UO Lewis Integrative Science Building CUG Meeting - Schematic Design Wednesday, October 7

Preview:

DESCRIPTION

UO Lewis Integrative Science Building CUG Meeting - Schematic Design Wednesday, October 7. Agenda. Budget Status Design Status Schedule CPC planning Next Steps. Adjustments. Sitework Site Boundaries Building Size Basement Fourth Floor Streisinger Rooftop - PowerPoint PPT Presentation

Citation preview

UO Lewis Integrative Science Building

CUG Meeting - Schematic Design

Wednesday, October 7

• Budget Status

• Design Status

• Schedule

• CPC planning

• Next Steps

Agenda

1. Sitework• Site Boundaries

2. Building Size• Basement• Fourth Floor• Streisinger Rooftop

3. Building Envelope• Glazing• Penthouse Cladding• Lightwells• Skylights

4. Interior Finishes• Glazing• Ceilings

5. Systems• Lighting• Laboratories

6. General• Basement Labs• Shell Space• Contingencies

Adjustments

Site Development

Plan Development

BASEMENT PLAN

SECOND FLOOR PLAN

THIRD FLOOR PLAN

FOURTH FLOOR PLAN

PENTHOUSE FLOOR PLAN

ROOF PLAN

Building Development

South

North

East

West

Aerial View from North East

Aerial View from North West

Street Level View from North

Street Level View from East

View from Huestis Hall Roof

View from Science Green

Section View – “Up-and-Over” Connection

Cut-away View – Science Green Connection

End

Schedule

• Campus Planning Meeting – October 12• Schematic Design Report• Design Development – User Meetings• Design Schedule

• DD Oct 09 – Feb 10• CD March 10 – Sept 10• Permitting & Bidding• Phased Bid Packages

• Construction Start Target

Details

• Campus Planning Meeting• SD approval process• Project Websitehttp://www.uoregon.edu/~eeng/lisb.html• Other?