Vilnius Energy Forum
7 November 2018
LNG solutions & recent projects
Jos Glorie
Business Development Director
Virtual pipe line for power generation
10.000 Nm3/hr @ 8 barg feeding 40 MW
power plant – Island of Madeira
LNG supply by 40ft containers
One way travel (approx.) road 200 km/sea 950 km
Unloading of containers
with LNG pumps
Submerged Combustion vaporisers (SCV)
Shop pre-fabricated units full stainless steel design
Mid scale duty SCV with
multiple burners per unit
to reach required capacity, max. 20 MW.
LNG/L-CNG station Public station
Scope of supply:
- Concrete pre-fab building with LNG pump skid and control system separated
- LNG dispenser (with filling – and gas return hose)
- Credit card payment system (Tokheim)
- 60 m3 vertical LNG tank (PED certified), 12 bar MAWP
- "saturation on the fly“ enabling saturated LNG supply for various filling pressures.
L-CNG fuelling Public station
Scope of supply:
- CNG dispenser
- Credit card payment system (Tokheim)
- 625 Nm3/hr high pressure ambient vaporiser
L-CNG fuelling
Quick fill CNG buffer
2.400 liter @ 200 barg
Bottle rack capacity
High pressure
Odorizer system
High pressure
LNG piston pump
LNG fuelling station
2x LNG
dispensers
LNG pump skid
with saturation
on the fly
Control
compartment
with payment
terminal
60 m³
Fully shop manufactured
LNG bunkering system
LNG bunkering of dual fuel (LNG/MDO) propelled ferries
450 m3/hr bunkering capacity
up to 15 bargFiscal flow metering
750 meter 8” VIP from pump
skid to loading arm
6” loading arm
Fjordline ferry
Risavika Harbor - Norway