Topic 3 – Safety Management Process – Other Steps CEE 763

Preview:

DESCRIPTION

Topic 3 – Safety Management Process – Other Steps CEE 763. DIAGNOSIS. DIAGNOSIS. Objective to gain an understanding of crash patterns and causes so that potential countermeasures can be selected at the candidate sites Steps Safety data review: crash statistics, collision diagrams, - PowerPoint PPT Presentation

Citation preview

1

CEE 763 Fall 2011

Topic 3 – Safety Management Process – Other Steps

CEE 763

2

CEE 763 Fall 20112

DIAGNOSIS

3

CEE 763 Fall 20113

DIAGNOSIS

Objective to gain an understanding of crash patterns and

causes so that potential countermeasures can be selected at the candidate sites

Steps Safety data review: crash statistics, collision

diagrams, Assess supporting documentation Assess field conditions Identify safety concerns

4

CEE 763 Fall 20114

CRASH SUMMARY

5

CEE 763 Fall 20115

COLLISION DIAGRAMS

6

CEE 763 Fall 20116

SITE CONDITION DIAGRAM

7

CEE 763 Fall 20117

SELECT COUNTERMEASURES

Objective Select countermeasures that can effectively

reduce the crashes identified in DIAGNOSIS

Steps Identify contributing factors

• Haddon Matrix

Select countermeasures

8

CEE 763 Fall 20118

HADDON MATRIX

Example Haddon Matrix for Rear-end Crash

9

CEE 763 Fall 20119

CRASHES AT SIGNALIZED INTERSECTIONS

Angle crashes

Rear-end or sideswipe

Left- or right-turn

Nighttime

Wet pavement

Pedestrian/bicyclist

10

CEE 763 Fall 201110

CRASH MODIFICATION FACTORS (CMF)

11

CEE 763 Fall 201111

CRASH MODIFICATION FACTORS (CMF)

12

CEE 763 Fall 201112

CRASH MODIFICATION FACTORS (CMF)

13

CEE 763 Fall 201113

ECONOMIC APPRAISAL

Benefit-cost analysis Change in crash Convert benefits to $ Estimate project costs Benefit/cost ratio Non-monetary considerations

14

CEE 763 Fall 201114

ECONOMIC APPRAISAL

15

CEE 763 Fall 201115

ANNUAL BENEFITS TO PRESENT VALUE

Example: What is the benefit cost ratio for a countermeasure implementation that will cost $3,000,000, but with an annual benefit of $872,400? Assume service life is 5 years and a rate of return of 4%.

16

CEE 763 Fall 201116

PRIORITIZE PROJECTS

Project prioritization Ranking by economic

effectiveness measures Incremental benefit-cost

analysis Optimization methods

17

CEE 763 Fall 201117

SAFETY EFFECTIVENESS EVALUATION

Evaluation of the actualeffectiveness Observational Before-after

studies