Underfrequency Load Shedding Report
Jerry Rust
WECC
October 21, 2010
•NERC PRC-006-01
•WECC Consolidated Coordinated Plan
•Recommendations
Automatic Underfrequency Load Shedding – WECC Focus● Preserve the existing WECC Consolidated
Coordinated Plan - Variance
● Applicable to Correct Entity UFLS entities – responsible for the ownership,
operation, or control of UFLS equipment (WECC-0065 Criterion)
Automatic Underfrequency Load Shedding – WECC Focus● WECC Consolidated Coordinated UFLS Plan
13-page document posted for 30 days September 22, 2010 – closes October 22, 2010
Response to comments due back November 21, 2010
Is it complete? Did we miss something or miss-quote something?
Automatic Underfrequency Load Shedding – WECC Focus● Some issues within the approved standard may
cause WECC OC and PCC to re-think implementation M.E.B.12. Each Planning Coordinator shall have
dated evidence such as reports, data gathered from an historical event, or other dated documentation to show that it participated in a UFLS design assessment per Requirements E.B.12 and E.B.4 if UFLS program deficiencies are identified in E.B.11
Automatic Underfrequency Load Shedding – WECC Focus● E.B.11 Each Planning Coordinator in whose
area a BES islanding event results in system frequency excursions below the initializing set points of the UFLS program, shall participate in and document a coordinated event assessment with all affected Planning Coordinators to conduct and document an assessment of the event within one year of event actuation to evaluate: E.B.11.1. The performance of the UFLS equipment E.B.11.2. The effectiveness of the UFLS program
Automatic Underfrequency Load Shedding – WECC Focus● So what does this mean
Compare to the simulations that established the plan and determine if the actual event did not match the simulations – why? What is wrong? What changed? Etc.
Does WECC have the simulation model that establish the plan – in the past an ad-hoc group does the simulation analysis. It is maintained and updated? Is it an operating case with reflection of reserve?
Automatic Underfrequency Load Shedding – Recommendation● WECC form a permanent group to maintain the
simulation model and to be able to run a comparison analysis in the event it needs to be done. (maintain some kind of continuity of personnel) Reports to the JGC
Event Analysis has been under OC in the past
Automatic Underfrequency Load Shedding – Implementation● Effective one year following the first day of the
first calendar quarter after applicable regulatory approvals. January 1, 2011 anticipated date
● Finish WECC-0065
● Address where and whom to maintain simulation
Questions