Transforming

A LOVABLE KANPUR

TO

A LIVABLE KANPUR

In Managing MSW in Kanpur

1A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

The project has to be SELF-sustainable

Follow the book (Law)religiously

Near ZERO landfill: thus maximum derivation

Zero tolerance for compromise in quality

Integrated and Inclusive Approach

1

2

34

5

4A2Z Infrastructure Ltd.

:

We make self sustainable projects, otherwise it will keep on depending on Govt. grants,

and alibis for non-performance, none of which could be allowed. So the garbage has to

undergo metamorphosis to something useful and commercially viable like:

1. Compost

2. RDF

3. A C&D waste value added plant like manufacturing bricks,blocks or even plain aggregate

4. Plastic recycling

5. Inorganic recyclable material

6. Waste to energy, by using appropriate technology likecombustion/steam cycle route or biomethanation

7. Advertising on C&T vehicles

8. collection and Transportation user charge revenue

9. CDM

5A2Z Infrastructure Ltd.

Our projects are integrated i.e. C&T and P&D to us only, because:

It ensures synergies in operation

One of the many operators may prove to be the weakest link in the chain

The entire system is efficient for there are no allegations/counter allegations amongst

multiple operators

Fixation of responsibilities is possible

Costs are controlled because of there will be no duplicity of efforts

And Inclusive, to include all the stakeholders like Public, State, and most important the

garbage dependant populace like Rag Pickers

6A2Z Infrastructure Ltd.

Only good quality sells and sells repeatedly.A small example:

Quality of Compost vis a vis FCO Specification

Sl No. City Compost FCO Spcefication

Vasundra Test Report as

per SGS Report dated 12th

August 2010

1 Moisture % 15-25% by weight 19.70

2 Color Dark Brown to Black Black

3 Odour NIL Agreeable

4 Partical Size

90%Pass 4 MM

Is Sieve 100% pass

5 Bulk Density g/ml < 1 0.9

6

Total minimum Organic carbon%

g/Cm3 12 18.6

7 Total Minimum N % 0.8 1.2

8 Total Minimum P % 0.4 1.14

9 Total Minimum K % 0.4 0.95

10 C:N Ratio 20:1 or Less 15.5:1

11 PH 6.5-7.5 7.6 7A2Z Infrastructure Ltd.

When the land is decreasing for Food, Forest, Housing and Recreation, it will be

criminal to burden the mother earth with something as dispensable as Garbage.

Moreover, the landfilling discourages recycling and increases the dependence of a

project to depend on Govt. doles to feed a landfill killing the spirit of self

sustainability.

8A2Z Infrastructure Ltd.

When a system, society or legislature, decides a law it is an effort of that system to find a

best solution for the problem of the time relevant to that times. So we, at A2Z, abide by

laws religiously. And we respect the right of every human being to live a life of self respect,

social respect and dignity.

So all our operations, be it collection & transportation or processing & disposal, are

conducted strictly meeting the letter and spirit of MSW (H&M)

Rules, 2000 and various recommendations of CPHEEO and try to emulate the best

International practices for handling such materials.

9A2Z Infrastructure Ltd.

10A2Z Infrastructure Ltd.

11A2Z Infrastructure Ltd.

Kanpur project: A factsheet

1. Population: 3.6 million

2. Quantity of MSW: 1500 MT/day

3. Per capita waste generation: 472g/person/day

4. Project Life-cycle period: 30 years

5. Project part funded by JNNURM grant upto 45% of the project value

6. Land: 46 ha

7. Project Cost: Rs. 120 Crore, other than power plant

8. Employment provided: 2500 men

9. C&D waste component: Less than 10%

10. OrganicWaste component: 50-55%

11. Plastics: < 6%

12. Project running for last 2 years

13. Landfill population so far: ZERO

14. Compost sold so far: More than 100,000 MT

15. Results: Commercially sustainable,

16. ULB interests secured by Substitution Agreement

17. C&T Charges paid by KNN: Rs. 456/MT

18. Tipping fee for processing: ZERO

19. Tipping fee for Disposal: ZERO

20. Collection of User Charges: By A2Z. Daily deposit in Escrow account. KNN pays most of C&T

charges to A2Z from this Escrow account

A2Z Infrastructure Ltd.

S. No. Problem A2Z Solution

1 Hills of waste Reclamation of land by remediation of legacy waste

2 Dhalaos Door to door collection / Bins

3 Ineffective primary collection systemDoor to door collection system of garbage to be

strengthened

4 Garbage strewn around the binsA conservancy worker after every 20 bins to take care

of garbage lying outside the bins

5 The present operations yet to become self-sustainable A2Z ops sustainable by selling compost and RDF

6 Failed WtETechnology selection to be reviewed and RDF to be

potentiated

7 Ragpickers rehabilitationRagpickers must move out of dump to mainstream job

with the concessionaire

8Non-collection of user charges

Collection of user charges must be allowed through

necessary amendments in bye-laws to make enforce

discipline in the polluters

9 NO Service in Slum Areas They MUST be served

Mixed wet heterogeneous garbage

D2D Primary Collection, & Secondary Transportation

Processing at IRRF:

1. Progressive Segregation

2. Aerobic Composting

3. RDF Compaction

4. Recyclables cleaning and sales

Power generation

13A2Z Infrastructure Ltd.

14A2Z Infrastructure Ltd.

15A2Z Infrastructure Ltd.

The A2Z touch

16A2Z Infrastructure Ltd.

The A2Z touch

17A2Z Infrastructure Ltd.

The A2Z touch

18A2Z Infrastructure Ltd.

The A2Z touch

19A2Z Infrastructure Ltd.

The A2Z touch

20A2Z Infrastructure Ltd.

Collection & Transportation

The city and all cluster ULBs are divided into clear

working zones which may be contiguous with the

existing zonal structuring of the respective ULBs.

A2Z starts the working prospectively and progressively

so that all the zones get covered in 90 days of the

COD.

The door to door collection starts at 7 am and will go

on till 1 pm.

Even in the slum areas are covered efficiently.

All the team members going door to door for

collection of garbage are called Safai Mitra. Each

Safai Mitra wears an eye catching uniform which is

clean and has protective gear on his body like gloves

and mask etc.

The Safai Mitra with an 8-bin rickshaw goes to a

house and whistles. One member of the house comes

out with the package full of garbage and drops it in

one of the 8 bins in the rickshaw.

Once the rickshaw is full, it unloads into the nearby

1100 CC bin. The 1100 CC bin is unloaded in to the

Refuse Compactor.

There are no strewn garbage around the bins. The

area around bins are clean.

Each & every lane of each ward

and each bin location are

mapped, marked and tabulated.

Each of the vehicles is equipped

with GPS system and every

incidence of the compactor

halting at every bin is monitored

and recorded.

Old dhalaos (community waste stations/WSDs as

they are called in Any Indian City) have been

cleaned and abandoned.

The user charges are collected by us and we use the

onsite online data loggers to collect payment, track

user response and issue receipts.

25A2Z Infrastructure Ltd.

26A2Z Infrastructure Ltd.

27A2Z Infrastructure Ltd.

28A2Z Infrastructure Ltd.

29A2Z Infrastructure Ltd.

30A2Z Infrastructure Ltd.

•This material for RDF is shredded and homogenized to RDF Fluff

and is briquetted for greater market acceptance. Holcim in India

already buying for Kymore cement Kiln.

•Apart from Compost and RDF we recycle the Waste to produce:

•Value added products from laminated plastics like Lays

pouches.

•Recycled plastic granules from the non-laminated plastic

•Construction grade aggregate, Building blocks, interlocking

tiles, and agriculture aggregate from construction and

demolition debris.

31A2Z Infrastructure Ltd.

We are here to partner with Kanpur city in providing the most basic of civic

amenities to public – Clean city. And like true partners, we are available to

shoulder all responsibilities that are expected of us. We have never nurtured

the idea of our identity separately from Nagar Nigam. We are working for and

on behalf of NNK like their extended arm only

We welcome a reference check!

32A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

A2Z Infrastructure Ltd.

Recommended