USE ENERGY RIGHT
With Green Solutions on Waste Heat Recovery Cooling/Heating TechnologyWaste Heat Recovery Cooling/Heating Technology
By David ZhuBy David Zhu Sales Manager of Shuangliang Eco-Energy Systems Co.,Ltd.
What Exhausted is not Waste, but Money !
What shall we do?at s a e do
Purpose of CCHP, Co-Gen & Tri-Gen: Raise energy efficiencyMain method: Waste Heat Recovery Cooling/Absorption Cooling TechnologyMain method: Waste Heat Recovery Cooling/Absorption Cooling Technology
85%
Shuangliang Solutions
HRC SystemProduce
-5 ℃< t <25 ℃
Waste
HRC System 5 ℃< t <25 ℃Chilled water
heat Produce
HRH System Plus 40 ℃,Maximum 175 ℃
H t t tHot water or up to 6bar steam
Topic: Use Energy Right, Energy Efficiencyop c Use e gy g t, e gy c e cy
Part I Waste Heat Recovery Heating Technology
Part II Waste Heat Recovery Cooling TechnologyPart III Typical Application of WHRCPart VI Boundary of HRC/HRH Applications
Part I Waste Heat RecoveryPart I Waste Heat Recovery Heating Technology
– Absorption Heat Pump
65℃ 250℃20℃ 130℃Waste heat Source
Temperature
65 130 250Waste heat
20 70
Waste heat boiler2nd category heat pump
1st category heat pump
Heat source can be steam, hot water, heat-conducting oil, , , g ,multi component gas and other related media.
Type of Absorption Heat Pump
First-category: •Gas, oil, steam, hot water. •COP: 1 8~2 2COP: 1.8 2.2•Waste hot water 20~70 Deg.C•Hot water 40 plus less 100 Deg.C•Capacity Range: 2-35MWCapacity Range: 2 35MW
Secondary-category: •Waste heat above 65 Deg.Cg•COP: 0.48•Hot water 40 plus less 175 Deg.C•Capacity Range: 1-15MW
All system is Tailor Made
1st Category Steam Operated Heat Pump
Driving Heat sourceDriving Heat source Waste Heat SourceWaste Heat Source Output HeatOutput Heat
Waste HeatWaste Heat Heat Output
1.0 0.8 1.8
QQinin 11 QQinin 22 Q Q outout00
Save energy by 40% above!gy y %
Working Principle of 1st Category Heat Pump
60% heat
90 ℃
60% heat
Output 100% heat
66 ℃
30 ℃40% heat66 ℃
40 ℃50 ℃
Application in Metallurgy – Aluminium Industry
Application in District/City Heating Network in China
Guo Dian Power Datong No.2 Power Plant, China
Heating Capacity: 10x 35MWg p yThe biggest absorption heat pump
project in the world
China National Offshore Oil Corp., Tianjin, China
3 units of direct fired heat pump,p p,Recovering heat of underground water
2nd Category Heat Pump:
Middle Grade Heat Middle Grade Heat High Grade Heat High Grade Heat Low Grade Heat is Low Grade Heat is rejected by cooling rejected by cooling
water water
1.0 0.48 0.52
QQinin 00 QQ tt 11 QQ tt 22QQinin QQoutout 11 QQoutout 22
Working Principle of 2nd Category Heat PumpOutput 52% of heat from 109 ℃ hot water
37 ℃
p
32 ℃
109 ℃
85 ℃
85 ℃140 ℃
109 ℃130 ℃
Output 48% of heat from 109 ℃ hotwater
Application in Polysilican Industry
32℃
38℃
85℃
HRHHRH II
32℃
Rectifying columnHRH
UnitHRH II
109℃
Hot water140℃
109℃
Hot water
Steam2.5-3bar steam130℃
Silica reduction stove
Steam generator
Polysilican reducing furnace
Steam generator
Application in Petroleum and Chemical - Butadiene Rubber Producing
Daqing Petrochemical CoDaqing Petrochemical Co., China
Heating Capacity: 3370KWBenefit: save 48000 tons of
steam/year and saveli tcooling water
Difference between 1st & 2nd Category Heat Pump
•1st Category Heat Pump consume 60% useful heat to recover 40% energy from low level waste heat (>20 ℃).
• 2nd Category Heat Pump consumed 100% medium g y ptemperature (>65 ℃ ) heat energy and achieve 48% high temperature useful heat and generate 52% low temperature waste heat.temperature waste heat.
•1st Category Heat Pump need no cooling water in operation. But 2nd Category Heat Pump need cooling water systemBut 2 Category Heat Pump need cooling water system.
Part II Waste Heat RecoveryPart II Waste Heat Recovery Cooling Technology
Working Principle of HRC/Absorption Cooling
Charles law of Gases
T ∞ P, V = Constant
Pressure Temperature
101 kPa (760mmHg) 100 ℃
℃84 kPa (634mmHg) 95 ℃
6.9 kPa (52.4mmHg) 39 ℃
1 kPa (7.51mmHg) 7 ℃( g)
0.87 kPa (6.54mmHg) 5 ℃
0.75 kPa (5.68mmHg) 3 ℃
Two kinds of Liquid Mediums
Refrigerant: Water
Ab b Li hi B id S l iAbsorbent: Lithium Bromide Solution
Working Principle of HRC/Absorption Cooling
WORKING PRINCIPLE (Double Effect)
Features of Absorption Cooling Technology/Absorption Chiller
• Environmentally Friendly•.Environmentally FriendlyCFCs free, no harm to OzonosphereStatic equipment, low noise
• Low Operation Cost
• High Reliability
• Less Maintenance• Less Maintenance
Major HRC EquipmentsFlue Gas Based Multi Energy Absorption Chiller-- Flue Gas Based Multi-Energy Absorption Chiller
Variable Combination:•Flue Gas onlyy•Flue Gas + Jacket Water •Flue Gas + Make-Up Burner•Flue Gas + Jacket Water + Make-Up BurnerFlue Gas + Jacket Water + Make Up Steam•Flue Gas + Jacket Water + Make-Up Steam
Flue gas source:•Gas turbine/engine exhaust•Gas turbine/engine exhaust
Cooling Capacity Range: 99RT—2000RT
Hot water operated Absorption Chiller
Hot water can be used:From 70 ℃ to 180 ℃
Cooling Capacity Range:99RT—1488RT
Steam Operated Absorption Chiller
Steam can be used:From 0bar to 8bar
Cooling Capacity Range:99RT—3000RT
Direct Fired Absorption Chiller
Fuel:•Biogas•Natural gas•LNG•LPGDi l•Diesel
Cooling Capacity Range:99RT 3000RT99RT—3000RT
Part III Typical Application of WHRCPart III Typical Application of WHRC-- Co-gen/Tri-gen System
Types of Cogen/Trigen
Flue gas onlyg yFlue gas + Make-up burner/steamFlue gas + Jacket waterFlue gas + Jacket water + Make up burner/steamFlue gas + Jacket water + Make-up burner/steamFlue gas SteamFlue gas Hot watergFlue gas Hot water + Jacket waterJacket water only
Flue gas chiller with or without make-up burner
PT SMART, ,Indonesia,
594RT, flue gas only,3 gas engines + 3 chillers
Flue gas chiller with or without make-up burner
Hainan Hairan Hi-Tech Energy Co,Ltd., China1157RT flue gas + make-up burner chiller1157RT, flue gas + make-up burner chiller
3 gas engines + 1 chiller
Flue gas + jacket water chiller with or without make-up burner
National Laboratory, Italy896RT, flue gas + jacket water, g j
6 gas engines + 2 chillers
2008 Olympic Games y pMedia Center, China
CCHP Load PlanPPower Summer: Max load is 2.8 MW and the min load is 1.0 MW.Winter: Max load is 2.4 MW and the min load is 0.5MW.
C li d H tiCooling and Heating Summer: Max cooling load is 6840KW/h and supply/return water temp is 7-12℃.Winter: Max heating load is 5900KW/h and supply/return water temp is 60-50℃.
SystemSystemPower Gas engine for independent power supply, utility power acts as standby and make-up
CoolingCooling1 unit of flue gas + jacket water with burner chiller 1 unit of direct-fired chiller as standbyFlue gas temp: about 500℃, Jacket water temp: 90℃.
Heating Exhausted flue gas from chiller produces hot water for a 65m3 hot water tank for 24 hours sanitary hot water supply, 1 unit of 1.86 MW gas fired-boiler makes up inadequate hot water.
Flue gas chiller with make-up steam
Sinha Rotor Spinning Mills Limited, Bangladesh 1500RT, 3 gas engines + 1 chiller, 8 bar steam as make-up
DesignMachine room picture
Steam chiller + HRSG for gas/diesel engine/turbine
AutomaticDiverterValve
Exhaust 10 Bar STEAM TO STEAM Chillers
Exhaust
WASTE HEAT RECOVERY
Exhaust
WASTE HEAT RECOVERYBOILER/HRSG
EngineEngineEngine EngineEngineEngine
Financial Trade Center Karachi Pakistan
3 x 992 USRT 2 x 496 USRT2 x 496 USRT
5 Steam Chillers
Co-Gen System Gas Engines with HRSG
Pfizer, Singapore, 661RT, 1 steam chiller + HRSG for turbine
Hot water chiller + Waste Heat Recovery Boiler for gas/diesel engine /turbine
EXPANSIONTANKCHILLER Chiller Output- 250 TR
76 ℃
POWER
Bypass port >105 ℃.CHILLING
120 ℃
TITo Atm
>450 ℃
FINNED TUBE EXHAUSTHEAT RECOVERY UNIT
TI
JACKET WATER HEAT RECOVERY
91 ℃.93 ℃.
76 ℃78 ℃
Zee Television, India
270RT1 gas engine + 1 hot Water chiller
Hot water: 105/68 ℃
Combine all jacket water to one chiller
EngineEngineEngineTo chiller 91 ℃
70DC
90DC
Primary Circuit
To chiller 91 ℃
Secondary Circuit
Return 76 ℃
Colony Mills Ltd. Multan , Pakistan,2800RT 8 gas engines + 4 hot water chillers2800RT, 8 gas engines + 4 hot water chillers
GSK Biologics Vaccine Manufacture SingaporeGSK Biologics Vaccine Manufacture, Singapore223RT, 1 hot water chiller + 1 gas engine
Special Application for simultaneous Heating & Cooling Example proposal in Singapore
Heating:Is running 1 * 400KW boiler for 90℃ hot water from 60℃, plans to g , ppurchase one more same boiler for back up
Cooling:Cooling:Is using several direct fired absorption chillers
Proposal:Proposal:Special heat pump module for simultaneous Heating (400KW of 60/90℃ hot water) & Cooling (350KW of 12/7℃ chilled water)
Benefit:Shut down existing 1 boiler + 1 chiller, put them as standby and save consumption of natural gas
Working Principle of Special Application
90 ℃
60 ℃
400KW
7 ℃35 ℃
12 ℃350KW
30 ℃
Economic Analysis
1 Assume boiler efficiency is 95% to produce 400kw hot water need about1. Assume boiler efficiency is 95%, to produce 400kw hot water, need about 42.06m3 of 8609Kcal/Nm3 (36MJ/Nm3) natural gas;
2. Assume direct fire chiller's COP is 1.2, to produce 350kw chilled water, need about 29 04m3 of 8609Kcal/Nm3 (36MJ/Nm3) natural gas;need about 29.04m3 of 8609Kcal/Nm3 (36MJ/Nm3) natural gas;
3. If employee one boiler for 400kw hot water and one direct fired chiller for 350kw chilled water, totally needs 42.06 + 29.04m3 = 71.1m3 of natural gas;
4. Now our proposal needs 55.5m3 of 8609Kcal/Nm3 (36MJ/Nm3) natural gas only,4. Now our proposal needs 55.5m3 of 8609Kcal/Nm3 (36MJ/Nm3) natural gas only, SAVEMENT is 71.1 - 55.5 = 15.6m3 of 8609Kcal/Nm3 (36MJ/Nm3) natural gas every hour;
5. Assume factory runs this heat pump for 24 hours/day, 300 days/year, every y p p y, y y , yyear will SAVE 15.6m3/h * 24hours * 300days = 112320m3;
6. Cost of 8609Kcal/Nm3 (36MJ/Nm3) natural gas is SGD33/mmBTU, about USD0.89/Nm3, so EVERY YEAR CAN SAVE about USD0.89/Nm3 * 112320m3 = USD99964;
7. Payback time is less than 2 years.
Part VI Boundary of HRC/HRC ApplicationsPart VI Boundary of HRC/HRC Applications
B d f HRC/HRH A li tiBoundary of HRC/HRH Applications
Exist waste heatNeed cooling/heatingNeed cooling/heating
Combination of HRC & HRH Biochemical – Ethanol Producingg
THANK YOU!
Recommended