UPLAND EROSION CONTROL,

REVEGETATION, AND

MAINTENANCE PLAN

Federal energy regulatory Commission

oFFiCe oF energy ProjeCts

Table of Contents

I. ApplIcAbIlIty.......................................................1II. SupervISIonAndInSpectIon ................................... 3 A. environmental insPeCtion......................................3 B. resPonsibilities oF environmental insPeCtors...3III.preconStructIonplAnnIng.................................7 A. ConstruCtion work areas ................................7 B. drain tile and irrigation systems .....................7 C. grazing deFerment ...........................................8 D. road Crossings and aCCess Points ....................8 E. disPosal Planning ............................................8 F. agenCy Coordination .......................................9 G. sPill Prevention and resPonse ProCedures .....10 H. residential ConstruCtion ...............................10 I. winter ConstruCtion Plans ............................10IV. InStAllAtIon ...........................................................11 A. aPProved areas oF disturbanCe...........................11 B. toPsoil segregation..............................................13 C. drain tiles...............................................................14 D. irrigation................................................................15 E. road Crossings and aCCess Points.....................15 F. temPorary erosion Control...............................15 1. TemporarySlopeBreakers.................................... 16 2. TemporaryTrenchPlugs....................................... 17 3. SedimentBarriers................................................... 17 4. Mulch...................................................................... 18

V. reStorAtIon .......................................................... 20 A. CleanuP.................................................................... 20 B. Permanent erosion Control deviCes..................21 1. TrenchBreakers.............................................................. 21 2. PermanentSlopeBreakers............................................22 C.soil ComPaCtion mitigation.................................24 D.revegetation............................................................24 1. General...........................................................................24 2. SoilAdditives.................................................................25 3. SeedingRequirements...................................................25

1

UPLAND Erosion Control, Revegetation, and Maintenance Plan

May 2013 Version

I.aPPliCability

A. TheintentofthisPlanistoassistprojectsponsorsbyidentifyingbaselinemitigationmeasuresforminimizingerosionandenhancingrevegetation.ProjectsponsorsshallspecifyintheirapplicationsforanewFERCauthorizationandinpriornoticeandadvancenoticefilings,anyindividualmeasuresinthisPlantheyconsiderunnecessary,technicallyinfeasible,orunsuitableduetolocalconditionsandfullydescribeanyalternativemeasurestheywoulduse.Projectsponsorsshallalsoexplainhowthosealternativemeasureswouldachieveacomparablelevelofmitigation.

Onceaprojectisauthorized,projectsponsorscanrequestfurtherchangesasvariancestothemeasuresinthisPlan(ortheapplicant’sapprovedplan).TheDirectoroftheOfficeofEnergyProjects(Director)willconsiderapprovalofvariancesupontheprojectsponsor’swrittenrequest,iftheDirectoragreesthatavariance:

1. providesequalorbetterenvironmentalprotection;

2. isnecessarybecauseaportionofthisPlanisinfeasibleorunworkablebasedonproject-specificconditions;or

3. isspecificallyrequiredinwritingbyanotherfederal,state,orNativeAmericanlandmanagementagencyfortheportionoftheprojectonitslandorunderitsjurisdiction.

VI. off-roAdvehIclecontrol .................................27

VII. poSt-conStructIonActIvItIeSAndreportIng ..27 A.monitoring and maintenanCe............................ 27 B.rePorting................................................................. 29

2 3

UPLAND Erosion Control, Revegetation, and Maintenance Plan

May 2013 Version

II.suPervision and insPeCtion

A. ENVIRONMENTAL INSPECTION 1. AtleastoneEnvironmentalInspectorisrequiredfor

eachconstructionspreadduringconstructionandrestoration(asdefinedbysectionV).ThenumberandexperienceofEnvironmentalInspectorsassignedtoeachconstructionspreadshallbeappropriateforthelengthoftheconstructionspreadandthenumber/significanceofresourcesaffected.

2. EnvironmentalInspectorsshallhavepeerstatuswithallotheractivityinspectors.

3. EnvironmentalInspectorsshallhavetheauthoritytostopactivitiesthatviolatetheenvironmentalconditionsoftheFERC’sOrders,stipulationsofotherenvironmentalpermitsorapprovals,orlandownereasementagreements;andtoorderappropriatecorrectiveaction.

B. RESPONSIBILITIES OF ENVIRONMENTAL INSPECTORS

Ataminimum,theEnvironmentalInspector(s)shallberesponsiblefor:

1. InspectingconstructionactivitiesforcompliancewiththerequirementsofthisPlan,theProcedures,theenvironmentalconditionsoftheFERC’sOrders,themitigationmeasuresproposedbytheproject

SponsorsofprojectsplannedforconstructionundertheautomaticauthorizationprovisionsintheFERC’sregulationsmustreceivewrittenapprovalforanyvariancesinadvanceofconstruction.

Project-relatedimpactsonwetlandandwaterbodysystemsareaddressedinthestaff’sWetlandandWaterbodyConstructionandMitigationProcedures(Procedures).

4 5

UPLAND Erosion Control, Revegetation, and Maintenance Plan

May 2013 Version

dewateringactivitiesifsuchdepositionisoccurringandensuringthedesignofthedischargeischangedtopreventreoccurrence;andverifyingthatdewateringstructuresareremovedaftercompletionofdewateringactivities;

8. Ensuringthatsubsoilandtopsoilaretestedinagriculturalandresidentialareastomeasurecompactionanddeterminetheneedforcorrectiveaction;

9. AdvisingtheChiefConstructionInspectorwhenenvironmentalconditions(suchaswetweatherorfrozensoils)makeitadvisabletorestrictordelayconstructionactivitiestoavoidtopsoilmixingorexcessivecompaction;

10. Ensuringrestorationofcontoursandtopsoil;

11. Verifyingthatthesoilsimportedforagriculturalorresidentialusearecertifiedasfreeofnoxiousweedsandsoilpests,unlessotherwiseapprovedbythelandowner;

12. Ensuringthaterosioncontroldevicesareproperlyinstalledtopreventsedimentflowintosensitiveenvironmentalresourceareas(e.g.,wetlands,waterbodies,culturalresourcesites,andsensitivespecieshabitats)andontoroads,anddeterminingtheneedforadditionalerosioncontroldevices;

13. Inspectingandensuringthemaintenanceoftemporaryerosioncontrolmeasuresatleast:

a. onadailybasisinareasofactiveconstructionor

sponsor(asapprovedand/ormodifiedbytheOrder),otherenvironmentalpermitsandapprovals,andenvironmentalrequirementsinlandownereasementagreements.

2. Identifying,documenting,andoverseeingcorrectiveactions,asnecessarytobringanactivitybackintocompliance;

3. Verifyingthatthelimitsofauthorizedconstructionworkareasandlocationsofaccessroadsarevisiblymarkedbeforeclearing,andmaintainedthroughoutconstruction;

4. Verifyingthelocationofsignsandhighlyvisibleflaggingmarkingtheboundariesofsensitiveresourceareas,waterbodies,wetlands,orareaswithspecialrequirementsalongtheconstructionworkarea;

5. Identifyingerosion/sedimentcontrolandsoilstabilizationneedsinallareas;

6. Ensuringthatthedesignofslopebreakerswillnotcauseerosionordirectwaterintosensitiveenvironmentalresourceareas,includingculturalresourcesites,wetlands,waterbodies,andsensitivespecieshabitats;

7. Verifyingthatdewateringactivitiesareproperlymonitoredanddonotresultinthedepositionofsand,silt,and/orsedimentintosensitiveenvironmentalresourceareas,includingwetlands,waterbodies,culturalresourcesites,andsensitivespecieshabitats;stopping

6 7

UPLAND Erosion Control, Revegetation, and Maintenance Plan

May 2013 Version

III. PreConstruCtion Planning Theprojectsponsorshalldothefollowingbefore

construction:

A. CONSTRUCTION WORK AREAS 1. Identifyallconstructionworkareas(e.g.,construction

right-of-way,extraworkspaceareas,pipestorageandcontractoryards,borrowanddisposalareas,accessroads)thatwouldbeneededforsafeconstruction.Theprojectsponsormustensurethatappropriateculturalresourcesandbiologicalsurveysareconducted,asdeterminednecessarybytheappropriatefederalandstateagencies.

2. Projectsponsorsareencouragedtoconsiderexpandinganyrequiredculturalresourcesandendangeredspeciessurveysinanticipationoftheneedforactivitiesoutsideofauthorizedworkareas.

3. Planconstructionsequencingtolimittheamountanddurationofopentrenchsections,asnecessary,topreventexcessiveerosionorsedimentflowintosensitiveenvironmentalresourceareas.

B. DRAIN TILE AND IRRIGATION SYSTEMS

1. Attempttolocateexistingdraintilesandirrigationsystems.

2. Contactlandownersandlocalsoilconservation

equipmentoperation;

b. onaweeklybasisinareaswithnoconstructionorequipmentoperation;and

c. within24hoursofeach0.5inchofrainfall;

14. Ensuringtherepairofallineffectivetemporaryerosioncontrolmeasureswithin24hoursofidentification,orassoonasconditionsallowifcompliancewiththistimeframewouldresultingreaterenvironmentalimpacts;

15. KeepingrecordsofcompliancewiththeenvironmentalconditionsoftheFERC’sOrders,andthemitigationmeasuresproposedbytheprojectsponsorintheapplicationsubmittedtotheFERC,andotherfederalorstateenvironmentalpermitsduringactiveconstructionandrestoration;

16. Identifyingareasthatshouldbegivenspecialattentiontoensurestabilizationandrestorationaftertheconstructionphase;and

17. VerifyingthatlocationsforanydisposalofexcessconstructionmaterialsforbeneficialreusecomplywithsectionIII.E.

8 9

UPLAND Erosion Control, Revegetation, and Maintenance Plan

May 2013 Version

compliancewithallapplicablesurvey,landownerorlandmanagementagencyapproval,andpermitrequirements.

F. AGENCY COORDINATION Theprojectsponsormustcoordinatewiththeappropriate

local,state,andfederalagenciesasoutlinedinthisPlanand/orrequiredbytheFERC’sOrders.

1. Obtainwrittenrecommendationsfromthelocalsoilconservationauthoritiesorlandmanagementagenciesregardingpermanenterosioncontrolandrevegetationspecifications.

2. Developspecificproceduresincoordinationwiththeappropriateagenciestopreventtheintroductionorspreadofinvasivespecies,noxiousweeds,andsoilpestsresultingfromconstructionandrestorationactivities.

3. Developspecificproceduresincoordinationwiththeappropriateagenciesandlandowners,asnecessary,toallowforlivestockandwildlifemovementandprotectionduringconstruction.

4. Developspecificblastingproceduresincoordinationwiththeappropriateagenciesthataddresspre-andpost-blastinspections;advancedpublicnotification;andmitigationmeasuresforbuildingfoundations,groundwaterwells,andsprings.Useappropriatemethods(e.g.,blastingmats)topreventdamagetonearbystructuresandtopreventdebrisfromenteringsensitiveenvironmentalresourceareas.

authoritiestodeterminethelocationsoffuturedraintilesthatarelikelytobeinstalledwithin3yearsoftheauthorizedconstruction.

3. Developproceduresforconstructingthroughdrain-tiledareas,maintainingirrigationsystemsduringconstruction,andrepairingdraintilesandirrigationsystemsafterconstruction.

4. Engagequalifieddraintilespecialists,asneededtoconductormonitorrepairstodraintilesystemsaffectedbyconstruction.Usedraintilespecialistsfromtheprojectarea,ifavailable.

C. GRAZING DEFERMENT Developgrazingdefermentplanswithwillinglandowners,

grazingpermittees,andlandmanagementagenciestominimizegrazingdisturbanceofrevegetationefforts.

D. ROAD CROSSINGS AND ACCESS POINTS Planforsafeandaccessibleconditionsatallroadway

crossingsandaccesspointsduringconstructionandrestoration.

E. DISPOSAL PLANNING

Determinemethodsandlocationsfortheregularcollection,containment,anddisposalofexcessconstructionmaterialsanddebris(e.g.,timber,slash,mats,garbage,drillcuttingsandfluids,excessrock)throughouttheconstructionprocess.Disposalofmaterialsforbeneficialreusemustnotresultinadverseenvironmentalimpactandissubjectto

10 11

UPLAND Erosion Control, Revegetation, and Maintenance Plan

May 2013 Version

ThisfilingrequirementdoesnotapplytoprojectsconstructedundertheautomaticauthorizationprovisionsoftheFERC’sregulations.

Theplanshalladdress:

1.winterconstructionprocedures(e.g.,snowhandlingandremoval,accessroadconstructionandmaintenance,soilhandlingundersaturatedorfrozenconditions,topsoilstripping);

2.stabilizationandmonitoringproceduresifgroundconditionswilldelayrestorationuntilthefollowingspring(e.g.,mulchinganderosioncontrols,inspectionandreporting,stormwatercontrolduringspringthawconditions);and

3.finalrestorationprocedures(e.g.,subsidenceandcompactionrepair,topsoilreplacement,seeding).

IV.installation

A. APPROVED AREAS OF DISTURBANCE 1. Project-relatedgrounddisturbanceshallbelimitedto

theconstructionright-of-way,extraworkspaceareas,pipestorageyards,borrowanddisposalareas,accessroads,andotherareasapprovedintheFERC’sOrders.Anyproject-relatedgrounddisturbingactivitiesoutsidetheseareaswillrequirepriorDirectorapproval.Thisrequirementdoesnotapplytoactivitiesneededto

G. SPILL PREVENTION AND RESPONSE PROCEDURES

Theprojectsponsorshalldevelopproject-specificSpillPreventionandResponseProcedures,asspecifiedinsectionIVofthestaff’sProcedures.AcopymustbefiledwiththeSecretaryoftheFERC(Secretary)priortoconstructionandmadeavailableinthefieldoneachconstructionspread.ThefilingrequirementdoesnotapplytoprojectsconstructedundertheautomaticauthorizationprovisionsintheFERC’sregulations.

H. RESIDENTIAL CONSTRUCTION Forallpropertieswithresidenceslocatedwithin50feet

ofconstructionworkareas,projectsponsorsshall:avoidremovalofmaturetreesandlandscapingwithintheconstructionworkareaunlessnecessaryforsafeoperationofconstructionequipment,orasspecifiedinlandowneragreements;fencetheedgeoftheconstructionworkareaforadistanceof100feetoneithersideoftheresidence;andrestorealllawnareasandlandscapingimmediatelyfollowingcleanupoperations,orasspecifiedinlandowneragreements.Ifseasonalorotherweatherconditionspreventcompliancewiththesetimeframes,maintainandmonitortemporaryerosioncontrols(sedimentbarriersandmulch)untilconditionsallowcompletionofrestoration.

I. WINTER CONSTRUCTION PLANS Ifconstructionisplannedtooccurduringwinterweather

conditions,projectsponsorsshalldevelopandfileaproject-specificwinterconstructionplanwiththeFERCapplication.

12 13

UPLAND Erosion Control, Revegetation, and Maintenance Plan

May 2013 Version

a. thelocationofeachadditionalareabystationnumberandreferencetopreviouslyfiledalignmentsheets,orupdatedalignmentsheetsshowingtheadditionalareas;

b. identificationofthefilingatFERCcontainingevidencethattheadditionalareaswerepreviouslysurveyed;and

c. astatementthatlandownerapprovalhasbeenobtainedandisavailableinprojectfiles.

PriorwrittenapprovaloftheDirectorisrequiredwhentheauthorizedconstructionright-of-waywidthwouldbeexpandedbymorethan25feet.

B. TOPSOIL SEGREGATION 1. Unlessthelandownerorlandmanagementagency

specificallyapprovesotherwise,preventthemixingoftopsoilwithsubsoilbystrippingtopsoilfromeitherthefullworkareaorfromthetrenchandsubsoilstoragearea(ditchplusspoilsidemethod)in:

a. cultivatedorrotatedcroplands,andmanagedpastures;

b. residentialareas;

c. hayfields;and

d. otherareasatthelandowner’sorlandmanagingagency’srequest.

2. Inresidentialareas,importationoftopsoilisanacceptablealternativetotopsoilsegregation.

complywiththePlanandProcedures(i.e.,slopebreakers,energy-dissipatingdevices,dewateringstructures,draintilesystemrepairs)orminorfieldrealignmentsandworkspaceshiftsperlandownerneedsandrequirementsthatdonotaffectotherlandownersorsensitiveenvironmentalresourceareas.Allconstructionorrestorationactivitiesoutsideofauthorizedareasaresubjecttoallapplicablesurveyandpermitrequirements,andlandownereasementagreements.

2. Theconstructionright-of-waywidthforaprojectshallnotexceed75feetorthatdescribedintheFERCapplicationunlessotherwisemodifiedbyaFERCOrder.However,inlimited,non-wetlandareas,thisconstructionright-of-waywidthmaybeexpandedbyupto25feetwithoutDirectorapprovaltoaccommodatefullconstructionright-of-waytopsoilsegregationandtoensuresafeconstructionwheretopographicconditions(e.g.,side-slopes)orsoillimitationsrequireit.Twenty-fivefeetofextraconstructionright-of-waywidthmayalsobeusedinlimited,non-wetlandornon-forestedareasfortruckturn-aroundswherenoreasonablealternativeaccessexists.

Projectuseoftheseadditionallimitedareasissubjecttolandownerorlandmanagementagencyapprovalandcompliancewithallapplicablesurveyandpermitrequirements.Whenadditionalareasareused,eachoneshallbeidentifiedandtheneedexplainedintheweeklyorbiweeklyconstructionreportstotheFERC,ifrequired.Thefollowingmaterialshallbeincludedinthereports:

14 15

UPLAND Erosion Control, Revegetation, and Maintenance Plan

May 2013 Version

andrepairs.

4. Fornewpipelinesinareaswheredraintilesexistorareplanned,ensurethatthedepthofcoveroverthepipelineissufficienttoavoidinterferencewithdraintilesystems.Foradjacentpipelineloopsinagriculturalareas,installthenewpipelinewithatleastthesamedepthofcoverastheexistingpipeline(s).

D. IRRIGATION Maintainwaterflowincropirrigationsystems,unless

shutoffiscoordinatedwithaffectedparties.

E. ROAD CROSSINGS AND ACCESS POINTS 1. Maintainsafeandaccessibleconditionsatallroad

crossingsandaccesspointsduringconstruction.

2. Ifcrushedstoneaccesspadsareusedinresidentialoragriculturalareas,placethestoneonsyntheticfabrictofacilitateremoval.

3. Minimizetheuseoftrackedequipmentonpublicroadways.Removeanysoilorgravelspilledortrackedontoroadwaysdailyormorefrequentasnecessarytomaintainsaferoadconditions.Repairanydamagestoroadwaysurfaces,shoulders,andbarditches.

F. TEMPORARY EROSION CONTROL Installtemporaryerosioncontrolsimmediatelyafterinitial

disturbanceofthesoil.Temporaryerosioncontrolsmustbeproperlymaintainedthroughoutconstruction(onadailybasis)andreinstalledasnecessary(suchasafter

3. Wheretopsoilsegregationisrequired,theprojectsponsormust:

a. segregateatleast12inchesoftopsoilindeepsoils(morethan12inchesoftopsoil);and

b. makeeveryefforttosegregatetheentiretopsoillayerinsoilswithlessthan12inchesoftopsoil.

4. Maintainseparationofsalvagedtopsoilandsubsoilthroughoutallconstructionactivities.

5. Segregatedtopsoilmaynotbeusedforpaddingthepipe,constructingtemporaryslopebreakersortrenchplugs,improvingormaintainingroads,orasafillmaterial.

6. Stabilizetopsoilpilesandminimizelossduetowindandwatererosionwithuseofsedimentbarriers,mulch,temporaryseeding,tackifiers,orfunctionalequivalents,wherenecessary.

C. DRAIN TILES 1. Marklocationsofdraintilesdamagedduring

construction.

2. Probealldrainagetilesystemswithintheareaofdisturbancetocheckfordamage.

3. Repairdamageddraintilestotheiroriginalorbettercondition.Donotusefilter-covereddraintilesunlessthelocalsoilconservationauthoritiesandthelandowneragree.Usequalifiedspecialistsfortesting

16 17

UPLAND Erosion Control, Revegetation, and Maintenance Plan

May 2013 Version

2. TemporaryTrenchPlugs

Temporarytrenchplugsareintendedtosegmentacontinuousopentrenchpriortobackfill.

a. Temporarytrenchplugsmayconsistofunexcavatedportionsofthetrench,compactedsubsoil,sandbags,orsomefunctionalequivalent.

b. Positiontemporarytrenchplugs,asnecessary,toreducetrenchlineerosionandminimizethevolumeandvelocityoftrenchwaterflowatthebaseofslopes.

3. SedimentBarriers

Sedimentbarriersareintendedtostoptheflowofsedimentsandtopreventthedepositionofsedimentsbeyondapprovedworkspacesorintosensitiveresources.

a. Sedimentbarriersmaybeconstructedofmaterialssuchassiltfence,stakedhayorstrawbales,compactedearth(e.g.,driveablebermsacrosstravelways),sandbags,orotherappropriatematerials.

b. Ataminimum,installandmaintaintemporarysedimentbarriersacrosstheentireconstructionright-of-wayatthebaseofslopesgreaterthan5percentwherethebaseoftheslopeislessthan50feetfromawaterbody,wetland,orroadcrossinguntilrevegetationissuccessfulasdefinedinthisPlan.Leaveadequateroombetweenthebaseoftheslopeandthesedimentbarriertoaccommodate

backfillingofthetrench)untilreplacedbypermanenterosioncontrolsorrestorationiscomplete.

1. TemporarySlopeBreakers

a. Temporaryslopebreakersareintendedtoreducerunoffvelocityanddivertwaterofftheconstructionright-of-way.Temporaryslopebreakersmaybeconstructedofmaterialssuchassoil,siltfence,stakedhayorstrawbales,orsandbags.

b. Installtemporaryslopebreakersonalldisturbedareas,asnecessarytoavoidexcessiveerosion.Temporaryslopebreakersmustbeinstalledonslopesgreaterthan5percentwherethebaseoftheslopeislessthan50feetfromwaterbody,wetland,androadcrossingsatthefollowingspacing(closerspacingshallbeusedifnecessary):

Slope(%) Spacing(feet)

5-15 300

>15-30 200

>30 100

c. Directtheoutfallofeachtemporaryslopebreakertoastable,wellvegetatedareaorconstructanenergy-dissipatingdeviceattheendoftheslopebreakerandofftheconstructionright-of-way.

d. Positiontheoutfallofeachtemporaryslopebreakertopreventsedimentdischargeintowetlands,waterbodies,orothersensitiveenvironmentalresourceareas.

18 19

UPLAND Erosion Control, Revegetation, and Maintenance Plan

May 2013 Version

(2)constructionorrestorationactivityisinterruptedforextendedperiods,suchaswhenseedingcannotbecompletedduetoseedingperiodrestrictions.

d. Ifmulchingbeforeseeding,increasemulchapplicationonallslopeswithin100feetofwaterbodiesandwetlandstoarateof3tons/acreofstraworequivalent.

e. Ifwoodchipsareusedasmulch,donotusemorethan1ton/acreandaddtheequivalentof11lbs/acreavailablenitrogen(atleast50percentofwhichisslowrelease).

f. Ensurethatmulchisadequatelyanchoredtominimizelossduetowindandwater.

g. Whenanchoringwithliquidmulchbinders,useratesrecommendedbythemanufacturer.Donotuseliquidmulchbinderswithin100feetofwetlandsorwaterbodies,exceptwheretheproductiscertifiedenvironmentallynon-toxicbytheappropriatestateorfederalagencyorindependentstandards-settingorganization.

h. Donotusesyntheticmonofilamentmesh/nettederosioncontrolmaterialsinareasdesignatedassensitivewildlifehabitat,unlesstheproductisspecificallydesignedtominimizeharmtowildlife.Anchorerosioncontrolfabricwithstaplesorotherappropriatedevices.

pondingofwaterandsedimentdeposition.

c. Wherewetlandsorwaterbodiesareadjacenttoanddownslopeofconstructionworkareas,installsedimentbarriersalongtheedgeoftheseareas,asnecessarytopreventsedimentflowintothewetlandorwaterbody.

4. Mulch

a. Applymulchonallslopes(exceptincultivatedcropland)concurrentwithorimmediatelyafterseeding,wherenecessarytostabilizethesoilsurfaceandtoreducewindandwatererosion.Spreadmulchuniformlyovertheareatocoveratleast75percentofthegroundsurfaceatarateof2tons/acreofstraworitsequivalent,unlessthelocalsoilconservationauthority,landowner,orlandmanagingagencyapprovesotherwiseinwriting.

b. Mulchcanconsistofweed-freestraworhay,woodfiberhydromulch,erosioncontrolfabric,orsomefunctionalequivalent.

c. Mulchalldisturbeduplandareas(exceptcultivatedcropland)beforeseedingif:

(1)finalgradingandinstallationofpermanenterosioncontrolmeasureswillnotbecompletedinanareawithin20daysafterthetrenchinthatareaisbackfilled(10daysinresidentialareas),asrequiredinsectionV.A.1;or

20 21

UPLAND Erosion Control, Revegetation, and Maintenance Plan

May 2013 Version

3. Rockexcavatedfromthetrenchmaybeusedtobackfillthetrenchonlytothetopoftheexistingbedrockprofile.Rockthatisnotreturnedtothetrenchshallbeconsideredconstructiondebris,unlessapprovedforuseasmulchorforsomeotheruseontheconstructionworkareasbythelandownerorlandmanagingagency.

4. Removeexcessrockfromatleastthetop12inchesofsoilinallcultivatedorrotatedcropland,managedpastures,hayfields,andresidentialareas,aswellasotherareasatthelandowner’srequest.Thesize,density,anddistributionofrockontheconstructionworkareashallbesimilartoadjacentareasnotdisturbedbyconstruction.Thelandownerorlandmanagementagencymayapproveotherprovisionsinwriting.

5. Gradetheconstructionright-of-waytorestorepre-constructioncontoursandleavethesoilintheproperconditionforplanting.

6. Removeconstructiondebrisfromallconstructionworkareasunlessthelandownerorlandmanagingagencyapprovesleavingmaterialsonsiteforbeneficialreuse,stabilization,orhabitatrestoration.

7. Removetemporarysedimentbarrierswhenreplacedbypermanenterosioncontrolmeasuresorwhenrevegetationissuccessful.

B. PERMANENT EROSION CONTROL DEVICES 1. TrenchBreakers

a. Trenchbreakersareintendedtoslowtheflowof

V. restoration

A. CLEANUP 1. Commencecleanupoperationsimmediatelyfollowing

backfilloperations.Completefinalgrading,topsoilreplacement,andinstallationofpermanenterosioncontrolstructureswithin20daysafterbackfillingthetrench(10daysinresidentialareas).Ifseasonalorotherweatherconditionspreventcompliancewiththesetimeframes,maintaintemporaryerosioncontrols(i.e.,temporaryslopebreakers,sedimentbarriers,andmulch)untilconditionsallowcompletionofcleanup.

Ifconstructionorrestorationunexpectedlycontinuesintothewinterseasonwhenconditionscoulddelaysuccessfuldecompaction,topsoilreplacement,orseedinguntilthefollowingspring,filewiththeSecretaryforthereviewandwrittenapprovaloftheDirector,awinterconstructionplan(asspecifiedinsectionIII.I).ThisfilingrequirementdoesnotapplytoprojectsconstructedundertheautomaticauthorizationprovisionsoftheFERC’sregulations.

2. AtravellanemaybeleftopentemporarilytoallowaccessbyconstructiontrafficifthetemporaryerosioncontrolstructuresareinstalledasspecifiedinsectionIV.F.andinspectedandmaintainedasspecifiedinsectionsII.B.12through14.Whenaccessisnolongerrequiredthetravellanemustberemovedandtheright-of-wayrestored.

22 23

UPLAND Erosion Control, Revegetation, and Maintenance Plan

May 2013 Version

b. Constructandmaintainpermanentslopebreakersinallareas,exceptcultivatedareasandlawns,unlessrequestedbythelandowner,usingspacingrecommendationsobtainedfromthelocalsoilconservationauthorityorlandmanagingagency.

Intheabsenceofwrittenrecommendations,usethefollowingspacingunlesscloserspacingisnecessarytoavoidexcessiveerosionontheconstructionright-of-way:

Slope(%) Spacing(feet)

5-15 300

>15-30 200

>30 100

c. Constructslopebreakerstodivertsurfaceflowtoastableareawithoutcausingwatertopoolorerodebehindthebreaker.Intheabsenceofastablearea,constructappropriateenergy-dissipatingdevicesattheendofthebreaker.

d. Slopebreakersmayextendslightly(about4feet)beyondtheedgeoftheconstructionright-of-waytoeffectivelydrainwateroffthedisturbedarea.Whereslopebreakersextendbeyondtheedgeoftheconstructionright-of-way,theyaresubjecttocompliancewithallapplicablesurveyrequirements.

subsurfacewateralongthetrench.Trenchbreakersmaybeconstructedofmaterialssuchassandbagsorpolyurethanefoam.Donotusetopsoilintrenchbreakers.

b. Anengineerorsimilarlyqualifiedprofessionalshalldeterminetheneedforandspacingoftrenchbreakers.Otherwise,trenchbreakersshallbeinstalledatthesamespacingasandupslopeofpermanentslopebreakers.

c. Inagriculturalfieldsandresidentialareaswhereslopebreakersarenottypicallyrequired,installtrenchbreakersatthesamespacingasifpermanentslopebreakerswererequired.

d. Ataminimum,installatrenchbreakeratthebaseofslopesgreaterthan5percentwherethebaseoftheslopeislessthan50feetfromawaterbodyorwetlandandwhereneededtoavoiddrainingawaterbodyorwetland.Installtrenchbreakersatwetlandboundaries,asspecifiedintheProcedures.Donotinstalltrenchbreakerswithinawetland.

2. PermanentSlopeBreakers

a. Permanentslopebreakersareintendedtoreducerunoffvelocity,divertwaterofftheconstructionright-of-way,andpreventsedimentdepositionintosensitiveresources.Permanentslopebreakersmaybeconstructedofmaterialssuchassoil,stone,orsomefunctionalequivalent.

24 25

UPLAND Erosion Control, Revegetation, and Maintenance Plan

May 2013 Version

2. SoilAdditives

FertilizeandaddsoilpHmodifiersinaccordancewithwrittenrecommendationsobtainedfromthelocalsoilconservationauthority,landmanagementagencies,orlandowner.IncorporaterecommendedsoilpHmodifierandfertilizerintothetop2inchesofsoilassoonaspracticableafterapplication.

3. SeedingRequirements

a. Prepareaseedbedindisturbedareastoadepthof3to4inchesusingappropriateequipmenttoprovideafirmseedbed.Whenhydroseeding,scarifytheseedbedtofacilitatelodgingandgerminationofseed.

b. Seeddisturbedareasinaccordancewithwrittenrecommendationsforseedmixes,rates,anddatesobtainedfromthelocalsoilconservationauthorityortherequestofthelandownerorlandmanagementagency.Seedingisnotrequiredincultivatedcroplandsunlessrequestedbythelandowner.

c. Performseedingofpermanentvegetationwithintherecommendedseedingdates.Ifseedingcannotbedonewithinthosedates,useappropriatetemporaryerosioncontrolmeasuresdiscussedinsectionIV.Fandperformseedingofpermanentvegetationatthebeginningofthenextrecommendedseedingseason.Dormantseedingortemporaryseedingofannualspeciesmayalsobeused,ifnecessary,toestablishcover,asapprovedbytheEnvironmentalInspector.

C. SOIL COMPACTION MITIGATION 1. Testtopsoilandsubsoilforcompactionatregular

intervalsinagriculturalandresidentialareasdisturbedbyconstructionactivities.Conducttestsonthesamesoiltypeundersimilarmoistureconditionsinundisturbedareastoapproximatepreconstructionconditions.Usepenetrometersorotherappropriatedevicestoconducttests.

2. Plowseverelycompactedagriculturalareaswithaparaploworotherdeeptillageimplement.Inareaswheretopsoilhasbeensegregated,plowthesubsoilbeforereplacingthesegregatedtopsoil.

Ifsubsequentconstructionandcleanupactivitiesresultinfurthercompaction,conductadditionaltilling.

3. Performappropriatesoilcompactionmitigationinseverelycompactedresidentialareas.

D. REVEGETATION 1. General

a. Theprojectsponsorisresponsibleforensuringsuccessfulrevegetationofsoilsdisturbedbyproject-relatedactivities,exceptasnotedinsectionV.D.1.b.

b. Restoreallturf,ornamentalshrubs,andspecializedlandscapinginaccordancewiththelandowner’srequest,orcompensatethelandowner.Restorationworkmustbeperformedbypersonnelfamiliarwithlocalhorticulturalandturfestablishmentpractices.

26 27

UPLAND Erosion Control, Revegetation, and Maintenance Plan

May 2013 Version

VI. oFF-road vehiCle Control

Toeachownerormanagerofforestedlands,offertoinstallandmaintainmeasurestocontrolunauthorizedvehicleaccesstotheright-of-way.Thesemeasuresmayinclude:

A. Signs;

B. Fenceswithlockinggates;

C. Slashandtimberbarriers,pipebarriers,oralineofbouldersacrosstheright-of-way;and

D. Conifersorotherappropriatetreesorshrubsacrosstheright-of-way.

vii. Post-ConstruCtion aCtivities and rePorting

A. MONITORING AND MAINTENANCE 1. Conductfollow-upinspectionsofalldisturbedareas,as

necessary,todeterminethesuccessofrevegetationandaddresslandownerconcerns.Ataminimum,conductinspectionsafterthefirstandsecondgrowingseasons.

2. Revegetationinnon-agriculturalareasshallbeconsideredsuccessfulifuponvisualsurveythedensityandcoverofnon-nuisancevegetationaresimilarindensityandcovertoadjacentundisturbedlands.Inagriculturalareas,revegetationshallbeconsidered

Lawnsmaybeseededonascheduleestablishedwiththelandowner.

d. Intheabsenceofwrittenrecommendationsfromthelocalsoilconservationauthorities,seedalldisturbedsoilswithin6workingdaysoffinalgrading,weatherandsoilconditionspermitting,subjecttothespecificationsinsectionV.D.3.athroughV.D.3.c.

e. BaseseedingratesonPureLiveSeed.Useseedwithin12monthsofseedtesting.

f. Treatlegumeseedwithaninoculantspecifictothespeciesusingthemanufacturer’srecommendedrateofinoculantappropriatefortheseedingmethod(broadcast,drill,orhydro).

g. Intheabsenceofwrittenrecommendationsfromthelocalsoilconservationauthorities,landowner,orlandmanagingagencytothecontrary,aseeddrillequippedwithacultipackerispreferredforseedapplication.

Broadcastorhydroseedingcanbeusedinlieuofdrillingatdoubletherecommendedseedingrates.Whereseedisbroadcast,firmtheseedbedwithacultipackerorrollerafterseeding.Inrockysoilsorwheresiteconditionsmaylimittheeffectivenessofthisequipment,otheralternativesmaybeappropriate(e.g.,useofachaindrag)tolightlycoverseedafterapplication,asapprovedbytheEnvironmentalInspector.

28 29

UPLAND Erosion Control, Revegetation, and Maintenance Plan

May 2013 Version

6. Effortstocontrolunauthorizedoff-roadvehicleuse,incooperationwiththelandowner,shallcontinuethroughoutthelifeoftheproject.Maintainsigns,gates,andpermanentaccessroadsasnecessary.

B. REPORTING 1. Theprojectsponsorshallmaintainrecordsthatidentify

bymilepost:

a. methodofapplication,applicationrate,andtypeoffertilizer,pHmodifyingagent,seed,andmulchused;

b. acreagetreated;

c. datesofbackfillingandseeding;

d. namesoflandownersrequestingspecialseedingtreatmentandadescriptionofthefollow-upactions;

e. thelocationofanysubsurfacedrainagerepairsorimprovementsmadeduringrestoration;and

f. anyproblemareasandhowtheywereaddressed.

2. TheprojectsponsorshallfilewiththeSecretaryquarterlyactivityreportsdocumentingtheresultsoffollow-upinspectionsrequiredbysectionVII.A.1;anyproblemareas,includingthoseidentifiedbythelandowner;andcorrectiveactionstakenforatleast2yearsfollowingconstruction.

TherequirementtofilequarterlyactivityreportswiththeSecretarydoesnotapplytoprojectsconstructedundertheautomaticauthorization,priornotice,oradvancednoticeprovisionsintheFERC’sregulations.

successfulwhenuponvisualsurvey,cropgrowthandvigoraresimilartoadjacentundisturbedportionsofthesamefield,unlesstheeasementagreementspecifiesotherwise.

Continuerevegetationeffortsuntilrevegetationissuccessful.

3. Monitorandcorrectproblemswithdrainageandirrigationsystemsresultingfrompipelineconstructioninagriculturalareasuntilrestorationissuccessful.

4. Restorationshallbeconsideredsuccessfuliftheright-of-waysurfaceconditionissimilartoadjacentundisturbedlands,constructiondebrisisremoved(unlessotherwiseapprovedbythelandownerorlandmanagingagencypersectionV.A.6),revegetationissuccessful,andproperdrainagehasbeenrestored.

5. Routinevegetationmowingorclearingoverthefullwidthofthepermanentright-of-wayinuplandsshallnotbedonemorefrequentlythanevery3years.However,tofacilitateperiodiccorrosion/leaksurveys,acorridornotexceeding10feetinwidthcenteredonthepipelinemaybeclearedatafrequencynecessarytomaintainthe10-footcorridorinanherbaceousstate.InnocaseshallroutinevegetationmowingorclearingoccurduringthemigratorybirdnestingseasonbetweenApril15andAugust1ofanyyearunlessspecificallyapprovedinwritingbytheresponsiblelandmanagementagencyortheU.S.FishandWildlifeService.