Training Meeting

Preview:

DESCRIPTION

Training Meeting. Insert Date. c/LTC Hritz c/CSM Delk. Agenda. S1-S4 Shop Briefs & S5-S9/PAO Calendar Significant Events * Event 1 * Event 2 * Event 3 * Etc. Lab discussion (T+6 – T+1) T-1 Assessment Command Staff Briefs. S-1:. Unexcused Absence(s): - PowerPoint PPT Presentation

Citation preview

Training Meeting Insert Date

c/LTC Hritzc/CSM Delk

Agenda • S1-S4 Shop Briefs & S5-S9/PAO • Calendar • Significant Events

* Event 1* Event 2* Event 3* Etc.

• Lab discussion (T+6 – T+1)• T-1 Assessment• Command Staff Briefs

S-1: S-1:

Unexcused Absence(s):

•20 NOV 2013 – PT – Delk – Late

Excused Absence(s):

•18/20 NOV 2013 – PT – Erb – LASIK

•18 NOV 2013 – Kluesener – PT – Bold Warrior

•18 NOV 2013 – Rahm – PT – Bold Warrior

•18/20 NOV 2013 – Lockie – PT – Employment

•18/20/21 NOV 2013 – Burt – PT – Adrian College

•18/20/21 NOV 2013 – Walters – PT – Adrian College

Total Attendance Data:

•MSL I: 12 PT

•MSL II: 10 PT

•MSL III: 8 PT

•MSL IV: 18 PT

The attendance data for the Rocket Battalion’s Dining-In (21 NOV 2013) will be sent forward no later than 1800 on 22 NOV 2013.

S1 – Current Project(s):

1.Rocket Battalion – Awards Distribution: This task will be completed no later than 28 NOV 2013. The previously outlined course of action was discarded due to simple time constraints.

1.Updated MSL Rosters: Starting on 25 NOV 2013, I will begin working on the tentative MSL attendance rosters for the Spring 2014 academic term.

S-2:Weather Report

S-2:Weather Report

Effects of the Weather

PT: Mostly cloudy all week with chances of rain increasing later in week. Temperatures steadily low 30s. LAB: 60% chance of rain. Ensure cadets bring appropriate gear.*Weather accurate as of 061400NOV2013

S-2:Crime Report

S-2:Crime Report

Week of 20OCT2013 Crime Data(Source: Toledo Blade - ~2 mile radius around UT Campus)

•11 Burglaries (Dark Red) +6•2 Thefts (Pink) +1•1 Robberies (Purple) -1•1 Felonious Assault (Green) +0

Notes:-6 more crimes in comparison to last week. -2 crimes located to south west of campus near Byrnes and Oasis.

Week of 27OCT2013 Crime News

•No UT Alerts or reported news

My Chances of Being a Victim:

• Toledo: Violent Crimes: 1 in 99• Ohio Violent Crimes: 1 in 325• Toledo Property Crimes: 1 in 17• Ohio Property Crimes: 1 in 30

S-3: S-3:

• Task Tracker

S-4:Logistics Report

S-4:Logistics Report

UPDATES

-Issued all cold weather gear at first lab-Need supply SGTs for each company

Battalion Staff UpdatesBattalion Staff Updates

• S5/S7

• S6

• PAO

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SAT/SUN

1 2 3 4/5

6 7 8 9

Bring a Friend to PT

Lab 1 Forming Squads

10

0800 Training Meeting

11/12

13 14 15 16

Lab 2 Squad Attack

17

0800 Training Meeting

18/19

20

Martin Luther King, Jr. DayNo Classes

21

22 23

Lab 3

24

0800 Training Meeting

25/26

27 28 29 30 31

0800 Training Meeting

1/2

January 2014

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SAT/SUN

3 4 5 6 7

0800 Training Meeting

8/9

10 11 12 13 14

0800 Training Meeting

15/16

17 18 19 20 21

0800 Training Meeting

22/23

24 25

26 27 28 01/02

3 4 5 6 7 8/9

February 2014

Spring Break

T+6 Insert DateEvent

OIC: c/LTC Hritz – AOIC: c/MAJ Wineland

T+6 Insert DateEvent

OIC: c/LTC Hritz – AOIC: c/MAJ Wineland

OIC’S INTENT:To teach the MSIs and IIs the fundamentals of a SQD Attack lane and to prepare the MSIIIs for CST through the execution of a lane, and mentorship thereafter.

CONCEPT OF THE OPERATION: Phase I: Planning Phase II: SetupPhase III: Execution of Lab

a. Push-up Event c. 2 Mile Run b. Sit-up Event d. Height/Weight

Phase IV: Recovery / AAR

INCLEMENT WEATHER PLAN: Push-up/Sit-up events conducted in HEC Gym. 2 Mile Run at the UT Rec Center.UNIFORM: IPFU (Winter Top/Cap/Gloves), Water Source, Follow AR 670-1 Grooming Standards

Task MatrixTask Matrix

Name Rehearsals Setup Detail During Execution Recovery

Akers

Annis

Burt

Delk

Diaz

Erb

Gardull

Hritz

Kenny

Kluesener

Lockie

Mains

McCord

Rahm

Scere

Schoonover

Vail

Walters

Williamson

Wineland

Cadre Needs i.E (Transportation to and from Miakonda)

TimelineTimeline

Time Event

0515 MSIV’s Arrive

0515-0530 Setup (move mats, gather equipment, etc.)

0530 MSI’s, II’s, III’s arrive

0530-0540 MSI’s, II’s, III’s stretch and prepare for RAPFT, movement to mats

0540-0545 Push-up event brief

0545-0555 Push-up event execution (4*2.5 = 10 minutes)

0555-0605 10 minute rest and Sit-up event brief

0605-0615 Sit-up event execution (4*2.5 = 10 minutes)

0615-0630 2 Mile Run event brief and movement to UT Bike Trail

0630-0650 2 Mile Run event execution

0650-0700 Movement to HEC

0700-0720 Height and weight measurement

0720 Dismissal

Lab TrackerLab Tracker

T+5 Insert DateEvent

OIC: c/LTC Hritz – AOIC: c/MAJ Wineland

T+5 Insert DateEvent

OIC: c/LTC Hritz – AOIC: c/MAJ Wineland

OIC’S INTENT:To teach the MSIs and IIs the fundamentals of a SQD Attack lane and to prepare the MSIIIs for CST through the execution of a lane, and mentorship thereafter.

CONCEPT OF THE OPERATION: Phase I: Planning Phase II: SetupPhase III: Execution of Lab

a. Push-up Event c. 2 Mile Run b. Sit-up Event d. Height/Weight

Phase IV: Recovery / AAR

INCLEMENT WEATHER PLAN: Push-up/Sit-up events conducted in HEC Gym. 2 Mile Run at the UT Rec Center.UNIFORM: IPFU (Winter Top/Cap/Gloves), Water Source, Follow AR 670-1 Grooming Standards

Task MatrixTask Matrix

Name Rehearsals Setup Detail During Execution Recovery

Akers

Annis

Burt

Delk

Diaz

Erb

Gardull

Hritz

Kenny

Kluesener

Lockie

Mains

McCord

Rahm

Scere

Schoonover

Vail

Walters

Williamson

Wineland

Cadre Needs i.E (Transportation to and from Miakonda)

TimelineTimeline

Time Event

0515 MSIV’s Arrive

0515-0530 Setup (move mats, gather equipment, etc.)

0530 MSI’s, II’s, III’s arrive

0530-0540 MSI’s, II’s, III’s stretch and prepare for RAPFT, movement to mats

0540-0545 Push-up event brief

0545-0555 Push-up event execution (4*2.5 = 10 minutes)

0555-0605 10 minute rest and Sit-up event brief

0605-0615 Sit-up event execution (4*2.5 = 10 minutes)

0615-0630 2 Mile Run event brief and movement to UT Bike Trail

0630-0650 2 Mile Run event execution

0650-0700 Movement to HEC

0700-0720 Height and weight measurement

0720 Dismissal

Lab TrackerLab Tracker

T+4 Insert DateEvent

OIC: c/LTC Hritz – AOIC: c/MAJ Wineland

T+4 Insert DateEvent

OIC: c/LTC Hritz – AOIC: c/MAJ Wineland

OIC’S INTENT:To teach the MSIs and IIs the fundamentals of a SQD Attack lane and to prepare the MSIIIs for CST through the execution of a lane, and mentorship thereafter.

CONCEPT OF THE OPERATION: Phase I: Planning Phase II: SetupPhase III: Execution of Lab

a. Push-up Event c. 2 Mile Run b. Sit-up Event d. Height/Weight

Phase IV: Recovery / AAR

INCLEMENT WEATHER PLAN: Push-up/Sit-up events conducted in HEC Gym. 2 Mile Run at the UT Rec Center.UNIFORM: IPFU (Winter Top/Cap/Gloves), Water Source, Follow AR 670-1 Grooming Standards

Task MatrixTask Matrix

Name Rehearsals Setup Detail During Execution Recovery

Akers

Annis

Burt

Delk

Diaz

Erb

Gardull

Hritz

Kenny

Kluesener

Lockie

Mains

McCord

Rahm

Scere

Schoonover

Vail

Walters

Williamson

Wineland

Cadre Needs i.E (Transportation to and from Miakonda)

TimelineTimeline

Time Event

0515 MSIV’s Arrive

0515-0530 Setup (move mats, gather equipment, etc.)

0530 MSI’s, II’s, III’s arrive

0530-0540 MSI’s, II’s, III’s stretch and prepare for RAPFT, movement to mats

0540-0545 Push-up event brief

0545-0555 Push-up event execution (4*2.5 = 10 minutes)

0555-0605 10 minute rest and Sit-up event brief

0605-0615 Sit-up event execution (4*2.5 = 10 minutes)

0615-0630 2 Mile Run event brief and movement to UT Bike Trail

0630-0650 2 Mile Run event execution

0650-0700 Movement to HEC

0700-0720 Height and weight measurement

0720 Dismissal

Lab TrackerLab Tracker

T+3 Insert DateEvent

OIC: c/LTC Hritz – AOIC: c/MAJ Wineland

T+3 Insert DateEvent

OIC: c/LTC Hritz – AOIC: c/MAJ Wineland

OIC’S INTENT:To teach the MSIs and IIs the fundamentals of a SQD Attack lane and to prepare the MSIIIs for CST through the execution of a lane, and mentorship thereafter.

CONCEPT OF THE OPERATION: Phase I: Planning Phase II: SetupPhase III: Execution of Lab

a. Push-up Event c. 2 Mile Run b. Sit-up Event d. Height/Weight

Phase IV: Recovery / AAR

INCLEMENT WEATHER PLAN: Push-up/Sit-up events conducted in HEC Gym. 2 Mile Run at the UT Rec Center.UNIFORM: IPFU (Winter Top/Cap/Gloves), Water Source, Follow AR 670-1 Grooming Standards

Task MatrixTask Matrix

Name Rehearsals Setup Detail During Execution Recovery

Akers

Annis

Burt

Delk

Diaz

Erb

Gardull

Hritz

Kenny

Kluesener

Lockie

Mains

McCord

Rahm

Scere

Schoonover

Vail

Walters

Williamson

Wineland

Cadre Needs i.E (Transportation to and from Miakonda)

TimelineTimeline

Time Event

0515 MSIV’s Arrive

0515-0530 Setup (move mats, gather equipment, etc.)

0530 MSI’s, II’s, III’s arrive

0530-0540 MSI’s, II’s, III’s stretch and prepare for RAPFT, movement to mats

0540-0545 Push-up event brief

0545-0555 Push-up event execution (4*2.5 = 10 minutes)

0555-0605 10 minute rest and Sit-up event brief

0605-0615 Sit-up event execution (4*2.5 = 10 minutes)

0615-0630 2 Mile Run event brief and movement to UT Bike Trail

0630-0650 2 Mile Run event execution

0650-0700 Movement to HEC

0700-0720 Height and weight measurement

0720 Dismissal

Lab TrackerLab Tracker

T+2 Insert DateEvent

OIC: c/LTC Hritz – AOIC: c/MAJ Wineland

T+2 Insert DateEvent

OIC: c/LTC Hritz – AOIC: c/MAJ Wineland

OIC’S INTENT:To teach the MSIs and IIs the fundamentals of a SQD Attack lane and to prepare the MSIIIs for CST through the execution of a lane, and mentorship thereafter.

CONCEPT OF THE OPERATION: Phase I: Planning Phase II: SetupPhase III: Execution of Lab

a. Push-up Event c. 2 Mile Run b. Sit-up Event d. Height/Weight

Phase IV: Recovery / AAR

INCLEMENT WEATHER PLAN: Push-up/Sit-up events conducted in HEC Gym. 2 Mile Run at the UT Rec Center.UNIFORM: IPFU (Winter Top/Cap/Gloves), Water Source, Follow AR 670-1 Grooming Standards

Task MatrixTask Matrix

Name Rehearsals Setup Detail During Execution Recovery

Akers

Annis

Burt

Delk

Diaz

Erb

Gardull

Hritz

Kenny

Kluesener

Lockie

Mains

McCord

Rahm

Scere

Schoonover

Vail

Walters

Williamson

Wineland

Cadre Needs i.E (Transportation to and from Miakonda)

TimelineTimeline

Time Event

0515 MSIV’s Arrive

0515-0530 Setup (move mats, gather equipment, etc.)

0530 MSI’s, II’s, III’s arrive

0530-0540 MSI’s, II’s, III’s stretch and prepare for RAPFT, movement to mats

0540-0545 Push-up event brief

0545-0555 Push-up event execution (4*2.5 = 10 minutes)

0555-0605 10 minute rest and Sit-up event brief

0605-0615 Sit-up event execution (4*2.5 = 10 minutes)

0615-0630 2 Mile Run event brief and movement to UT Bike Trail

0630-0650 2 Mile Run event execution

0650-0700 Movement to HEC

0700-0720 Height and weight measurement

0720 Dismissal

Lab TrackerLab Tracker

T+1 Insert DateEvent

OIC: c/LTC Hritz – AOIC: c/MAJ Wineland

T+1 Insert DateEvent

OIC: c/LTC Hritz – AOIC: c/MAJ Wineland

OIC’S INTENT:To teach the MSIs and IIs the fundamentals of a SQD Attack lane and to prepare the MSIIIs for CST through the execution of a lane, and mentorship thereafter.

CONCEPT OF THE OPERATION: Phase I: Planning Phase II: SetupPhase III: Execution of Lab

a. Push-up Event c. 2 Mile Run b. Sit-up Event d. Height/Weight

Phase IV: Recovery / AAR

INCLEMENT WEATHER PLAN: Push-up/Sit-up events conducted in HEC Gym. 2 Mile Run at the UT Rec Center.UNIFORM: IPFU (Winter Top/Cap/Gloves), Water Source, Follow AR 670-1 Grooming Standards

Task MatrixTask Matrix

Name Rehearsals Setup Detail During Execution Recovery

Akers

Annis

Burt

Delk

Diaz

Erb

Gardull

Hritz

Kenny

Kluesener

Lockie

Mains

McCord

Rahm

Scere

Schoonover

Vail

Walters

Williamson

Wineland

Cadre Needs i.E (Transportation to and from Miakonda)

TimelineTimeline

Time Event

0515 MSIV’s Arrive

0515-0530 Setup (move mats, gather equipment, etc.)

0530 MSI’s, II’s, III’s arrive

0530-0540 MSI’s, II’s, III’s stretch and prepare for RAPFT, movement to mats

0540-0545 Push-up event brief

0545-0555 Push-up event execution (4*2.5 = 10 minutes)

0555-0605 10 minute rest and Sit-up event brief

0605-0615 Sit-up event execution (4*2.5 = 10 minutes)

0615-0630 2 Mile Run event brief and movement to UT Bike Trail

0630-0650 2 Mile Run event execution

0650-0700 Movement to HEC

0700-0720 Height and weight measurement

0720 Dismissal

Lab TrackerLab Tracker

T-1 AssessmentT-1 Assessment

• Planning:• Issue: We were originally given such a

short notice (one month) of the possibility of competing in the Norwegian Foot March.

• Discussion: Due to such a short suspense, our training time was severely reduced, which hindered us from reaching our full potential in securing a record time for completing 18.6 miles.

• Recommendation: We will begin planning in January, and begin training early next year in order to bring multiple teams to participate and achieve better results in November (2014).

• Preparation: • Issue: While we were prepared to complete

the 18.6 mile distance in 4:09 (twenty-one minutes under the standard of 4:30), our time could have been drastically reduced if we trained well ahead of time.

• Discussion: Our training capacity was reduced due to such a short suspense, which slowed down our completion time as a result.

• Recommendation: I recommend that we begin training well ahead of time—at least three months before the actual event next November.

T-1 AssessmentT-1 Assessment

• Preparation con’t:• Issue: We were originally given such a

short notice (one month) of the possibility of competing in the Norwegian Foot March.

• Discussion: Due to such a short suspense, our training time was severely reduced, which hindered us from reaching our full potential in securing a record time for completing 18.6 miles.

• Recommendation: We will begin planning in January, and begin training early next year in order to bring multiple teams to participate and achieve better results in November (2014).

• Execution: • Issue: While we were prepared to complete

the 18.6 mile distance in 4:09 (twenty-one minutes under the standard of 4:30), our time could have been drastically reduced if we trained well ahead of time.

• Discussion: Our training capacity was reduced due to such a short suspense, which slowed down our completion time as a result.

• Recommendation: I recommend that we begin training well ahead of time—at least three months before the actual event next November.

CLC Prep OfficerProgress Report

CLC Prep OfficerProgress Report

Conditioning PlatoonConditioning Platoon

Commander’s Intent:

All cadets that have failed any section of their APFT, are injured, or have weight issues will report to conditioning platoon to work on physical performance in order to pass the APFT

T+1 Training:

Monday: InsanityWednesday: Insanity Thursday: Insanity

Army Physical Fitness Updates:

•Physical assessment cards are completed

AAR:

Continue to improve on PRTEncourage cadets to show up to PT consistently

Alpha CompanyAlpha Company

Commander’s Intent: T+1 Training:

T-1 AAR: Issues:

Bravo CompanyBravo Company

Commander’s Intent: T+1 Training:

T-1 AAR: Issues:

Recon PlatoonRecon Platoon

Commander’s Intent: T+1 Training:

T-1 AAR: Issues:

Marksmanship TeamMarksmanship Team

Commander’s Intent: T+1 Training:

T-1 AAR: Issues:

Varsity Rifles Troop L-1Varsity Rifles Troop L-1

Commander’s Intent: T+1 Training:

T-1 AAR: Issues:

Battalion CommandBattalion Command

CadreCadre

Recommended