Important dates for the term projectImportant dates for the term project
Team list due: Oct, 24th (in class). Term project proposal due: Nov, 15th (5:00 pm). Term project presentation due: Dec, 5th (in class). Term project report due: Dec, 16th 5:00 pm.
Form a team Form a team
Each undergraduate team has 3-4 team members. One student will act as the team contactor. Team contactor can be
selected by the team or we may assign one if no one selected. Normally we assume that each member will contribute the same
efforts to the whole project. If not, the team contactor needs to submit a contribution table which describes the percentage each team member contributes to the project. The contribution table should be discussed within your team before turned in.
Final grade of each team member equals:(Team grade)*(Your contribution)*(Number of team members)
Each graduate has 1-2 team members.
Find an appropriate topicFind an appropriate topic
Types of topics: Social Science Engineering applications Environmental Business More…
The topic should be of feasible size Make sure the topic is not too big or hard to finish before the presentation Data availability
The topic should be a problem that you can apply GIS tools to solve. What is the problem? Why you can use GIS tools for this problem? How?
Topics from last time 1.Topics from last time 1.
Transportation System of Tsim Sha Tsui Target: Using GIS to resolve the traffic congestion problem.
Air pollution in Pearl River Delta Target: Air pollution assessment using GIS.
New private school in HK island Target: Find a appropriate location to open a new private school.
Property Management Target: Search for a new home using GIS
Rechargeable battery collection Find feasible locations to setup battery collection points.
Topics from last time 2.Topics from last time 2.
Competition study for the new HK Disneyland Target: Market competition studies of HK and Shanghai Disneyland.
GIS for demographics analysis Target: Migration study using GIS.
Superstore competition study Target: Find a suitable location for a new PNS store.
Strategic waste collection Target: GIS analysis for setting up waste collection strategies.
Public library Target: Location for a new public library.
Methodology
Construct a logical spatial analysis flow chart that details the project steps will make the success of the analysis more likely. What types of analyses will you perform?
Overlays? Buffering?
Spatial interpolations? The spatial analysis flow diagram should include:
An outline of the procedures required for the data A logical sequence of procedures to be performed A list of all the data required for each step
Data availability
Hong Kong’s data Boundary file Population
You can also make the data by digitalizing Data on the web
Google by keywords A complete set of data resource prepared by Stanford library
US national data US by state International data
Project proposalProject proposal
Before you start doing the project, you will need to submit a proposal. The proposal includes, What you want to do? Why GIS is useful for your project? How you want to do it? What kind of deliverables you will submit?
The proposal does not have to be long. Three to five A4 double-space pages should be a reasonable size.
As we receive the proposal, we will give you advices to see if your proposal is feasible.
Project presentationProject presentation
20 minutes for each team. Normally PowerPoint files. Submit your final presentation files in digital format together with
your final report by 5: 00 pm Dec, 16th (Friday).
Example 1. Property ManagementExample 1. Property Management
Legend
I2 MTR station
I< Shopping mall 2
I1 Bus Stop
ËÌ Schools 2
®v Hospitals/ Clinics
$+ Sport Hall
IA Car Park
Rail
Schools
Shopping mall
Parks
Properties
富強苑Fu Keung Court
康和別墅Cornvwel
Name (Chinese)
Name (English)Final
marksPrice per
square feet
Area of flat
Purchase Price
Floor
Direction facing
富強苑 Fu Keung Court 4.1243,400
890 3,026,000
12 E
康和別墅 Villa Cornvwel 3.570
4,900 1,050
5,145,000
19 N
新德園 Sunderland Town Houses
3.4547,800
1,070 8,346,000
36 W
Kowloon Tong
富強苑 Fu Keung Court
康和別墅Cornvwel
Ten major steps for each caseThree case studies for a family cycle
Example 2. Rechargeable BatteryExample 2. Rechargeable Battery
DCNO DCCA_ENG Potential DCNO DCCA_ENG Potential
3718 Heng To 10238.5 3736 Chui Tin 4870.7
3720 Sunshine City 7044.2 3704 City One 4664.6
3721 Lee On (Sha Tin) 6796.6 3702 Lek Yuen 4610.5
3708 Pok Hong 6407.1 3733 Hin Ka 4512.0
Both qualitative and quantitative analysisThe idea of gap analysis
Final reportFinal report
Final report should include all necessary information. Usually it should include at least, Data file used (usually it should be a shape file). A Doc file which describes in details of the project (goals, data used, models created,
steps, results), with necessary pictures/images. Some maps to present your analytical results. Attribute table and charts.