft)

"* * t -.

^-0 J

«5«^J

^-oM^

Ttit D«t»

Boring Dl<

Casing H«

Q*ug« H«

rS.

\o?s.

-^of,\

•fc,^

1***

v-vs-*.^-m«t«r(2rl T.'fftight ^.^"ivD9

Ight ^.OoS* j

Uet»r Reading

Vs

Start Flnlah

own:

\-3CV\-*

ncl^M

v-ac^o

oow

,3 WO

.-^rt.2

J^fx:.?

»«.-«!

/5E«.TK

WM

"^<&"s~^<^^/^

^^ r

I7£?&1

,xm.

1 e/i ^-5 ^^

V^OITVX^X

l^t *? 4 ^ V

i«Cl.3

l^no.5

(•JT^I ^

^2%c^-"¥;

l3£iS^

f^67C.r

c^ ,

^^^

i^s^c

. Time

Start Flnlth

\^-c,o

O

?-oo

yo-oo

|S"-c0

O

5--cso

yo-cc

iS-oo

^o-oo

3^5^

O

«5:oo

/C -CQ

"2c- o o

^:<bO

' o • oo

IS OQ

"3 c : c o

•-•00

10 -• o o

/ S - o o

30.- oc,

37-5S

-e-,0

'S'-o o

1C • 0 O

/ 5"C'O

»OUC« IHOtMlltt.

WT-IV-A 39 of 5

r.^-e^ >PACKER TEST LOG

Project Title

Project Mo. \V.x-\v:-^\

Location

Borlno No.

.Peraonnel

-SMTP Test Date

Boring Dlameter(2rL

zzzzmz— Casing Height

Gauge Height

Teat No.

\ 5 f i L

>,

>o < -

'

Depth Interval

To(ft) From (ft)

sc.;Qd

T<?<r

\fcvo

rJ^L

Depth to.WaterTable

t V

J

-^

A^?l

Height °'Qauge(ft)

•=-^9J

v~-~ <£

J?:L

QauoePreaatn

~3 O 5 \

i^Stts V

<?p*i

Meter Reading

•s-9Start J Finish

IW5.7

^^

Cw— - 1

t-«JaJ>>«oV

•v^5\-f1

WV

<>*.~--<

^1 r

; p

Time

Start Finish

O

•V.cxa

\c,:oo

^^ * ^~* Cj

v C; • ^^ C2

^S-.C)C.

• ULSULND » »OOC<

WT-IV-A HO of 57

PACKER TEST LOG

Project

Project MO-Location

Boring No.

.Paraonne)!

Boring Dlamatar(2ri

Casing Halght

Qauga Halght

TMt NOL Depth M*rv«l

To(n) Fro«(rt)

Depth teWater

TableHeight •' U»t«f Reading

1Stan 'J Finish

. Tim*

Start Finish

AO

oca

i c : o O

<= '00

/O

/c co

."Jo

1

KT-IV-A u: of 57 IOUCK iHoiNf in. F c

DOUBLE PACKER TEST DETAILS

PROJECT

*PROJECT NJMBER

'.Vs. SM/P CORING / ~~TLj/[Jo<l

PERSONNEL -*:

tlttlblDATE

HEIGHTUF

\\ ' DEPTH TO

WATER TAB.E

V

\ \X PACKER

\P E ^ - C R A T E D P.PE

HOLE D:

P A C K E R -

DEPTH

9I p / /

HEIGHT OF GAJGE C-b =^

I

STEEL CA5.NG DE PTH

DEPTH TOPACKER -

\

\

TEST INTERVAL _

PS.x

X

s* /»/*'>> 20f*', o.J 3^-'

\ t

^7//""y HASLAKC l KHrf' ~J KtGiNlERt, PC.

WT-IV-A 42 of 57

SINGLE PACKER TEST DETAILS

NAME

PROJECT NJUBER

LOCATION

CORING / BO'

PERSONNEL

DATE _

T/Tv •—•J

M£>GMT oc CAS

\

\

P.C- *&'£» TA8.E

A M E ' E ' - - - _

^'r^* ~" - ~ -x^

I

\

•5*£EL Ci3

DEPTH TC r- 0 LPACKER -> -^ «• ^

\

\

ES~

\

\

\

SC'ES r* -• -«'

ft BOUCKGK5.SCIK

SINGLE PACKER TEST DETAILS

PROJECT MAMF 6H P

PROJECT NUMBER

LOCATION ThorrYyOr J-Lcilij-fr.

CORING / BORING

PERSC

DATE .

B"

HEIGHT OF CASING ,STICK HP Z.'jV .,

\

\

\/QO/V DEPTH TO/ ' •£ ' WATER TAB-E

-roc

\ / \

/ PACKER

\PERFORATED P;PE

\HOLE

THEIGHT OF GAUGE

t* °

DEPTH TlPACKER

\

STEEL CAS.NG OFPTH dJ-5 a^

IX /

\

\

BEDROCK

TEST .MERVAL

\

J.U

\

S O T E S ^f ^/OS/', 30^$;.

/~7// BLASIANC t »OUCNINGINEEK. P.C.

WT-IV-A o' 57

PACKER TEST LOG

5*rcp Test Date

111.1

\

f

"reject No.ocatlon

taring No.>er*onnel

Depth

"»V"S

\ \^ - \ C, — Ti \

j s - . — r-\- •>->.-^. _ c ,C-L<^^\ -=rw^

FroflKfO

^1

1/

^

Depth te.WaterTable

\c-X'«J

••• •-" r.

(

Height •'

>^S>,

•-^y ..

Boring Oil

Casing Hi

Qauge Hi— •.

Qauge

\0 »',

•J0^;

^^\

U "-rimetorfcr) ' *^»ight O.^^v ,,£

i0ht D."V^ ^90

Meter

Start ^

iHlT^ C

HiTO

if^cf.1^

I f WC.,

;tf^S"5 M

) i^Q^Q,^

1 *^ ^fj ^

* ^j > |j - &

H5>f.C

.M-CCJ

n :?.«t

^H^-V\ ^

ISS^t-

S«5tl.C

Htcr'i

Flnlih

Mnc7

i-i oT.l

iwc.f

.HW.^f

/«^07

I«^.C

H51C-C

H^-LC-

i-J-icr,. j

,u,,. g

HMfl ?.

\ - * t ^S ^

i^.cf.C

MCc" «

««S^

. Time

Start Flnlth

0

^ cG

iC'OO

. 5-:oo

^0-^N

5S-o>

O

S'-oc

ic*4

1 ? : CO

?o-^

D^ co

o

S> 00

• o-oo

S*. o^

10 ? OO

^:00

"3Or P V

3So>

?c-oo

5:cc

/c.-c 4

iS-oc

?CJ' O O

3 V co

"*«=• oc

q-«c

\0'.Q0

(5-.CJG

T . a

PACKER TEST LOG

Project

Project No.Location

Boring No.

.Peraonnel

S>AT? rest Date.

_ Boring Dlameter(2rl_

.Casing Height

Gauge Height

*

1

]

T««t No.

\*&

f ^

— -'

Depth Interval

To(M) From (ft)

•3^-X!U

V 3-5J• *J

•3S\,5\j

,? "5. 5 J

Depth to.WaterTable

\ c ->o

Vc.V,!J

Height °'Qauge(n)

^-^\ J

\ .^s»0J

QauQ*Preaauv

~^>0^s\

\ O^«;\

^Cc>«>\

~Sors*

Meter Reading«i 2

Start ^ Flnlah

/4cr?.5

ims.?

/ V 7 40.0

iwC£'H»C

HT?C^

\M-~VC;\

\^-v-vc..\

H7TC7

v^-nc.'i

^ «.* -f

<^ e

HCIS.'f

/«J?HP.O

/VTT?.'5

H»c.<:

/HT7C.C

/•/?K.C

\H:\-\C.lr

iHl^C.^

H77C.-T

H-HCf

^«>> -<

cg- ^^

. Time

Start Flnlah

I?:o6

Oc-oc.

•^'T.-oT.

(b

9-cc

/O-Co

c

S'oo

/O'CiC

C5

^'.00

\o : o o

1>C:OO

•a-s-c-^

"B'CrOO

*} t C^O

ic- oo

1 9- 'Co

^ : 0 o

\O-.GO

1 9 : co

^ ' OCi

\o • cs o

\^ . C30

WT-IV-A 46 of 57 i tOUCIC tNOrNCf n. f C

PACKER TEST LOG

11t1t

Ib

1

>ro)*ct TH

»roj*ctNo..ocatlofi

loring No.

>«r*oraie)l

Texn)

SSS;/

U -Pfaa».. '-— C -« :.

112- Ifo-^ t

jj i Tr^^ T*, ii./

M/J- cTCS

sWu

o«ptfi tc.WaterTable

*-t7T*

.

Height •'

i.e.

T«st Dtt*Boring Ota

Casing HU

Qcugc Ht

£=.

(0

20

^

-T/Jv/n

meterf?r) 5 "

k|?ht ^ ^^^C

Ight i - C= '

Btart

-i-flt-S

A^f5 1

ifcSSo. V

DtS**.*

2Wft7-S

7^7r.

Z'.l&.l

2^25.3

JtW-S

?•«?«•» 4,

ITO-< '4

Flnlah

s

?fe?5a-v

PfcSVi-3

2fcC,S.S

2CC7S.S

?«t-*.T

^7i<= }

X8tS.l

S#W

^^

1~DH M

C-^>/00

, Tim*

Start Finish

0

5~.'

/O

^a

^

/a

/5

D

5

/O

>5

i

SwJL.

/o^L

i5.|

20

S

/O

,5

20

S^

/o . /

;s

ZO

WT-IV-A «i7 of 57

PROJECT

PROJECT NJMBE1

DOUBLE PACKER TEST DETAILS

kVto . 5Hl<r Sftl I7 ; CORING / BORING ftlld'T . \

lb.2.' PERSONNEL

DATE

THE'GHT OF GAJGE

f<9 o-X

1HEIGHT OF CASING-/ .

S T I C K IIP /. rt «x1

0 • \ . X o

\\ 12?' DEPT

r.TL WATERTbC

V

H TOTA3_E

\ / \

^ ' \

HOi-E ri AUF TF a ~ > < o

-1

%

<vS^s_

JL

oo

0

o0

o0

^s >

i/v_y

1

.

I «

DEP1PAC

TEST

^ ^ f

^~ SOi L ~*\ \

/ \

'H TO oU. & r\ /*ER , .<!:_ v<

\

\ / X

^- BEOROCK -N

so' ^ x

— ^\ /^

/

\ \

NOTES s^ '£O/°*i' cUI

^7tfi.-KUSi, r c.

WT-IV-A 48 of 57

SINGLE PACKER TEST DETAILS

NAME

PROJECT NJUBER

LOCATiQ*! lj .A«;fa

AllJ'T .-

PERSONNEL

0*TE '<9//y£y

ST.Clf UP

V a ;

\

\' OEPTM TCWATER TAB_£

•ToC

\/ P A C K E R -

^P£^=CS»A*EC P ?E

T cr GAJGE -i

t

\

\

DEPTH TOPACKER _ Jk£

\

0 C -if.b-- -. I

> ^

-EST

l^:

-) •"

f\0

/ ~J/S

~ " c. !k P.iiHKK. » C

WT-IV-A* a9 o' 57

SINGLE PACKER TEST DETAILS

PROJECT SfffS ^H I ?

PROJECT NJMBER . ' /C . /D-Z /

CORING / l\>"r

PERSONNEL ^-•>..->

/0//2/8?DATE

HE'GHT OF GAUGE^ T o 7 ^HEIGHT OF CASING T-,—,'

STICK UP / T!~ \

0 • v . x< o

\\ 1~l/>' DEPT

I? « - WATER

-roc.

V

^

H TCTAB-E

\ / \

X ' \

\ \ '

HOLE DIAMETER I_~J^3

79« ) ' j)

-

^0

o

0

oo

oo

o

0

o

y.

• *

OEP'PAC

TEST

1

1^ ' ' • /

/ \5TFFL CASING DFOTH / •->- ^ **,

"H TO O-^ <C~ - /KF9 r.J.-^<^X

\

\ / X

^ SEOROCK --.

\ ' \^ /

1NTF»VA| /O-~>

3n- cj

N O T E S ' -J

=T-.V -0 r^*.-%w. A

- -

2^ »OUCKEN&INEEn. f.C.

WT-IV-A 50 of 57

SINGLE PACKER TEST DETAILS

PROJECT

PROJECT

LOCATION U '/' ' "?

5ilfs ^M CORING / BORING.

PERSONNEL L'->•

DATE .

. 5

HEIGHT Of GAu

G^T OF CASAS-'CK ::P /

o

\

\

T3L-roc.

\ |CEPTH TO

WATER TA3.E

\

IjV

DEPTH TO /2«r '0PACKER ' ! •-> v V

\

\

\\

PE

\

\ \

SC-ES '

k.^^.

•lASlANO « >OUCK

*c

WT- 'V-A

SINGLE PACKER TEST DETAILS

PROJECT Sn\fPROJECT NJMBER

LOCATION .tV'O'V .^s T3 '~ '•'":'

CORING / BORING Jl

PERSONNEL CS^

DATE .

IHEIGHT Or G A J G E

O /O

HEIGHT OF CASING^-, 'STICK UP . / >£<.,$

O • x - X o

\\ -7 -)->' DEPT

"^ *"- WATER"ToC-

V

H TOTA8.E

\ / \

X ^ \

\ \ /

r V^,HOLE D ! A M E T £ R j£_^_

^ /

HFPTH • " - ^QS,

-

/^O

o

o

oo

0

C

o

oo

7)—/

.

*

DEP1PAC

_

TEST

1

•"• ' ^°r ' • 'o . \ so""^ ^> x

/ \ /

'K TO /-p iT f. X*KFR /J-^ ^S.

*s .*

\

\ / \

- p '.f^- BEDROCK ^

\ ^ \

;.Tr.v., ?i. S '

\i-i . a ^ y

N O T E S :

•^•\

SLiSLAND t »OUCK

WT-IV-A 52 of 57

PACKER TEST LOG

Pra|e,et THU ft\icr_.rt«t~'- . S»«XC

Pro^et Ma. 1113- )G-"3 l

Location VjO , «» t., ~~vj^c.>.

paring Ma. Js^v^j — ~~\

.Personnel L$$i>- jmf

* Te»t Date yes — \-a-<2 V

Borlng OlametaK2r) S "'fc- ~x Caalna Height \ . 1- *V -. 5!

Q«uge Height ^ - <O c.i

T«e*He> Depth M«nr«l

To<fU Pro«(rt)

D«pth to

Height «' M«t«r Reedinga/o>

Start ^ Flnlah

Tim*r*u^»

Start Finish

-r\ -.00

Voo

^Pt-

^: CO

r xpv» -.s \ O »j < i

' I^ X "i'HC.CC.'c

O

"1

0 cr oo

. s;.- oo

C'CO

tT:

W T - f V - A 53 o' 5-

PACKER TEST LOG

1.1

Teat No.

vu

•I

Ni^c:

f

Project Tit

Project NoLocation

Boring No.

'ersonnel

l«-\?\... xW- SHTPO

Test Oat«Boring 01

• /o- \ -a -e +•ameter(2r) S ta

V^Jx,^-^^.^ -\-Vr.^cOi, Caalna Helaht \.rV"^N «..Q.

V^^o--^

/^?f l /

4

Depth Interval

To(ft) From (ft)

-*«\v"'

3V c/"

:

51 J

'

\^.SX

30

^^

n.< r

'

Depth to.

Water

Table

C7cy

r,

brlrJd J

Height °'Qauge(ft)

'^.oV6

d

3-0^^

i.tc!/J

Gauge Height ~^ -0 V^

Gauge I Meter ReadingPreewra I ojj

• A^

\ Start ^ Flnlih

\ O p <; \

Vo-=,5\

^ffS.

-?oTS\

T3^\

/O ^

0 «=xO 5)^/

/

-20 fl^'

a^«\c >

^QT^Vi ^

-J^-V^P

^-VHTX

•>W«

IS .o

^^o-l5

•»^\V5

•*^ ao "2 \ ^[

W4.7^

&•( w& 7 • Y

^^s.(

flU«,'

«W3^

^^^^ .^

STVOS 1

rvw.5

^>X^.C

''XAC^-S

'5c»"V?'i. \

•a«\e7i.-SL

•a^o.T,

"3VOV.3

^^o.»

^^70'

J«fi67.f

^-^^

.W6H.5

3%»>

. Hme

Start Finish

to"

^ -00

/o:co

O

C'C«

h.CO

CD

• Til

vs-w

\CU^

0

0

0

0

0

<?-co

\C» ". O O

i^- rOO

C'.oo

U : oo

/C ' 00

cr-co

,c:n

iC,^

N>-\-\

f.c«

5-cc

^•LVC

b =G

5 -co

A^.x ^W 3? tt<Si*l / gL-f™

WT-IV-A 54 of 57ILA5LAND 4 IOUCK INCINflK. ' C.

SINGLE PACKER TEST DETAILS

PROJECT CORING / B O R I N G . . \

PROJECT NJMB1R

LOCATION VJ-<V>r* DATE ?/33/^

OF

• '\

\WATER TAB_E

\

T—HE:GnT OF GAJGE ~'

PE"»SC«ATES P PE

\

E P

a

I

\

\

S'-EL ci

DEPTH TOrAC«CE«»

\

\ / \

\

'ES

\

\

NC'ES sz* *• • -/• —

<a)«"5i.-= -v^« — • 4)

-. ,„'. ^« iOOCX

-!'. -A 55 o'

SINGLE PACKER TEST DETAILS

"^ i • £* iPROJECT NAMF li & • . «^' J< K>S K I

PROJECT NJMBPF .'!?.' b .?J

i • i , . . r •

IHEIGHT OF CASING . • . '

STICK UP ,<?2/ 0,5

0 • v . o

•-. \\ tf 71 DEPT

-'' *' WATER

V

\ /

\ x-

\ \

HOuE D' tMETER I__lix_

DrpTH ' /^. -^ ^5

NOTES S o_,^; . J T-f >•' *^

s2-- t^ x ~ « ^^c M s* a. \ *^

f

•t-V

H TOTA3.E

\

\

/

\

/^

y^

o0

o

0

o

oo

o

oo

^

TS

CORiN

PERSC

DATE

**s"

%I/

i

s /BORINS /nO i7 _~TX»A. Kio.'D

WNFI C'-*-'

9

T_

HE'GHT Or GAUGE £• o ^^-

,

f

>m -—

DEP-

PAC

TEST

I

o .' \ SO'L~^ ^ x

X- \

•H T O , / «'« XKFR '/, ^ ^X

\ ^

\ / ^

II tygt .1 6 r ^

^ BEDROCK -v

\ ^ \/ «/

-5- A /?INTFRVAI _/— "^

/

" . vu

/ ~7// ' y »LASLXNO i IOOCK

WT-IV-A 56 of 5'

PACKER TEST LOG

1111

.1

Teat Me.

\

^

Projact Tit

Profact No

Location '

Boring No.

•araormal

to ^ — "• *v*w - ^> n'T?j

»-O -^cc- ~~^V..N— .Os,

/ ' GL" \t } ^^™ i^j»^ ^^/^_ (

Depth Interval

To(fO Fro»(fi)

H*y0

HVJ

Hor/0

A x ' o J> 0

Ocplti to.

T«5I«

-v. '-

-v.s;-'

Hvlght °*

•i -Cd^

•l 1 ^s

Tast Data

Boring Oil

Casing Hi

Qauga Hi

Oauge

ICpsi

•>o si

-to^-i

iGp^ i

WOo^\

^— >o— , i-

S S / »v

'^ll?ht "i.^.\X «-CX.

,lnht ^5>SV>4

-'

U«t»r Reading

Start 1 Flnlali

^>CTVH.C

^-Vo-V4.C

-J-Vc-VS

^^S

^-vo-vs:

"^^Ct*>-O

•a>\«-a

l"\VC^ ^

^>^o^.-V

TVUS^

^^HO.=

^He^

a-vs-v-s &

OT.^^CO

WL*

a-te^vc

^_^

^a^^-.

^~-

^m.

^-vics.^

, ^2>OSO 1

TVlVi-'i

7>v^^mc

I>«;MCC

Ti-vcco .

. Tim*

Start Flnlth

O £ - C O

^-"OO / O ' O O

0 5-oo

5.-CO (OlGO

O 'O-oo

O ^ • Go

~-<r.o /c-ce

fo-to |<5:co

1

-Jc-.oc, ^«5:oo

0 «5 •- <a o

1

S""oo IO- oo

/o.-cc i T • oc

v^ -ce -ac-^o

WT-IV-A 57 of 57 •ULTJIVO « IOUCV IMCIHCIK. * C

. In-Situ Permeability Test Logs

,T -35

PERSOW

TIME

o

IN SITU PERMEABILITY TEST&\3~L~1/POO WFATHFR ^o * <yrp u _,-r- HATF alrfo

i i '

ELAPSED TIME

^Iv .%' r - f Aj ' . .

^.^0^ -r^5TT.^/

TtiWl CfeoH, -S.^of u; o^

rc «oc - 3^9'

WATER(BELOW GROUND)

1S.OO' TOG'

}H (jji\\ t\vA put&• '

K TOO +.*(, -

WATERLEVEL ELEV.

^PTC 3-^y.o

(rs

q.w rcE^~^ — ^

W T - I V - S ' o' 6

ITiuj-^-L.

IN SITU PERMEABILITY TEST_ _ _ , __ / OueEc^sT iuT~

PERSONNFI TLT/?£0 WFATHFR 52° SITF ^ OATP U/?/f7

TIME

0

/

ELAPSED TIME

0

"^NSer

^S€C

" uJe.Mf -fo s-fe-^i

^/Hfei^pf^ -fto ILST -I-I a i m m crJ i' /fr^/

" D?i^/n/r^ u/t// /?/

UM)-?^ di'diA-f rJ

Tblfi.) Opfh -rr-oc -I.Q3'

WATER(BELOW GROUND)

?. 9 ? r^@ 5^/iC

6>. s-W/'c

I - \ Jc /i^nfKfai^'Hy

/

rti 4 ri'^irn A?AO ^j jy ./

^ k<- Ihf. hv k?tin .

2) .q c / ' roc

WATERLEVEL ELEV.

Stefcc

?5/ ^ U^eA/ 7 7^>

o///'/W ;JJ

WT-IV-B 2 of 6

.r,iA,-3

PERSONf

TIME

C7

0

IN SITU PERMEABILITY TEST/ oi/erCfl5T

JPI .~5Lj/f9D WFATHFR«N>cM SITF *T HATF^/7/J?/ owetc.

ELAPSED TIME

M see!J ^er!0 scr19 s^r

2V <*fy\ secV/« s?c:

Hi/5b MsG= ^3-^ = Otrfpf CA

A WATER LE\/£1L

/!>/£)' TDil/

o.iro.os'0.05"

aoTo.ol1

O.Ci '

^W,c

,19 rocs/nG slfc/r^

«/

!

WATERLEVEL ELEV

_ t <%TC.l LCyf_

%t-Ou- Gt5X^'V>

WT-IV-B 3 of 6

IW-ST

IN SITU PERMEABILITY TESTPFRSONNFl POO WFATHFR flixLKAsV qiTF ^ T niTFakkl

TIME

0

' 'ELAPSED TIME

5" -5<^IP vr

3o s^1/-.

^q Ser

H9- ser

6> 5<^

i:ofT\\1O

\:M\"Vr^iXo^y.il,2:'M

W6s:o^(o'.lb1: 0^.oo-9:3012:50

A WATER LS\/£L

/^.3' TO^.^l.lVurim1

ua'i.o9'l,/)^'lo I '

&<!«'0.9?'aW1

o.^s'o.^0^'

o.riorto.sfc'0.50'

0.%'

a^/ '0.3^'0.3Va33'

WATERLEVEL ELEV.

_ wAiti i.e\/4uTJfUO*' CMSO^Mb

WT-IV-B 4 of 6

y ~

PERSONf

TIME

f A </j - 5r

IN SITU PERMEABILITY TESTMPI POO WFATHFR <ilTF HATF

ELAPSED TIME

[^:^<"20*0535:00

A WATER LLVEL.

n.iio'o.io'

~ r +ic

WATERLEVEL ELEV

W T - I V - B 5 o- 6

H^e. ' cftW-50

IN SITU PERMEABILITY TESTPFRSONNFlPDO /TZ_T WPATHFR^ffPC^T ftlTF U/T HATF /J/5 /*>

TIME

o

'

ELAPSED TIME

Wser.245CC-

33 sec •

H3 s^c.

S~5~5£C.

l:0si: i61.^81:3^pico

?/*(nP r/ il =i - . p-

A WATER LEVfcL

n.T-' ^ c. -( .39- '

1.0?'

£>.•«'

o.W'rj.w'o.^i '^a 1

. O.N'(').CM'

•5TRT1C

WATERLEVEL ELEV.

Wi^Ttt Utu£U-

"" "Btuow/ kK,;>L-"O

-- — "~t

^S.^'tO.^- 33.V^'\X

WT-IV-B 6 of 6

"N.

WATER LEVEL RECORDS•~cA^ job Titu 5HIP

Job No. .\ of \

C3-\

Stlckup

'?1~~ai:*->o V X - •« H«*J*

WellDepth

WaterDepth

1- .

WaterElev.

WT-IV-C 1 of 11

Comments

i/'C/?>

By

MJLSLAMO 4 KXK*tNOINICK, PC.

WATER LEVEL RECORDS

t«. ^ ^^ i *. • \ \ ^^* NJ2* • J Job Title.

Job No. _Sheet l_of_l.

WcU SllckupDepth

W«t«rDepth

WaterElev.

Comments By

\*^»>*4

VA

J^M

NA

•LAILAMC » MOWCKVtOMIItS. PC.

wr-iv-c : of i:

WATER LEVEL RECORDSJob Till* SHU'

W.U

Nv^0_^>s

^"A-N^j— <>

V . -0 — ^)C

v~> "^O "~ ^5

Stickup

1, «Vc

^ %^Vc

T. -^-Toc

-5AV-TUC

WellDepth

C <6V-cxr

C 9^TcC

C.«fcVoC

C tv- c

WaterDepth

(g -7^'

i

6 .t5 Vcc

»

WaterElev.

1/.7-51

^v.-vV

^.^^

^•a.oV

^

Job k.-, \\-i - \ C.*X\

Shtat V of \

Comments

CW-ev^', S_Y ""vTSo. l-r7

V^W^VA,,, .0,^7

V A ^ O N-*-*4-<jy v^^f\^> j i//c/^ •

J J '

By

,-. ,,,

•LA « LA MB k »OWCKP.C.

WT-IV-C 3 of 11

WATER LEVEL RECORDSJob TitleJob No. -Sheet_L

- — €> "

\ - a . \C ..of L

StlckupDepth

W«t«rDepth

WaterElev.

Comments By

x - »x

^-^ \\

KAIIAMD » KXKXre.

WT-iv-C 4 of n

WATER RECORDSJob TitleJob No. .Sheet__L_of L

v^y

Stlckup

•a -\V-5t

WallDepth

.u

WaterDepth

\\

WaterElev.

=\<5,.CM

Comments

s\-A C....\«. > a |T.)7

By

BoiHiin, PC

WT-IV-C 5 of 11

WATER LEVEL RECORDS-X... . ^-A.i Job Title

Job No. .Sheet i_of.

SllckupDepth

WaterDepth

WaterElev.

Comments

^ -v ^ >• • -V w

*>=$-

^

By

•ULSUkMO » »OWCK* c.

WT- tV -C 6 of "

-

Svt,,

WcU

lANo-Si

»*v>-V

WATER LEVEL RECORDS'v^'^s^*,--. ~rV, «s T^cA-^s, Job mi. ifliP "«•*-' ^

Stlckup

Q.CC^c'

cc> ^

WellDepth

-%%^c^.

-5-i.H t'-tccl

WaterDepth

c^-5 •

/^.^cTOCl

/

Wate rElev.

/o-?.«jy'

/ c f . C C '

*

Job No /i "3 . / C . "3 1

Sheet ' of '

Comments

rraO l«^t/ Mr«A. /i//(./f,?

<^ 1 " Tr>.J£Ji«c '^/&/6?-^ </ ' /

By

<~~>- ^L. ^' ov^v \Y~3r "&.C V

S ~ T / y J •LAILAHB » >OOC«

WT-IV-C 7 of 11

WATER LEVEL RECORDS

Job TitleJob No.

\>^<,

Stlckup WellDepth

WaterDepth

WaterElev.

Comments By

V* "^ -»c

,*^7IX-L« "7 A 1/6"*

P. -

T

H\'-tcc

c,^ Ml-ro<:

^

-, Ichfkl

H 1f

-33-7 ^ •

^ -r- vr -,«-*>

•LASIAHO ft •OWCXPC

»T-tv-C 8 of

WATER LEVEL RECORDS-.0. ^\V^,

Job No.Of \

O-.'C.e

WcU Stickup WellDepth

WaterDepth

WaterElev.

Comments By

-• r

- G

TV-G

/0-5.-30

'S-C

VJ T ~^L \ -OSJ oC*T-\ ^ ^

&•OIULMO I »OOC*

P.C.

WT-IV-C 9 of 11

WATER RECORDSJob Till* Vilr

W.U

^^^O^^T

Wv_->

Stlckup

vcV

\.V

WellDepth

i

\

WaterDepth

c • "^ v>C

1

I

WaterElev.

«VSV

^•v.\V

Jab Ma \N- i - \C- i \

Shaftt \ _ o t \

Comments

7

f i

By

-, -X. > A

/ ~* ~ •Lfc » »owcxHIM. f C

WT-IV-C TO of 11

s~

W.U

V^-fc

VAv^,-B

WATER LE

Stlckup

^-^

~*.

WellDepth

^.0^

HSo\.33

WaterDepth

•S.W-rvc

^cj^c

VEL R

WaterElev.

)oogc '

^>oxl

^

ECORDSJob Tltl* . t|pJob No, . \Vi.

Shaet \ of \

Comments

7

W-vo N-^D v\ i »

.-•.-, .-.\ C ."i \

^/.Jp

S~f%-~7 «ULIU

By

INOINIIK.

WT-IV-C 11 of 11

WINSTON THOMAS FACILITYSUPPLEMENTAL HYDROCEOLOCIC INVESTIGATION

QUARTERLY GROUND-WATER SAMPLING SCHEDULE

Sample Event 1 March 9, 10, 11, 1988Sample Event 2 The Week of June 6, 1988Sample Event 3 The Week of September 5. 1988Sample Event 1 The Week of December 5, 1988

WT-V 1 of

VI. CHANCES/ADDITIONS TO SUPPLEMENTAL HYDROCEOLOCICINVESTIGATION PLAN

ADDITIONS/CHANCES

SUPPLEMENTAL HYDROCEOLOCIC INVESTIGATION PLANWINSTON THOMAS FACILITY

Additions/changes to the Supplemental Hydrogeologic Investigation Plan byPhase 2 Task are listed below. The task number and work activity stated inthe Supplemental Plan are listed on the left and the additions or changes arelisted on the right.

Task/Work Activity in the Plan Additions/Changes

A.

1.

2.

Task 2.1 - Continuous Soil Test Boring/Rock Coring

Five of the eight proposed monitoring welllocations will be sampled continuouslythrough soils and bedrock to anapproximate depth of 60 feet or to the topof the Borden Croup (Note: Theboring/coring depth was modified in thePhase 1 Progress Report [January 1987] tobe 25 to 30 feet into the aquifer).

Boring/corings will be drilled according toASTM Standards and Protocols provided inAppendices A and B of the SupplementalPlan. An on-site geologist will log the soiland rock.

Install temporary surface casing, ifnecessary.

Gamma ray logging.

Packer testing, one test per well oradditional tests at potential flow zones.

a. Rock core depthsaveraged approximately47 feet.

b. One additionalcontinuous rock corewas sampled at thelocation of Well MW-3D.

c. One additionalcontinuous soil boringlocation was splitspoon sampled at thelocation of Well MW-3S.(Note: Thismodification was statedin the Phase 1 ProgressReport, January 1987).

a. Rock core featuressymbols andabbreviations weremodified from thosepresented in theSupplemental Plan (seeSection WT-IIA forsymbols /abbreviationsutilized).

a. Permanent surfacecasing was installed toprevent overburdencollapse.

a. Completed perSupplemental Plan.

a. Additional packer testswere performed (seeSection WT-IV-A).

1 of 3 5 / 9 / 8 8

Task/Work Activity in the Plan Add itions / Changes

6. Water level monitoring (3 rounds in 30days).

7. Assessment of soil /rock test data andground-water elevations.

B.

1.

2.

C.

1.

Task 2.2A - Monitoring Well Installation/Rock

Install eight monitoring wells, either byreaming of any coreholes to 5-5/8 inchdiameter, or by air rotary drilling atproposed monitoring well locations.

Gamma ray and caliper log any newmonitoring well locations not at the locationof a corehole.

Task 2.2B - Monitoring Well Installation/Soil

Well installation in water bearingunconsolidated deposits.

a. Completed perSupplemental Plan.

A preliminary evaluationwas conducted to determineif there should be anychanges to theSupplemental HydrogeologicInvestigation Plan. On thebasis of this evaluation,the following workactivities were alsocompleted:

a. Survey of two waterlevel measuring pointsto be used as gaugingstations in Clear Creek.

b. Installation of oneadditional corehole andthe construction of thiscorehole into a deepcased monitoring well.Well MW-3D.

c. Installation of twointermediate-casedbedrock wells. WellsMW-51 and MW-31.

d. Relocation of one of thetwo remaining bedrockwells. Well MW-7.

a. Completed perSupplemental Plan andadded 2 additionalwells. Wells MW-51 andMW-31.

a. Completed perSupplemental Plan.

a. One well installed. WellMW-3S.

2 of 3 5/9 /88

Task/Work Activity in the Plan Additions/Changes

D. Tasks not specified in Supplemental Plan. a. Additional water levelmonitoring wasconducted after allPhase 2 wells wereinstalled.

b. Packer testing wasperformed at welllocations not previouslycored.

c. In-situ permeabilitytesting was performedin cased monitoringwells.

3 of 3 5 / 9 / 8 8

Bennett's Dump

DATA TRANSMITTAL

BENNETT'S DUMP

WESTINCHOUSE ENVIRONMENTAL SERVICESWALTZ MILL SITE. PENNSYLVANIA

MAY 1988

BLASLAND 6 BOUCK ENGINEERS, P.C.5793 WIDEWATERS PARKWAYSYRACUSE. NEW YORK 13214

TABLE OF CONTENTS

SITE PLAN

II. SOIL BORING, ROCK CORING, MONITORINGWELL INSTALLATION DATA

A. Boring/Coring LogsB. Monitoring Well Specifications Table

III. GEOPHYSICAL DATA

A. Gamma Ray LogsB. Caliper Logs

IV. HYDROGEOLOGIC DATA

A. Packer Test Logs and Configuration FormsB. In-Situ Permeability Test LogsC. Water Level Records

V. GROUND-WATER SAMPLING SCHEDULE

VI. CHANGES/ADDITIONS TO SUPPLEMENTAL HYDROGEOLOGICINVESTIGATION PLAN

V BORING, CORING AND MONITORING WELL NOMENCLATUREBENNETT'S DUMP

SUPPLEMENTAL HYDROGEOLOGIC INVESTIGATION PLAN

The locations of the monitoring wells installed during the Phase 2, Site

Investigations are presented on the proceeding figure depicting the Bennett's

Dump Site. All monitoring wells are designated by the prefix "MW-" followed

by a number designating a location. The location numbers may be followed

by one of the letters listed below:

D - Indicating a deep cased bedrock well.

^, i - Indicating an intermediate in depth cased bedrock well.

S - Indicating a shallow PVC-cased overburden well.

If no letter follows the location number, then the well is an open-hole

bedrock well./V ••"''

The prefix "B-" followed by a number indicates a soil test boring at the

location designated by the number. The prefix "C-" followed by a number

indicates a rock coring at the location designated by the number. At most

locations the sequence of drilling activities began with a soil boring. A rock%*

coring was drilled next and finally the corehole was reamed to construct an

open-hole or deep-cased bedrock monitoring well. Therefore, for example at

Location 1, the soil test boring would be designated as B-1, the rock coring

as C-1 and the open-hole monitoring well MW-1. Continuing with this

example, if casing was installed at Location 1 to construct a monitoring well,

it would be designated as MW-1D. Any intermediate bedrock and shallow

overburden wells, if installed would be drilled at adjacent locations and

designated as MW-li and MW-1S. If no soil test boring or rock coring was

installed, the well at Location 1 would be designated as MW-1 if open-hole or

"'"•' MW-1D, if cased. In t'nis instance, no reference to B-1 or C-1 would be

occur.

1 of 2 5 / 9 / 8 8

Throughout this Data Transmittal, locations designated by a number have

different prefixes attached to them. In summary, with respect to the

Bennett's Dump Site:

1. B-1. C-1 and MW-1 refer to the same location.

2. B-2. C-2 and MW-2 refer to the same location.

3. B-3. C-3 and MW-3 refer to the same location.

<J. B-fl, C-Q and MW-ft refer to the same location.

5. B-5. C-5 and MW-5 refer to the same location.

6. MW-6D refers to a cased bedrock well where no soil test boring or

rock coring was installed.

7. MW-6i is a cased monitoring well located immediately adjacent to

MW-6D.

2 of 2 5 / 9 / 8 8

II. SOIL BORING, ROCK CORING, MONITORING WELLINSTALLATION DATA

I/—iff 7 iLA$lAHO ft SOIJCK T

*~—yy~J INOIMtlRS, f.C. 1

SOIL DATA

P

It-

<uo

SI

T(

SA

MP

LE

S

/

\ /

SA

MP

LE

NO

.

- — «i

P.E

CO

VE

SY ir

Tl

pill S

uD-1

T.

-

ROCK DATA

6r.

zor

Num— II Ir

=1=1h

z8b.

e

of ,r

NfA Nol appll<

1 1 J

SOll 1amph .

• Air rotary drilled samplesobtained at the surfacenear the anrtulws « th a s

E—

——

mrACE ELEVATION

IP or CASING ELEV<

C

reatc

E

r tha

%

RE

CO

VE

.1Y

001C

S?

•(z

IHspoon p

ahle.

eve.

i. —

— -

RA

TE (

MIN

./F

T)

— R

-

1

nrfl Crnetrj

. , , tSUBSUhrACE LOG KEY ^

SOIL /ROCK DESCRIPTION

SOIL /ROCK CLASSIFICATION

DO Rock Quality Deqre* - themm of the lengths of piecesfour Inches long or greaterdivided by Ihi length ofIhe cor*.

Inches to ,lion.

Soil/Rock Classifications

(SYR 1/7) Color of soils using Munsell ColorChart(5GY fM) Color of rock t.slnq GeologicalSociety of American Rock Color Charts

nAtr, .

mow

RO

CX

FE

AT

UR

ES

-H-

1\ w

*l.l

Ce

GE

OL

OG

ICC

OL

UM

N

Rock

— Mfl-ii(7UR

Irf -— laf -

• — If -— vf -— h»f— BRI— v -

Wl -it -o -Ir -1 - 1

P -m -gm -gl -e -he -nc -Hlf

— Sly

ologk Co

dl¥*U

Feature Symbols t Abbreviations

) - number of MB In a runraptureIrregular fracturelow annle fracturehnrlrnnlal fracturenc lined fracturevertical fracturrhigh angle fracture

* - broken tone

"w^h-rerl ,on- Condition of Fracture Surfaces

.TiSEd* ;-»"^ron stained J ' sm<TO»h

amlnea J ' rOU9h

solution ertlarqpment with patinamuri In openinggrten mi'd In opening

gtauconltkcalcllehoneycomb weatheringnol recovered

• healed fractureStringer*- stylollte

lumn Symbols

^-rVr"_ —_. —

0t

to

iiiJ

Dolomite

Limestone

Shale

Slltsionc

Ceodes

Crtnold*

Olofragmenis

MAY 1988SMI

Z^ "" ""W

_JfJt HAStAHO ft IOUCK""if ~~J INOINHB1 F.C.

SOIL DATA

u.

I

aUlo

•2o

SA

MP

LE

S

SA

MP

LE

N

O

IIJ)

AU

3AC

O3U

UJ

§

Z

SoR-AC£ ELEVATION- -r „.,.., ^ c r .

ROCK DATA

O

zIT

U

OITU.

1C1

o.

%

RE

CO

VE

RY

7#

1~7 - f f

- ' 7 ' . J ~ ~ .

0oIT

CiT

RA

TE

(MIN

/FT

)-J

3

£

"7

L1

-T

3

U

?

"l

U

c

-

•j

-

'••

•t

5

-

•"•

J

SUBSURFACE LOG ,«•SOIL /ROCK DESCRIPTION

SOIL /ROCK CLASSIFICATION

. i

' , s .-i/y v — O / / /" / J^ i /r-<y 2 oifr./ Or^a<rs p / ' . jAf^^y

/ ' ^ J t

LltyE^ToML, J ^ l(&^>j

' T^- ' ci '> 7 o ' LS -'" " e> ' 'CtftfLV "-I M£ 5,7- 1 /*Jt. -

3^-37,^' C-r^c/: - i ,;- -,,-.,..

r

^ ,o ^ -' r ' } ' /v •* <, " • / "' i5 / v ~ • v L • " ~ -> ' ' - i ' . -, ^ • • i1 i ' i^ • ( j v^ j — ^ '

"* 5>S - "^ ^ / ^y

c

BD-II-A 2 of 17

rRO

CK

FE

AT

UR

ES

/^

•\>^

.

L>

l'>

X^\

^ 1

/C/k

^

GE

OL

OG

IC

CO

LU

MN

, J ...

V?

1

«;.

C^o

^ '

^>i r

;•-••*:i

i

3>b

J_j-^i

%•

1

LASIAMO&BOUCKPC.

S<X Si'A

I I

J 1

ROCK DATA

SUBSURFACE LOG

;£SCS.»>~>0*(

SOi. /30CK C'-iSS

- C T . ^ a

BD-H-A 3 of

OoS

fOL

OG

I

CO

LU

MN

Q

•USUNO ft BOUCX SUBSURFACE LOG

SOIL DATA ROCK DATA SOIL/RCCK DESCRIPTION

•10

'.5

Nft

2/

100

•=&

SOIL/ROCK CLASSIFICATION

0-iiS' C.L>Lt'Y1, civ , tfAS/eMSl, sxd Sciri, roo-i-e-rl, rrvr-r , \ -~,&-r.

/ '

f 75 ~ -CT^T' L. //ttf ' J > • • * S.~

wz

"' 0

SURFACE ELEVATION Tw^^ ' H^TE_BD-II-A of 17

Z

Xt—aUJo

•<//

_"»_y MJULAND ft SOUCX^mj& ~*~^T •MAIUBKBt • /*j M •fv%vln»BV*1 ~.W.

SOIL DATA

SA

MP

LE

S

SA

MP

LE

N

O

RE

CO

VE

RY (

FT

)

UJ3

§

Z

ROCK

0

z

<r

oau. *.

DATA

%

RE

CO

VE

RY

SURFACE ELEVAT.ON '-; . L.VTOP OF CAS '.r- F- c^-,nn| ~u-'.i~"

Oo

RA

TE

(MIN

/FT

)'f

SUBSURFACE LOG:• - |yyW ' t'

SOIL/ROCK DESCRIPTION

SOIL /ROCK CLASSIFICATION

10,0- *12. 01 Ike- let) ver-btoJ -fi^^ho-f yf

'-II. I, - ^2.0' llliC«"hc

RO

CK

FE

AT

UR

ES

1

GE

OL

OG

IC

CO

LU

MN

i

niTE • ? - = i - - < -OiT - BD-II-A 6 of 17

2

SOL DATA

z0,hiO

id

_ji

>1

1I

>ii

F

//

/r

x**"

SA

MP

LE

NO

1

I

•J

^

RE

CO

VE

RY (fT

)l

I-T

1.

'45

.a

^5

5

/Q

'p

>«>

i

MOCK DATA

O

z3

f

h.

1.0

&.

%

RE

CO

VE

RY I

ooK

RA

TE

(MIN

/FT

) |

(Ofl 13 tS «/

^

3

i />» lio i« H V

a•u

J> l*-0 J7 fl^ 9S "7

7

«>

3

*f

SURFACE ELEVATION --4J,. >'TOP OF CASk6 ELFV4TKWI V*" 3

CAT

OAT

SUBSURFACE LOG \

SOX/MOCK OCSCWTION

SOIL /ROCK CLASSVXATION

^^ * * 7 ' * c

•r'.a^-t.O SXLT , elay«yf«J«cV. <s~j(*/l)

u,",Tk Uac^C w.t«^s.

fc ft- T - o ' ^. Jt . r'

<lj."/i »s»t Uc l^r^- .-i- -«' =-» 0-5 -

salu -t ve4 «a 10 .«?«'.

!e--.J...i **l <.'•'- tA -J Sty™

r CL i _, |-« •

mul

5UJIk1Co§

•~* /

ll

1

1\ \

1- I .' ^

^f

riL

-^ -~

.

BD-!!-A 7 of 17

y^3L_ M AM AftHk •. •aueir

SOIL DATA

u.

X

a.uo

70

3O

-^

SA

MP

LE

S

SA

MP

LE

ND

.

RE

CO

VE

RY (F

T)

SURFACE ELEVAT

TOP OF CASING E

Ul

Z

ROCK

d

zK

Y

iKU.

?7

s.

Y'

DATA

%

RE

CO

VE

RY

*P

inw -13.:..

o0It

<J5

DAT

DAT!

RA

TE

(MIN

/FT

)

I

5

i

^7

5

5

c[

I.

7

Cf

^Q

1

17

^II

13

^l

if

£

SUBSURFACE LOG

SOIL /ROCK DESCRIPTION

SOIL /ROCK CLASSIFICATION

l/'i" 7/'C> ClWt STO/Vl'r m-tcw^. qr«.v. wtfiTit,i . ' d ' •

^ ,a .^^ a •*- IU>~

^* i j 1 1 Md *\o c ^ *o **• OLO >w * c^. i CA r frt 1*1 5 1

3o-i ', ^2.5', 34-aV ^X35 5 ' 3C lx " idSS'3"? 1 / '

5 'tl W^"*- cdW .odX—

T 0vi£S • f *• *- il O T^ 'MOi /*y»f*. i . ( i 1 , /

l^Cj _,

7

<^/__/vfT "V

- 'S •JJi-1'' "1

RO

CK

FE

AT

UR

ES

^

:

GE

OL

OG

IC

CO

LU

MN

4 8

^

i

t*'

* .=

i

! 11

n1

BD-II-A 8 of 17

2-&-(* SMSS.**0*6*

9M.OATA

za.s

| S

AM

PLE

*

1 S

AM

PtC

N

O

(U)

AM

1AO

93W

SURFACE ELEVATTO* OF CASIM6 E

hi

X

MOCK DATA

O

X

Kh.

S.

VKW

OuhiC

5?

ooK

[RAT

E IM

IN/F

T)

5"

^

1

r

(

MM -*5' '

Lr^Tin* -3«-l

OAT

OAT

*

SUBSURFACE LOG

SO«./AOCK OESCtHPTtON

SOIL /ROCK CLASSIFICATION

iTB-ll.^' uJ/*\£ ^TofJ? »^*d.j^.a»«-y)

- s • -i. - •*

RO

CK

FE

AT

UR

ES

GE

OLO

GIC

CO

LUM

N

1I

BD-II-A 9 of IT

SOIL DATA

. 0

.- 5

1.5 >o

ROCK DATA

>ttU

O^

SUBSURFACE LOG

SOIL/ROCK DESCRIPTION

SOIL /ROCK CLASSIFICATION

O-^t'STLT, oi 'sU gr«.i/ ,J/2J)

«.« * >'"« *<•«* 5€&.-vi

cruc-e i < lUu(7/S^ .

. f '

, » — -

BD-II-A 10 of 17

SUBSURFACE LOG

SOL DATA NOCK DATA SO4./ROCK DESCRIPTION

SOIL /ROCK CLASSriCATION

EO

LO

GIC

OL

UM

N

V Jifc >ffi 90 3

5

'- 35. j ' -.cOil ' ^

>**£i*-« k»->4

•i,^ 4 i-O

'-31V

V f (T»r ',« 'fim.-f.lfJ

i_JI

1

: /-^

BD-H-A T: of - :

^ •MM| ^

^& J JUtUMOftJOUCK

SOIL DATA

&X

a.wo

0

$

SA

MP

LES

V

1

V

v

SA

MP

LE

NO

.

1 RE

CO

VE

RY (F

T)

SURFACE ELEVAT

TOP OF CASING E

ItJ

Z

MOCK DATA

6

zK

J/

1

^

;

i

1

1

f

1 P

%

RE

CO

VE

RY

ION 1 ~ ~! .~l

FWiTlON "* ~'~1 ' ^

oocc

DATE

[RAT

E W

IN /F

T)

SUBSURFACE LOG ^IK^ "5

SOIL /ROCK DESCRIPTION

SOIL /ROCK CLASSIFICATION

.•/'-E-0 'S'li , bl«Je( •

a.o'-?.s'cLAv5;Uy

Oa 'COff

T^^w«ue«,*- i y, te-

i

fhi\rocA.a (^^^ tVv^.Tfi«Ll /Ja»M3 Vii(o

x>~e «i«J«rb^.o,\l Moiil

orowoA . u' c T •i I

j/Jf^ ^c-cliu~. «r&.v/,(W5~),.''l'car^,,-RO

CK F

EATU

RES!

GE

OLO

GIC

CO

LUM

N

o • .

6 "°o

1 •*

tIfI

(

I

/

_l_ -7^'.^

BD-II-A 12 of 17

2

^=SO*. DATA

~h^

ZfA.hi0

;,»

i*

.*>

r

'

f>hi_l

1

•0

| S

AM

PL

E N

O

IREC

OVER

V <F

T)

!

s5X

,

1

II

|

j

'

1

Il

1

1

1 ;

l! 1

S.Rr*C? ELEvt'n

*MB**C.

ROCK DATA

O

Z3K

»

V

1

|e

|%

RE

CO

VE

RY

lJ f

eoK

^ [RAT

E (M

m /F

T)

i • , i.1i!

* :

1

1

V

!

,

1

•j

[ !

V

]

I

i.

r , i ! ,1 ;k 1

-

V

i

!

1

» i ten. ,t9 ' _ r.tT'

"^ / — '

SUBSURFACE LOG

^^SOIL/ROCK DESCRIPTION

SOIL /ROCK (XASSriCATlON

1 /• J '•*^Jl^-.l nr.y^SV7/,> cnl B,. , wae-.

•^ ---;^Sy,lW.~7/,yV,)r.c«.^.,»^ 11* -'-i-wf—i^^lM)^,,^

Jf6r« re, . | fn—^./'i^ tl«c« ^C'-'»

' ro-^,«»Ji. .w

lf>22-O -*r«cf *'*/'**' c^l^^i)

2lJ» -2;!a LJ»««^T>W, ••c.-a. .>« .rfcy/Syy/ j

''fllf -<»^tOtr 13S»i T-^roj^ -.roi-

sV^'^—Vv^^' ar<J»Js 4." 0J,Jf t^^/V/i )

jS4>'-aTS tr^sTxe, -«<^.^t^./V)6\rtl£.r^.i^. - ^ A ^

^1-0 - IO |_T*ievro»lc , ~«».. t . ;A> .r*. mJ.-^

1. ^ 1,^4-yay /W5-N*i ;

l«^k»^»»^k.c . -ri i «. -*o«S- -ir«t-.fc«ri.

^ZSiSJyi.i^r^.^

. -<0 »-rVOl«fc» 1»VW ' --«c«.«— t

a?.3 ~r5.o ^Tj-eiTau j. »«* ,* 3r^v/K* )- . . r - . - /l ^•1»**"'.r*.*/rjL|lcar«.'.»»i --.-<ra.lt;-., rrfc^..f^-v.

o^iy^ C' yol jfc" -o»* !»?»<.—.«•»» -!••« aejAit.

-^^ -1 „ j'i-rwEiTMJ1. _ i^— .- .fs'»y /^/t/' j ••»*•> -Cn*.*

— 1> W3t,I

•-2 "i* O »^J»f*"i'-= •*« j— ai'»"'» /'•'"". -3«~ l».'«k»i

?u i • • » -at *»«-'•_ ».- o -a^t - -««.«<^ -.4

rs.j '-H5 j uT^t r^ £, ^-- Y-V 6s-) w.<.. y \d\<.»a*4i ! V !»-<.. "..T* ' b<vota»^\

i1 - ~ • f t~ !

ROCK

FEA

TURE

S]

GE

OL

OG

IC

CO

LU

MN

/1 1!

L 11

1 11

j ;

/ if

f i1

1 f1

1 1i

i 1i

f i/

/ 1

"l j~ '

f1 1

. B B .1

i

1 >

i• . «»

1 'It

t 1

! \\

! I

IT* Of Ctsw.-. c^r^-no*. "7~T ^ ~*~ eCv.*.l C«.i"'-c; ^l»-e.t.o~ "7S7-^-O

B D - l l - A 73 of 17

Z

^SOIL DATA

Xh-Q.UJ0

• Vo

^*

| S

AM

PL

ES

1 S

AM

PL

E

NO

.

RE

CO

VE

RY

(F

T)

SURFACE ELEVA^TOP Oc CtSlKC- E

tu

5z

•LAffl AMD ft 1MOMOM,

OUCKIkMte

ROCK DATA

6z

ze

1!

>t-i

!

1

1

1

iu.

O

%

RE

CO

VE

RY

F*/iTiOh. ~!£1.^<

0OK

5?

DtTE

[RAT

E (M

IN/F

T)

SUBSURFACE LOG ,

SOIL/ROCK DESCRIPTION

SOIL /ROCK CLASSIFICATION

^HC^-^W.'I '.<-<..-. -b J vt _ s~,ut.i^ ( . . - • »£> </?.' I •

i , - | , - s

ROCK

FEA

TURE

S!

GE

OLO

GIC

CO

LUM

N

! 1

1 1! 1

1

BD-II-A 14 of 17

4Z¥?tLAffLAHDft 1OUOK

%tfte

SOIL DATA

£Z

Q.UJo

0

5

'0

'5

1 S

AM

PLE

S

\

1 S

AM

PL

E

NO

.

/J/A

RE

CO

VE

RY (F

T)

fj/t

'

A

SURFACE ELEVATTOP OF CASING E

3

z

^

MOCK DATA

O

zK

1

^5

3,

b.

IX

ID.2-

1.-5

s

0.5

I7!.*

il. w

1%

RECO

VERY

T4

03

IK>

'ON . - . - . - >

F VAT ION • ~i

•o0c

86

4 4

DATE

[RAT

E (M

IN/F

T)

6

£>

£

n

\

3

V

(,

(,

"}

>

SUBSURFACE LOG

SOIL /ROCK DESCRIPTION

SOIL /ROCK CLASSIFICATION

0- 3-» travel C;\l fo,J '

l««ri./;««ior.

»*r»,iwc ,

T,.. y-W.I _'...; ..r,..,.v ,

»-«^r 0 \W l 0,"y( -

J

*^ 0 I

ry / . /^Y yij

V

' • NC

V/,

RO

CK

FE

AT

UR

ES

1

!•;•

GE

OLO

GIC

1

CO

LUM

N

i/ i

I

t

1

1

BD-II-A 15 of 17

o

-..*/

ys=&-. MA»t«t«* •tfttifne

" 3^ t WOWBML P.C.

SOIL DATA

P!tzH-auo

2o

iS

»-6

|

SA

MP

LE

S

1 S

AM

PL

E

NO

.

RE

CO

VE

RY (

FT)

SURFACE ELEVAT

TOP OF CASING EL

in

iz

ROCK DATA

6

Z

K

JH

ik.

ff.S

e

[%

RE

CO

VE

RY

O N ~ ». 2 . J>

F WAT ION 72,1.^11

ooa:

85

[RAT

E (M

IN/F

TJ

^3SUBSURFACE LOGW*

SOIL /ROCK DESCRIPTION

SOIL /ROCK CLASSIFICATION

li-S -^l.o l_T^t tS^Wu, i.«R*-«.»fc^ ^7 tMttf s*«t «

d»rtyf//B^of»»v< ^loyRfc/k) CW.ilTf«C*A««fft « Od i^Cfr f^. t^ »

1^20 Qr»<l«V« ^ r«t« ^o»i.|i?>,ejs .

(«>2/;o'«UlolJ*31.0- 3V.O l-T/"t STOWt , I.^K( ,. w 7 ..„«,„,,. S4

J J ' ' /Colcar,«. . t< , 4-r. rt £"»,,/, ( »ppearv

pora«.

^o'.^.o' Y-^ W" ,«», c.l«.»J. -A 1.5 -av.tsV.^-^4 i~ — 1 — J*^*^ ^

(?ai.f,4Lyl.l,w.SeO'- 3I -4* <-r/ttfSTOUff, rVvea.o^ara-yfWS)^ 5*7

C»lce.r«ri\/yd««t<; «', liC,,«x.%, ^e';--^ ..j ^a. w^^r^a*-V-a.';« ' l.ikt .U«cr~, I6^e !,„Jalfaf^.i,. ^ ^> '

il-t'-lto' er«J,«« ^,tU »-,of f f«>M'>ArBi.W\oryozix»_) '

a^Mor^ ^nare ^orOOS .

^3>t-3 '-'it.t' StUuE , tn». el»<wr^wa') Caj<i **~.* .

\(-f\'- ' / /•o' L.ZM6STOUF, L'eUV oli-t ara.y/S/^N

^ 3 «r LO » i ' r*a •:, i .-. c. r ' *• Jo • o " ~i * 1 • "^ 5

ROCK

FEA

TURE

S]

i

\

y

>

GE

OLO

GIC

CO

LUM

N

1

1 11

//

/

1

/ 1

\

1

1

1r1 iii i/ i// / •i7 I

1 Ii

1 ii

1 11i

11

I

. 1

BD-II-A 16 of 17

>s=Z-> •t «•! AMt •. •<ft*tfie

SOIL DATA

X

0.klO

• vs

1 S

AM

PLE

S

1 S

AM

PL

E

NO

.

RE

CO

VE

RY (F

T)

SURFACE ELEVAT

TOP OF CASING- E

kl

_l

Z

ROCK DATA

0

Ik.

g

|%

RE

CO

VE

RY

DM ~l?~i • 0

_Fi/'TION IS'-'IM

ooK

[RA

TE (M

IN /F

T)

SUBSURFACE LOG^

SOIL/ROCK DESCRIPTION ,

SOIL/ROCK CLASSIFICATION

1 » y*y i( 7 -^ •

•R

OC

K F

EA

TU

RE

S

GE

OLO

GIC

CO

LUM

N

I

n*TF "- 1-M

\ 03 O^" U.V . '_,-,. .1^ C l ^ V ^ ^ . O ^ / . - I - '^

BD-II-A 17 of 17

B. Monitoring Well Specifications Table

HOMIKMINC MIL OfIAI11MNMM'S DUMP

MUOMINGION, INDIMM

1 ...... »

Dull

MIL

Pri.l». 1 (•«

(4.1 MO ('.round

( ltv«l Ion 1 1 tv«l Inn

!"•! .('!•)

I'lilltCllVt

( • • Ing In

*»uli%uf tttt

..«'»•!..

Bur IngUtpth

l.'JLJ

•tillltpUl

11L-.J

HortholtblMtltrllntlitt|

«•))OlMtttr(Inctot)

PlDttGllvt

CttlnfDltMltr«»cn»i)

I»P» •»Conil ruc-

tion

Sc r ttnInttrvtl

f Itvtllen( f t . )

l.rttftl

Ptck Ciuul IWntOfiltt

lltvttlnn Into

. -J^U- ._ _J '.'

vt 1 Sttl [It*. C«ntrtli. ) ('t . ) Ctologlc Leo

MB.hT Mh.V I / . S 1 J-4/1" 1-J/l" i 10 Optn N/A N/A N/A 0-J.»' Rttf-BrimnCl.y

J.»'-I.V Cr*y S i l l yCl.y

tton*lO.i'-ll' No RtcoxryII'-**1 Htnwnl.h-Cr.,

t 1»«ftton«

Hl.l' II.0' 5-i/S" J-V»" » ID Opon N/A N/A 0-11 N/A 0-».7V YillcmUh-RtdSl l ty City

*.?V-*r Cray llnt-Itnn*

111.1,1' M.n1 *I.O' 4 •>/»" WB" * ID Open N/A N/A 0-11 9! N/A 0-0. SS1 Ntd CnyCl<y*y S i l l

O.Bi'-'l.:!' K.d-V.llot.City 4 S.nd

«.>)'•»' D*rk CnyCl*yty Sill

('•;' No Rtcovtcyr-U.U' (,r«y lim-it «n«

Cr«y Shi It17. J'-»l' Crty llmt-

Itont

I ,.f- I -

TABLE (Continued)

lop of Depth of

Protective Protective Protective Screen GravelCasing Ground rasing In Boring Well Borehole Well Casing Type of Interval Pack Grout

Well Elevation Elevation Subsurface Depth Depth Diameter Diameter Diameter Construe- Elevation Elevation IntervalNo. (ft.) (ft.) (ft.) (ft.) (ft.) (inches) (Inches) (Inches) tion (ft.) (ft.) (ft.)

11-* 73i.80' 730.0' 12.0' llO.O1 <lO.O' 5-5/8" 5-5/8" 6 ID Open N/A N/A 0-12 9!

Bentonite

Seal Elev. General

(ft.) Geologic Log

N/A 0-*' Red Brown Silt*'-6' Yellowish-Red

Silty Clay6'-6.5' White Lime-

stone6.5'-7' Ho RecoveryT-W Cray-BrownLimestone

MW-5

M*-6i

HW-60

727.61 '

712.06'

731.99'

727 .7 '

732.1'

732.0'

15.0'

1.21

13.5'

18.0' 16.0'

ill.5'

5-5/8"

5-5/8"

5-5/8"

5-5/8"

2.0"

2.0"

6 ID Open N/A N/A 0-15 gl N/A 0-1.*' Gravel F i l lI.I'-J.O* Black SiltJ.O'-B.O1 Brown-RedHud

8.5' Rock Weathered

9.0'

10.0'-»5.0' Cray-Brown

Limestone

6 ID Screened 72*.1'-71*.1• 725.8'-71*.1• 0-* gl 728.1'-725.8'

6 ID Screened 707.5*'-697.*' 710.8'-697.*' 0-19.2 gl 712.8'-710.8' 7.0'-16.8« Olive Cray

Limestone36.8'-36.9' Black Shale36.9'-*1.5' Cray Lime-

stone

BD-II-B 2 Of 2

- 2 -

A. Gamma Ray Logs

ft».c

GAMMA RAY LOGGING

SITE.

NO

RATF 9/tt/8~

WELL /BOftSNG NO "8~f*

FLUC LEVEL «Vg?>g

n i«n M

CASING HEIGHT ABOVE GROUND —LlQ-

PERSONNEL.

EQUIPMENT nr«;rp=oTioi>t

BACKGROUND START

BACKGROUND END

TIME CONSTANT

RANGE

PAGE .OP.

TIME

S'ffi*

ff.-JV

8 ifc

DEPTH

5*1•T.L >*.

•Kb•M.O

•to.o

•fio•4(0

fo.o

310

45.4?I| J70

jfco

sr.oJV !. Jvc>

S3.O

310

3/.O

30.Q

ZS-0

^0

Z?0

ZL.O

COUNTS

/»/

12

II

17

if

n/3

7

£

?

fO

zoi2

f

/</

if

/<?

//

/i"

iiTi? 3

i-f.o <r

z2o /y

TIME

*T-7

DEPTH

ZZO

Zt.o

io.<?

no

f*J

• 7.0

ft.o

/f.tf

^»-F i / <7; /7.O

COUNTS

12

/3

/«/

/2

ffi

it

/rff

IK

,7

1 .-z/7 ^y//t> £o

: /OO <tl

<t.0 53

• H~> ~fi

7.0 r*

^.^ £5

5TL7 "7

^^> -<K

Zo &

TIME DEPTH (COUNTS

-

;

!

f-'/O 2 L) 3O

TiME DEPTH COUNTS

\

BD-IM-A of 5

•ULSLAND ft tOUCKr.c.

GAMMA RAY LOGGING

PROJECT PERSONNEL.

PROJECT MO //-2-/a--

9/17/K1

EQUIPMENT DESCRIPTION

JcAural Sa.miMa. Le<-.ei«f

WELL /BORING NO "8- £ ; Mio - 2.

FLUID LEVEL iVcofl Toe

Fi urn X/2.O

CASING HEIGHT ABOVE tiPftiiun o?.Hd»

BACKGROUND START.

BACKGROUND END

TIME CONSTANT

R A N G E I

S-?

PAGE .OF.

TIME

2-iV^

-

3:of

D E P T H

•/?.¥^

yioV2.<7

<ff.o•J0.O

3<t.O3,V. 7

37.<7

2..0

»! 0

&.&

3?.0

31-0

3i.oSO.Jzs.o

Ztr.v

L7.0

1LO

te'O

l .o

£3.0

ti.0ZI.&

COUNTS

23. Z.

fS.ff

Soif.O

norfo/ff.O

fiTO

tto8J

fO.Z.

ff.H

8.0

tO.T

/ira;3.*.f3.»

ff.O

/•i'.O

f~i>s r?.r/O.O

,3.r

T I M E

3 -tZ

-

D E P T H

Zo.off.o

tS-Of7.O

tt.V

tr-or*0

/3.0fT-O

If.O

tff.Q

?&f!.O

7.0

f ,O

>Ta

SoS.o

z-o

COUNTS

p.t?

trotf.O

12,0

/f.o/•to/0.7rt.o/a oIf.O

Za.J

Z#3

SZ3

t>r:of/fTo

fZo.O

1/00*<r.oJ^o

T I M E D E P T H COUNTS

1

TIME D E P T H COUNTS

BD-III-A 2 of 5

KAllANC 4 BOWC!PC

GAMMA RAY LOGGING

PROJCCT NO

WELL /BORING NO

FLUID.

HFiewr AROVF

DESCRIPTION.

„_ I (L L «^

BACKGROUND START

TIME CONSTANT.

PAGE .OF.

TIME DEPTH COUNTS IME DEPTH COUNTS T I M E DEPTH COUNTS TIME DEPTH COUNTS

Jf.

'3-0 81 O

.7.0 ioo-Q

•/'HZ //.O

«/ 32 /To

350 /(.&

9.0 •/•Tfc /8

v-oa * z I // O

9.O f^.Q

"SZO e-o

'20 TO

'2 (..0

Zf.O

<so /oo r

/o.o -n (_o

Jv-_>

A >a,

BD-MI-A 3 of 5

KASIANO * KK»C«momiut, p.c.

GAMMA RAY LOGGING

ppn.irr-r

PROJECT

WELL /BORING NO

FLUID LEVEL _£

FI urn /r£ C?

SITE. y-rr

CASING HEIGHT ABOVE GROUND

PERSONNEL.

EQUIPMENT RFSCRIPTIftM

BACKGROUND START 5~2 O & &'. to

BACKGROUND FMR ->"/• O Q U\ O g>

TIME CONSTANT /6? ^.e^

RANGE

PAGE .OF.

TIME DEPTH COUNTS TIME DEPTH COUNTSl TIME | DEPTH | COUNTS | TIME | DEPT H | COUNTS

V2-V"? /Z-S~TOC

rt.o

V^.c? fR-o Z.7.V

e-o n.o

J-7V7 f&.o

/To /(.O3.8.0 /7s ffro

Tt.O l/.e? i'/S'/' (3-0

3C..O iZ-O /f.ill.'T il.O

J'/.O 11.0 ,'O.Q n.oC3.CP f.O

.0572^ 7.0 rz.o

6.0

JTO

i'JV f.c;

£.0

5"J7 f.O

tl.O /<J.O

i" -/','' Lf.o Z7.-

ZJD o

BD-III-A 4 of 5

GAMMA RAY LOGGING

PROJECT J&nSi:

PROJECT NO //l-'«--2/

ftATF tl/t.lt"

•ELL /BOOING NO

FLUC LEVEL

CASING HEIGHT ABOVE GROUND

PERSONNEL.

EQUIPMENT DESCRIPTION Ja

BACKGROUND tTABT

BACKGROUND rNB 3S-Q g rt if

TIME CONSTANT _ 10 >S.

RANGE _ iQ"-

PAGE .OF.

TIME

fYW«

///re

,/vr

DEPTH

*%<*'

J<ff'

Jitf'

iaur'

3ttf'

Sao

it»'

z&'

&.*

u.o'

£f*

+*-*'

i .-u/AO :i*

COUNTS

•to

t-0

?.o

utr

1*0

;~>.o

Z*0

;*-o

t.u10

no

f-iO

ff.jt

.*/J «»«.

tft9 fro

.«* »&^

»*.•' r?.*'

. J>V 2? J(

•f.- /&-••

iivt, . ••&' ;f. .'

•"<-• ;?.•

: '?* r» o1 'ii.-' £; J>

TIME

a-'X.

DEPTH

.YC

/«.*-»'

?-»'

t---»'

Z»'

*-"

>~0

y*'_

3«"

i

COUNTS

Jl"*'

."i*>

tr.0

?>.&

fT.a

T^e

r*.o

(•<»

?Z-«?

i

i ;

!

TIME DEPTH COUNTS

!1

TiME DEPTH

!

E

COUNTS

1

!

i

[

[

I

BD-lll-A 5 of 5

B. Caliper Logs

CALIPER LOGGING

pa'vjFCT g*joe*~ jvrraj >*•* <ITF AT»«*->T"I Qu*»* PFBCDMNFI iM/ / < • - > • *

DOQjfcT urt .if->r-i.'

*ELL /Bom*

CASING HCiGH

DEPTH

•/l.'J '

^0

vy:^

v*<;

*ao

•/?.,/

y/j

VO-J

3T<?

n-sJ7.0

St.*

l>-o

*•<>J30

720

ji 0

30.3

-<g

f-' J

•: «in «w-l

r ABOVE GRCK.

HOLEOrAME'E"

r.fi'"-

-~-*.c, fa

>-3"

>-?•

--«- /7-

-

-

-

-

— -.. 0 r- -•

*-^(l

-

'

-

•^

-i"

Ml '•**'

DEPTH D,r2' FR

j'3 rfft.rs- r.a'^.: v-7-

'.j >-.i"

.--. *./ "

.f.;y fcv-"

/f. J

.-#. fc. i *

« 2

/^;

/5/

' ~ |

/r,;I

. »

,r^

/•^ o

>O

7-t1

"C/

«/.y . -

». O

ii-

js-.o - ~ o

z«. c) " 6'-*

«^ - >Ty

.tJ ~*> >-.- ^

! ,-^ fc-r rJ»

x--' c.« zc/ ti'

DEPTH

1.0

EQUIPMENT

CALIB^ATlOt

CiLIBRATlOf

" /Df^^B'PTknM -^v 'fc *r~* -• •"• '

j STAR- G.">S" -3ItstJ.1

j rwn C.^ . T> \ . <

np 1

HOrE

«•

DEPT-

o.es4X

HOLEDIAMETER

:li

i

* w~-

8D-1H-B 1 of 5

KAf LAND * MOCTtMWMIIK. ».C.

CALIPER LOGGING

PROJECT

PROJECT

DATE nM&~i

SITE.

f>{"f-i>

PERSONNEL

EQUIPMENT

>-+s-

WELL / BORING NO

CASING HEIGHT ABOVE GROUND

CALIBRATION START C."a^"-3TTa J c^~v

CALIBRATION END C.oo" "3^Va J ^^,,. r» r\ ^ _ ..

PAGE OF

DEPTH

W. /}-

^•«/o

<S7.i)

*l.O

-//.V

VC.tf

59.0

JS.J

DtO

3*-O

3J^tf

jy «?

J3.r

jjo

J2.<3

>. t

3C.7

*f.o

S9 ->

^?.<J

Jt-O

2i~.v

**.o

33-3

.ra.o

$t,3

Sv.*>

ff.O

HOLEDIAMETER

J-i*

^

••

*

P

/*

M

*•

«.

*

MC^tM k

IT.*'

r.<*"*JOTIU "

r m.4

i

u

-

I-

^

H

«*

«

•t

-

DEPTH

fS-J

i">.a

((.J

,)-')"

fi~Z

ff

rv.i

r*

13.11

/3.1>

it-O

/f.<J

,o.O

?.o

&0

7.'t

•7.0

6.--1

1~. o

HOLEDIAMETER

r.t1'

M'

«t

— ,»

fc »

<.<?'

>-7'

r-3'V.7"

r.9"

>Tl"

«i

It

«

••

,•

«.o"

*

*

••

DEPTH

HOLEDIAMETER DEPTH HOLE

DIAMETER

BD-III-B i of 5

._> CALIPER LOGGING

MMV^CT """tt-vw-A4rrfcyv/ Jw»/* <iTF 2».-« r * t>,~.*

f»t\fn Mft '/j-'f-^'

pATP «•/?/•

WELL / BORW<

CASING H£lCM-

DEPTH

•/*.»/-*i7

VJU.*

«7*

u»W/.<7

v«,o

**X.9

7ZJ

JtJ3To

? MO S*~-l

r ABOVE GROL

HOLEDIAMETER

czr~i-v"

*ert3

<..?<-.-»

4^

t/rfc.i-.-

rv j to:>0

--2-U

^.0 L,

UJt. S 40

rr o

z*»

:*.o

T..O

'.-o

— _ r-

^ ., --,,r '.'* «- r«-i..c»^3 ^U. -

rs

cMP J-2

V

DEPTH

,^^

» 7 J l?

,2£I-

/ (^(

,7*

.4.2

ft °

tr.i,,:*>-•>~0

.fO

HOLEDIAMETER

ST

«,<;

«.."•

rer.T

-

r?

c't«?--

/ J W.-? o '

/» I/ i~f

/•- J

;.<? £»J j t .•>.a to

t-o

r o?

o t '

«

DEPTH

PERSONNEL

EQUIPMENT

CALlBRATlOA

CALIBRATION

PACP \

HOLEDIAMETER

'

CM/ #7?nFsrmPTinm-^Xx^ — YL*-

«rraB" C.^s" X i .-[ r,.

i Furs C.\**1-t> J ,,o».x^.r* § ^* ^

OF _^^^_^^

DEPTH HOLE

n

,

kr

: \

1

BD-III-B 3 of 5

HASIAMP i MUCKIMOWMIM, ».C

CALIPER LOGGING

PROJECT SITE

PROJECT NO.

DATE 'll

WELL/BORING NO

CASING HEIGHT ABOVE GROUND

PERSONNEL

EQUIPMENT

6C^V-o C-Svy^ \-^.ac.\^ < .....

CALIBRATION START.

CALIBRATION END £.

.- «•«*.-«

TTTs ^«^\>.

PAGE . OF.

DEPTH

W.I

S3.0

</2-0

•//.O

«/ao

7^.o

J5-0

7>.o

JC e

TTp

3*.0

•J?-°

33. 1/

3,:o

3 1>,0

sf-o

Zf.o

J7.°

ft.o

if.o

Z-t.o

i.7.0

Zl-o

Jr. o

ZiA J

/*.&

/?• -1

;->.0

HOLEDIAMETER

u-H2'

r.^-t*

4

V

••

•*

*•

.

«

*

*

y

,.

!•

*»»Ttu "

i--<2"

sT.W

iTVi'

«

»-•"'

r.&~SK"

6.-"'

DEPTH

/^r

/^•./

(t.i

ft.o

ff.O

rtt

/**fS.Z

fto

/y-v

i?.0

ff.O

(O.to

f.u

*J7.0

£.<•'

r.fj

40

3.0

^-f

HOLEDIAMETER

)-*<l "

itW*

«

!^V*

6.0**

r-7*'

STfcl'

k*

rSu'

C7^'

.•

i"-(,7 "

-'

••t*

r-M'*•&

f

tf

DEPTH HOLEDIAMETER DEPTH HOLE

DIAMETER

» vcm* .•<t'',\i/-'. 'h.-~*j- rf £_ 6-jr

BD-III-B 4 of 5

CALIPER LOGGING

EL.

//2-tf-2.i

DATE 10/21/Iff

WELL / BORIN€ NO - /*»»fc6

W»NS iC'Ci T ABOVE GROUND -^ '

CALIBRATION START C"

PAfiF OF

DEPTH MOLEDUMETER DEPTH MOLE

DIAMETER DEPTH HOLEDIAMETER

HOLEDIAMETER

i7.0

/ (O

¥20

tjf.0-

/3.0 A.O'

tz.oif.0'

<f.O

33^0 6. Of'

32.O

30-O

Zf.O

2*0

22.0

BD-Ul-B 5 of 5

DATA

DOUBLE PACKER TEST DETAILS

PROJECT NAME _i ''

C~-?/v,JT|^ •i^'Vv.r^

COMING / BORING ?.-« lAzST Mo- 1

PERSONNEL

(lt-,+f!]o I WOT

DATE 7-

9HEIGHT OF GAJGE -*

IHEIGHT OF CASING ,

STICK UP O^Otj

O • ^ o

\

V

H TOTABLE

\ / \

/ \

HOLE DIAMETER _l_2_

-1

v_

%

oo

o

0

0

o0I

1

DEP1PAC

TEST

"<, ' :^*-/ \

0'H TO f /7 /tr* -2^-S ei'

^\

\ / X

^"^ /

^- BEDROCK ^.

. ^ \

_3I-0 X

\

NOTES O ?;•-<*- __ v" 4-^^-

O c) '"= C.-.V --- f

0

^ f »

/ N ' i 'j".T ; X^o-r^,^

IUULAMO » •owec

BD-IV-A 1 of 29

SINGLE PACKER TEST DETAILS

COMING

PHOJCCT NJMBEW l'3.- < S - ? <

I' ..•TTc. DATE

9

HEIGHT Of CASINGSTICK vr -

\ \/ PACicES

\Pi^roRA^E; P P£

^

\E P

J i

DEPTH 1^

HEIGHT OF GAJGE

\- " r* "*

• 0\

\

•STEEL CAS.NG nroTH i 1 • S C.V

DEPTH TOPACKED _

\

\

^-

\

TEST —

i

/~JW

BD-IV-A 2 of 29

•tewHH re

SINGLE PACKER TEST DETAILS

LOCATION

&.J.X- 5.1.NUMBER M2-IS' 1*

7 .,4,TD.>

CORING / BORING .

PERSONNEL 3 L"S

DATE ? ' JT " ' '

9

HEIGHT OF CASI^sr.rif IIP ^>

\

\'» DEPTH TO

\ \

/ PACKER-

\P E R F O R A T E D P I P E

\

HOLE DIAMETER

THEIGHT OF GAUGE

^

: V80-11-")

•STEEL CASING DEPTri__illI_S1/

DEPTH TOPACKER _

\

\

TEST

/

BEDROCK

/.0

.—I— 7T.O ^

BD-IV-A 3 of 29

f ~J? •LASIANO* (OUCK

PACKER TEST LOG

1111

*

,

z

>roj»ct Tit

*roject No

.ocatton

lorlng No.

'eraonnel

Depth

Tvftt)

^5

N*

.D0*r«^4 . " u»^V

TV.T

Fre*(rt)

3..o

a • . vi - ~ -

,e- '• .'•'.

D«»n to.WatvrT«M«

0-3? +i

°.

a- 3v

^--.

H«loht •'

^ (J

5 IS

i

Teat Date

Boring DU

Casing H<

Gauge Hi

OAUOAe^VBflW

10

2o

30

10

"7- a^-??

imeterfer) J S "

•Ight Ci &> ' o<^ £/^ ' f ^il ht -"Y5 .{

^

M«i*r Kttadina

Start , Finish

ISWX*

/<*!>*

/S^S-3

iSWfi

/SV/^.7

^27.«

/S,3T</

/5VV60

«f<flj?

r^/7/3V^2

•5 .<

' -v. -.-

L*o,/c«o3.»

iC«/oS3

•S««>1-0

/5V/4- 7

<Sf 27-S

<t/2<r-y

^50 -<f

JSVU.7

/rc,7?.J

;^-7

,c^.v

«*,» i

. Tlma

Start Finish

'

5

/o:-n

,<:Wo

Ci

S:.%

/O'so

»S

IQ-.4-7-U

iS- VO

30-.00

?i^

• era

:S.B:>

00,- 1

o «c

S /o

/o ,S

"S 20

O

S

c

/ o

BD-IV-A 4 of 29

PACKER TEST LOG

IF

1

E

.f

Teat No.

3

Lj

»ro)ect Tit

»ro)ect No

.ocatlon

taring No.>oraonnel

f? 1 <. /|f C/OO.VMW «|-o~ O,t-»

I / I ' /? -? /

*~D iJ "VN&<?\*<* P*r* *J~/U IV CS

• * - » < • - ! ^

JL~

Depth Interval

To(ft) From(M)

^V

/

as^fu

id 4<j

Depth to.WaterTable

a.^/j0

O-^ifU

Height •'OaugeCn)

^s;/o

3.4*'

Teat Date

Boring Dlt

Caalng H

Gauge Hi

££.

26

.

M

20

7- 21 - 3 7imeterfer) </-^ '

night

llflht J-«/S'e.C0

Meter Reading

Start Finish

.5T/7.0

iS1^!.?- Z-

/S-771

/SST/.<g

/5U7.5

• Stfi-7

;c^7.9

J57b7.«

,^5.0

/577<?-V

5TJ?-4/

5^06 .

,5^1.5

15^3-2

;S^T - :

|^to2.-L

/ST77--

.ssf/.y

/5^6W.5

/W7.7

y5,7n-c,

)S7o7,8

;c-,^.|

,?7-^.y,S7?2.Y

«SOC.?

/5K/.4

K9^-l

:5^T.-]

.5*».V

. Time

Start Finish

o

//o:/t

^o

^

/o

75

0

•s

10

1 5

^

5

//.-*</

•5

/0. (4

'5

?0

5

/.

75

23

S

lt>

i 5

2.0

5

i i ' & y

/5'fta

BD-IV-A 5 of 29

PACKER TEST LOG

Projoct Tttto

Projoct No—Location

. IT«»t Date

_BorinQ

Borinfl No.

.Casino Holght

Qaug*

».

•/;>,f.

O tk M*nral

T«Cfl> Fra«(n)

^

2Qc.ru

D«9« I*.Water

T«M«

5 3*.yv^

H«I«M •'OMBCW)

2-vsirJ

Oaup*

30

M*t«r Reading

Start Finish

/SSVfl.o

'S<rfrt- 2

/5«**-2

/6676.C

/€X?z

/S«r«»9-Z

/(.OTfe-b

ltt?4-5

. Tim*

Start Finish

>^

s

10

/•s

5

/o

/ s^o •' 1 5

BO-IV-A 6 of 29

DOUBLE PACKER TEST DETAILS

PROJECT NAME /2>/it>M(r*ron • £><

PROJECT NJM8ER

LOCATION

CORING /

PERSONNEL

DATE .

HEIGHT OF GAUGE <•£> y

1HEIGHT OF CASlUG,-!/

STICK UP £.1 l<£

O • \ ^ o

\\ f< -,,1 DEPT

/3-fcT WATERToe

H TOTABuE

\ / \

' \

MOLE D 'AMFTE" ''.

ll

r%

(—%

"s_

o0

o

o0

oo

1H

/

-J

i

i

.

*

DEPTPAC

TEST

• ^SOiL— , \0 . \ ' J o

/ \

•H TO s?s £? ' h /KFR . ,.5i.r -^

\ ^

\ / \

^- BEDROCK •>.

3^.oJ: /6 /

\ ^

NOTES *~J ^ f>'-i

*^ — / "Toc -

S~~7/J^^ BLXJLAMO i lOUCC/2—/ t?.owi;(«, P t

BD-IV-A 7 of 29

SINGLE PACKER TEST DETAILS

PRC.EC'

PROJECT NJUBER

- . - < 3

PERSONNEL

9

NfjGMT OF CASING- -.-3' jSTICK JF fc^T^J

/ - / . ) °x -O \ - o

\

i

\ ( 1~*' 3EPT« TC//- T "? WATER TAB^E

~ToC

/

T \

TM E ' G n T OF GAJ3E

i

' 0• >

X

\TC

PACKS "» _

\

P£^-C3A-EC P PE

\ \

TEST IMT

X

_L'

' 1

-VAtLANJ . *>K-»: ^ I••^ sun re ———'

B D - i V - A 3 of 29

PACKER TEST LOG

F

F

L

e.F

Test No.

\

^x

'reject Tltl•reject No.ocatlon

lorlng No.'ereonnel

• f>\\~E?

|Q- 5-^a->

- . ~-ee* c , -.

~s--s <L-1j .

Depth Interval

To(ft) From(ft)

^^V5o

MVJ

•as.sv^J

/4i,J

Depth to.WaterTable

\-a . VV. ij

«\v,a

Height »'Oauge(ft)

/

1

.

2-i$

Test Date

Boring Dla

Gating H(

Gauge He

£=.

\Nr,-.

^o^X

lb..j

/o«i

S-H-b^-

meter(2r) 1.S"

light •P.HV^Q.

laht ~%^,9j

Meter Reading

Bttrt Flnlih

/CCCC.F

ICCC*S

ICO**

IMI.B

JCo^.o

I£CVS.\

yio13.7

ycc1??."^

UK.O

ic,^.e

1 CHi."?-

ISI54.C

VC-AWS

\ t \ f .o. - \

vwViO

/COCF.S

/^7o^

»«-*,.6

/««.5

;coeq. i

/<o«.3

/Cc,,^

lCte'f.7

IC.33.2

KHI.l

K15t.€

;cic^

\ t \ tc.-A

\C.V*V3

K.9C.,

. Time

Start Finish

O

?• 'oo

/ 0 -Co

f T - 0 0

d

5":00

/ C : 0 0

'•s CO

O

c.^s

/o-Oo

i.,,0

o

VOO

\ O : GO

^ • o c,

/' o : O o

/S- . -co

"2.O : OO

?. 00

10 : 00

1 C" C C

^c.-2>

C.'^o

/c -gc

i?.'50

^C^"

*3 ' ci e,

\ 0 : O O

•^.co

BIAIUXC » KX)C«

B D - I V - A 9 of 29

PACKER TEST LOGt> \o«—*

pfL

ef

Teet Ne.

9-5-97

-3—

'rojoct THI

'roj»ct No.occtlon

loring No.•rsonnol

• J bHIr

,r i_,c_'i^

— ^•tt's •^rr%^-^

"^»-"> C-JL

C_^*-, l^-v^5-

Depth Mental

To<fO From (ft)

HV,3j

W.c(

H^ •«>'

Wc54

-3VHT* SJ—

/

Water

^U

«Vr!,

Height •'

5-Wj

i?- ^

j

Test DfttA ^T " i — 5 /

Borirm DUm«t«rf?rl H. , "

Citing H«

Qiugt He

£3.

\o?,,

-Jo-^-i

"^CJf«\

/Op^i

sc?c;

Ight "S.Hl'n^

Ight ~^c \x , . ^w

Mater Readingn \JrT\-

•tart J Flnlah

ICIK.I

itW.^

\«ec\

»C^\«5v t.-3-aS M

» 00*05.

A«S^^-

\c«vx

.'f£?:\

1 e^M^.S

»C^9cT

/ c re . s

/C««.|

IC^f.C

/«•!.!

.r«re

/C/CT.I

ViOo«=.V

it^xs

\WC-it - 1^ C. .0

ii7S .1-

\«T1.»

V,_,^H ^

16-SIL-S

/ i"5^--?

f f? rc.?

ic-scw

? i *rr.i

>£^,j -,

/C10PS

«H«,,

. Time

Start Flnlah

l?:oo

C

c.CC3

Vo:«^» O.Q

C?

*> " oo

) c ' c o

i S"oo

C

?-t

/o-co

/ 5" "cc

c

-Tjce

/o-oc

^>C-0&

eg-oc.

io.-co

» S - oo•>c< : 0 0

?:00

i O ' o c

t S-CQ

-3o:6c

^ : oo

/e. • oo

i S" •• o o

2o -c o

^ ' o o

/ c • oo

lS-oa

3D-IV-A TO of 29

PACKER TEST LOG

Project Till*Project No.

Location ~~ ,

Boring No- _, .,.Paraonna!

"5H(P T«.tn«t.; /Q-|c_qi '^ Boring Dlam0ter(2r)

,,-. ,~r-->c»0<^~rr>o-.~ T^ Citing H«lght

~ ,— ^> C, - 5r 3 ft.i.g. H.lght

"r--- 5" • "^

H ^"

i ^\~V x <5

^.^^J

T**t No.

^_

Depth Inttrvftl

To(ft) From(ft)

-^9.b

\

D*pth to.Wal»r

«v.^\\J)1

Htlght «'

^PJ

•r.-aofV,

"?o^>s\

Mtt»r

attn 0

I6»P5.7

;cw

/«SM

;^/a.o/ f f* "7 "? O/ *• T J . O

Flnlih

/«4M«

/Ccyi . i

/ t fCO.O

/«?>6

^^7.8

. Tlm«

Start Finish

/ c'00

O

ST'co

/Q.-CO

ly.-oo

2o:^0

5": CO

J O ' C O

1 S" oo

•30--^

BD-IV-A 11 of 29• UJLXHD 4 tOVCt tH9tMltr

DOUBLE PACKER TEST DETAILS

"

~ 3^_ .

J «— ~/

\

C*S>sa T

WATCH TAB.E

/ &*;«£»

1

9T

OCP"?AC

c°^o V50'--) ^ ^

/ \5TFCL CA5 t«G =E»TH /3-O ^

J

'H TC pp r n X«r. AC^.S^ x-

\

\ x \

-r= ppr

'ItXEH-

• JL£T

X

BD-IV-A '2 of 29

^y-MASIAMC » IOVO

.. »C

DOUBLE PACKER TEST DETAILS

PROJECT N A M E

PROJECT

LOCATION

D Silos 5HIP CORING / BORING. /3~3

•• '5- W T2.CT

D A T E

9T

HEIGHT OF GAJGE

HEIGHT OF CASING , 'STi f .K UP £41 ^Sl

O • \ - N o

\

^ 1 T?' OEPT

r. t~ ~ WATERTOC

T

H TO

TAB-E

\ / \

/ \P F O F n O A T T P l P;P T —

HOLE D iAMETER i^___

4/n' \Q£P JH If (J a, *

/^

/-"

^%

0

o

O

0

O

O

O

I

-^

t-/

Vy/fo

i

*•• -•-

DEP1PAC

TEST

O . \ ' * O

'H T0 ' / c

\- *" ^

\ / X

/.7'

H-VJ X

\ \

KNQINIIK. P.C.

BD-IV-A 13 of 29

PACKER TEST LOG

Tett Dlte

pL

B

f

\

•2

toject No.ocetlon

orlng No.ereonnel

\o-\q--^3L~v Afc^ — is, ^

T ,-"- C-s

<=- «=:>•=. / -3" \T~S-

Depth Interval

Te<n> FromCft)

vs.o

^^o l ft

e.q

^.<)

Depot to.W«ler

T^^

M.-V&MJ

HelpM •'

ofttrAc^

<U',9•j

.

Borino Dlsmeter(2r) H S"Citing He

Qeuge He

•3.

S — \ __>-^ VJ>

\C s\

^Cfsv

^O^c,

i9ht ^.HV-.S

loht V .^<iv« Sij

Mater

•tart

-^=

\ C.~^O"5.%

icm*

;c^«

/C-J73.t

i«a^.^

/cm-F

/C^-J.^

/i?:«j.i

fC^c c

/6W.4

y£?^.-3

/C»c.c

Needing

Finish

-A\ «-.'»-.J

\c-?.-ri.c

/C"5!?3.£

'^Q?S

10% £

i«-axe

j,^v 5

*e>^ C

/ C 5 3 C C

»C<->M

/<:^i

K55C.C

/£>>/ . M

. Time

Start Finish w

<*-OC "W P •f

o

5'c o

»C-OG

,5-CO

Ci

1 -

/to 5"

IV'CO

0

S-c-o

/t'Co

iS oo

c ' OO

/ c - o o

1C-: O O

^C : CCi

^ : 0 O

/c 05-X.

3C OCJ

? <=o

io oo

i ? : o o

-Dc:^

,>

BO-;V-A '^ of 29i »owec

PACKER TEST LOG

Project Title

Project No. \

Location

T««t n.t.

Borlno Dlam«ter(2r)

Boring No.

.Personnel

i~_$*_ Casing

Gauge Height

T««t Na.

"S

Dtpth Interval

To(ft) From(fi)

il.H'J "iJ

D«pth to.WaUrTkbl*

H.1-6VJ

Htlght OfQ«u8»(n)

4.?;ij

Oli>9«PrtMur»

\ O 0 S\

"2 Ci ^> s\

"^>0ps»

M»|«r R«4dlngo «» \\t- VOi

Sttrt j Flnlth

ytf'SHH.'s

/fi-SSo.l-

/<;^rc.s

/£*5C->.i

\ C-X.TI.H

\<^vu.\

\csoe,.\

\CM-i^.^

I CH-^A

\ t«^\. \

\ Ctv^.c

^ CCT?.^

1C TT'sO. ?-

/CTS-C.5

/fsca.i

/rsce.i

\t^\.\

\ GH ofcj

NCH'a.S.^

\iHHH. <^

\ fs5\ . \

i C.C 0 o

uc^i.%

vc-^-s^v.fc

. Tim.

Start Flnlth

0

<3'- <^o

iO'ts o

1 ^ "e>o

O

S '• «r> o

^o :C^CL

v^ ' to

e

CT-C.O

\o •• <= i

\ ^:c>c;

*? •' o o

/C .'00

1 <T oo

"3c^ <t.Q

S : ®Ci

\ 0 : ocj

\ ^ • oo

"S.C : 00

" C e o

^ t • e. o

\S: : 00

TlC -C;o

BD-IV-A 15 of 29 tLXIULMB t tCXJCt

DOUBLE PACKER TEST DETAILS

. .MBE« 112./6.II PERSONNEL,_ TJ t-J

\

\

\TO

WATER TAB.E

P E « » J C « » A - E : <• «>E

»A:*£»-. , »

0 iME-£»

9-f

GA-SE -^> *

Vsoo\

• S T E E L CAS-.5 S£"TM /?.Q^

PACKE*

\

/

• *

§2X

B D - I V - A 16 of i9•* - -

MJLSLAlfS » »OUCB

DOUBLE PACKER TEST DETAILS

NAME _[

PROJECT NUMBER

LOCATION £*""<

..!.... Si-U 5H) P CORING / BORING *-•*•! £"*/

PERSONNEL

DATE 1

HEIGHT OF GAUGE

HEIGHT OF CASINGSTir* UP -S ,/

•"'• 1 °x 'O • x - c?

\

_2llZlP««ATER

X /

V

H TOTABLE

\ / \

\ - \

PArifTB -

MQLE DIAUF Tf.« ., _

pFPTH

%

kt_

0

o

oo

o

o0

I

— >

1,

H

^-J

J

•• - -

DEP1PAC

TEST

^— ••

S* ' .°/ •

o . Vso"0 ^ ^

/ \

J

'H T° 1 </ 1 /«E» . , '' f^f-J /\

\ / ^

^^ c. BEDROCK .

. ) \(fJTFPVAl 5.6

_/5.5 X

\

NOTES J -^

MJUlANOt •OUCC

BD-IV-A 17 of 29

PACKER TEST LOG

pfL

I

f

\

K .

^

roj»et Till

toftct No.ocatlon

ortog No.

•rsorwwl

^ <T V- ' T=»

\ \-^-\S --5-b

-*» \Y*T — 1^> «

^_M c--/C.^.rl-i^-3-

Deptti Mervel

TrflO Fro«(rt)

ic/^

T-^d-s.s)1

J

,05.9VJ

*=-\ \A^t

\c\1 9j

/

WaterTable

J

^,_

t.0\«>

Height •'Qawge(n)

-3 . ,3

S=^~^

^'9

T«»t Dit»

Boring Dla

Caving Hi

Qiugt Ht

Oauge

)Ge> si

~Sz=

>cr,

-30fs-

^Ovc,

-V J -< 'tt L

m«t*r(2r) 4.S "ight -a.^\Q

l?ht ~i-5'-^o

Meter

•tan

1 b« "^ ^ Q

/ WT. C- £ ^

lfW.¥

/S7SFZ

> IT *^f(*-t^A

1 *^P 1 ^ C

HF^.f

1-,-r^E

,ve.n

M6i:.S

H?0.4

i •*£>?.?

H?«.o

/ i -s .ar

:-iVJ'|.S

Finish

"f »8C ^

Hit>. *r

/V75E-C

msn.c

H^H.1

.^c.t

i .1

-631.?

/^sca.H

lic^.-j

i,rS7.c

Hlr7.o

M,5,,c

/^.^

. Time

Start Finish ^

C

5 oo

1C: CO

IMP

^

o

S e c

/c-c"?

1 S" oo

c?

S:co

/c «c-

j r cc

0

^ 00

S"*. c o

(O " O o

IS" '^2

?C'.,,

.c Ne*,. V <v

«;:oc

/S" co

Oo.- oo

<r:ca,

/ o . o o

f 5 • Oo

Qc roc

c-

;c,oc

r'

BD-IV-A 18 of 29love*

f 4,PACKER TEST LOG

ppL

B

.P

Taat No.

^tt*(

^

ro)*ct Tltlroj»ct No.ocatlon

orlng No.•raonnel

"SK PU~a- \^ -"^

""^ . fs ^»^^--r>

^?-H ;C-^

c_«si I-T-XJ^S-

Depth Interval

To(rt) From(M)

^*>\13

,9u

\V,9

i-.1 0l^n-Xj

i

Depth |0>

WatarTabla

cc -y ,o1

G.cTQ3"

Height •'Qauge(ft)

Q.-V^

-i.sVI

.

Taat DateBoring Dla

Casing Hi

Gauge He

Oauga

-V^,\

/or,

-aor,;

•30 sT

J ^^ t«? ^™ "^ i "^^

met«rf2ri ^ .^ *"

loht ^."c-^.SNt

I0ht - 3 - S ' o V•j

Meter Reading

Start Finish

ma^

mavi

t'So?^

,5ePHi-

i So^.Q

i <; o c. ?

\c^M?>

ITcO.^

/S r^C. i

IS on 7

\s\x% o

\^^P,C'

\s\c* ••*

isn^i.n

)uq^ M

|Coo«;.C

lS03««.-3

lso-ai.3

is-o^c.^

ISoH-i.C

•,5c«.-%

IScf C. i

l^-'oB*) .7-

I^I<3*S

\ ^ \"%t.c

\ T \ c •% r?

v^^.H

V^\CL;

. Time

Start Finish

/O DO

i S - G Q

O

C'.-c

/c .oo

1 J I C3O

O

Too

/o.-co

IS.'CO

O

q:0o

1 070CT

"v ^ r oo.

1 S 'OO

^o.-cc

C' ?'o

io • oo

1 S": oo

Do:<,o

5". oo

/ c .• o o ,

I1?: co

OC:CO

S'oO

\ 0- o c

'\ : o o

"-xo-.oc

(UUULMD t »OUC» IMWHIft

BD-IV-A 19 of 29

PACKER TEST LOG

ProHct Trtto

Projtct No.Location ~~

Boring No.Paraonnol

*iH \ V

xv^ -\^_-3L~

^ « ., -^c^> sTir

~R>-H C-4^^- /— vr^

T«.t B.I. ^ ^^- ~ * *-

> Bortno Dlam«tar(2r) H.«S IV

--V" C««lng HajIgM "i.c*,^

. 0«»g* H.lpht ^,S t^

Taat Ma.

^

Dapth Manral

To<fO Fra»(rt)

\S5\|J

lY,.»

Oaptti ta.

Tabla

c.ctt

Halghi •'

^s\,9-

Oauga•taaav*

\0?5',

^ops,

^c cv

Malar Maadlng

•tart Flnlih

\«5-ttSc

V^IO?.^

I^OCf

i y W5

wa-Mr

XS«>.%

(53'M.'»

,c-^r |

-,C.L,i5^C^

IS"5I- C

i^D?

V^S.-

\=«C.^

i S 03 f.9

1 S'aot.l

i 'a'WS.

l^ftT

I S 3 S 3 - 1

,c-£ c 5

\-^c^

\S1\H. c

l^«.*

irs^o.'i

. Tlma

Start Finish v

a

S co

\C. c<=

\ «: - to

o

S co

; C ' C C

i T ' o o

Ci

S oc

\C ^c

N^ CC

^ C C,

N o '. C> c;

x « = - - o c

-a«a-- <so

^ oo

/ O r e o

i S" c-o

2 o -.00

S' oci

1C 00

\ : o o

"i c : c c.

j

•1

•ULIUkMt 4 »OWC«

BD-IV-A 20 of 29

SINGLE

PRttJFCT NAMF Ijl0t>v^ fot ' ^lW

PBO.JFCT NllURFR I 1 2. | O . U-l

i or AT ION fifniO&rK |ja_i*->\^>

1HEIGHT OF CASINGSTICK IIP riu^w/jrt

O. - \ . X o

\\ ~}~a ' DEPT

\ /

\ /-

\ \Hm F niiUFTFR -^ '*

RFPTH ^-^^i0

N O T E S ' ^ pVi/ 2A»i I0«j^'i

_ No v/^J

PACKER TEST DETAILS

A*

H TC

TABLE

\

\

/

-

p

f—

fy

~^0f><^ <•

CORIN

PE«S(

D A T E

ft

0 '

0

oo

o

o0

o

0

o

^

y//LJ

•vi i v ^~ —r- <L »^\ «(; / pnpiNf; /'l^v — ' > •«-» T- v~*^ _ \

INWFl 52-0

9-T-

^ I 9// f,HEIGHT OF GAUGE *-to ^- >

1

••<•

DEP1

PAC

TEST

' •

o . \ SOIL~J ^^

\ .,,,,STEEL CiS^MG SE»TH ' 3. CJ -$.

3

rH TO/7<O n\ /'K F R F\-*Sj- *^ **. jl

\ ^

i

\ / \

' ^ !'fc'dL /

^ BEDROCK -,

\ J \y

INTERVAL -•>'^

\ \

J

•"•^^

tNwINliK, C C.

BD-IV-A 21 of 29

SINGLE PACKER TEST DETAILS

PROJECT

15

, OCATift-

'M- NG / BORSNG.

It- 1

DATE

THE-GHT QC SAJSE _

HEIGHT OF CASING

STICK UP £»*« jJ«t»jt

O \ . X o

\

?to\«ATraT

J

V

n TOTAB-E

\ / \

. x > \

\

<S/a"MQs. £ 0 ' *• UE * E ' "

/ L -•*.

^

-

/-

5%

0

O

o

oo

0

o

o

co

/?

c

.

OCP1PAC

TEST

1

> 1^-SOi_-\ \

0 \ 1 cf

FH TO -3^ n '. /«rR _3O.o.k

\

\ / X

— V

XB^OCK^ ^

IKTERVAL (uO

' x \

/"-

»>omiin. re

BD-IV-A 22 of 29

PACKER TEST LOG

ffII

.F

Teat No,

\

-a

»roject Tit

'reject No..ocatlon

Soring No.'ersonnel

Depth

To(rt)

H^ij

^5j

• \'f \fJc \*^\ rA-r v\ Sr(\^

o x

v*-^ < NX*. >•**• -c \\,* *. \r> •*» v*- v^

W-^o-^

-5- ~^_V\^ V-

Interval

From(ft)

AO; jj

^SJ

Depth to.WaterTable

™\\

^9j

Height •'

-a.c:.

TLCl«

Test DateBoring Dli

Casing H(

Gauge H«

Qeuge

\0 ^ c \

'"2iCip«,v

~" >O cr'i^

^ ,\

\ «•

imeter(2rl

\ 5 1 'Si T

c; V«,"light o . <s^ „. . .

-^

ipht -^ . C ~ . S

»-o^, "P. ""Cr^^cc,^ V\ S^-«A

Meter Reading

Start Flnlth

•a^eVi

•a«\«\«>H.s

^^^c T,

ws*

^-\^s?.\

^^c.s

•a-N^w^

^•\c^ ^

-**\<\^^

^«\W

^WE.\

•aWC.q

. Time

Start Flnlfh

O

o

CD

0

o

0

c-

S

c-

q

c^

^

•UkSlAMD « COUCK IHOIMIln

BD-IV-A 23 of 29

SINGLE PACKER TEST DETAILS

M A M F -SH

1/2. f5. < J

ME>GHT OF CASiSG

\\ T0/

ifli.3 WATER TABi.E

\/ PAC«E«

\PEPPORATED P.PE

\HOLE 0>AMETE^

y

TH£

^ ' -3E £•& - -S

•S'EEL CASM6 DEDTH /3J".XJIDEPTH TO

PACKED

\

\

BEDROCK

\

TEST

X

BtCJNIIK. f C

BD-IV-A 2« of 29

DOUBLE PACKER TEST DETAILS

PROJECT NAUE /J/cD(wrWian i>>V'i S'Hl P

PROJECT NJM8ER

LOCATION (W-/1/

CORING

PERSONNEL

r iAir /0/2J/&

9

HEIGHT OF CASINGSTICK UP frufi *«/*yo«f«

\\ ~ DEPTH TO

TABwE

\ \/ PACKER

\P E R F O R A T E D PiPE

P A C K E R -

HOLE D I A M E T E R

/o .a

^

THEIGHT OF GAUGE

|__

CASING DEPTH /— •-/

DEPTH TO

\

\ \

BEDROCK

TEST

D R O K -x

' '

'

\

KAtLAMO t tOWCC•lamiMt, ».c

BD-IV-A 25 of 29

DOUBLE PACKER TEST DETAILS

PHOJCCT - ' ? ' , _ PEftSCNNEL T/-T

IO/22/B1

HCiCHT Of C*$i*6STiCK u

x

\\ OCPTH TO

4TEa T4B-E

\ / \

/ PAC«E«

\PC«PO»*^CO f.PC

PACKE1*

oc » '

TCAJGE -\*>

\•STEEL C»S HC QgPTM X3. " -^

\

TEST INTERVAL

8E3"»OCIC -^

' ••

/

. ^.n-

. .^ -- '

BD-IV-A 26 of 23

PACKER TEST LOG/*•

F

FL

E.F

Teat No.

I

^

»ro)ect Till

'reject No..ocatlon

lorlng No.'eraonnel

• &\w \_^-»ta.^ «=,\A \\»

\x i.vs.-iV""Y^^v^VL.** ~- ..v~r-

VW-J-C .'vv - - - • • " •

Depth Interval

To(ft) From(ft)

^v.^Vv")

^?/V,i

^ C x 9

-axMI

Depth t«.WaterTable

^fl

o.^i

Height •'Qauge(ft)

-a-CV,!

-\ r% 0J-w « J

Te»t DateBoring Dla

Gating Hi

Gauge He

ZZ.

teo5.

«O p^ \

— » .

v -

\«^p\i ^~vmeter(2r) ^ VF,iloht ^ -^^ T9

. v A

Ipht "^ . G o 0J

M«|«r Reading

8tart Finish

^n-i-^vo i

a^-^x 6,

v*\^1

w^.-s

w^\

•a^« °t

-i-nb^-e.

i^S^^ • ^

Wv5.2

^0^.0

^eoM i

Tbo-3-3 c

3eo«^

•W^X

ovv^:-^

•a^n.

•avxviA

lv^o

OT1^.8

•awx.5

^•nsa

-3M^?

l*c.iM.I

•%c»-30.c

?00^,.5

•Soosff.C

. Time

Start Flntah

0

O

vao

\\: IS

isr.-oo

o

^:oo

/C-OC

1ST:C^

C

<3 • C 0

/r?.- oo

IS -oo

5

500

XV*S

\ *> ' CO

a » . oo

£ •' 0, 0

/ O : 0 0

i 5" .'o5

^ : /<5

*> ' o o

/0.-OC7

»5.-oe "

^0:00

• LAILXNC » »OUC« IWCWHfl

BD-IV-A 27 of 29

PACKER TEST LOG

fI1f

T.alMa.

^

/-/Tifcr

^

^

»ro)oct No.

.ocatton

lor Ing No.'•raonnol

\\-i.\«;.'3L\• ,- t-,, *-£•»...-.«.

y^^. C

Depth M.rval

Trflt) Fr«m(M)

•vsiU

-* w \1

•^*

T lVeO

-j^ 9^

^ ^

D.ptft to.

e-^ 5

^

.0\

V,«

H.lghl •'

Oawg.(ft)

O C V 3

"a C^ 3J

^c l j

Boring Dl>mat*rf?r) *5 ^kf

Casing Hi

Qiug* Ht

Oaug*

^Cse>< \

-^e.^ii

XC^i

"3 o p s »

loht -^.e\ l-vvo-S4n

ipht 'i.C^JI

U*t*f Heading

Blarl Flnlih

"^ooH^L?

^c«;l.P

^00^1

~^oo9~f.'

-So\-i-i

•»6.C

-5HS& M

feisv^

^C*.'^

^o,i ^.

~5o\~v\ o

-io.-v-sc

-^^

~*---VC £

•x~s*.i.

•%co1e.?

^ccff^O

^-c-ls.C

^cx^c.C

-5-H?^

-^c.1^- 1

telCC?

*>o\C%-H

"3c.\t^. \

Sc i~V"?.c

"fcn«=-\

V>l%C c,

t 1-

. Tim.

Start Finish ^

O

^: co

/o.oo

\?0o

0

^^ - ^ ^.

i o r o

i £-. .

0

- oc:

o

S cc

xc.^

^ '00

/ O : o o

iT'-io

"io.-oo

«? 00

/o c o

• 5 ^ 1

"2o.- oo

e- os

V O : oc

^" -oo

\c--S5

\^-:oci

xS^c ac-ie;

BD-IV-A 28 of 29•UUUMC t *ove*

PACKER TEST LOG

Project Title

Project No._Location

<:\\\7* Test P«t«

.Boring Dlameter(2rLu

Boring No..Personnel

ov^^> Caalng Height

— C Gauge Height.

.c\Hx..

1

Test No.

"5

1

Depth Interval

To(fl) From(ft)

^\\ai Q. XJ]

Depth to.WaterTable

^'JJ

Height •'0«oo»(n>

-x.c\a]

Otu^ePreMtfV

~^o»« \

Meter Reading

Gko \\t.'-O>

Start J Flnlih

"S«siv.o.ci

•^c^.^.c,

V= VBT-.o

"««> \"\<i -

^to \9i-5. 5

-^c.VP.'V.C:

~*=\«\<=.-*.

•^eA'i.v

. Time

Start Flrilth

O

S'.o*

/O '00

v^r-.oc.

*5 • o ei

\<=- C>.C3

/T-oo

• .o :csc>

BD-IV-A 29 of 29• UJULND t »<XIC* IM»IH||r

PERSONr

TIME

o

IN SITU PERMEABILITY TEST^Fl r) Lm ) / \ w& ^FAT^FR ^f^C^T*' ITF D^f} nATFPA/f?

ELAPSED TIME

J5ser

2^ser

Y? ^cr

% Sec

5V sec./

lio^f\ \01

i;ni;ac/i:36i ;c/^

r-5"D2:0^0-!)^g^g

^:M2:4?£;5H

3:0:-^:o9

•5:1?-

A WATER L£V£i_

q c ' r^/ -'( J J 1 Lx *. -

1.795'I.?-?'

1.?^'/

f,63'

U6

/.5?'

/. S '

/O7)'

(.%'

/.^'

/.^'

1 - 3 1 '

I.P?'

W37

A / 7 5 '

f.wrf .041

(.&•

10'

.9V• 95T'

WATERLEVEL ELEV.

"W?t"w*«u^l>

*! />/?-H- -O.S' ^ O.V - BD-IV-B 1 of 3

PERSONf

TIME

IN SITU PERMEABILITY TESTJFI ~L5 /fOO WFATHFR C/JLr/v STTP P)D nATF /-2/9&

I

ELAPSED TIME

Y^P

LI: GOQ3(J

H'.SS"s'Oft

?.'lf%-c.JL

m\iLAO'OL_

& WATER L£V£i-

Dfil'

O.^l6'

O ?$"S '

0.65"'0.^5"'

0-^(75'

D.YO.li'O.Ofc

WATERLEVEL ELEV

BD-IV-B 2 of 3

Mk)-bQ

PERSONf

TIME

O

3:1 0pm

IN SITU PERMEABILITY TEST^\^L.y/POO WpATHFR P-Hv CUv SITF 13O HATF «A? fa

ELAPSED TIME

~^( 3LC

^ 5CC

51 stc5? sec

/:o?C^i;wi:34

i.^r^.'033:11a;^?3.^$"•7:50q;sts:«6.^/1:30Wo9:30

/o:3£•i ivo

A WATER LEVLu

3, "57' TOC -1,7%'

K7<-T

/•6'1,5?'wrH<f.^/1

/.^'i,w1.19'i.irl.oJif) I1

o.irO.L

Wn.n.&'o.2\o,/?-O.\lO.ol'

WATERLEVEL ELEV.

owrt^ill. i _ £ v t w

Q*L.O« 6/TOt//V^

ic.' . 73' BD-IV-B 3 of 3

WATER LEVEL RECORDS Job Titto 6/»fl~...r/3. 'Job No. /is-/*-*'

Wall No.

(natal. Date,

Location

Fm. Scraanad

Stickup

Well Dlam

Wall Material 4

Casing Eiev

« « f <«.*.'«.*«» I7.S-' Weil Depth _f£££l

USAI&.I*- Screen Length Qj>«

Ground Elev. _ T3i.so'.«l Screen Slot A/ /A1

Dat« StickupD«pth

Water0«pth

W«t»rEl«v.

Comm«nt8 By

tf lo -AC LI 7 24,.

73V. i Yrtor O*t.t*r f-.~

^.

»- • *• 1 ^ *

V73V. 51

0 J (

NQTES:

BD-IV-C 1 of 7

HASUNO ftMMNUM, P

WATER LEVEL RECORDS JobTttte 5'^

Sheet _i_ef

Wai NO. - 2

InataL Date

Location

Fm. ScraanadSttekup

Wall Olam.

Wai Matertal_^-_ i

Casing Elev—

Ground Elav.

u-J* 1^ »

bT lOc

Wai Dapth

Scraan Length 2~.

Scraan Slot '

Dat*

8-9-?-)

.-< T

Stickup

0

Depth

- /

WaterDepth

WaterElev.

73 C -««/

Comments

r ••<

By

NQTES:

BD-IV-C 2 of 7

4V >Otff IT

w/

Wall No.

Inatal. Di

Location

Wall Mai

Casing E

Ground !

Date

< 3 - 4 - 9 l

«.vv,

<z-23-<n

9-??-V7

c,_«,_7 1

<?-

O'ER LEVEL RECOF

»te ~ ? - 3 " b - 8 7

tarial S-(-^P 1 p^c. '., ^0^,LL

ilav. ln. Toe^i ^ ^ JT ^. •»|O\1 / J "7 f^ y^ ¥• IV V. / -* • L. w C^*

^

Stlckup

3M1~

x ^^

^..^-x

J-^^'OC

3.M1-3C

2.^^

Depth

V / . Q . "

^

Hl.OcJ

. °

m-iuJt

WaterDepth

70-1^

13STO,

7-Sii^

'7- Sfo Tor

7.72TOC.

l.l^Toc

^DS

Fm. 8cr

Stlckup

Wall Dli

Wall De

Screen

Screen

WaterElev.

7ZM1

•fco.y/

17 0,17

720.1 3

7M.T-7

Il1.9(.

Job TltUJob No.Sheet.

aanad „ L

im. ^

pth ^

Length

Slot

Coi

. ->

J.'^-"i^ V

1 / 51 ?^ T[

NQTES:

/=>

S.L

of

.s1!

V / . Q /

3p»*L.i.i

AJ A

BD-IV-C 3 of 7

•L4SLANO t lOOCK

WATER LEVEL RECORDS

Wtl No.

btataL Data.

Location '.

Wai

Casing Elov

Ground Elav.

JobTttteJob No.

Fm. Scrtanad 'Stickup - *

Wan Diam..

Wall Dapth

Scraan Langth

Screen Slot

0«t«

7-01 -Si

<?---%!

9-/0-?7

- - Z 2 -1 1

}-o-<n

r •£-*•>

Stickup

_r

3^

5.«6-S'

- ^T

3 7^

^ b*.

W*l0«pth

W ^ S

_

_

VO V5'

w«t«rDepth

-n=.v

8-^iToc

«-iaTX.

*-i2^0t

^.WSTQd

Wat«rEtov.

7 2 3 . 3B

-

7 7 ? . f ?

-?:° Vi

172 »"'?

7?l ?5

Comments

~ ai*— r*. -- _ • ».7T«—

^.a2?i« ?r^**i«. -t«>

r

f 3S A^

~s * "

By

T*~

;r T

T^I

TcT

c-^

NQTES:

BD-IV-C a of

WATER LEVEL RECORDS Title

Job No. U 9 - 1Sheet _!_ of _!

Well No.

(natal. Date,

Location

Fm. ScrtenadStickup LI

Well Material.Casing Elev..Ground Elev.

^.L, Qa,\U«Well Diam..

Well Depth

£ '

Screen LengthScreen Slot

Tic

NQTES:

Date

//-S-1*!

Stickup

/u/.

W«llDepth

</5.o'

W«t«rDepth

5.io«.0a

WaterElav.

122-40

Comments By

u*

BD-IV-C 5 of 7

MAIIANO ft lOWCVMWNUB, P.C

WATER LEVEL RECORDSJob THte ^ooJ..vr-1-o, S.'-f«

Ma M3- /S -Z I

WalNo,

total. Data.

Location __j

Wai

Fm. Scratnad __LStlckup mWell Dlam.

?vc Wan Dapth

Casing Ekv. 7-32,-cx,

Ground Etev. ^^? \p

Scraan Langth

Scraan SlotHi.

NQTES:

8D-IV-C 6 of ?

Oat*

.i-»-*i

|^^ » T • •

Stfekup

wA

-//Ar

'

D th

n.^

T

Wat*rDepth

5.07^Y-SST*.

WaterEl*v.

727.^1

ia 7 ?/

Comment* By

«^

WATER LEVEL RECORDS Job TltlaJob No.8haat_l_of.

Well No.

Inatal. Date.

Location _J

Well MaterialJiie*

Casing Elev ~2

Ground Elev.\ \ £ U v .

Fm. Screened _

Stlckup M/A

WellDlam.

Well Depth

Screen Length _

Screen Slot

^^ i*ifs riat

r I -.j V

• Of(JTic

Date

/ l-S-*7

1-2-1-1)7

Stlckup

M /A

X//A

W«llD«pth

3M.t4/J

^<.-)i<^0

Wat«rDepth

^•«/V(?3

VVfeP0

WatarElav.

1QT.53

7 2 S . f e ^

Comments

n:io^^

By

tx**

iLl

NQTES:

BD-IV-C 7 of 7

•LASLANO « iOOCK

BENNETT'S DUMPSUPPLEMENTAL HYDROCEOLOCIC INVESTIGATION

QUARTERLY GROUND-WATER SAMPLING SCHEDULE

Sample Event 1Sample Event 2Sample Event 3Sample Event 4

March 8, 9, 1988The Week of June 6, 1988The Week of September 5, 1988The Week of December 5, 1988

BD-V 1 of 1

VI. CHANCES/ADDITIONS TO SUPPLEMENTAL HYDROCEOLOCICINVESTIGATION PLAN

ADDITIONS/CHANCES

SUPPLEMENTAL HYDROCEOLOCIC INVESTIGATION PLANBENNETT'S DUMP

Additions/changes to the Supplemental Hydrogeologic Investigation Plan byPhase 2 Task are listed below. The task number and work activity stated inthe Supplemental Plan are listed on the left and the additions or changes arelisted on the right.

Task/Work Activity in the Plan Additions/Changes

A.

1.

2.

3.

Task 2.1 - Continuous Soil Test Boring/Rock Coring

The four proposed monitoring well locationswill be sampled continuously through soilsand bedrock to an approximate depth of 80feet or to the top of the HarrodsburgLimestone Formation. (Note: Theboring/coring depth was modified in thePhase 1 Progress Report [January 1987] tobe to 25 to 30 feet into the aquifer).

Boring/corings will be drilled according toASTM Standards and Protocols provided inAppendices A and B of the SupplementalPlan. An on-site geologist will log the soiland rock.

Install temporary surface casing, ifnecessary.

4. Gamma ray logging.

5. Packer testing, one test per well oradditional tests at potential flow zone.

6. Water level monitoring (3 rounds in 30days).

a. Rock core depthsaverage approximately42 feet.

b. One additionalcontinuous rock corewas sampled at thelocation of Well MW-5 .

a. Rock core featuressymbols andabbreviations weremodified from thosepresented in theSupplemental Plan (seeSection BD-II-A forsymbols/abbreviationsutilized).

a. Permanent surfacecasing was installed toprevent overburdencollapse.

a. Completed perSupplemental Plan.

a. Additional packer testswere performed (seeSection BD-IV-A).

a. Completed perSupplemental Plan.

1 of 3 5 / 9 / 8 8

Task/Work Activity in the Plan Additions/Changes

D. Tasks not specified in Supplemental Plan. a. Additional water levelmonitoring wasconducted after allPhase 2 wells wereinstalled.

b. Packer testing wasperformed at welllocations not previouslycored.

c. In-situ permeabilitytesting was performedin cased monitoringwells.

3 of 3 5 /9 /88

Recommended