Third Global Project Task Force (GPTF) Meeting
Cape Town, South Africa 17-19 September 2012
Proceedings
- 2 -
List of Documents Agenda item 1 - Adoption of the agenda
GPTF/3/1 Secretariat Provisional and annotated agenda GPTF/3/1/1 Secretariat Detailed programme
GPTF/3/J/1 Secretariat Provisional list of participants GPTF/3/J/2 Secretariat Provisional list of documents
Agenda item 2 – GPTF terms of Reference and Rules of Procedure
GPTF/3/2 Secretariat GPTF Terms of Reference and Rules of Procedure
Agenda item 3 - Programme Coordination Unit (PCU) progress report
GPTF/3/3 Secretariat PCU progress report Agenda item 4 - Regional Coordinating Organization (RCO) Status Reports Agenda item 5 – Strategic Partners information papers on their involvement in
ballast water issues Agenda item 6 - Global Industry Alliance and IMO-EBRD Marine Biosafety Initiative
progress report
GPTF/3/6 Secretariat GIA and IMO-EBRD Marine Biosafety Initiative progress report
Agenda item 7 – Plan of Activities and Budget
GPTF/3/7 Secretariat Plan of Activities and budget
Agenda item 8 – Any Other business Background documents
GloBallast Project Document
Report of 1st GPTF (2008)
Report of 2nd GPTF (2010)
Final report of the Mid-Term Evaluation
Information note for participants
- 3 -
Opening Address Delivered by John Paul Muindi, on behalf of Stefan Micallef, Director, MED, IMO
Ladies and Gentlemen,
Distinguished participants,
On behalf of Stefan Micallef, Director of the Marine Environment Division of the International
Maritime Organization, I am very pleased to welcome you to Cape Town on behalf of IMO for
this third GloBallast Partnerships Global Project Task Force Meeting.
It is great to note that this meeting is attended by most, if not all, GloBallast Lead Partnering
Countries and Regional Coordinating Organizations, as well as several of the Strategic
Partners: without you all, this Project will not be possible and IMO, as the executing agency
for the Project, would like to thank you again for your exceptional commitment and
dedication. GloBallast is an essential part of the IMO technical assistance activities and from
the very positive feedback that we get, both from delegations at the IMO Headquarters, and
through the IMO regional coordinators around the world, we realize how much this team of
Focal Points have contributed to the implementation of the Ballast Water Management
Convention, at all levels.
Together, you have created great momentum. In fact, looking at the global, regional and
national levels together, more than 150 specific activities have been implemented under the
Project over the past two years since the last Global Project Task Force Meeting, which is of
course astounding. And it seems as if this is not just a high and impressive number of
activities - we are actually starting to see the impacts of your efforts, through legal and policy
reforms in all of the GloBallast regions, as well as in other parts of the world.
As of today, 36 countries have ratified the Ballast Water Management Convention
representing 29.07% of the total world tonnage, but there are some remaining issues to
address before the Convention enters into force, such as the final details of the Port State
Control guidelines and the additional guidance on sampling. These issues are currently being
looked at by the relevant IMO bodies and we hope that they should be concluded in the near
future.
As you gather here in Cape Town this week to discuss the work plan for the coming years, it
is important to take a look at what we have learnt so far. Here, the Mid-Term Evaluation of
the Project, concluded by an independent consultant by the end of last year, plays an
important role. It is fair to say that you can be extremely proud of the results so far, but there
- 4 -
is still a lot to do. However, if we keep working together, building on all the experiences
accumulated over the years, we should be able to meet the objectives that we have set for
ourselves when we agreed to work together to implement this Project. You can rest assure
that the continuation of the Project has the strongest support from IMO.
Finally, we would like to thank Mr Adnan Awad from the International Ocean Institute of
Southern Africa for hosting the meeting, as well as UNEP and Andy Hudson for the
continuous support and the long standing cooperation between our organizations.
Ladies and gentlemen, allow me to close these opening remarks by expressing our sincere
good wishes to all the participants in this Global Project Task Force Meeting. We at IMO
would like to thank you again for your outstanding and continued commitment to the Project
and for taking the lead globally in working with the implementation of the Ballast Water
Management Convention.
I know that many of you have come from very far away for this meeting. This shows exactly
the kind of spirit that has made GloBallast Partnerships a flagship Project and a pride for us
at IMO. We expect the GloBallast Partnerships to continue its championing efforts as the
Ballast Water Management Convention reaches its Entry into Force criteria and beyond.
We wish you all the best of luck for the meeting over the next three days.
Thank you very much.
- 5 -
Group Photograph
From left to right: - 1st row: Ms. Aïcha Cherif (GBP PCU), Ms. Maja Markovčić-Kostelac (Croatia), Ms. Beverly Philip (Trinidad & Tobago), Eng. Kamal H. El-Kazzaz (Egypt). - 2nd row: Mr. Jack Barnett (Panama), Ing. Juan Sansegundo Deolivera (Venezuela), Capt. Luis Diaz Monclus (Venezuela), Mr. John Paul Muindi (IMO), Mr. Adaangiak Akanteyam (Ghana), Dr. Jacques Abe (IGCC/GCLME), Eng. Faisal Mohammed Maree (Yemen), Cdr Patrick McNeil (Bahamas), Mr. Brent Edward Williamson (Bahamas), Mr. Antoine Blonce (GBP PCU), Mr. Hector Huerta (CPPS). - 3rd row: Mr. Jonathan Pace (REMPEC), Mr. Murat Korcak (Turkey), Eng. Waleed Alsuheimat (Jordan), Dr. Mohammad Badran (PERSGA), Mr. Anthony Talouli (SPREP), Mr Andrew Hudson (UNDP). - 4th row: Capt. Raphael Baumler (WMU), Mr Fredrik Haag (GBP PCU), Mr. Bertrand Smith (Jamaica), Cdr. Felton L. Gilmore (RAC/REMPEITC-Caribe), Commodore Garnet Best (Trinidad & Tobago), Mr. Stanislav Suprunenko (EBRD).
- 6 -
Meeting Agenda
Opening remarks (welcome messages) 1 Adoption of the Agenda 2 GPTF Terms of Reference and Rules of Procedure 3 Programme Coordination Unit (PCU) Progress Report 4 Regional Coordinating Organization (RCO) Status Reports on Regional and National
Progress 5 Strategic Partners information papers on their involvement in ballast water issues 6 Global Industry Alliance and IMO-EBRD Marine Biosafety initiative progress report 7 Plan of Activities and Budget 8 Any Other Business
- 7 -
Minutes of the Second GloBallast Partnerships Global Project Task Force Meeting
The GloBallast Partnerships (GBP) Project Coordination Unit (PCU) organized the 3rd GEF-UNDP-IMO GloBallast Partnerships Global Project Task Force (GPTF) meeting, in Cape Town, South Africa, from 17 to 19 September 2012. The meeting was hosted by the International Ocean Institute Southern Africa (IOI-SA), and included an Open Seminar on Experiences and New Tools, which was organized on 19 September 2012 in order to present the latest tools under development by the Project and discuss this in the wider context of capacity building in the region. The open seminar was kindly hosted by the South African National Biodiversity Institute (SANBI). The meeting was attended by 30 participants in total (the list of participants is given in Annex 1) from almost all Lead Partnering Countries (LPCs), namely: Bahamas, Croatia, Argentina, Egypt, Ghana, Jamaica, Jordan, Nigeria, Panama, Turkey, Trinidad and Tobago, Venezuela and Yemen; all RCOs: CPPS, IGCC/GCLME-RCU, PERSGA, REMPEC, RAC/REMPEITC-Caribe and SPREP; as well as strategic partners such as the World Maritime University (WMU) and the European Bank for Reconstruction and Development (EBRD). Additional participants from South African stakeholders attended the open seminar on the third day, but are not captured in the Annex 1. The opening session was addressed by:
Mr. Andrew Hudson, Head, UNDP Water & Ocean Governance Programme and UNDP/GEF Principal Technical Advisor, International Waters,
Mr. John Paul Muindi, International Maritime Organisation (IMO) Regional Coordinator for East and Southern Africa (Anglophone), on behalf of Mr. Stefan Micallef, Director, Marine Environment Division, IMO,
Mr. Adnan Awad, Director, International Ocean Institute Southern Africa (IOI-SA).
Mr. Fredrik Haag, Chief Technical Adviser, GEF-UNDP-IMO GloBallast Partnerships As per the GPTF Rules and Procedures, the meeting was chaired by UNDP (Mr. Hudson). Agenda Item 1: Adoption of the Agenda The agenda (attached as Annex 2) was adopted without any amendments. The reversed order of agenda items, to accommodate for a better discussion, in particular on the progress report and work plan, was noted and approved. The detailed programme of the meeting can be found in Annex 3. Agenda Item 2: GPTF Terms of reference and Rules of Procedure The Chairman emphasised the importance of the GPTF as the highest advisory body of the project and invited the Secretariat to introduce document GPTF/3/2. The Terms of Reference and Rules of Procedures were adopted by 1st GPTF Meeting in 2008, and later amended by the 2nd GPTF Meeting in 2010. During a brief discussion, the GPTF noted several minor errors, mainly due to the change of timeline for the Project. The Terms of Reference and Rules of Procedures were adopted with these amendments, and the updated Terms of Reference are attached at Annex 4.
- 8 -
Agenda Item 4: Regional Coordinating Organization (RCO) Status Reports on Regional and National Progress The review of the Project progress started with presentations from each of the RCOs, namely: CPPS, IGCC/GCLME-RCU, PERSGA, REMPEC, RAC/REMPEITC-Caribe and SPREP, who were invited to present a summary of progress on BWM at the national and regional levels for their respective regions, based on preliminary questionnaires that had been sent to the LPCs prior to the meeting and on a template sent to the RCOs, attached at Annex 6. South-East Pacific region - CPPS The Regional Technical Coordinator of the Permanent Commission of the South Pacific (CPPS), Mr. Hector Huerta, provided an overview of the RCO itself, the MoU between CPPS and IMO (October 2009, to facilitate the implementation of activities under the GloBallast Partnerships), the regional action plan and the Galapagos Commitment (2012) where the CPPS member states (Argentina, Chile, Colombia, Ecuador, Panama and Peru) expressed their willingness to collaborate with the IMO in order to address the invasive species issue. Mr. Huerta also summarized the work carried out in the region, especially the Regional Task Force Meetings (Chile 2008, Argentina 2009, Colombia 2010 and Chile 2012) and the capacity building activities. The status at the national level is summarized in Table 1 below:
Table 1: Progress at National Level – CPPS
West and Central Africa region - IGCC/GCLME-RCU Dr. Jacques Abe, Officer-In-Charge of the Interim Guinea Current Commission (IGCC) and the GCLME Project, presented an overview of the progress and challenges in the Guinea Current Large Marine Ecosystem (GCLME) region, which includes 16 countries of West and Central Africa (WACAF).
- 9 -
Twelve out of sixteen countries responded to the LPC questionnaires (which was sent out to all countries in the region), giving Dr. Abe the opportunity to present a thorough analysis of the progress in the non-LPCs, as shown in Table 2 below:
Table 2: Progress at National Level – IGCC/GCLME One of the main points of interest underlined by IGCC/GCLME was the need to further develop the twinning with LPCs in order to disseminate the best practices and experiences in the region. Red Sea and Gulf of Aden region - PERSGA Dr. Mohammed Badran, Director for Projects’ Management, Scientific Research and Monitoring, of the Regional Organization for Conservation of the Environment of the Red Sea and Gulf of Aden (PERSGA), outlined the progress in the PERSGA region, and indicated that the Ballast water management Regional Strategy has been drafted and approved at the Technical Level. Several activities have been implemented in Egypt, Jordan and Yemen; and specific Project funds were allocated to twinning activities in Djibouti and Sudan. It was agreed that Dr. Badran will share their experiences from the twinning activities with the other regions as soon as possible, to assist the other regions in their preparations for similar activities. Mediterranean region - REMPEC Mr. Jonathan Pace, Senior Programme Officer, Regional Marine Pollution Emergency Response Centre for the Mediterranean Sea (REMPEC), presented the progress in the Mediterranean region, following a brief introduction of the Centre and the region. A Regional Strategy and an Action Plan have been prepared and developed by a Regional Task Force over the period 2008-2011 and adopted by the 17th Ordinary Meeting of the Contracting Parties to the Barcelona Convention (Paris, France, February 2012). They set eight strategic priorities and actions concerning ballast water management in the region such as a Regional System for compliance, monitoring and enforcement. Harmonized voluntary temporary arrangements for ballast water exchange in the Mediterranean were also adopted and applied as from 1 January 2012.
- 10 -
The delegate from Croatia, Ms. Maja Markovčić-Kostelac, stated that within the Commission from the Protection of the Adriatic Sea, the Adriatic Sea Ballast Water sub-commission has been established in order to enhance cooperation between the six states of the Adriatic Sea. Ms. Markovčić-Kostelac added that in 2013, a proposal will be submitted to IMO to designate the Adriatic Sea as a Particularly Sensitive Sea Area (PSSA) which, as the additional protective measures, will include measures related to ballast water management. Wider Caribbean region - RAC/REMPEITC-Caribe Cdr. Felton L. Gilmore, IMO consultant at the RAC/REMPEITC-Caribe and newly appointed GloBallast focal point, presented the Wider Caribbean region (WCAR) and the progress in the LPCs (Bahamas, Jamaica, Panama, Trinidad & Tobago, Venezuela). He explained that BWM is competing with other demands and needs in the region such as garbage or oil spill. However, Table 3 below detailed the good results achieved in the region: even if only Trinidad & Tobago has ratified the BWM 2004 Convention in the region, all the other countries have drafted proposals which are under various levels of scrutiny and review.
Table 3: Progress at National Level – WCAR
Cdr. Gilmore also noticed that the Regional Ballast Water Strategy and Action plan have been revised in April 2012. South Pacific region - SPREP Mr. Anthony Talouli, Marine Pollution Adviser at the Secretariat of the Pacific Regional Environment Programme (SPREP), presented the recent and forthcoming activities in the SPREP region, which hosts nearly 600 Marine Protected Areas (MPA) including the largest MPA in the world. A regional CME and legal training was organized in 2011, as well as several National activities on Economic Assessments, Status Assessments, Strategies and Legislation in Fiji, Samoa and Tonga.
- 11 -
Agenda Item 3: Programme Coordination Unit (PCU) Progress Report The presentations by the RCOs were followed by a progress report (attached as Annex 5) by the PCU, covering the period from 1 October 2010 to 1 September 2012. The presentation included an introduction and background, which provided a context to the current status of activities and highlighted the objectives and expected outcomes for the Project. The progress with activities at all levels in relation to the expectations in relation to the Project Document was presented. In particular, the progress with national activities (see summary at the end of Annex 5) was highlighted stressing the need for those LPCs that have not yet requested the funds for national consultancies in support of the national strategy and legislation development, to do so as soon as possible. The presentation was followed by an in-depth discussion, highlighting a number of issues of relevance to the further implementation of the Project. Comments and results from the discussions during the meeting are presented under Agenda Item 7, Plan of Activities and Budget. Agenda Item 5: Strategic Partners information papers on their involvement in ballast water issues The Strategic Partners in the GloBallast Partnerships project were all invited to present their relevant progress and work plans. World Maritime University (WMU) Capt. Raphael Baumler, Assistant Professor at WMU briefly presented the Maritime Post-graduate University established by IMO in 1983, which offers several Master Degrees and PhDs. The WMU is a long-standing partner of the GBP Project and has co-developed with the PCU several training packages and guidelines, and is currently developing a Risk Assessment guidance document. WMU is also contracted regularly as consultants in national and regional training activities. International Ocean Institute Southern Africa (IOI-SA) Mr. Adnan Awad, Director of IOI-SA, introduced the International Ocean Institute in general and the IOI-SA based in Cape Town in particular, which is supervising and coordinating all the IOI centers based in Africa. The IOI-SA is also a frequent partner of the Project and has participated in the development of several training packages and guidelines. At present, Mr. Awad is leading the development of a new guidance document on Port Biological Baseline Surveys (PBBS). Mr. Awad is also a frequent lecturer and consultant on national and regional training activities. Agenda Item 6: GIA and IMO-EBRD Marine Biosafety initiative progress report Ms. Aicha Cherif from the GBP PCU presented the Global Industry Alliance (GIA) progress report. Table 4 below presents the status of implementation of the GIA activities:
- 12 -
Table 4: Status of implementation of the GIA activities
Mr. Stanislav Suprunenko, Environmental Specialist at the European Bank for
Reconstruction and Development (EBRD), presented the IMO-EBRD Marine Biosafety
initiative progress report. Working with the IMO, the EBRD's Shareholder Special Fund has
so far made available €320,000 to fund training and awareness programs and to support the
development of the technical and infrastructural capacity required to cope with the
implementation of the BWM Convention.
It was noted that training programmes, including both introductory and advanced training
courses for mainly the private sector, were successfully conducted in Russia and Ukraine in
2011. The next phase will begin in October 2012 in Turkey and may later include other
countries.
Agenda Item 7: Plan of Activities and Budget
Mr. Antoine Blonce from the GBP PCU summarized the main conclusions of the Mid-Term
Evaluation (MTE) report, which is an integral and compulsory part of project management for
all GEF-funded projects, and thus an important part of the GBP project work plan. The MTE
was conducted by an independent consultant (Mr. Rick Boelens, Ireland) from May to
December 2011.
The main conclusions of the report are as follow:
.1 the Project has progressed very well towards achievement of its objectives;
.2 good synergies between the Project activities and the IMO ITCP activities;
.3 public-private partnerships may constitute a significant source of co-financing;
.4 significant benefits gained by facilitating and encouraging adaptive
management; and
.5 the report recommends the GloBallast Project as an example of best
practices.
However, the report also underlines that, even if the GBP Project in many respects can be
used as an example of best practice, there is still room for improvement, most notably on the
following points:
- 13 -
.1 improving the annual reporting between LPCs, RCOs and the PCU;
.2 maintaining the continuity on the BWM experts in the governments; and
.3 increased attention on the GIA.
The PCU noted that it already addressed the GIA issue by allocating an assistant dedicated
to the public-private partnership aspect of the GBP Project.
Mr. Haag then detailed the technical and financial progress report of the Project including a
proposal for an extension of the Project until 2016, at no further increase to the total Project
funding from GEF. This extension will be possible due to the prudent financial management
throughout the Project, as well as the extensive co-financing from IMO and other, external,
sources. Based on this proposed extension, Mr. Haag then continued with a presentation of
a proposed draft work plan and budget for 2013-2016 (see Annex 7).
Group discussion
Following these detailed reports, the participants were invited to break into working groups
(per region) in order to share experiences, assess the remaining barriers, and discuss the
work plan of the GBP Project. The following questions served as a starting point for the
discussions:
General questions
To what extent the Project has been successful in helping your region/country in preparing for the entry into force of the BWM Convention; and
If the draft work plan (GTPF 3/7) is appropriate to ensure we achieve the objectives of the Project and thus prepare your region/country for the Convention.
Specific questions
Over all work-plan and meeting the Project Objectives
1. Does the draft Plan of activities prepared by the PCU (GPTF 3/7) meet the objectives for the Project? Does it address the points/concerns raised by the MTE? Please use the list of indicators from the Project Document in your discussions.
2. In what way, if any, can/should the work plan be modified to better assist countries in your region(s) to achieve the objectives of the Project and prepare for the Convention? Are there any specific barriers that need to be addressed that are not captured in the Project and the Draft plan of activities?
Regional strategy and diffusion of experiences
3. Are there any particular countries in your region that would benefit from
greater encouragement and/or assistance (i.e. ‘twinning’)? What kind of
assistance?
4. What would be the best ways to transfer the knowledge gained in the LPCs to
other countries in the region?
- 14 -
5. What do you see as the main barriers when it comes to ensuring
implementation of the Regional Strategy and Action Plan?
Improving co-operation and efficiency
6. How do we improve the dialogue within and between the regions?
7. How do we improve the reporting from LPCs and RCOs to the PCU? Do we
need a more formal annual reporting format?
The session resulted in a very valuable list of priority actions, as identified by the regions and LPCs, highlighting the specific needs in terms of activities needed in order to fulfil the objectives of the Project, and most importantly for each LPC to be able to implement the BWM2004 Convention. The list of priority actions that resulted from the group discussions is attached in Annex 8. It was agreed that the list will serve as the main guidance for the PCU when organizing and prioritizing the intersessional activities, and that as many activities and recommendations as possible shall be incorporated into the work programme for the Project. Following the group discussions, the meeting endorsed the work plan for 2013-2016 and the PCU invited for further comments by correspondence. The meeting endorsed the PCU proposal to extend the Project by a further two years, and to request the Executive Committee to approve the extension formally at its earliest opportunity. It was noted that, following the formal approval of the budget extension by the ExCom later this year or early 2013, a revised budget for 2013-2016 would be prepared and submitted to UNDP for approval. This budget will be adjusted to reflect the extension of the timeline of the Project. Agenda Item 8: Any Other Business No other issues were raised. Closing remarks were given by UNDP (Mr. Hudson), IMO (Mr. Muindi) and the GloBallast PCU (Mr. Haag).
- 15 -
Open Seminar on Experiences and New Tools Following the conclusion of the formal agenda, the meeting was opened up to external participants, as a Seminar on Experiences and New Tools. The seminar showcased the experiences from the region (southern Africa) since the Pilot Phase, as well as the latest developments in terms of the implementation of the Convention in South Africa. Furthermore, the latest GloBallast tools under development were presented (PBBS guidelines and risk assessment guidance). The seminar concluded with a discussion on training needs and possibilities. The full programme can be found in Annex 3. Field visit to Test Facility The GPTF also included a field visit to a test facility for ballast water treatment systems, located in the Port of Cape Town. The visit was hosted by Mr Bernard Jacobs, Chief Executive Officer of Resource Ballast Technologies (RBT), a ballast water treatment system developer based in Cape Town, and included a guided tour of the facility, including an introduction to the treatment system itself as well as the processes for testing the system to IMO standards. This visit was followed by a visit to Cape Point and the Cape of Good Hope.
Mr. Bernard Jacobs present the test facility and explains the treatment system testing process
- 16 -
ANNEX 1 List of Participants
LEAD PARTNERING COUNTRIES (LPCS) BAHAMAS
1 Mr. Brent Edward Williamson
Response Coordinator Ministry of Transport and Aviation Port Department Prince George Wharf Port of Nassau Nassau, Bahamas Tel: +1 242 322 1596 / +1 242 322 8832 Email: brentwillbah@gmail.com
2 Commander Patrick McNeil
Port Controller Ministry of Transport and Aviation Port Department Prince George Wharf Port of Nassau Nassau, Bahamas Tel: +1 242 328 7126 /+1 242 302 0200 Email: patrickmcneil56@live.com
CROATIA 3 Ms. Maja Markovčić-Kostelac
Head, International and Legal Department Ministry of Maritime Affairs, Transport and Infrastructure Prisavlje 14 10000 Zagreb Croatia Tel: +385 1 616 9070 Email: Maja.Markovcic@pomorstvo.hr
EGYPT
4 Eng. Kamal H. El-Kazzaz
General Manager of Marine Environment Protection National Coordinator BWM Red Sea Egypt Red Sea Ports Authority Ministry of Transport P.O.Box 1 Porttawfiq Suez Egypt Tel: +20 62 3191123 Mobile: +20 122 1624 186 Email: kmkazaz@hotmail.com
- 17 -
GHANA 5 Mr. Adaangiak Akanteyam
Dep. Director (Inspections and Survey) Ghana Maritime Authority Ministries Post Office, P.M.B. M34 Accra Ghana Tel: +233 302 684 382 / +233 244 957190 Email: aakanteyam@ghanamaritime.org / aakanteyam@hotmail.com
JAMAICA 6 Mr. Bertrand Smith
Director-Legal Affairs Maritime Authority of Jamaica Office Centre Building 12 Ocean Boulevard Kingston Jamaica Tel: (876)967-1060-65/967-1067 Fax:(876)922-5765/922-5766 Email: bsmith@jamaicaships.com
JORDAN 7 Eng. Waleed Alsuheimat
Director, Maritime Safety Department Jordan Maritime Authority, Aralsheed Street, P.O Box 171 Aqaba – Jordan Tel: +962 3 2015858 Ext 104 E-mail: tech@jma.gov.jo
NIGERIA 8 Mrs. Ufuoma Martha Okorigba
Chief Marine Environment Management Officer Marine Environment Management Department Nigerian Maritime Administration and Safety Agency (NIMASA) No. 4 Burma Road Apapa Lagos Nigeria Tel: +234 803 307 1101 Email: ufuokorigba@yahoo.com
9 Mr. Ahmad Abari Principal Marine Environment Management Officer Marine Environment Management Department Nigerian Maritime Administration and Safety Agency (NIMASA) No. 4 Burma Road Apapa, Lagos Nigeria Tel: +234 803 307 1101 Email: ahmed_abari@yahoo.com
- 18 -
PANAMA 10 Mr. Jack Barnett
Technical Officer Compliance and Enforcement Department Panama Maritime Authorithy Albrook, Pancanal Plaza, Edificio Pancanal Piso 3 Panama City, Panama Tel: +507 501 5030 / +507 501 5366 Email: jackbarnett@amp.gob.pa
TURKEY 11 Mr. Murat Korcak
Engineer Ministry of Transport, Maritime and Communication Başbakanlık Denizcilik Müsteşarlığı GMK Bulvari No: 128 Maltepe /Ankara Turkey Tel : +90 312 232 38 50/2174 Email: murat.korcak@denizcilik.gov.tr
TRINIDAD AND TOBAGO
12 Ms. Beverly Philip
Director of Maritime Services Ministry of Transport of Trinidad and Tobago Level D, 23rd floor, Hyatt Compound Wrightson Road Port of Spain Trinidad and Tobago Tel: +1 868 473 8238 Email: Beverly@tstt.net.tt / msddir@tstt.net.tt
13 Commodore Garnet Best (Ret’d)
Consultant LP#60 - Lot No. 3 Don Miguel Ext. El Socorro San Juan Trinidad and Tobago Tel: 1 868 683 4401 Email: garnetbest@gmail.com
VENEZUELA
14 Ing. Juan Sansegundo Deolivera
Gerente de Seguridad Integral del Instituto Nacional de los Espacios Acuáticos INEA Edificio INEA Las mercedesMunicipio Baruta Estado Miranda 1080 Venezuela Tel: +58 212 909 1552 Email: sansegundo.juan@gmail.com /jsansegundo@inea.gob.ve Asuntos.internacionales.inea@gmail.com
- 19 -
15 Cap. Luis Diaz Monclus
Consultor Marítimo Boyantes Las Mercedes – Caracas 1060 Venezuela Email: lediazm@usa.net
YEMEN
16 Eng. Faisal Mohammed Maree General Director of Maritime Safety and Pilotage Maritime Affairs Authority P.O. Box 1133 Aden Yemen Tel: +967 2 221 581/582/587 Email: faisal_moree_1@yahoo.com / pms@maa.gov.ye
***
REGIONAL COORDINATING ORGANIZATIONS (RCOs) CPPS 17 Mr. Héctor Huerta Rodríguez
Coordinador Técnico Regional Plan de Acción para la Protección del Medio Marino y Áreas Costeras del Pacífico Sudeste Av. Carlos J. Arosemena km 3 Ed. Classic 2do Piso Guayaquil Ecuador Tel. +593-4-2221200 Email: cpps_pse@cpps-int.org
REMPEC 18 Mr. Jonathan Pace
Senior Programme Officer Regional Marine Pollution Emergency Response Centre for the Mediterranean Sea (REMPEC) Maritime House Lascaris Wharf Valletta VLT 1921 Malta Tel: +356 21 337296/7/8 E-Mail: jpace@rempec.org
RAC/REMPEITC-Caribe 19 Cdr. Felton L. Gilmore
IMO Consultant RAC/REMPEITC-Caribe Aviation & Meteorology Building Seru Mahuma z/n
- 20 -
Curacao Tel: +5999-868-4612 (General) Tel: +5999-839-3718 (Direct) Email: fgilmore@cep.unep.org
PERSGA 20 Dr. Mohammad Badran
Director, Projects' Management, Scientific Research and Monitoring Regional Organization for Conservation of the Environment of the Red Sea and Gulf of Aden “PERSGA” PO Box: 53662 Jeddah 21583 Saudi Arabia Tel: +9662 6573224 ext. 204 Email: mohammed.badran@persga.org
IGCC/GCLME-RCU 21 Dr. Jacques Abe
Officer-In-Charge UNIDO/IGCC Project 5, Broz Tito Avenue P.O. Box: 324, Cantonments Accra Ghana Tel: +233 302 781 225 /243 630 649 Email: j.abe@unido.org
SPREP 22 Mr. Anthony Talouli
Marine Pollution Adviser Secretariat of the Pacific Regional Environment Programme (SPREP) PO Box 240 Apia Samoa Tel: +685 21929 ext243 Email: anthonyt@sprep.org
***
STRATEGIC PARTNERS/OBSERVERS IOI-SA
23 Mr. Adnan Awad
Director, International Ocean Institute - Southern Africa Department of Biodiversity and Conservation Biology University of the Western Cape P. Bag x17, Bellville 7535 Cape Town South Africa Tel. +27 (0)21 959 3088 Cell +27 (0)82 785 9678 Email: awad.adnan@gmail.com
- 21 -
WMU 24 Dr. Raphaël Baumler
Assistant Professor World Maritime University P.O. Box 500 - 210 24 Malmö Sweden Tel: +46 40 35 63 382 Email: rb@wmu.se
EBRD 25 Mr. Stanislav Suprunenko
Environmental Specialist European Bank for Reconstruction and Development One Exchange Square London EC2A 2JN United Kingdom Tel: +44 20 7338 7408 Mobile: +44 7584 686449 Email: SupruneS@ebrd.com
UNDP 26 Mr. Andrew Hudson
Head, UNDP Water & Ocean Governance Programme & UNDP/GEF Principal Technical Advisor, International Waters FF-9100 1 United Nations Plaza New York, NY 10017 United States Tel: +1 212 906 6228 Email: andrew.hudson@undp.org
IMO
27 Mr. John Paul Muindi IMO Regional Coordinator United Nations Complex Gigiri, Block M - Middle Level P.O. Box 30218 (00100) Nairobi, Kenya Tel: +254 20 7624377 (direct line) +254 20 7624378/4427 Fax: +254 20 7624485 Email: jmuindi@imo.org
***
- 22 -
SECRETARIAT/GLOBALLAST PCU 28 Mr. Fredrik Haag
Chief Technical Adviser GloBallast Partnerships Marine Environment Division International Maritime Organization 4 Albert Embankment London SE1 7SR United Kingdom Tel : +44 207 463 4161 Mobile: +44 (0)79 17797 090 Email: fhaag@imo.org
29 Mr. Antoine Blonce Technical Adviser GloBallast Partnerships Marine Environment Division International Maritime Organization 4 Albert Embankment London SE1 7SR United Kingdom Tel:+44 (0)20 7463 4127 Mobile: +44 (0)78 8157 6538 Email: ablonce@imo.org
30 Ms. Aïcha Cherif Project Management Assistant GloBallast Partnerships Marine Environment Division International Maritime Organization 4 Albert Embankment London SE1 7SR Tel: +44 207 463 4215 Email: acherif@imo.org
___________
- 23 -
ANNEX 2 Annotations to the
Provisional Agenda 1 Adoption of the Agenda
1.1 The meeting will be invited to adopt the agenda of its second session. 2 GPTF Terms of Reference and Rules of Procedure 2.1 The Programme Coordination Unit (PCU) will briefly introduce the GPTF Terms of Reference and Rules of Procedure, as adopted by the 1st GPTF meeting and revised by the 2nd GPTF meeting. 3 PCU Progress Report 3.1 A briefing paper on the progress in implementation of project activities will be submitted by the PCU. 3.2 The meeting will be invited to consider the report and to provide advice on this matter. It is expected that, after a general exchange of views, GPTF will endorse the report. 4 Regional Coordinating Organization (RCO) Status Reports on Regional and
National Progress 4.1 The representatives of the six RCOs will be invited to present the status of their initiatives with regard to the project’s implementation at regional level. The presentations will focus on the organizational aspects, communications with LPCs and PCs, regional mechanisms/forums, and current status of regional discussions on ballast water issues. The RCOs will also summarise the progress made in each of the 15 LPCs. 5 Strategic Partners information papers regarding involvement in the ballast
water issues. 5.1 The Strategic Partner Organizations will be expected to brief the meeting on their specific interest in ballast water issues and any relevant activities in the last two years. 6 Global Industry Alliance (GIA) and IMO-EBRD Marine Biosafety Initiative
progress report 6.1 The PCU will introduce a paper on the activities carried out under the framework of IMO- Global Industry Alliance. The paper will also summarise the progress made under the IMO-EBRD Marine Biosafety Initiative. 6.2 The meeting will be invited to consider the report and to provide advice on this matter. It is expected that, after a general exchange of views, the GPTF will endorse the GIA report. 7 Plan of Activities and Budgets
7.1 The PCU will present the status of Project expenditures as of 1 September 2012. The paper will also detail the co-financing achieved so far to support the objectives of the Project.
- 24 -
7.2 The PCU will outline a revised plan of activities taking into account the progress achieved so far and propose an extension of the project timeline for a further two years. 8 Any other business
8.1 Participants will be invited to bring any other relevant issues to the attention of the GPTF.
___________
- 25 -
ANNEX 3 Programme
Day 1 - Monday, 17 September 2012 (Winchester Mansions Hotel)
08:30 Registration 09:00 Opening remarks (welcome messages)
- UNDP-GEF - IMO-GloBallast PCU
09:15 Adoption of the Agenda
GPTF Terms of Reference GEF-UNDP briefing on the role of the GPTF
09:30 Summary of progress on BWM at the National and Regional level – Presented
by RCOs based on LPCs pre-GPTF questionnaires 10:30 Coffee break 11:00 Summary of progress on BWM at the National and Regional level – Presented
by RCOs based on LPCs pre-GPTF questionnaires (continued) 12.30 Lunch 14:00 Strategic Partners information papers on their involvement in ballast water
issues 14:15 Global Industry Alliance and IMO-EBRD Marine Biosafety initiative progress
report 14:30 Programme Coordination Unit (PCU) progress report (technical and financial) 15:30 Coffee break 16:00 Programme Coordination Unit (PCU) progress report (technical and financial)
continued 18:30 Ice-breaker function at the Winchester Mansions courtyard
Day 2 - Tuesday, 18 September 2012 (Winchester Mansions Hotel)
09:00 Round Tables: discussion of work plan 2012-2014 10:30 Coffee break 11:00 Summary discussion – Outcome of round Tables Field trip programme – timings approximate
- 26 -
12:00 Departure by bus from hotel 12:30 Lunch at Panama Jacks Seafood Restaurant in Port of Cape Town 14:00 Test facility visit 15:00 Visit to Cape of Good Hope 19:00 Return to hotel and End of day 2 Day 3 - Wednesday 19 September 2012 (Kirstenbosch Botanical Gardens) 08:00 Departure by bus from hotel to Kirstenbosch Botanical Gardens (SA National
Biodiversity Institute (SANBI) Continuation of GPTF Agenda 08:45 GEF-UNDP-IMO GPTF Meeting wrap-up (revised work plans and budgets) 10:30 Coffee break Open Seminar on Experiences and New Tools 11:00 Welcome remarks, DDG of SANBI Introductory remarks, Chief Technical Adviser, GloBallast Partnerships
Project, IMO Introductory remarks, SA National Department of Transport 11:30 SAMSA maritime strategy and BW management – CEO SAMSA 11:45 South Africa - A GloBallast pilot country case study. How is the IMO BWM
Convention being implemented in South Africa (IOI-SA) 12:30 Lunch 14:00 Presentation of the new Guidelines for Port Biological Baseline Surveys and
experiences from within the region (IOI-SA) 14:30 Presentation of the new Guidelines on Ballast Water Risk Assessment (WMU) 15:00 Coffee break 15:30 National & Regional stakeholder meeting to develop a strategy for maritime
environment training & capacity building 17:00 Meeting closes 19:00 Department of Transport - Sponsored dinner function for all participants (Two
Oceans Aquarium)
***
- 27 -
ANNEX 4 GPTF Terms of Reference &
Rules of Procedure
Terms of reference for the Global Project Task Force
(As revised by 3rd GPTF Meeting) Background
1 As this is a global project, it is necessary to have a global advisory and coordination mechanism to guide the PCU and participating countries in the implementation of programme activities, and to provide a forum for consultation and communication between the various international parties involved or with a vital interest in the programme. A Global Project Task Force (GPTF) has therefore been formed. The Terms of Reference for the GPTF are as follows: Role
2 The GPTF will be the highest advisory body of the programme. The GPTF will review the activities of the programme and will provide advice to the IMO and UNDP on the general directions to be followed. The GPTF will make its final recommendations to IMO and UNDP based on the principle of consensus. An organogram for the GloBallast Partnerships project explaining the functional relationships among the various stakeholders of the project is given in Annex 1. Membership
3 Initial GPTF membership will include a representative from each of the Lead Partnering Countries (LPC) and Regional Coordinating Organizations (RCO) as well as one each from GEF/UNDP, the private sector, other donor partners, the NGO community and the IMO. Two representatives from GloBallast Phase-1 Pilot Countries on a rotational basis will also be invited to GPTF meetings. Additional members can be added at the discretion of the IMO and UNDP on the advice of GPTF. The PCU Chief Technical Advisor (CTA) will act as Secretary to the GPTF. The GPTF will be chaired jointly by IMO and UNDP. A list of LPCs and RCOs is given below. Lead Partnering Countries (LPCs)
Argentina Bahamas Chile Colombia Croatia Egypt
- 28 -
Ghana Jamaica Jordan Nigeria Panama Trinidad and Tobago Turkey Venezuela Yemen
Regional Coordinating Organizations (RCOs)
Permanent Commission for the South Pacific (CPPS) Guinea Current Large Marine Ecosystem (GCLME) Regional Organization for the Conservation of the Environment of the Red Sea & Gulf of Aden (PERSGA) Regional Marine Pollution Emergency Response Centre for the Mediterranean Sea (REMPEC) and Regional Activity Centre for Specially Protected Areas (RAC/SPA) Regional Activity Centre/Regional Marine Pollution Emergency, Information and Training Centre - Wider Caribbean (RAC/REMPEITC-Carib) South Pacific Regional Environment Programme (SPREP)
Tasks
The GPTF will advise and assist the IMO and UNDP on the following tasks:
- Provide overall strategic policy and management direction to the programme; - Assist in identifying and allocating programme support for activities consistent
with programme objectives; - Biennially review and assess the progress of the programme and its
components; - Biennially review and approve the work plan and comment on the budgets of
the programme and its activities, and provide strategic direction on the work plan;
- Provide guidance to the PCU in coordinating and managing the programme
and its activities; - Create mechanisms for interaction with the private sector (shipping, ports),
NGO and other stakeholders (e.g. public health); and
- 29 -
- Seek additional funding to support the outputs and activities of the
programme.
Meetings 4 The GPTF will meet on a biennial basis. These three meetings will be built around the three key operational events:
- Inception meeting: agreeing on a detailed work plan and preparation of an inception report - Mid-term meeting: providing implementation status and an external mid-term evaluation
- Final meeting: discussing achievements, lessons learned and next steps / sustainability.
5 As much as possible, the GPTF meetings will be held back to back with the IMO MEPC meetings. During the project years 2009 and 2011, an Executive Committee, composed of UNDP/GEF, IMO and the PCU will convene to discuss project implementation, focusing on feedback from issues raised in the annual APR/PIR reports.
- 30 -
GEF (Funding Agency)
IMO (Exe. Agency)
PCU (Proj. Coordination)
RTFRTF
NFPNFP
NPCNPC
ITFITF
GPTF (St. Committee)
RCO (Reg. coordination)RCO (Reg. coordination)
NTFNTF
NGO Group
Strategic
Partners ($)
GloBallast Partnership - Organogram
UNDP (Implem. Agency)
ANNEX 1: Project Organogram
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
Rules for Procedure for the Global Project Task Force
(Revised by the 3rd GPTF Meeting) Introduction
6 The purpose of these Rules of Procedure (ROP) is to provide a uniform basis for the Global Project Task Force (GPTF) of the GEF/UNDP/IMO Project-GloBallast Partnerships (the Project) and its subsidiary bodies, to conduct their work in an efficient and effective manner having regard to the available resources of the Project. 7 The ROP are applicable to the work of the GPTF and any subsidiary bodies that it may establish. The Chairmen of the GPTF and any subsidiary bodies should make all efforts to ensure strict compliance with the ROP. 8 The ROP and the appendices thereto was approved and adopted by the 1st Meeting of the GPTF and will be kept under review and updated as necessary by the GPTF in the light of experience gained in their application. Role of the GPTF
9 The role of the GPTF is to provide strategic advice and guidance on the activities of the Project and ensure the achievement of its development objectives, as outlined in the UNDP Project Document, in a co-ordinated, efficient and cost-effective manner, and to provide a forum for regular and on-going review and approval of the Project’s Implementation Plan. GPTF Tasks
10 The GPTF will advise and assist the IMO and UNDP on the following tasks:
- Provide overall strategic policy and management direction to the programme; - Assist in identifying and allocating programme support for activities consistent with
programme objectives; - Bi-annually review and assess the progress of the programme and its components; - Bi-annually review and approve the work plan and comment on the budgets of the
programme and its activities, and provide strategic direction on the work plan; - Provide guidance to the PCU in coordinating and managing the programme and its
activities; - Create mechanisms for interaction with the private sector (shipping, ports), NGO and
other stakeholders (e.g. public health); and - Seek additional funding to support the outputs and activities of the programme.
Membership 11 Membership of the GPTF is open to:
- the Global Environment Facility (GEF); - the United Nations Development Programme (UNDP); - the International Maritime Organization (IMO);
- 32 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
- the National Focal Point (NFP) from each of the Lead Partnering Countries (LPC;) - the Project Focal Point (PFP) from each of the Regional Coordinating Organizations
(RCO); - one representative of each donor Financial Institution (FI); - one representative of Industry Task Force (ITF); - one representative from GloBallast Pilot Phase; - the following Observers:
- one representative each from International Chamber of Shipping (ICS) and
International Association of Independent Tanker Owners (INTERTANKO); - one representative from each of the environmental non-government
organizations - International Union for the Conservation of Nature (IUCN) and World Wide Fund for Nature (WWF);
- any other party approved by a meeting of the GPTF in accordance with these
ROP. Observer Members 12 The GPTF may grant Observer status to any organisation that is able to make a substantial contribution to the Programme, including but not restricted to the Observers listed under membership above. 13 Decisions by the GPTF to grant Observer status to any organisation shall be based on the following principles of purpose:
- for the purpose of enabling the GPTF to obtain information and/or expertise from an organisation with special knowledge, experience and/or interest in any particular subject relating to the Programme; and
- for the purpose of enabling an organisation which represents a large group who’s
activities have a direct bearing on the Programme, and vice-versa, to express their points of view to the GPTF.
14 Observer status may not be granted to an organisation unless it undertakes to support and promote the activities of the Programme. 15 The granting of Observer status shall confer the following privileges on an organization:
- the right to receive all documents relating to GPTF meetings; - the right to submit written statements on items of the agenda of GPTF meetings; and - the right to attend GPTF meetings and to make representations at such meetings, in
accordance with these ROP and the Chairman’s prerogative.
16 While, as a general rule the GPTF will make decisions based on the principle of consensus, including consensus of Observer members, in accordance with paragraphs 26 to 29, when voting is necessary Observer Members do not have voting rights.
- 33 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
17 All Observer members shall keep the GPTF fully informed of those aspects of their own activities which are likely to be of interest and relevance to the Programme. 18 The GPTF shall review from time to time the list of Observer members and decide any necessary changes. Chairmanship & Secretariat 19 The GPTF will be chaired jointly by IMO and UNDP. 20 Any subsidiary groups which might be established shall elect from among their members a Chairman and Vice-Chairman. 21 The Chief Technical Adviser (CTA) of the Programme Coordination Unit (PCU) based at the International Maritime Organization (IMO) shall act as the Secretary of the GPTF and any subsidiary groups which may be established. He may delegate his functions to staff of the PCU and will be assisted in these functions by an IMO Officer back-stopping to the Programme. In carrying out these functions, he will have access to the resources and facilities of IMO. 22 It is the duty of the Secretariat to receive, process and circulate to Members all reports, resolutions, recommendations and other documents of the GPTF and its subsidiary bodies. Meetings
23 Throughout the project, the GPTF will meet on a biennial basis. These meetings are built around the 4 key operational events:
Inception meeting (2008): agreeing on a detailed work plan, budget and preparation of an inception report
Mid-term meeting (2010): providing implementation status and review of an external mid-term evaluation and the GloBallast Partnerships Project Implementation Plan for the period of 2010-2014
Interim meeting (2012): providing implementation status and review the GloBallast Partnerships Project Implementation Plan for the period of 2012-2014
Final meeting (2014): discussing achievements, lessons learned and next
steps/sustainability. 24 As much as possible, the GPTF meetings will be held back to back with the IMO MEPC meetings. During the project years 2009 & 2011 & 2013, an Executive Committee, composed of UNDP/GEF, IMO and the PCU will convene to discuss project implementation, focusing on feedback from issues raised in the annual APR/PIR reports. 25 The Secretariat, acting on the direction of the Chairman, shall notify Members at least two months in advance of the holding of a meeting. Agenda
26 The provisional, annotated agenda and supporting documents for each Meeting shall be prepared by the Secretary and shall normally be communicated to the Members 2 weeks before the opening of the meeting. 27 The first item on the provisional agenda for each meeting shall be the adoption of the agenda. 28 The provisional agenda for each meeting shall include:
- 34 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
- any item proposed by a member; - any item proposed by the Secretariat; - all items the inclusion of which has been requested by the GPTF at a previous
meeting; and - any item of the agenda of a previous meeting, consideration of which has not been
completed, unless otherwise decided by the GPTF.
29 In circumstances of urgency the Secretary, with approval from the Chairman, may include any item suitable for the agenda which may arise between the dispatch of the provisional agenda and the opening of the meeting, in a supplementary provisional agenda which the GPTF shall examine together with the provisional agenda. Languages
30 The official language of the GPTF is English. Decision making and voting
31 In general, the GPTF will arrive at decisions by consensus of all Members, including Observers. 32 In exceptional situations where consensus may not be possible, the GPTF will arrive at decisions by voting, if required. The GPTF should normally vote by show of hands. Each Member organisation shall have one vote, except Observers, who shall not have the right of vote. Subsidiary bodies
33 The GPTF may establish and dis-establish such subsidiary bodies as and when it considers necessary. Such subsidiary bodies shall follow these ROP so far as they are applicable. 34 The subsidiary bodies should, as necessary, operate under the instructions of, and report to, the GPTF. Conduct of business
35 Seven Members shall constitute a quorum. 36 The Chairman shall declare the opening and closing of each meeting. He shall direct the discussion and ensure observance of these ROP, accord the right to speak, put questions to the vote and announce decisions resulting from the vote. Co-ordination and review of work plans
37 The GPTF should periodically examine the Project’s Implementation Plan, establish priorities, allocate work to subsidiary bodies and review the allocation of meeting dates to each body and their future work plans and provisional agendas, taking into account any recommendations made by meetings of the GPTF and subsidiary bodies. 38 The GPTF Chairman should, at the end of every 2 years, submit to the GPTF a joint plan covering the activities, priorities and meetings of the subsidiary bodies over the following 2 years. 39 The GPTF should:
- 35 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
- decide on items to be included in the work plans of their subsidiary bodies with clear and detailed instructions for the work to be undertaken;
- establish priorities and target dates or the number of sessions needed for the
completion of the consideration of such items; and - assign work on such new items to appropriate subsidiary bodies.
40 The following should apply when the GPTF is invited to consider proposals for the inclusion of new items in its Work Plan:
- specific indication of the action required; - the need for the work proposed and its relation to the objectives of the Programme; - the scope and issues involved; - the costs to the Programme, the maritime industry, the legislative and administrative
burdens involved and benefits which would accrue therefrom; and - its degree of priority and a target completion date.
Preparation and introduction of documents and reports
41 For each meeting, the Secretariat shall prepare the following documents:
- the provisional, annotated agenda; - official invitations to all Members; and - the meeting report.
42 Documents should be prepared in single spacing and be as concise as possible so as to facilitate their timely processing. In order to enhance the clear understanding of documents, the following should be observed:
- all documents should include a brief summary prepared in accordance with the form given in appendix 1;
- substantive documents should conclude with a summary of the action the relevant
body is invited to take; - information documents should conclude with a summary of the information contained
therein.
43 All documents should be made available to GPTF Members by the Secretariat 4 weeks or more before a session and should be introduced in the plenary for the proper consideration of the matter concerned. 44 Reports of the GPTF and their subsidiary bodies should, in general, contain, under each section, only:
- a summary of key documents and listing of other documents submitted by GPTF Members and the Secretariat;
- a summary of views expressed, during consideration of an item, which may have
influenced the decision taken by the reporting body (thus not allowing the reports to
- 36 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
turn into summary records, Statements by delegations should be included therein only at their express request during the session); and
- a record of the decisions taken.
45 Whenever possible, each subsidiary body should indicate in its report the progress made towards the target completion date set by the GPTF(s) for each major item. 46 Chairman of subsidiary bodies should not introduce their reports to the GPTF, as these should be taken as read. Observance of the Rules of Procedure
47 These ROP should be observed strictly. This will assist Members in preparing adequately for each meeting and enhance their participation in the debate and decision-making process during meetings. It will also avoid delegations experiencing difficulties when developing positions on subjects on the agenda of the GPTF or its subsidiary bodies. Members should ensure that their experts attending meetings of subsidiary bodies are adequately informed and instructed on any action necessary to give effect to decisions made by the GPTF.
- 37 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
STANDARD FORMAT FOR DOCUMENTS
(APPENDIX 1) The text of all the documents should be preceded by a brief summary prepared in the form, and containing the information, as set out hereunder.
SUMMARY Executive summary: This description should be brief, outlining the proposed
objective and if this is a new proposal/activity then it should include information on whether a proposal will have any financial implications for the Project budget.
Action to be taken: A reference should be made to the paragraph of the
document, which states the action to be taken by the GPTF, subsidiary body, etc.
Related documents: Other Key documents should be listed to the extent
they are known to the originator of the document.
***
- 38 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
ANNEX 5 Progress report
SUMMARY
Executive summary: This document provides an overview of the progress achieved in the implementation of the GloBallast Partnerships Project during the reporting period.
Action to be taken: Paragraph 10
Related documents: GPTF/3/7
1 This report covers the reporting period from 1 October 2010 to 1 September 2012. More than 150 specific activities (over 6 activities per month) to achieve the expected outcomes of the Project were undertaken at the global, regional and national levels, during the reporting period of 23 months. Most activities were undertaken with the backstopping and technical support of IMO’s Marine Environment Division and its Biosafety Section, and with significant co-financing support from Regional Coordinating Organizations (RCOs), Lead Partnering and Partnering Countries of the Project, the IMO-ITCP Programme, the Global Industry Alliance (GIA)and numerous strategic partners. 2 Looking at the Project work plan, last revised at the Global Project Task Force (GPTF) in 2010, approximately 70% progress against the current targets has been achieved at the Global and Regional level of the implementation of this project (as estimated by the PCU) as of 1 September 2012. All global and regional targets for the reporting period have been either met or exceeded. The legal, policy and institutional reform (LPIR) process at the national level, which, during the first few years of the Project, had been slower than anticipated, has now picked up momentum. The accelerated efforts at the national level are a direct result of the Project intervention at this level during 2010-2012. However, considerable efforts are still needed to overcome the political and capacity related constraints in some LPCs. Considering the relatively very short window of political opportunities in some countries to agree on policy and legislative reforms, the current extension of the project (until 2014) may prove to be insufficient, and the PCU is keeping a close eye on the developments at national level. Furthermore, as noted in the Mid-Term Evaluation completed in December 2011, the dissemination and sharing of experiences and capacity built within and between the regions will take longer than initially envisaged. Twinning activities can only be successfully implemented if at least one of the involved countries has reached a certain level of experience with respect to e.g the development of national assessments and strategies. Dialogue at the national and regional level, such as the regional strategy and action plans developed by the Regional Task Forces, are also essential elements. 3 Figure 1 below summarises the project objectives, expected outcomes, outputs and planned activities.
- 39 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
Figure 1: Summary of GloBallast Partnerships Objectives, Expected Outcomes and Activities
Modif.Risk
Assessm.
guidelines
Risk
Assessm.
training
Modif.Risk Assessm.
guidelines
Risk Assessm.
training
Develop
guidance
for
sediment
reception
facilities
Develop guidance for sediment reception
facilities
- 40 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
4 Table 1 below summarises the progress achieved in terms of implementation of activities under the different outcomes of the Project, as per the Project Document and the latest Project Implementation Plan.
No Output and activity Description Completed Partially completed
(%)
To be Started
Comments
1.1 Project Management and coordination structures in place at global, regional and local level
1.1.1 Hire, equip and maintain project coordination unit staff and office at IMO HQ
1.1.2 Establish and support Global Project Task Force (GPTF)
1.1.3 Designate and coordinate with regional coordinating organizations
1.1.4 Establish and maintain regional task forces
1.1.5 Establish project coordination in each LPC, including identifying lead organization (LO), national focal point and national project coordinator
1.1.6 Establish and maintain National Task Forces
1.1.7 Represent and promote GloBallast Partnerships in international and regional conventions and forums
Continuous
2.1 Institutional capacities are enhanced through a comprehensive training program on Ballast water management
2.1.1 Update GloBallast Introductory Modular Course for Ballast Water Management
2.1.2 Hold training courses on BWM using updated Modular Training package (Introductory Training Package)
Additional 5 regional trainings
2.2 Risk-based, rapid status assessment reports are developed and used to guide country activities
2.2.1 Develop template and guidelines for rapid assessments Partnership with IOI
2.2.2 Develop rapid status assessments 90% 13/15 LPCs
2.3 Economic aspects of marine bio-invasions factored into national strategic planning
2.3.1 Develop guidance for economic assessments
Published with IUCN
2.3.2 Develop national economic impact and response cost assessments, taking into account the need for financial sustainability
75% 11/15 LPCs
2.3.3 Aggregate economic information
- 41 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
2.4 National Ballast Water Management Strategy (NBWMS) developed and implemented
2.4.1 Develop guidelines for national BWMS development, including options for financial sustainability
2.4.2 Hold (a) regional harmonisation (including regional LPI assessment) and (b) Sustainability workshops
Continuous Same as RTF meetings.
2.4.3 Hold national stakeholder workshops Continuous Same as NTF
meetings
2.4.4 National Ballast Water management Strategy (BWMS) developed 90% 13/15 LPCs
2.5 National legal reforms instituted
2.5.1 Develop legal road map, model legislation and training manuals
2.5.2 Train LPC lawyers on developing legal frameworks for BWM
2.5.3 Develop national legislation 70% 10/15 LPCs
2.6 Specialist capacities improved for BWM
2.6.1 Develop model BWM (specialist) course
2.6.2 Capacitate Training Institutes for delivery of Introductory course and specialized courses
2.7 Compliance monitoring and enforcement indicators are developed and national systems enhanced, with an emphasis on risk-based priority setting, and the use of voluntary approaches
2.7.1 Develop and disseminate model CME framework, including indicators
2.7.2 Hold training workshops on CME
2.7.3 Countries implement modified CME systems
2.7.4 Conduct follow up reviews of modified CME systems and develop lessons learned study
3.1 Baseline information established on biodiversity and alien species presence in major ports
3.1.1 Update Port baseline survey protocols
3.1.2 Hold training workshops on port baseline survey design and implementation
3.1.3 Develop country, regional and global rosters of taxonomy experts Revised as Activity 3.4 (as per 2nd GPTF)
3.1.4 Train local taxonomists in generic tools and methodologies for marine invasive detection and analysis
3.1.5 LPCs carry out baseline surveys and develop national marine invasive reports
20% LPC funded
3.1.6 Compile country baseline data and input into GMEIS (see activity 3.2)
3.2 Global Marine Electronic Information System (GMEIS) for Ballast Water Management Established
- 42 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
3.2.1 Identify GMEIS design/architecture options
Initial discussions started
3.2.2 Hold GMEIS expert workshop for design / architecture selection
3.2.3 Develop country profile database format and disseminate to participating countries
3.2.4 Provide training and technical assistance on knowledge management and database development for LPCs
3.2.5 Develop country profile databases
3.2.6 Develop and maintain GloBallast web portal Continuous
3.2.7 Launch and maintain national BWM websites 20% 2/15 LPCs
3.3 Stakeholder and public awareness of ballast water management and marine bio-invasion issues is raised and sustained
3.3.1 Stakeholder outreach to GB pilot regions, LMEs and Regional Seas Continuous
3.3.2 Publish and post semester newsletters
Continuous Replaced by website news, Twitter, Flikr, Youtube, etc
3.3.3 Develop, update and translate GloBallast brochures and publications Continuous
3.4 Development of a Risk Assessment
framework at the national level
3.4.1 Modification of the GloBallast Risk Assessment methodology to assist CME 50%, to be
finalized 2013
New activity as agreed by 2nd GPTF
3.4.2 Training on using GloBallast Risk assessment Tools New activity
as agreed by 2nd GPTF
4.1 Strategic partnership forged with shipping industry
4.1.1 Set up a Global Industry Task Force to meet annually and provide input to GloBallast Partnerships
4.1.2 Hold biannual industry dialogues between GIA Task Force and the GloBallast Steering Committee
Continuous
4.2 Globally agreed standards developed for ballast water technology test facilities
4.2.1 Develop framework for ballast water treatment equipment test facility standards and inter-calibration procedures
75%
- 43 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
4.2.2 Hold experts workshop to propose test facility standards and procedures
3 meetings held, 4th workshop planned Nov. 12
4.2.3 Develop and disseminate standards and procedures manual for ballast water treatment equipment test facility standards
On-going
4.3 Solutions devised and best practices publicized on port-based reception facilities for ballast water tank sediments
4.3.1 Identify dry dock site and conduct feasibility study for pilot sediment facility
GPTF agreed to replace this with a guideline on best practices. To be initiated late 2012
4.3.2 Construct and manage pilot sediment facility
4.3.3 Assess pilot facility operation and disseminate lessons learned
4.4 State of the art in Ballast water treatment technology solutions identified and publicized
4.4.1 Establish Ballast Water Innovation Fund and support innovative projects
redesigned as GIA Fund
4.4.2 Hold biennial global R&D forums and biennial technology conferences
Continuous 4 held (2008, 2009, 2010, 2011)
5.1 Project monitoring, evaluation and reporting systems established and implemented
5.1.1 Conduct mid-term evaluation and initiate mid-course corrections MTE
completed Dec. 2011
5.1.2 Conduct terminal evaluation
5.1.3 Develop and submit APR/PIRs and other required GEF/UNDP project monitoring reports
Continuous
- 44 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
5 A summary of key activities undertaken during the reporting period is given below: Global level
2nd ExCom extended the Project till December 2014.
2nd Global Project Task Force meeting in October 2010.
Publication of the guideline on Economic Assessment for Ballast Water Management jointly with the International Union for the Conservation of Nature (IUCN).
Translation of Monograph 18 “Guidelines for development of national ballast water management strategy” and GloBallast Monograph 19 “Economic Assessment for Ballast Water Management: A Guideline” in French with the support of Total Fondation.
Translation of Monograph 18 in Spanish with the support of Colombia and CPPS.
All three GBP Monographs have been translated in Russian and Arabic (draft).
Publication of a Joint GloBallast Monograph No. 20 and GESAMP Reports and Studies No. 83 on “Establishing Equivalency in the Performance Testing and Compliance Monitoring of Emerging Alternative Ballast Water Management Systems”.
Finalisation of an advanced training course on the operational aspects of BWM, funded by the GloBallast Partnerships Project, the Global Industry Alliance, and the IMO ITCP.
Coordination and facilitation of EBRD Phase 1 and phase 2 trainings on BWM in Russia and Ukraine, using GloBallast training packages.
Finalisation of a training package on CME issues in partnership with WMU and IUCN with support from the IMO ITCP, the Total Foundation and MPA Singapore, intended for Port and flag State Control officers. Translation of the training package in French, Spanish and Arabic.
2nd Global Test Facility Forum, Singapore and 3rd Global Test Facility Forum, Turkey.
1st IMO/GloBallast – IMarEST Shipbuilders’ Forum on BWM, Singapore and 2nd IMO/GloBallast – IMarEST Shipbuilders’ Forum on BWM, Turkey.
5th International Conference and Exhibition on BWM, Singapore.
4th R&D Conference on Ballast Water Management with focus on Compliance, Monitoring and Enforcement, Istanbul, Turkey.
Significant outreach activities undertaken in non-GBP regions, pilot countries and partner countries (Participation in the project Steering Committee meeting of the Agulhas Somali Current Large Marine Ecosystem Project, participation in the inception meeting of the ASEAN-India Cooperation project on the transfer of alien invasive organisms in South/ South-East Asia, Participation as Chair of the Joint MTEC-IMO-GloBallast Conference session & Panel discussion on Ballast Water Management and Marine Biosecurity during the International Maritime-Port Technology and development Conference MTEC 2011 in Singapore, Caspian consultancies, CaspEco steering committee). Several of these activities, that were co-financed by IMO and other partners, included regional capacity building programmes, regional strategy developments and national seminars and workshops.
Participation in international / regional forums (GEF-IWC6, RAC/REMPEITC-Caribe Steering Committee, etc.) as well as all relevant IMO Committee meetings (TCC, MEPC)
Development of Template and Guidelines for Port Biological Baseline Surveys in partnership with IOI-SA, NIO and IUCN initiated.
Development of a Risk Assessment guideline at the national and regional level in partnership with WMU initiated.
7th GloBallast Global Industry Alliance Task Force (GIA-TF). Meeting with new partners (Keppel) via teleconference.
Finalisation of the Mid-Term Evaluation of the GloBallast Project.
New CTA and TA appointed/recruited.
Development of online risk assessment tool with TUBITAK/Turkey initiated.
- 45 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
Regional level Approximately 20 activities were undertaken at the regional level during the reporting period. This is slightly less than during the previous reporting period, which is due to the fact that the focus during the period 2010-2012 has been national level progress, also coordinated by the RCOs. The key activities at regional level are summarised below:
Series of Regional Task Force meetings in all 5 regions (WACAF, South East Pacific + Argentina, Wider Caribbean, Mediterranean, Red Sea and Gulf of Aden) and strategies revised.
West African regional strategy was translated in French, Spanish and Portuguese.
Regional strategies developed in South Asia and Caspian regions.
Regional CME training courses in all five GBP regions.
Regional Legal training for Asia conducted in Singapore, and for the South Pacific conducted in Fiji.
A regional training course for Black and Caspian Sea littoral States on Port Biological Baselines Surveys was held in Georgia.
National level
Panama joined the Project as the 15th LPC and as the 5th in the Wider Caribbean region.
Several NTF meetings were held by all LPCs. NTFs were established and NTF meetings held is several PCs also.
A series of national seminars were held in non-LPC countries (Bangladesh, Benin, Cameroon, China, Indonesia, Kenya, Liberia, Peru, Senegal, Sri Lanka, Syria and Tanzania, Angola, Comoros, Fiji, Georgia, India, Madagascar, Mozambique, Thailand and Viet Nam). (Uruguay, Honduras, Syria, Montenegro, India, Sierra Leone and Tanzania).
Most of the Pilot Phase countries involved in the delivery of regional and global GBP activities, e.g. as consultants (South Africa, Brazil, Ukraine, India).
National consultancy projects to undertake BWM status assessments, economic assessment, legal review, and to develop a national BWM strategy completed in most LPCs. 2 countries (LPCs, PCs and Pilots) from the GBP regions ratified the IMO BWM Convention during the 2010-2012 period.
All LPCs are on track to adopt their national strategies during late 2012.
6 Annex 1 gives a detailed list of activities conducted during the reporting period, as per the logical framework (LogFrame) for the Project. The activities are shown against the expected outcomes and outputs set for the project.
7 As further detailed in document GPTF/3/8 (Plan of activities and budget) the adaptive and prudent financial management used in the Project, as well as the significant co-financing efforts by RCOs, LPCs, PCs, the IMO ITCP and strategic partners, has meant that while the actual expenditure per year has been significantly less than the initial, approved annual budget, all major targets for the reporting period have been met or exceeded. 8 These continued efforts have resulted in a contingency resource buffer within the Project budget. As indicated in previous reports, this has been done mainly in view of the anticipated barriers (mainly political and capacity related) for the legal, policy and institutional reforms that are still remaining at national level, as well as the slower than expected pace by which such reforms are taking place in some of the LPCs and PC countries. The saving made through co-financing in the initial years of the Project will therefore mitigate the financial risk, if any, during the remaining period of the Project.
- 46 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
9 The total cash and in-kind co-financing so far to support the Project objectives is estimated to US$ 21,490,512, which includes both cash and in-kind co-financing support received from e.g. IMO, LPCs, PCs and Strategic Partners. The ratio of total co-financing as of 30 June 2012 to GEF actual expenditure for the reporting period is 7.66, well exceeding the expected co-financing ratio of 1:3, as per the GEF-UNDP ProDoc. Action Requested of the GPTF 10 The GPTF of the GEF-UNDP-IMO Partnership Project is requested to review the attached report on Project progress and make necessary revisions to ensure all activities are correctly reflected.
***
- 47 -
ANNEX 1: GloBallast Partnerships Project- Status Report Project Title: Building Partnerships to Assist Developing Countries to reduce the Transfer of Harmful Aquatic Organisms in Ships’ Ballast Water (GloBallast Partnerships) Project Goal: To reduce the risks and impacts of ballast water mediated marine bio-invasions caused by international shipping. Objective: To assist vulnerable developing countries to implement sustainable, risk-based mechanisms for the management and control of ships’ ballast water and sediments in order to minimize the adverse impacts of aquatic invasive species transferred by ships. OVERVIEW OF PROGRESS ACHIEVED TOWARDS OUTCOME 1
Expected Outcomes
Outputs
Expected Activities
Indicator (as per Pro-Doc LogFrame)
OUTCOME 1: Learning, evaluation and adaptive management increased Project Management (Outcome 5 of the ProDoc)
Project Coordination Structure in place Monitoring and Evaluation Reports (QPR, APR)
Establish PCU 3 GPTF meetings Establish RCO 3 x 5 RTF meetings Formalize LA, NFP and NPC in LPCs Establish NTFs in LPCs GBP in international and regional forums
The project team at global, regional and local levels is effectively coordinating the project
- 48 -
DETAILED LIST OF ACTIVITIES UNDERTAKEN TO SUPPORT OUTCOME 1 (activities in shades show the progress since October 2010) No Activity Dates Outcome / Description Venue Funding (cash + in-
kind)
Project Coordination Unit
1 Recruitment of CTA October 2007 PCU established partly London, UK GloBallast Funds
2 Recruitment of Administrative Assistant April 2008 PCU strengthened London, UK GloBallast funds
3 Recruitment of TA October 2008 PCU established fully London, UK GloBallast Funds
4 Recruitment of Programme Management Asst.
September 2010 PCU changes London, UK GloBallast Funds
5 Appointment of new CTA January 2012 PCU changes London, UK GloBallast Funds
6 Recruitment of new TA June-July 2012 PCU changes London, UK GloBallast Funds
Global Task Force
1 First Global Project Task Force (GPTF) Meeting
March 2008 PIP approved and GPTF formalized
London, UK Cash- in-kind of 85K and time in-kind of 30K from LPCs) and some limited GloBallast funds
2 1st GBP Executive Committee Meeting February 2009 Progress Evaluated, strategy
refined London, UK UNDP In-kind – 5K
3 2nd
GBP Executive Committee Meeting January 2010 Progress Evaluated, strategy refined, project time-line extended
Malmo, Sweden
UNDP In-kind – 5K
4 Second Global Project Task Force (GPTF) Meeting
October 2010 Review of LPC/RCO progress 2008-2010 Review of expenditures 2008-2010 Endorsement of decision by ExCom to extend the project until December 2014 Approval of work plan/Budget 2010-2014
London, UK GloBallast funds 37K LPC cash and time in-kind 30K RCO cash and time in-kind 10K Strategic Partners cash and time in-kind 30K
5 3rd
ExCom Meeting November 2011 Progress Evaluated, strategy refined
London, UK GloBallast funds
6 3rd
GPTF Meeting September 2012 Cape Town, South Africa
GloBallast Funds 100K Strategic Partners cash and time in-kind LPCs cash and time in-kind RCOs cash and time in-
- 49 -
kind
Regional Coordination Organizations
1 Regional Coordination Units Formalized in six Regions
October 2007 RCOs identified ( REMPEC, REMPEITC, CPPS PERSGA, GCLME/IGGC and SPREP) and coordinators nominated
GBP Regions In-kind from RCOs (72K)
2 MoU with CPPS finalized for implementation of GBP activities
October 2009 RCO arrangements for financial reporting formalized
London, UK Time-kind from CPPS and IMO (10K)
3 MoU with PERSGA amended to include implementation of GBP activities
June 2009 RCO arrangements for financial reporting formalized
London, UK Time-kind from PERSGA and IMO (10K)
Regional Task Forces
1 1st Mediterranean Regional Task Force
Meeting and seminar on Ballast Water Management
September 2008 Establishment of Regional Task Force and Development of Key elements of Regional Strategy
Dubrovnik, Croatia
MTF (REMPEC) Fund – 50K cash + GloBallast Fund (23K) + in-kind by countries (48K)
2 1st South East Pacific Regional Task
Force Meeting and Seminar for Ballast Water Management
September 2008 Establishment of Regional Task Force and Development of Key elements of Regional Strategy
Valparaiso, Chile
CPPS Fund (15K) GloBallast Fund (2K) + in-kind 12K
3 1st West and Central Africa (GCLME
Region) Task Force Meeting and seminar on Ballast Water Management
2006* Establishment of Regional Task Force and Development of Key elements of Regional Strategy
Ghana, Accra IMO ITCP (20K) + UNIDO (50K) + in-kind of 48K
4 2nd
(Interim) South East Pacific Regional Task Force Meeting and Seminar for Ballast Water Management
September 2009 Further elaboration of the regional strategy document and development of an action plan
Buenos Aires, Argentina
CPPS Fund (10K) IMO ITCP (20K) GloBallast Fund – (2K) LPC In-kind – (20K)
5 2nd
West and Central Africa (GCLME Region) Regional Task Force Meeting and seminar on Ballast Water Management
July 2009 Elaboration of the regional strategy based on the previous regional discussions and development of an action plan
Abidjan, Côte d’Ivoire
IMO ITCP Funds – 55K Country in-kind – 5K RCO In-kind – 10K
6 1st Red Sea and Gulf of Aden Regional
Task Force Meeting and seminar on Ballast Water Management
June 2009 Establishment of Regional Task Force and Development of Key elements of Regional Strategy
Aqaba, Jordan GloBallast Funds (20K) LPC in-kind – (20K) PERSGA In-kind – (10K)
7 1st Wider Caribbean Regional Task
Force Meeting and seminar on Ballast December 2009 Establishment of Regional Task
Force and Development of Key Panama City, Panama
IMO ITCP – (40K) UNEP- (15K)
- 50 -
Water Management elements of Regional Strategy COCATRAM – 1.5K Panama In-kind – 30K REMPEITC In-kind – 20K
8 2nd
Mediterranean Regional Task Force Meeting and seminar on Ballast Water Management
May 2010 Further elaboration of the regional strategy document action plan. Draft final Strategy endorsed.
Istanbul, Turkey
IMO ITCP – 50K MTF (REMPEC) Fund – 25K cash + in-kind by countries (48K)
9 3rd
South East Pacific Regional Task Force Meeting and Seminar for Ballast Water Management
September 2010 Review of Regional Action Plan and progress
Bogota, Colombia
CPPS Fund – 20K LPC/PC in-kind – 20K
10 Participation of the WCAR RCO in the Regional Workshop for Senior Maritime Administrators in Trinidad and Tobago
February 2011 Awareness and facilitation of regional harmonization on Ballast Water Management
Port of Spain, Trinidad and Tobago
IMO ITCP – 1.6K
11 2nd
Red Sea and Gulf of Aden Regional Task Force Meeting and seminar on Ballast Water Management
June 2011 Review of progress achieved since 1
st RTF and agreement on draft
strategy for adoption and endorsement by the Contracting Parties to the Jeddah Convention.
Hurghada, Egypt
GloBallast Funds – 25K LPC in-kind – (5K) PERSGA In-kind – (20K)
12 3rd
GCLME Regional Task Force Meeting and seminar on Ballast Water Management
September 2011 Review of Regional Action Plan and progress + Translation of Regional Strategic Action Plan into French, Spanish and Portuguese
Lome, Togo Cost captured under outcome 2
13 2nd
Regional Task Force Meeting and seminar on Ballast Water Management
November 2011 Review of Regional Action Plan and progress
Kingston, Jamaica
Cost captured under outcome 2
14 South Asia Regional Ballast Water Management Strategy Development Meeting
May 2012 Mumbai, India IMO ITCP Funds – 40K
15 4th Regional Task Force Meeting on the
implementation of the Ballast Water Management Convention
July 2012 Review of Regional Action Plan and progress
Valparaiso, Chile
Cost captured under outcome 2
National LA, NFP, NPC
1 Identification of Lead Agency, National Focal Point and Project Coordinator in 13 LPCs
January – July 2008 September 2009 (Nigeria)
National level project implementation mechanism / institutional framework
LPCs LPC In-kind (156K)
2 Nigeria joined as LPC March 2010 Nigeria
3 Panama joined as LPC July 2011 Panama
National Task Force Meetings and Seminars
- 51 -
1 Turkey-First National Seminar and Task Force Meeting on Ballast water Management
October 2007 draft NTF and National Roadmap Istanbul, Turkey
National Budget (20K cash) + in-kind 16K
2 Croatia-National Seminar and Task Force Meeting on Ballast water Management
May 2008 Formation of NTF and Development of National Roadmap
Zagreb, Croatia National Budget (20K cash)+ GloBallast Budget + in-kind 16K
3 Turkey-Second National Task Force Meeting on Ballast water Management
May 2008 Development of National Policies Ankara, Turkey National Budget (20K cash) + in-kind 16K
4 Colombia- 1
st National Seminar
on Ballast water Management
July 2008 Formation of NTF Bogotá, Colombia
UNEP Fund (4K) + National Budget (15K) + in-kind 16K
5 Colombia 2
nd
National Seminar on Ballast Water Management
October, 2008 Training using the introductory Ballast Water Management course from IMO-GloBallast
Cartagena, CO National Budget (20K) + in-kind 16K
6 Colombia- 2
nd National Task Force Meeting
October 2008 Development of National Roadmap and Action Plan for BWM
Cartagena, Colombia
National Budget (5K) + in-kind 5K
7 Colombia 3
rd National Ballast Water Management
Seminar
June, 2009 Capacity building and Awareness Raising In the Pacific coast
Palmira,CO National Budget (5K) + in-kind 5K
8 Colombia, 4
th National Ballast Water Management
Seminar
August 28, 2009 Confirmation of the technical adviser group of the NTF
Cartagena, CO National Budget (5K) + in-kind 5K
9 Colombia, 3
rd NTF meeting
November 4, 2009 Review of national level progress and action plans
Bogota, CO National Budget (5K) + in-kind 5K
10 Colombia, 4
th NTF meeting
July 27, 2010 Selection of consultants for National Ballast Water documents
Bogota, CO National Budget (5K) + in-kind 5K
11 Colombia, 5th NTF meeting September 10, 2010 Preparation of the Country report
for the II RTF (CPPS) meeting Bogota, CO National Budget (20K) +
in-kind 16K
12 Bahamas-National Seminar and task Force Meeting on Ballast water Management
September 2008 Awareness raising and Development of National Task Force
Nassau, Bahamas
UNEP Fund (4K) + National Budget (15K) + in-kind 16K
13 Trinidad and Tobago-National Seminar and task Force Meeting on Ballast water Management
September 2008 Formation of NTF and Development of National Roadmap
Port of Spain, Trinidad and Tobago
UNEP Fund (4K) + National Budget (15K) + in-kind 16K
14 Argentina-National Seminar and task Force Meeting on Ballast water Management
September 2008 Formation of NTF and Development of National Roadmap
Buenos Aires, Argentina
UNEP Fund (4K) + National Budget (15K) + in-kind 16K
- 52 -
15 Venezuela – National Task Force Meeting
Formation of NTF and Development of National Roadmap
Caracas, Venezuela
National Budget (20K) + in-kind 16K
16 Jamaica – National Task Force Meeting February 2008 Formation of NTF and Development of National Roadmap
Kingston, Jamaica
National Budget (5K) + in-kind 16K
17 Chile – National Task Force Meeting October 2008 Formation of NTF and Development of National Roadmap
Valparaiso, Chile
National Budget (20K) + in-kind 16K
18 Egypt – 1st National Seminar and task
Force Meeting on Ballast water Management
June 2009 Formation of NTF and Development of National Roadmap
Suez, Egypt IMO ITCP – 3K LPC In-kind – 10K
19 Jordan – 1st National Seminar and task
Force Meeting on Ballast water Management
June 2009 Formation of NTF and Development of National Roadmap
Amman, Jordan IMO ITCP – 3K LPC In-kind – 10k
20 Yemen – 1st National Seminar and task
Force Meeting on Ballast water Management
July 2009 Formation of NTF and Development of National Roadmap
Sanaa, Yemen IMO ITCP – 3K LPC In-kind 10K
21 Ghana – 1st National Task Force
Meeting February 2009 Formation of NTF and
Development of National Roadmap
Accra, Ghana LPC In-kind – 10K
22 Panama – 1st National Seminar and
national Task force meeting February 2009 Start discussing the NTF formation
and Development of National Roadmap
Panama City, Panama
Country In-kind – 10K
23 Panama – 2nd
National Seminar and national Task force meeting
December 2009 Formation of NTF and Development of National Roadmap
Panama City, Panama
Country In-kind – 10K
24 Nigeria– 1st National Seminar and
National Task force meeting February 2010 Formation of NTF and
Development of National Roadmap
Lagos, Nigeria IMO ITCP – 8K LPC In-kind – 10K
25 Honduras - 1st National Seminar and
National Task force meeting May 2010 Formation of NTF and
Development of National Roadmap
Tegucigalpa, Honduras
IMO ITCP – 8K Country In-kind – 10K
26 Uruguay – 1st National Seminar and
National Task force meeting May 2010 Capacity building and Awareness
raising Monte video, Uruguay
IMO ITCP – 8K Country In-kind – 10K
27 Argentina – 2nd
National Seminar and National Task force meeting
May 2010 Review of national level progress and action plans
Buenos Aires, Argentina
IMO ITCP – 8K LPC In-kind – 10K
28 Ghana – 2nd
National Seminar and National Task force meeting
June 2010 Review of national level progress and action plans
Accra, Ghana GloBallast Funds – 2K LPC In-kind – 10K
- 53 -
29 Tanzania – 1st National Seminar and
National Task force meeting September 2010 Capacity building and Awareness
raising Dar es Salaam, Tanzania
IMO ITCP – 2K Country In-kind – 10K
30 Sierra Leone – 1st National Seminar
and National Task force meeting February 2010 Capacity building and Awareness
raising Freetown, Sierra Leone
IMO ITCP – 8K Country In-kind – 10K
31 Yemen – 2nd
National Seminar and National Task force meeting
February 2010 Review of national level progress and action plans
Sanaa, Yemen IMO ITCP – 8K LPC In-kind – 10K
32 Jordan – 2nd
National Seminar and National Task force meeting
February 2010 Review of national level progress and action plans
Aqaba, Jordan IMO ITCP – 8K LPC In-kind – 10K
33 Syria – 1st National Seminar and
National Task force meeting February 2010 Capacity building and Awareness
raising Lattakia, Syria IMO ITCP – 8K
Country In-kind – 10K
34 Syria – 2nd
National Seminar on BWM July 2010 Capacity building and Awareness raising
Lattakia, Syria GloBallast Funds – 2K Country In-kind – 5K
35 Egypt – 2nd
National Seminar and National Task force meeting
February 2010 Review of national level progress and action plans
Suez, Egypt IMO ITCP – 8K LPC In-kind – 10K
36 Venezuela Regular bimonthly meetings
Review of national level progress and action plans
Venezuela LPC In-kind – 60K
37 Trinidad and Tobago 3 NTF Meetings Review of national level progress and action plans
Port of Spain, Trinidad and Tobago
LPC In-kind – 30K
38 China – National seminar and consultation meeting
October 2010 Review of national level progress and action plans
Qingdao, China IMO ITCP – 10K Host country In-kind – 5K
39 Benin – 1st National seminar November 2010 Capacity building and Awareness
raising Cotonou, Benin IMO ITCP – 4K
Host country In-kind – 2K
40 Cameroon – 1st National seminar November 2010 Capacity building and Awareness
raising Douala, Cameroon
IMO ITCP – 4K Host country In-kind – 2K
41 Liberia – 1st National seminar November 2010 Capacity building and Awareness
raising Monrovia, Liberia
IMO ITCP – 4K Host country In-kind – 2K
42 Senegal – 1st National seminar November 2010 Capacity building and Awareness
raising Dakar, Senegal IMO ITCP – 4K
Host country In-kind – 2K
43 Ethiopia – 1st National seminar November 2010 Capacity building and Awareness Adis Ababa, IMO ITCP – 4K
- 54 -
raising Ethiopia Host country In-kind – 2K
44 Kenya – 1st National seminar November 2010 Capacity building and Awareness
raising Mombasa, Kenya
IMO ITCP – 4K Host country In-kind – 2K
45 Peru – 1st National seminar November 2010 Capacity building and Awareness
raising. Transfer of knowledge from Pilot country (Brazil)
Lima, Peru GloBallast funds 1.6K Host country In-kind – 2K
46 Panama – National consultation meeting with CPPS on the BWM Convention
December 2010 By regional coordinator to promote ratification and implementation of the BWM Convention
Panama City, Panama
GloBallast funds 1.6K CPPS 1K Host country In-kind – 2K
47 Bangladesh – 1st National seminar December 2010 Capacity building and Awareness
raising Dhaka, Bangladesh
IMO ITCP – 4.6K Host country In-kind – 5K
48 Sri Lanka – 1st National seminar December 2010 Capacity building and Awareness
raising Colombo, Sri Lanka
IMO ITCP – 4.8K Host country In-kind – 5K
49 Indonesia – 1st National seminar December 2010 Capacity building and Awareness
raising Jakarta, Indonesia
IMO ITCP – 5.2K Host country In-kind – 5K
50 Turkey – 2nd
National Task force meeting
February 2011 Increase awareness. Approval of national BWM strategy and action plan
Istanbul, Turkey
GloBallast funds – 1.2K LPC In-kind 5K
51 Viet Nam – 2nd
National seminar April 2011 Capacity building and Awareness raising
Hanoi, Viet Nam
IMO ITCP – 4.7K Host country In-kind – 2K
52 Angola – 1st National seminar including
twinning with Brazil May 2011 Capacity building and Awareness
raising Luanda, Angola IMO-UNIDO funds –
8.4K Host country In-kind – 15K
53 Thailand – 2nd
National seminar May 2011 Capacity building and Awareness raising
Bangkok, Thailand
IMO ITCP – 5K Host country In-kind –
- 55 -
2K
54 Fiji – 1st National seminar May 2011 Capacity building and Awareness
raising Suva, Fiji IMO ITCP – 5K
Host country In-kind – 2K
- 56 -
55 Mozambique – 1st National seminar July 2011 Capacity building and Awareness
raising Mozambique IMO ITCP – 4K
Host country In-kind – 2K
56 Madagascar – 1st National seminar July 2011 Capacity building and Awareness
raising Madagascar IMO ITCP – 4K
Host country In-kind – 2K
57 Comoros – 1st National seminar July 2011 Capacity building and Awareness
raising Comoros IMO ITCP – 4K
Host country In-kind – 2K
58 Georgia – 1st National seminar July 2011 Capacity building and Awareness
raising Batumi, Georgia
IMO ITCP – 4K Host country In-kind – 2K
59 India – National seminar and consultation meeting
September 2011 Review of national level progress and action plans
Mumbai, India IMO ITCP – 7K Host country In-kind – 5K
60 Tonga – 1st National seminar August 2011 Capacity building and Awareness
raising Tonga Host country In-kind –
2K
61 Ghana – 3rd
NTF September 2011 Review of national level progress and action plans
Accra, Ghana LPC in kind 5K
62 Marshall Islands – National seminar October 2011 Capacity building and Awareness raising
Marshall Islands
SPREP funds
63 Jordan – National Task Force Meeting March 2012 Capacity building and Awareness raising
Aqaba, Jordan GloBallast Funds 5K Host country in kind 10K
64 Trinidad and Tobago – National Task Force Meeting
April 2012 Review of national level progress and action plans
Port of Spain, Trinidad and Tobago
Host country in kind 2K
65 Malta – National seminar April 2012 Capacity building and Awareness raising
Valletta, Malta SafeMed II Funds
66 Tunisia – National Seminar June 2012 Capacity building and Awareness raising
Tunis, Tunisia IMO ITCP Funds 20K
67 Nigeria – National Task Force Meeting July 2012 Review of national level progress and action plans
Nigeria GloBallast funds 5K
68 South Africa – National progress seminar for GloBallast Phase 1 pilot country
September 2012 Cape Town, South Africa
- 57 -
69 Morocco – National Seminar October 2012 Capacity building and Awareness raising
Morocco IMO ITCP Funds 20K
70 Israel – National seminar October 2012 Capacity building and Awareness raising
Israel SafeMed II Funds
71 Turkey – National Task Force meeting 2012
GBP in International and Regional Forums
1 GBP Participation in Black Sea Commission Meeting
October 2007 Development of GB Pilot phase follow-up Strategy
Istanbul, Turkey
GloBallast Budget
2 GloBallast Information Seminar – side event at the Conference of Parties of Barcelona Convention
January 2008 Seminar on Ballast Water Management convention and GloBallast Project
Almeria, Spain GloBallast Budget
3 Marine Biosecurity Lecture at Global Oceans Forum
April 2008 Lecture on Ballast Water Convention and Biosecurity
Hanoi, Vietnam BBC Project Fund (6K)
4 GloBallast PCU in INTERREG Ballast Water Opportunity Project Inception Meeting
24 March 2009 Lecture on BWM Issues, Convention, GIA and GBP
Hamburg, Germany
INTERREG – 3k
5 GloBallast PCU in Panama International Maritime Conference
February 2009 Lecture on BWM Issues, Convention, GIA and GBP
Panama City, Panama
GloBallast Funds – 10K
6 GloBallast facilitated a one day seminar on marine biosafety in the East Asian Seas Congress
November, 2009 Awareness raising on Ballast Water /biosecurity issues, invited speakers from the region and recommendations to Ministerial Forum
Manila, Philippines
IMO ITCP – 50K PEMSEA – 10K
7 GloBallast PCU and two RCO representatives participated in the GEF IW-5 Meeting
October 2009 Information sharing with other GEF programmes and key stakeholders, organized participant led workshop on BWM and participated in the Private sector partnership forums
Cairns, Australia
GloBallast Funds – 28K
8 GloBallast gave a keynote speech in the Total Foundation Biodiversity Seminar
October 2009 Lecture on BWM Issues, Convention, GIA and GBP
Les Porquerolles, France
TOTAL Foundation – 4K
9 GloBallast gave a invited talk in the ACI Ballast Water Conference
May 2009 Lecture on BWM Issues, Convention, GIA and GBP
Amsterdam, Netherlands
ACI – 3K
10 GloBallast gave a invited talk in the IMAREST Marine Environment Briefing
October 2009 Lecture on BWM Issues, Convention, GIA and GBP
London, UK
- 58 -
11 GloBallast participated in the Global R&D Forum on emerging BWM systems
January 2010 Lecture on BWM Issues, Convention, GIA and GBP to key stakeholders dealing with BWM issues
Malmo, Sweden
GloBallast Funds – 5K
12 GloBallast attended the GEF Assembly May 2010 GEF-IW workshop and lecture on BW issues and Project
Punta Del Este, Uruguay
IMO ITCP Funds – 5K GloBallast Funds – 2K
13 GloBallast participated in the ROPME BWM Steering Committee Meeting
April 2010 ROPME regional strategy and action plan for ballast water management
Through Video Conf
ROPME – 20K
14 Globallast participated in World Ocean Council – Sustainable Ocean Summit
June 2010 GloBallast Presentation on GEF Project, BWM Convention and GIA
Belfast, UK GloBallast Funds – 2K
15 GloBallast participated in ASCLME Regional Steering Committee meeting
September 2010 Awareness raising among ASCLME members
Dar-Es-Salaam, Tanzania
IMO ITCP funds – 5K
16 GloBallast attended the UN Inter-Agency Liaison Group Meeting
June 2010 Inter-agency cooperation on the issues strengthened and information exchange
Paris, France GloBallast Funds – 2K
17 GloBallast participated in the UN-EMG Issues Management Groups on Biodiversity
April 2010 Inter-agency cooperation on the issues strengthened and information exchange
Geneva, Switzerland
IMO ITCP Funds – 2K
18 GloBallast lectured at World Maritime University
2008, 2009, 2010, 2011 Awareness raising among WMU students who are mainly from maritime administrations of developing countries
Malmo, Sweden
WMU – 5K
19 GloBallast participated in the IMAREST – YMN event
June 2010 Lecture on BWM Issues, Convention, GIA and GBP to key stakeholders dealing with BWM issues
London, UK
20 GloBallast participated in the IMAREST – Marine Environment Briefing
November 2009 Lecture on BWM Issues, Convention, GIA and GBP to key stakeholders dealing with BWM issues
London, UK
21 GloBallast participated in the IMAREST – Ballast Water Expert Group
May 2010 Lecture on BWM Issues, Convention, GIA and GBP to key stakeholders dealing with BWM issues
London, UK
22 GloBallast participated in the Royal Institute of Naval Architects Event- Lecture
March 2010 Lecture on BWM Issues, Convention, GIA and GBP to key stakeholders dealing with BWM issues
London, UK
- 59 -
23 GloBallast participated in the Baltic Master II Regional Seminar on BWM
March 2010 Lecture on BWM Issues, Convention, GIA and GBP to key stakeholders dealing with BWM issues
Gdynia, Poland EU Funds – 10K
24 IMO Marine Environmental protection Committee Meetings (MEPC) 58, 59, 60, 61 and 62 – PCU Information Papers and GloBallast / RCO/ LPC Presentations
2008, 2009, 2010, 2011 Updated the MEPC delegates on the progress of the Project, the status of Convention and GIA
London, UK
25 Participation in the 12th Global meeting
of the regional seas (IMO-UNEP forum) September 2010 Workshop on the strategic aspects
of regional and inter-regional cooperation on BWM
Bergen, Norway
IMO ITCP 2K UNEP 15K
26 IMO-UNEP Forum on regional cooperation in BWM
October 2010 Development of regional strategies for BWM
London, UK IMO ITCP 22K
27 Participation in 5th International
conference and exhibition on BWM November 2010 BWM implementation, challenges
and opportunities Singapore GloBallast funds 2K
28 Participation of the WCAR RCO [and RTF chair] in CABI regional meeting on Invasive Alien Species
March 2011 Increase awareness and facilitation of regional harmonization on Ballast Water Management
Bahamas ITCP
29 Chairing of the Joint MTEC-IMO-GloBallast workshop during the International Maritime-Port Technology and Development (MTEC) Conference 2011 in Singapore
April 2011 Update on BWM related developments
Singapore GloBallast funds
30 PCU presentation at the Joint Informal Meeting for IMarEST, the Nautical Institute London Branch, and the Honourable Company of Master Mariners, London
July 2011 Presentation on BWM Issues, Convention, GIA and GBP to key stakeholders dealing with BWM issues
London
31 GloBallast PCU and two RCO representatives participated in the GEF IW-6 Meeting
October 2011 Information sharing with other GEF programmes and key stakeholders, organized participant led workshop on BWM and participated in the Private sector partnership forums
Dubrovnik, Croatia
GloBallast Funds – 20K
32 IMO-GloBallast and the Republic of Turkey R&D Forum on BWM, Compliance, Monitoring and Enforcement, the next R&D challenge
October 2011 Scientific and technical information sharing
Istanbul, Turkey
GloBallast Funds 30K
- 60 -
and opportunity
33 Shipbuilders’ forum on the BWM Convention
October 2011 Scientific and technical information sharing
Istanbul, Turkey
GloBallast Funds 5K
34 3rd
Test facility harmonisation meeting October 2011 Scientific and technical information sharing
Istanbul, Turkey
GloBallast Funds 6.7K
35 Participation of GloBallast PCU in the Rio+20 Conference
June 2012 Rio de Janeiro, Brazil
GloBallast Funds TBC
36 Participation of GloBallast PCU in the Yeosu Expo 2012
August 2012 Yeosu, Republic of Korea
GloBallast Funds TBC
AP/IP Reports
1 4 QPRs Submitted to UNDP April, July, Oct, December 2009
Progress feedback to UNDP London, UK
2 APR Submitted to UNDP October 2009 Progress feedback to UNDP London, UK
3 4 QPRs Submitted to UNDP April, July, Oct, December 2010
Progress feedback to UNDP London, UK
4 4 QPRs Submitted to UNDP April, July, October, December 2011
Progress feedback to UNDP London, UK
5 APR Submitted to UNDP October 2011 Progress feedback to UNDP London, UK
6 2 QPRs Submitted to UNDP April, July 2012 Progress feedback to UNDP London, UK
- 61 -
OVERVIEW OF PROGRESS ACHIEVED TOWARDS OUTCOME 2 (activities in shades show the progress since 2010)
Expected Outcomes
Outputs
Activities (2008-2012)
Indicator (as per Pro-Doc LogFrame)
OUTCOME 2: BWM Strategies in place and legal, policy and institutional (LPI) reforms implemented and sustained at National level
Institutional Capacity Rapid Status Assessment BW Economic Assessment NBWMS National Legal Reforms Specialist Capacities CME Systems
Update GloBallast Modular Course Introductory Training on BWM in six Regions Develop guidelines for rapid assessment Develop guidance on economic assessment Develop templates for NBWMS Develop model legislations and legal training module Develop CME model and indicators Rapid assessments at National level Economic assessment at national level Aggregation of economic data Regional policy harmonization workshops in five regions Regional sustainability workshops in five regions National level stakeholder workshops
Each LPC is implementing an effective program of ballast water management in line with the IMO Convention and any Regional Strategies.
- 62 -
Develop NBWMS Legal Training in five regions Development of National Legislations in LPCs Capacitating Training Institutes in LPCs CME training in five regions CME implementation in LPCs Review of CME system in LPCs
- 63 -
DETAILED LIST OF ACTIVITIES UNDERTAKEN TO SUPPORT OUTCOME 2 (activities in shades show the progress since 2010)
No Activity Dates Outcome / Description Venue Funding (cash + in-kind)
Update GloBallast Modular Course
1 Updating of Introductory Training Package on Ballast Water Management
January 2008 Major revision to the GloBallast package in line with the new IMO BWM Convention
Global/IMO IMO ITCP (25K cash)
2 Translation of GloBallast Introductory Training Package into Spanish
October 2008 GloBallast Training Package in Spanish
In-kind contribution by Argentina, Chile and Colombia (36K)+ ITCP funds for vetting the translation (11K)
3 Minor revision of Introductory Training Package on Ballast Water Management
February 2009 Updating of the Training Package by PCU with the latest feedback from previous deliveries
Global/IMO
4 Translation of GloBallast Introductory Training Package into Russian
April 2009
GloBallast Training Package in Russian
Global/IMO,
IMO ITCP– 11K
5 Translation of five modules of GloBallast Introductory Training Package into French
July 2009 GloBallast Training Package in French
Global/IMO and Accra, GCLME
IMO ITCP – 11K GCLME in-kind 5k
6 Translation of GloBallast Introductory Training Package into Arabic
December 2009 GloBallast Training Package in Arabic
Bahrain ROPME-MEMAC In-kind – 10K
- 64 -
Introductory Training on BWM in GBP Regions
1 Wider Caribbean Regional Training Course on Ballast water Management
February 2008 Regional Train-The-Trainer Course
Kingston, Jamaica
IMO – ITCP Fund (50K) + LPC in-kind cash (10K) + In-kind time (48K)
2 Mediterranean Regional Training Course on Ballast Water Management
April 2008 Regional Train-the-Trainer Course
Alexandria, Egypt IMO – ITCP Fund (89K) + LPC in-kind cash (10K) + in-kind time (48K)
3 Red Sea and Gulf of Aden Regional Training Course on Ballast Water Management
November 2008 Regional Train-the-Trainer Course
Aden, Yemen IMO – ITCP Fund (65K) + LPC in-kind cash (10K) + In-kind time (48K)
4 South East Pacific Regional Training Course on Ballast Water Management as part of the ROCRAM regional Training
March 2009 Regional Train-the-Trainer Course (including other ROCRAM countries)
Viña del Mar, Chile
IMO ITCP Fund – 80k LPC In-kind – 20K ROCRAM In-kind – 10K CPPS In-kind – 10K
5 West and Central Africa (GCLME) Regional Training Course on Ballast Water Management
March, 2009 Regional Train-the-Trainer Course
Accra, Ghana IMO ITCP Funds – 20k UNIDO – 30k LPC In-kind – 10K IMO-In-kind – 10K
6 South Pacific Regional Training Course on Ballast Water Management
June 2009 Regional Train-the-Trainer Course
Suva, Fiji IMO ITCP Funds – 45K Country In-kind – 5K SPREP In-kind – 5K
7 Caspian Regional Training Course on Ballast Water Management
April 2009 Regional Train the –Trainer training on BWM
Baku, Azerbaijan IMO ITCP Funds – 42K Country in-kind – 20K
8 Baltic Regional Training Course on Ballast Water Management
June 2009 Regional Train the –Trainer training on BWM
Klaipeda, Lithuania
IMO ITCP Funds – 40K Country in-kind – 20K
9 Central American Region Regional Training Course on Ballast Water Management
October 2009 Regional Train the –Trainer training on BWM
San Jose, Costa Rica
IMO ITCP Funds – 50K Country in-kind – 20K
10 Western Indian Ocean Regional Training and seminar on Ballast Water Management
April 2010 Training on BWM issues to ASCLME Project stakeholders
Port-Louis, Mauritius
ASCLME – 20K
- 65 -
Develop Guidelines for Rapid Assessment
1 LoA with IOI Finalized to jointly develop the National BW Assessment guidelines
October 2009 Formalized IOI Partnership as a Strategic Partner
Global/IMO GloBallast Funds – 2.5K IOI Funds – 2.5K
2 National BW Assessment guidelines published as a monograph and reprinted
December 2009 April 2011
Tools for LPCs to undertake national assessments
Global/IMO GloBallast Funds – 5K GloBallast funds 3K
Rapid assessments at National level
1 Turkey – National Ballast Water Study (national project)
2007-2008 National assessment, risk assessment, GIS system development and collection of ballast water data
Turkey Turkey (cash -500K)
2 Croatia– National Ballast Water study (national project)
Based on 2004-2005 study
Implementing a national assessment and studies
Croatia N/A
3 Turkey – GloBallast Consultancy Task on National BWM Status Assessment
September 2010 Final report submitted Turkey GloBallast Funds – 5K LPC in-kind – 5K
4 Argentina – GloBallast Consultancy Task on National BWM Status Assessment
July 2011 Final report submitted Argentina GloBallast Funds – 5K LPC in-kind – 5K
5 Chile – GloBallast Consultancy Task on National BWM Status Assessment
July 2011 Final report submitted Chile GloBallast Funds – 5K LPC in-kind – 5K
6 Colombia – GloBallast Consultancy Task on national BWM Status Assessment
July 2011
Final report submitted Colombia National budget – 20K GloBallast Funds – 5K
7 Jamaica – GloBallast Consultancy Task on National BWM Status Assessment
May 2010 In progress Jamaica GloBallast Funds – 5K LPC in-kind – 5K
8 Ghana – GloBallast Consultancy Task on National BWM Status Assessment
September 2010 Final report submitted Ghana GloBallast Funds – 5K LPC in-kind – 5K
9 Nigeria – GloBallast Consultancy Task on National BWM Status Assessment
May 2011 Final report submitted Nigeria GloBallast Funds – 5K LPC in-kind – 5K
10 Jordan – GloBallast Consultancy Task on National BWM Status Assessment
February 2011 Final report submitted Jordan GloBallast Funds – 5K LPC in-kind – 5K
11 Jordan in-depth overview and additional assessment in Arabic
June 2012 Final report submitted Jordan GloBallast Funds – 5K LPC in-kind – 10K PERSGA 10K
11 Yemen – GloBallast Consultancy Task on National BWM Status Assessment
September 2010 Final report submitted Yemen GloBallast Funds – 5K LPC in-kind – 5K
12 Egypt – GloBallast Consultancy Task on National BWM Status Assessment
March 2012 Draft report submitted Egypt GloBallast Funds – 5K LPC in-kind 5K
13 Trinidad and Tobago – GloBallast Consultancy April 2012 In progress Trinidad and GloBallast Funds – 5K
- 66 -
Task on National BWM Status Assessment Tobago LPC in-kind – 5K
14 Panama –National Ballast Water study April 2012 In progress Panama LPC in-kind – 5K
15 Tonga-Fiji-Samoa January-March 2012
Final report submitted Tonga-Fiji-Samoa IMO ITCP Funds 6K Host country in-kind 5K
Guidance on Economic Assessment
1 LoA Finalized with IUCN on development of the Economic Assessment Guidelines and the first draft of the Guidelines completed.
July 2009 Formalized IUCN as a Strategic Partner
Global/IMO IUCN in-kind – 10K GloBallast Funds– 10K
2 National Economic Assessment Guidelines published as a monograph and reprinted
January 2011 April 2011
Tools for LPCs to undertake economic assessment
Global/IMO GloBallast funds 6K GloBallast funds 2.6K
Economic assessments at National level
1 Turkey – GloBallast Consultancy Task on National Economic Assessment
September 2011 Final report submitted Turkey GloBallast Funds – 5K LPC in-kind – 5K
2 Nigeria – GloBallast Consultancy Task on National Economic Assessment
May 2011 Final report submitted Nigeria GloBallast Funds – 5K LPC in-kind – 5K
3 Jordan – GloBallast Consultancy Task on National Economic Assessment
February 2011 Final report submitted Jordan GloBallast Funds – 5K LPC in-kind – 5K
4 Yemen – GloBallast Consultancy Task on National Economic Assessment
September 2010 Final report submitted Yemen GloBallast Funds – 5K LPC in-kind – 5K
5 Colombia – GloBallast Consultancy Task on National Economic Assessment
July 2011
Final report submitted Colombia National budget – 20K GloBallast Funds – 5K
6 Ghana – GloBallast Consultancy Task on National Economic Assessment
January 2012 Final report submitted Ghana GloBallast Funds 5K LPC in-kind – 5K
7 Chile – GloBallast Consultancy Task on National Economic Assessment
March 2012
Final report submitted Chile GloBallast Funds – 5K LPC in-kind – 5K
8 Jamaica – GloBallast Consultancy Task on National Economic Assessment
March 2012 In progress Jamaica GloBallast Funds – 5K LPC in-kind – 5K
9 Trinidad and Tobago – GloBallast Consultancy Task on National Economic Assessment
April 2012 In progress Trinidad and Tobago
GloBallast Funds – 5K LPC in-kind – 5K
10 Egypt – GloBallast Consultancy Task on National BWM Status Assessment
March 2012 In progress Egypt GloBallast Funds – 5K LPC in-kind 5K
Guidelines/templates for National BWM Strategy (NBWMS)
1 MoU Finalized with IUCN on development of the NBWMS Guidelines
July 2009 Formalized IUCN as a Strategic Partner
Global/IMO GloBallast Funds – 10K IUCN funds – 10k
- 67 -
2 NBWMS guidelines published as a monograph and reprinted
December 2009 April 2011
NBWMS Tools for LPCs Global/IMO GloBallast funds 2.8K
Develop NBWMS
1 Turkey – Developed a draft National Ballast Water Management Strategy
2008 Development of a Draft Strategy and National Policy based on the initial assessments
Turkey National Budget (cash – 200K
2 Turkey – GloBallast Consultancy Task on National BWM Strategy Development (summary of earlier study and translation)
May 2010 Final report submitted Turkey GloBallast Funds – 5K LPC in-kind – 5K
3 Argentina – GloBallast Consultancy Task on National BWM Strategy Development
July 2011 Final report submitted Argentina GloBallast Funds – 5K LPC in-kind – 5K
4 Colombia – GloBallast Consultancy Task on National BWM Strategy development
July 2011 Final report submitted – Waiting for NTF approval
Colombia GloBallast Funds – 5K LPC in-kind – 5K
5 Chile – GloBallast Consultancy Task on National BWM Strategy development
July 2011 Final report submitted Chile GloBallast Funds – 5K LPC in-kind – 5K
6 Jamaica – GloBallast Consultancy Task on National BWM Strategy Development
May 2010 In progress Jamaica GloBallast Funds – 5K LPC in-kind – 5K
7 Ghana – GloBallast Consultancy Task on National BWM Strategy Development
September 2010 Final report submitted Ghana GloBallast Funds – 5K LPC in-kind – 5K
8 Nigeria – GloBallast Consultancy Task on National BWM Strategy Development
August 2011 Final report submitted Nigeria GloBallast Funds – 5K LPC in-kind – 5K
9 Jordan – GloBallast Consultancy Task on National BWM Strategy Development
March 2011 Final report submitted Jordan GloBallast Funds – 5K LPC in-kind – 5K
10 Yemen – GloBallast Consultancy Task on National BWM Strategy Development
March 2011 Final report submitted Yemen GloBallast Funds – 5K LPC in-kind – 5K
11 Tonga-Fiji-Samoa January-March 2012
Final report submitted Tonga-Fiji-Samoa IMO ITCP Funds 6K
12 Panama –National Ballast Water Management Strategy
April 2012 In progress Panama LPC in-kind – 5K
13 Trinidad and Tobago – GloBallast Consultancy Task on National BWM Strategy Development
April 2012 In progress Trinidad and Tobago
GloBallast Funds – 5K LPC in-kind – 5K
Develop Model legislation and Training Module
1 Developed Model BWM legislation for English Speaking Caribbean Countries
November 2008 Model BWM legislation for WCAR region
Global/IMO IMO – ITCP Fund (20K)
2 Developed a Global Model Legislation for BWM
September 2009 A Global framework / model for BWM legislation at
Global/IMO GloBallast Funds – 5k
- 68 -
national level
3 Developed a set of tools including a legal roadmap, and legislative review
September 2009 set of tools including a legal roadmap, and legislative review
Global/IMO ITCP Fund – 10K
4 Established a GloBallast Global Legal Task Force
June 2009 Development of a roster of legal experts
Global/IMO LPC In-kind – 10K RCO In-kind – 10K
5 Held a Global legal expert workshop to develop a legal training package and finalized the training package
September 2009 Legal Training package to assist capacity building
Global/IMO GloBallast Funds – 13k
6 Translation of GloBallast Legal Training Package into Arabic
December 2009 GloBallast Training Package in Arabic
Global/PERSGA GloBallast Funds – 5K
7 Revision of Legal training package based on feed backs from first three deliveries
January 2010 Legal Training package to assist capacity building
Global/IMO GloBallast Funds – 4K
Regional Legal Training
1 Mediterranean Regional Training Course on Legal aspects of Ballast Water Management
December 2009 Regional Train-the trainer course in legal training
Istanbul, Turkey IMO ITCP Funds – 50K MED Trust Fund – 50K LPC In-kind – 20K RCO In-kind – 10K
2 Wider Caribbean Regional Training Course on Legal aspects of Ballast Water Management
December 2009 Regional Train-the trainer course in legal training
Panama City, Panama
IMO ITCP Funds – 40K LPC In-kind – 10K RCO In-kind – 5K
3 Red Sea and Gulf of Aden Regional Training Course on Legal aspects of Ballast Water Management
December 2009 Regional Train-the trainer course in legal training
Hurghada, Egypt IMO ITCP Funds – 30K LPC In-kind – 20K RCO In-kind – 10K
4 West and Central Africa Regional Training Course on Legal aspects of Ballast Water Management
June, 2010 Regional Train-the trainer course in legal training
Lagos, Nigeria IMO ITCP Fund – 80K IGGC Funds -LPC in-kind – 20K
5 South East Pacific + Argentina Regional Training Course on Legal aspects of Ballast Water Management
May 2010 Regional Train-the trainer course in legal training
Buenos Aires, Argentina
IMO ITCP Fund – 20K CPPS Funds – 5K -LPC in-kind – 20K
6 Central America Regional Training Course on Legal aspects of Ballast Water Management
May 2010 Regional Train-the trainer course in legal training
Tegucigalpa, Honduras
IMO ITCP Fund – 50K Country in kind 5K
7 Black Sea Regional Training Course on Legal aspects of Ballast Water Management
July 2010 Regional Train-the trainer course in legal training
Odessa, Ukraine IMO ITCP Fund – 58K RCO – 10K
8 South East Asia regional legal training on ballast water management for the South East Asia region under the IMO-Singapore third Party Programme
October 2010 Regional Train-the trainer course in legal training
Singapore IMO ITCP Funds – 15K Singapore In-kind 11K
- 69 -
9 South Pacific Regional Training on the Legal Implementation of the BWM Convention with particular emphasis on Compliance Monitoring and Enforcement
May 2011 Regional Train-the trainer course in legal training
Suva, Fiji IMO ITCP Fund 75K
Development of National Legislations
1 Turkey – Draft National Legislation 2008 Draft legislation in discussion
Turkey National Budget (cash – 100K)
2 Croatia – National Legislation Completed on 1 September 2007
National legislation in place Croatia National Budget (cash – 100K)
3 Croatia – Seminar on Ballast Water Convention, Regional Cooperation and National legislation
May 2008 National introductory seminar
Zagreb, Croatia National budget
4 Jamaica – held a national legislative workshop to start the process of drafting national legislation
December 2009 Capacity building among lawyers drafting national legislation prior to ratification of Convention
Kingston, Jamaica
GloBallast Funds – 2K LPC In-kind – 10K
5 Turkey – GloBallast Consultancy Task on National Legislation Development
May 2010 In progress Turkey GloBallast Funds – 5K LPC in-kind – 5K
6 Argentina – GloBallast Consultancy Task on National Legislation Development
January 2012 Final report submitted Argentina GloBallast Funds – 5K LPC in-kind – 5K
7 Jamaica – GloBallast Consultancy Task on National Legislation Development
May 2010 In progress Jamaica GloBallast Funds – 5K LPC in-kind – 5K
8 Ghana – GloBallast Consultancy Task on National Legislation Development
May 2010 Final report submitted Ghana GloBallast Funds – 5K LPC in-kind – 5K
9 Nigeria – GloBallast Consultancy Task on National Legislation Development
May 2010 Final report submitted Nigeria GloBallast Funds – 5K LPC in-kind – 5K
10 Jordan – GloBallast Consultancy Task on National Legislation Development
February 2012 Final report submitted Jordan GloBallast Funds – 5K LPC in-kind – 10K
11 Yemen – GloBallast Consultancy Task on National Legislation Development
May 2010 In progress Yemen GloBallast Funds – 5K LPC in-kind – 5K
12 Colombia – Draft National Legislation 2008 September 2010 Draft legislation in discussion by the NTF
Colombia National budget – 15K GloBallast Funds – 5K
12 Panama – Draft National Legislation December 2011 Capacity building among lawyers drafting national legislation prior to ratification of Convention
Panama GloBallast funds 15K
13 Tonga-Fiji-Samoa January-March 2012
Final report submitted Tonga-Fiji-Samoa IMO ITCP Funds 6K
- 70 -
Ratification of BWM Convention by GB Pilots, LPCs and PCs
1 Nigeria (LPC) 2005 BWM Convention Ratified Nigeria Country In-kind (50K)
2 Egypt (LPC) 2007 BWM Convention Ratified Egypt Country In-kind (50K)
3 Barbados (PC) 2007 BWM Convention Ratified Barbados Country In-kind (50K)
4 Sierra Leone (PC) 2007 BWM Convention Ratified Sierra Leone Country In-kind (50K)
5 Albania (PC) 2009 BWM Convention Ratified Albania Country In-kind (50K)
6 Antigua & Barbuda (PC) 2008 BWM Convention Ratified Antigua & Barbuda
Country In-kind (50K)
7 Liberia (PC) 2008 BWM Convention Ratified Liberia Country In-kind (50K)
8 South Africa (Pilot) 2008 BWM Convention Ratified South Africa Country In-kind (50K)
9 Mexico (PC) 2008 BWM Convention Ratified Mexico Country In-kind (50K)
5 Albania (PC) 2009 BWM Convention Ratified Albania Country In-kind (50K)
10 Brazil (Pilot) 2010 BWM Convention Ratified Brazil Country In-kind (50K)
11 Croatia (LPC) 2010 BWM Convention Ratified Croatia Country In-kind (50K)
12 Iran (Islamic Republic of) (Pilot country) 2011 BWM Convention Ratified Iran Country In-kind (50K)
13 Trinidad and Tobago 2012 BWM Convention Ratified Trinidad and Tobago
Country In-kind (50K)
Develop Specialist Courses
1 Held a Training package development expert workshop to identify the industry training needs and to outline the training package
June 2010 Identified industry training needs
Mumbai, India IMO ITCP Funds – 28K
2 Development of an advanced industry Training Package developed using a team of three international experts Resources mobilized from IMO ITCP and GIA
June 2011
Global/IMO Funds captured under outcome 4
3 Developed a Specialized training package for Port Biological Baseline Survey in partnership with NIWA, New Zealand
2008-2009 Specialized training course NIWA Funds – 20K
4 CME training package development workshop June 2011 Training course for Flag and Port State Control Officers
Malmo, Sweden Costs captured above
5 Development of CME training package with support from WMU, IUCN, and MPA Singapore
October-December 2011
Training course for Flag and Port State Control Officers
Global/IMO IMO ITCP 6K GloBallast Funds – 7K WMU – in-kind 5K IUCN-Total 20K cash – IUCN in-kind 5K MPA Singapore – In-
- 71 -
kind 15K
6 Translation of CME training course in Spanish March 2012 CPPS/Chile IMO ITCP Funds 5K
7 Translation of CME training course in French March 2012 Ghana IMO ITCP Funds 5K
8 Translation of CME training course in Arabic March 2012 PERSGA IMO ITCP Funds 5K
9 Consolidation and implementation training course on the ballast water management Convention
May 2012 Malta SafeMed II Funds
Regional training courses on CME
1 Mediterranean and CIS pilot training workshop March 2011 Training on CME Split, Croatia IMO ITCP 42K REMPEC/MTF 10K Industry in-kind 5K
2 South Pacific Regional Training on the Legal Implementation of the BWM Convention with particular emphasis on Compliance Monitoring and Enforcement
May 2011 Regional Train-the trainer course in legal training
Suva, Fiji Cost captured under outcome 2
3 West and Central Africa (GCLME) training workshop
September 2011 Training on CME Lome, Togo IMO ITCP 92K UNIDO-GCLME funds 36K
4 Wider Caribbean training workshop November 2011 Training on CME Kingston, Jamaica
GloBallast funds 37K UNEP 10K IMO ITCP – 49K
5 PERSGA training workshop May 2012 Training on CME Aqaba, Jordan IMO ITCP – 28.5K GloBallast Funds -6K LPC in kind 5K PERSGA 10K
6 CPPS training workshop July 2012 Training on CME Valparaiso, Chile GloBallast Funds -50K LPC In kind – 5K
Capacitating Training Institutes in LPCs
1 Colombia- National Training on Ballast Water Management using GloBallast Training package in Spanish
October 2008 Training on Ballast water Management
Cartagena, Colombia
DIMAR (Colombia) cash 50K + GBP Budget support for one legal expert
- 72 -
OVERVIEW OF PROGRESS ACHIEVED TOWARDS OUTCOME 3 (activities in shades show the progress since 2010)
Expected Outcomes
Outputs
Activities (2008-2012)
Indicator (as per Pro-Doc LogFrame)
OUTCOME 3: Knowledge management and electronic communications systems developed and utilized
Enhanced baseline information GloBallast Marine Electronic Information System Enhanced stakeholder participation
Update PB survey protocols PB survey training in six regions Develop taxonomy expert roster in six regions Taxonomy training for LPC experts PB Survey and Reports PBS information into GMEIS Select design Options for GMEIS GMEIS Expert Workshop Country Profile Database Format development GloBallast + GMEIS Webportal LPC Training on Country Profile Database LPC develop Country Profile Database National BWM websites Partnership with Pilot Regions, Pilot Countries and
Sufficient information is available to implement risk-based ballast water management systems and raised global awareness on ballast water management
- 73 -
LME regions Newsletters and e-forums Local brochures and publications at LPC level
DETAILED LIST OF ACTIVITIES UNDERTAKEN TO SUPPORT OUTCOME 3 (activities in shades show the progress since October 2010)
No Activity Dates Outcome / Description Venue Funding (cash + in-kind)
PBS Protocol Update
1 Updating of PBS Protocol in partnership with NIWA (draft)
October 2008
A draft updated PBBS protocol
New Zealand In-kind contribution by NIWA captured above.
2 Development of a Guideline Document on Port Biological Baseline Surveys in partnership with IUCN-NIO and IOI-SA
January-September 2012
Guideline document/GloBallast Monograph
Global GloBallast funds 4.5K NIO in kind 5K IOI-SA in kind 5K IUCN in kind 5K
3 NIO/GloBallast/IOI-SA/IUCN Workshop for the finalisation of the Port Biological Baseline Study Guidelines
March 2012 Draft updated Guideline Goa, India GloBallast Funds 6K NIO time in-kind IOI-SA time in-kind IUCN in-kind 5K
PB survey training
1 Mediterranean Regional Training Course on Port Biological Baseline Surveys for Ballast Water Management
October 2008
Regional Train-the-Trainer Course including hands on training
Istanbul, Turkey
SAFEMED Budget (85K) + MTF (20K) + NIWA in-kind (20K) + GloBallast Fund
2 Red Sea and Gulf of Aden Regional Training Course on Port Biological Baseline Surveys for Ballast Water Management
2006* Regional Train-the-Trainer Course including hands on training
Hurghada, Egypt
PERSGA budget cash 50K + GloBallast + NIWA In-kind contribution
3 Wider Caribbean Regional Training Course on Port Biological Baseline Surveys for Ballast Water Management (jointly with CPPS)
August 2009
Regional Train-the-Trainer Course including hands on training
Cartagena, Colombia
GloBallast Funds – 32K LPC In-kind – 10K RCO Inkind – 5K
4 South East Pacific Regional Training Course on Port Biological Baseline Surveys for Ballast Water Management (jointly with WCAR)
August 2009
Regional Train-the-Trainer Course including hands on training
Cartagena, Colombia
IMO ITCP Funds – 20K LPC in-kind – 10K RCO Inkind – 5K
- 74 -
5 South Pacific Regional Training Course on Port Biological Baseline Surveys for Ballast Water Management
June 2009 Regional Train-the-Trainer Course including hands on training
Suva, Fiji IMO ITCP Funds – 45K LPC in-kind – 5K RCO In-kind – 10K
6 West and Central Africa (GCLME) Regional Training Course on Port Biological Baseline Surveys for Ballast Water Management
July 2009 Regional Train-the-Trainer Course including hands on training
Abidjan, Cote d’Ivoire
IMO ITCP Funds – 65k LPC in-kind – 5K RCO In-kind – 10K
7 CPPS Regional workshop on harmonization of BW sampling and monitoring methodologies
February 2010
Regionally harmonized sampling methodologies
Chile CPPS Funds – 20K LPC inkind – 10K
8 Black sea and Caspian sea Regional Training Course on Port Biological Baseline Surveys for Ballast Water Management
July 2011 Regional Train-the-Trainer Course including hands on training
Batumi, Georgia
IMO ITCP Funds – 50K Host country in-kind 10K
9 CPPS Regional workshop on sampling techniques for ballast water
July 2011 Regionally harmonized sampling methodologies
Buenos Aires, Argentina
CPPS Funds – 17K LPC inkind – 10K
10 National Training Course on Port Biological Baseline Surveys for Ballast Water Management
August 2011
National Train-the-Trainer Course including hands on training
Lagos, Nigeria IMO ITCP funds 16K LPC in kind 5K
PBBS Surveys
1 Ghana PBBS of Tema Port September 2011
Baseline information and inventory of marine species
Ghana Country 25K in cash Country 10K in kind
Country Profile Database Format development
1 Develop Country Profile Database Format 2008 Draft Country Profile Database Format
Global/IMO GloBallast Fund – 2K
2 Pilot tested the Country profile database and database made operational through GloBallast website
November 2009
Country Profile Database format and database finalized
Global/IMO GloBallast Fund – 2K
3 Chile, Turkey, Croatia and Colombia completed the CPD
2009-2010
GloBallast + GMEIS Webportal
1 GloBallast Website Portal Update 2008 GloBallast Portal IMO, London GloBallast Fund – 2K
2 Ongoing website management and content generation including news flashes and electronic documents
2009 GloBallast Portal IMO, London GloBallast Fund – 1K
3 Strategic linkage established with MERC Global portal
2009 Link to wider global information sharing system on marine
IMO, London MERC Fund – 20K
- 75 -
pollution
4 Workshop on development of Geographic Information Systems, TUBITAK
February 2011
Discussion on available Turkish decision support systems and possible link to future GloBallast GMEIS
Istanbul, Turkey
GloBallast – 2K Host country in-kind 5K
5 Meeting with TUBITAK on web-based risk assessment tool
February 2012
Agreement on a roadmap towards a global version of Turkey online risk assessment tool
Istanbul, Turkey
GloBallast – 2K
Letter of Agreement with TUBITAK for the Development of a Global Web-based Risk Assessment Tool
September-December 2012
Online Ballast Water Reporting Form and database; Port Risk Assessment tool, building on the GloBallast Port Risk Assessment methodology; global database of Invasive Alien Species
IMO/Turkey GloBallast Funds - TUBITAK
LoA with WMU on RA?
Development of a Risk Assessment Framework at the national level
1 Letter of Agreement with WMU for the development of a guideline document for risk assessments at the national and regional level, in the context of the BWM Convention
March-December 2012
Guidelines, tools, and training for risk assessments at the national and regional level
IMO/WMU GloBallast Funds 25K WMU time in-kind
Partnership with Pilot Regions, Pilot Countries and LME regions
1 National Seminar on Ballast Water Management – Mauritius (Indian Ocean – Pilot Region)
January 2008
Development of National Roadmap
Port Louise, Mauritius
IMO-ITCP Fund (40K) + Country cash (20K) + country time in-kind – 48K
2 Contemporary Oceans Policy and Management Issues Seminar: World Maritime University Lecture (Global)
May 2008 Lecture on BWM convention and technologies
Malmo, Sweden
WMU Fund (cash 2K)
3 Ballast Water Management Workshop during OSCE International Expert Conference in the Black Sea Basin” (Black Sea – Pilot Region)
June 2008 IMO chaired and facilitated the workshop on Ballast water
Odessa, Ukraine
OSCE Fund (cash 3K) + time in-kind (10K)
- 76 -
management
4 Central America Regional Workshop on “Identify and address trade-related aquatic invasive species”
July 2008 GloBallast lecture on ballast water issues and management options
San Salvador, El Salvador
NOAA Fund (cash 5K)
5 Facilitated 1st ROPME/MEMAC Regional Steering
Committee Meetings for Ballast Water Management (ROPME Sea Region – Pilot Region)
November 2008
Development of Key elements of Regional Strategy and Action Plan
Manama, Bahrain
ROPME (cash 50 K) + in-kind 48K
6 National Ballast Water Training and Seminar – Montenegro
November 2009
Awareness raising and national roadmap development
Montenegro IMO ITCP Fund – 8K PC In-kind – 10K RCO In-kind – 5K
7 National Seminar on Ballast Water Management – India
November 2009
Awareness raising among the Port Sector
Goa, India GloBallast Funds – 2K Pilot Country In-kind – 10K
8 Participation of Pilot Country (South Africa, Brazil, Ukraine and India) experts in GloBallast Partnership Activities
2008-2010 Use of GloBallast pilot country expertise to expand the expertise pool
Global/IMO
9 Strategic partnership established with ASCLME region and LME Project
2009 Global/IMO
10 Supported second ROPME/MEMAC Regional Steering Committee Meetings for Ballast Water Management (ROPME Sea Region – Pilot Region)
April 2010 ROPME Sea Region BWM Circular and Regional Strategy
Global/IMO MEMAC Funds –
11 Strategic partnership established with ASEAN-India Programme on Ballast water and bio fouling
2009 In progress ASEAN Fund – 0.5K
12 ROCRAM Regional BWM Strategy RTF Meeting November 2009
Regional discussion of a draft Regional strategy for ROCRAM region and key elements to be included in Strategy
Buenos Aires, Argentina
IMO ITCP Funds – 80K LPC in-kind – 20K IMO In-kind – 5K
13 Mobilized ITCP resources for national BWM seminars in Indonesia, Sri Lanka, Bangladesh and China
2010 Preparation in progress for activity to be conducted in November/December 2010
Indonesia, Sri Lanka, Bangladesh and China
IMO ITCP Funds – 32K
14 Mobilized resources for regional legal training on ballast water management for the South East Asia region
2010 Preparation in progress for activity to be conducted in November 2010
Singapore IMO ITCP Funds – 50K
15 Mobilized resources for regional port biological baseline surveys for Black Sea (pilot region) and Caspian Regions
2010 Preparation in progress for activity to be conducted in March 2011
Georgia IMO ITCP Funds – 54K
- 77 -
16 Supported India’s efforts in mobilizing resources for Port Biological Baseline Surveys in all major Indian ports and also for Test facility developments
2010 India allocated USD15 million dollars in the 11
th
5-year plan
Mumbai, India India Cash Funds – USD15 million
17 Participation in Inception meeting for the ASEAN-India project on the Extent of transfer of alien invasive organisms in South/Southeast Asia region by shipping
December 2010
Transfer of experiences in relation to BWM. Close partnership
Munnar, India GloBallast funds 2K
18 GloBallast-CaspEco training in Caspian region National Focal Points on GloBallast tools for development of national BWM strategy
February 2012
Transfer of experiences in relation to BWM. Close partnership
Baku, Azerbaijan
GloBallast Funds 6K
19 Development of BWM national status assessment, economic assessment and national strategy in Caspian region
December 2011-June 2012
Transfer of experiences in relation to BWM. Close partnership
Azerbaijan, Kazakhstan, Russian Federation and Turkmenistan
IMO ITCP Funds 20K
20 Participation of GloBallast in CaspEco final Steering Committee
March 2012 Transfer of experiences in relation to BWM. Close partnership
Moscow, Russian Federation
GloBallast Funds 2K
21 Letter of Agreement with IOI-SA for the Development of a Guideline Document on Port Biological Baseline Surveys
January-September 2012
Guideline document/GloBallast Monograph
IMO/IOI-SA Costs captured above
22 South Asia Regional Ballast Water Management Strategy Development Meeting
May 2012 Mumbai, India IMO ITCP Funds – 40K
23 Regional Workshop to Develop a Regional Strategy and Action Plan to Implement the BWM Convention
July 2012 Baku, Azerbaijan
IMO ITCP Funds – 60K
22 3rd
GPTF Meeting in South Africa September 2012
Cape Town, South Africa
Costs captured above, under Outcome 1
23 National progress seminar for GloBallast Phase 1 pilot country
September 2012
Cape Town, South Africa
Costs captured above, under Outcome 2
- 78 -
Brochures and Publications and other awareness generation tools
1 GloBallast Brochures Published and distributed (2000 copies)
2009-2010 Awareness raising material
Global/IMO GloBallast Funds – 2k
2 GIA brochures published and distributed (2000 copies)
2009-2010 Awareness raising material
Global/IMO GIA Funds -2k
3 GloBallast Pull-up Poster 2009 Awareness raising material
Global/IMO GloBallast Funds - 1k
4 GIA Pull-up Poster 2009 Awareness raising material
Global/IMO GIA Funds - 1k
5 “Invaders from the Sea” – subtitled in Spanish 2009 Awareness raising material
REMPEITC RCO In-kind – 2K
6 “Invaders from the Sea” – script translated into French
2009 Awareness raising material
Global/IMO IMO ITCP Funds – 3k
7 “Invaders from the Sea” – script translated into Russian
2009 Awareness raising material
Global/IMO IMO ITCP Funds -
8 “Invaders from the Sea” – dubbed into Arabic 2009 Awareness raising material
Global/IMO ROPME/MEMAC Funds – 20K
9 Resources mobilized through GIA for a revision of Invaders from the Sea
2009 Awareness raising material
Global/IMO GIA Fund – captured elsewhere
10 Invaders from the Sea – screened in several international, regional and national forums
2008-2010 Awareness raising material
Global/IMO
11 Three Globallast monographs Published (rapid assessment guidelines, national BWM strategy guidelines and proceedings of the R&D symposium)
2009-2010 Awareness raising material
Global/IMO GloBallast Funds – captured elsewhere
12 Established Strategic Partnership with IUCN, World Maritime University (WMU) and Total Foundation on awareness raising and capacity building
2009 Awareness raising Global / IMO Total Foundation Fund – 90K
13 GloBallast Brochures reprinted 2011 Awareness raising material
Global/IMO GloBallast Funds – 1.1k
14 GIA brochures reprinted 2011 Awareness raising material
Global/IMO GIA Funds -1.5k
15 Globallast monographs 17, 18 and 19 published 2009-2010-2011
Awareness raising material
Global/IMO Cost captured under outcome 2
16 GloBallast Monograph 17 translated into Spanish 2010 Awareness raising material
Global/IMO Panama in-kind 5K
17 GloBallast Monograph 18 translated into Spanish 2011 Awareness raising Global / IMO Colombia and CPPS in-
- 79 -
material kind 5K
18 GloBallast Monographs 18 and 19 translated into French
2011 Awareness raising material
Global / IMO Total foundation captured above
19 GloBallast-GESAMP Monograph 20 2011 Awareness raising material
Global / IMO GIA funds captured under outcome 4
20 Monograph 17-19 translated into Arabic 2011 Awareness raising material
Global / IMO Total Foundation captured above
21 Monograph 17-19 translated into Russian 2012 Awareness raising material
Global / IMO GloBallast funds 6K
22 New GloBallast leaflet and updated website 2012 Awareness raising material
Global / IMO GloBallast funds 1K
23 New GloBallast leaflet for Rio+20 and Yeosu Expo 2012 Awareness raising material
Global / IMO GloBallast funds 1K
24 New GloBallast posters 2012 Awareness raising material
Global / IMO GloBallast funds 1K
25 “Invaders from the Sea” – dubbed into Korean 2012 Awareness raising material
Global/IMO Republic of Korea in kind
OVERVIEW OF PROGRESS ACHIEVED TOWARDS OUTCOME 4 (activities in shades show the progress since 2010)
Expected Outcomes
Outputs
Activities (2008-2012)
Indicator (as per Pro-Doc LogFrame)
OUTCOME 4: Public-private partnerships developed for accelerating technology solutions
Global Industry Alliance (GIA) Test Facility Standards Sediment Management Solutions BW R&D – Forums and State of the Art
Establishment of GIA General framework for Test facility harmonization and Global expert workshop on test Facilities Test Facility Manual GIA Fund R & D Forums
Cost effective technology solutions and testing standards are developed, tested and promoted through a successful partner-ship with industry
- 80 -
DETAILED LIST OF ACTIVITIES UNDERTAKEN TO SUPPORT OUTCOME 4 (activities in shades show the progress since October 2010) No Activity Dates Outcome / Description Venue Funding (cash + in-
kind)
Establishment of Global Industry Alliance (GIA)
1 Develop MoU with Industry Partners to form GIA October 2008 Conclusion of MoU with four partners (Vela, BP, APL and Daewoo)
IMO, London In-kind by all partners (100K)
2 Establish GIA Task Force and conduct first TF meetings
December 2008 GIA Task Force and meeting IMO, London Cash In-kind by all partners (20K)
3 Establish GIA Fund December 2008 GIA Fund Industry Cash (200K)
4 GIA Officially launched at IMO February 2009 GIA established IMO, London GIA In-kind – 10K GIA Fund – 3K
5 2nd
GIA task Force Meeting to select five GIA projects
February 2009 GIA projects approved and budget allocated
IMO, London GIA – In-kind – 5K
6 GIA – Activity 1: Global Forum on Test Facilities for BWM treatment systems
January 2010 Initial discussion on harmonization of testing protocols and development of an action plan
Malmo, Sweden
GIA Fund – 15K Test Facilities – 100K WMU – 2K
7 GIA – Activity 2: Global R&D Forum and Workshop on Alternative Systems for Ballast Water
January 2010 Information exchange among 150 participants on alternative BWM options and discussions on proving equivalency. Publication of proceedings
Malmo, Sweden
GIA Fund – 20K WMU – 20K Country / private sector delegates – 450K
8 GIA – Activity 3: Expert study on comparison of Alternative Management systems and establishment of a scientific basis for equivalency
Sep - December 2009
A scientific basis for comparing and approving alternative management options
IMO, London GIA Fund: 20K GESAMP time in-kind: 5K
9 GIA – Activity 4:GIA – CARES (Communication and Awareness Raising for Environmental Sustainability)
2008-2010 Development of a number of awareness raising tools (in progress)
IMO, London GIA Fund: 60K
- 81 -
10 GIA – Activity 5: Development of a Specialized BWM Training Package for Shipping and Port Industry
2009-2010 2012
Training package developed to meet special needs of the industry to implement the Convention
IMO, London GIA Fund: 44K Great Eastern Maritime Training Institute, India – 5K Private sector – time in-kind: 10K
11 Advanced specialised training package for Shipping and port industry translated into Russian
2011 Training package translated into Russian
EBRD EBRD Funds
12 3rd
GIA task Force Meeting to review progress September 2009 Review of GIA progress IMO, London GIA In-kind – 1K
13 4th GIA task Force Meeting to review progress January 2010 Review of GIA progress Malmo,
Sweden GIA Task Force –time in-kind : 5K
14 5th GIA task Force Meeting to review progress June 2010 Review of GIA progress IMO, London
(Video Conf) GIA Task Force –time in-kind : 2 K
15 Established partnership with EBRD to launch IMO-EBRD Biosafety Initiative
December 2009 Resources Mobilized IMO. London EBRD Cash Commitment – 300K
16 Held Joint EBRD-IMO-Training Partner Meeting May 2010 Training Strategy Developed EBRD, London
17 6th GIA task force meeting November 2010 Review of GIA progress Singapore GloBallast funds 5K
GIA partners in-kind 2K
18 EBRD Phase 1 training on BWM, using GloBallast training package
February 2011 Coordination and facilitation of training
Odessa, Ukraine
EBRD funds captured above
19 EBRD Phase 1 training on BWM, using GloBallast training package
April 2011 Coordination and facilitation of training
Gelendzhik, Russia
EBRD funds captured above
20 EBRD Phase 2 training on BWM, using GloBallast training package
December 2011 Coordination and facilitation of training
Odessa, Ukraine and Gelendzhik, Russia
EBRD funds captured above
21 7th GIA task force meeting via teleconference to
meet new partner Keppel January 2012 Review of GIA progress and
draft agreement on new activities
London, UK GIA Task Force –time in-kind : 2 K
22 EBRD trainings in Mediterranean region using GloBallast training package
2012 Coordination and facilitation of training
Turkey EBRD funds
R&D Forums
1 Joint GloBallast-NIO International Biofouling and Ballast Water Conference
February 2008 Scientific and technical information sharing
India India (cash 50K) + GloBallast Budget
2 Joint GloBallast-IESE International Conference on Ballast Water Management
October 2008 Scientific and technical information sharing
Singapore Singapore (cash 100K) + GloBallast Budget
3 IMO-WMU Global R&D Forum on Emerging January 2010 Scientific and technical Malmo, GIA Funds: captured
- 82 -
Alternative BWM systems information sharing Sweden elsewhere
4 IMO-GloBallast Turkey Global R&D Forum on CME
October 2011 Scientific and technical information sharing
Istanbul, Turkey
GloBallast budget Turkey (cash 5K)
Abbreviations: GBP: GloBallast Partnerships Project; BWM: Ballast Water Management; GPTF: Global Project Task Force; RTF: Regional Task Force; NTF: National Task Force; LA: Lead Agency; NFP: National Focal Point; NPC: National Project Coordinator; LPC: Lead Partnering Country.
________________
- 83 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
ANNEX 6 Template for Presentations by Regional
Coordinating Organizations
Each organization will be given approximately 15 minutes to present the information during the meeting. The following template has been developed to assist you in providing the information that may be of use for the meeting. You may wish to prepare a power-point presentation to inform the meeting. If you wish to circulate a summary of the report to other participants, please do send it to us at least one week prior to the meeting. It is expected that the information provided by the regional organization will include the following: Brief introduction to the region
Brief description of the region’s marine environment and resources and the importance of ballast water / marine invasive species issues to the region
Basic Information about the regional organization
Focal point for BWM
Brief description of the organization and its main roles / mandates related to marine environment protection in the region
List of member countries
Decision making mechanism at regional level Relevant regional agreements and conventions
Any existing regional conventions/protocols governing marine biosafety/biosecurity/ballast water issues.
Major challenges in terms implementation of a harmonized BWM regime in the region (e.g. regional cooperation, political support, institutional arrangements, technical capacity).
Existing inter-regional cooperation on marine biosafety/biosecurity/ballast water issues Status of BWM related activities
Progress at the regional level with o Development of a Regional Strategy o Training and capacity building o Other issues
Progress at the national level
Cooperation with other regions
Future challenges and needs Other Useful Information Please attach any other information that might be useful to the meeting. Longer documents, such as e.g. a Regional Strategy, can also be circulated to the participants but will not be distributed in hard copy at the meeting.
***
- 85 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
ANNEX 7 Work Plan and
Budget for 2013-2016
SUMMARY
Executive summary: This document provides a budget overview and proposes an extension of
the Project by another two years, at no increase in the total Project budget.
The document also provides a draft revised GloBallast Partnerships
Project Implementation Plan for the period of 2013-2016.
Action to be taken: Paragraph 17
Related documents: GPTF/3/3
Introduction and background
1 In accordance with the GEF-UNDP Project Document (ProDoc), the 1st Global Project Task Force
Meeting held in March 2008 developed and endorsed a Project Implementation Plan (PIP) to guide the
execution of the GloBallast Partnerships Project (GBP). The PIP (document GPTF/1/3) outlined a detailed
work plan and budget to achieve the main goal of the GBP which is to assist vulnerable developing countries
to implement sustainable, risk-based mechanisms for the management and control of ships’ ballast water and
sediments in order to minimize the adverse impacts of aquatic invasive species transferred by ships.
2 The 2nd
Global Project Task Force meeting in October 2010 revised the Project work plan for the
remainder of the Project, (GPTF/2/8), taking into account an extension of the Project timeline by a further two
years, until 2014. The work plan was later updated by the PCU and approved by the Executive Committee
meeting held in November 2011.
3 The GloBallast Partnerships Project is currently at mid-point of its implementation. Since the second
GPTF in October 2010, the main focus of activities has been on the national level, giving priority to the
establishment of a national information base and basic structures in the Lead Partnering Countries (LPCs),
such as National Task Forces and most importantly the development of national BWM strategies and
legislation. Other major project activities were the outreach to partner countries (PCs) and the development of
two advanced training packages. Furthermore, the Mid-Term Evaluation was completed in December 2011,
and its findings will serve as a guide for the continuous improvement of the implementation of the Project.
- 86 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
4 In line with the Logical Framework (LogFrame) for the Project (approved by GEF) and as per the
indicators of success identified for the Project, it is expected that, by the end of the project, all LPCs can
demonstrate significant improvement in legal, policy and institutional structures, with corresponding reduced
risk of ballast water borne marine bio-invasions. The LogFrame also identified the way of measuring this
over-arching indicator as follows:
All lead partnering countries (LPCs) have assigned a Lead Agency, formed a National Task
Force and developed National Ballast Water Management Strategy (NBWMS).
Each LPC has revised its legal instruments, instituted a risk-based compliance monitoring
and enforcement (CME) system, and established a sustainable financing structure for their
national ballast water management program.
All lead participating countries are proceeding towards ratification of the IMO ballast water
management Convention, with at least 10 LPCs having ratified and implementing the
Convention.
At least 3 neighbouring partnering countries have developed draft NBWMS.
The Regional Seas and LME conventions in each partner region include approved provisions
supporting improved BWM, the BWM convention and BWM regional strategies.
5 Since the achievement of the overall goal of the Project will be supported by four main outcomes, the
LogFrame had also included the indicators for each of the specific outcomes as well as their sources of
verification. A more detailed account of the outcome-based indicators and sources of verification, as per the
LogFrame is given below:
No Outcome: Indicators Sources of Verification
1 Learning, evaluation and
adaptive management
increased (Process
Outcome)
The project team at global,
regional and local levels is
effectively coordinating the
project, with objectives met,
and outputs completed in
time and within budget
Satisfactory / Highly
satisfactory ratings on key
activities and outcomes
during terminal evaluation
2 BWM Strategies in place,
with legal, policy and
institutional reforms
developed, implemented
and sustained at national
level (Process Outcome)
At project conclusion, each
LPC is implementing an
effective program of ballast
water management in line
with the IMO Convention
and any Regional
Strategies. During the
project, each LPC is sharing
the lessons learned with
other countries in the region
By the end of the project,
each LPC will have a
National Task Force and
approved National Ballast
Water Management
Strategy (NBWMS) in
place
All LPCs will have
revised legal structures,
improved Compliance
Monitoring and
Enforcement (CME)
systems and a cadre of
trained experts
Regional Task Forces and
Regional Action Plans in
place in each cooperating
region by the end of the
Project.
Regional Coordinating
Organizations are
- 87 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
facilitating the participation
of other partnering
countries in capacity
building activities hosted by
LPCs
3 Knowledge management
tools and marine monitoring
systems are effectively
utilized to expand global
public awareness and
stakeholder support,
improve understanding of
ballast water impacts on
marine ecology, and
enhance maritime sector
communications. (Process
Outcome)
Sufficient information is
available by the end of the
project for LPCs to
implement risk-based
ballast water management
systems. All LMEs and
regional Seas programs
globally have raised ballast
water management as an
important coastal zone
concern, with their
members taking steps to
address the issue.
Momentum on BWM is
sustained in the GB pilot
regions.
Global Marine Electronic
Information System
(GMEIS) is operational,
web sites are in place in
each of the 15 LPCs.
Newsletters are
published. The GMEIS
web portal includes
information showing
ballast water protocols
and strategies in each
LME and Regional Seas.
4 Public-private partnerships
developed to spur the
development of cost-
effective ballast water
technology solutions (P and
Stress Reduction Outcome)
Cost effective technology
solutions and testing
standards are developed,
tested and promoted
through a successful
partnership with industry
A GloBallast Industry
Alliance (GIA) is launched,
testing facility standards
are developed, sediment
facility options have been
piloted, at least 2 R&D
symposiums held, and the
BWM Innovation Fund
gets launched.
Note: text in bold shows the indicators that are yet to be fully demonstrated.
6 With the above objectives and outcomes in mind, the strategy adopted for execution of the Project is
based on a three-tiered approach:
A global component, managed through a Programme Coordination Unit (PCU) at IMO in
London, providing international coordination and information dissemination, including
the development of toolkits and guidelines, and establishing a strong cooperation with
industry and NGOs.
A regional component, providing regional coordination and harmonization, information
sharing, training, and capacity building in the application of ballast water management
tools and guidelines.
A significant country component, that establishes a fast track (LPC) and partner track
(PC) process for GEF-eligible countries in the priority regions. LPCs were selected based
on their commitment to develop and implement a National Ballast Water Management
Strategy (NBWMS), and to adopt legal, policy and institutional Reforms (LPIR).
- 88 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
Budget and Project timeline
7 The Project is aimed at assisting partnering countries by providing a “roadmap” on how to achieve
legal, policy and institutional reforms, and then by assisting partnering countries to steer the course. At the
centre of the project management approach is a significant country engagement, where ownership of the issue
and significant co-financing is expected from the beneficiary LPCs. Hence, the Project budget does not have
pre-determined budget allocations at the national level. Instead, a highly adaptive project management
approach is employed, where budget allocations are made as progress is demonstrated and specific, current
needs are identified. In addition, since ownership by countries and other stakeholders is crucial for the success
for the Project, it relies heavily on partnerships and co-financing. Therefore, the Project budget is revised by
the PCU and approved by UNDP every year.
8 The latest revision of the Project budget was approved by UNDP in May 2012, through Budget
Revision D (attached to this document as Annex 1). The next Budget Revision will be submitted in 2013,
which will take into account any savings through co-financing since Budget Revision D.
9 It should be noted that the total project budget remains the same as the original GEF approved budget,
despite the two year project extension and the additional number of activities carried out in the last two years.
This was possible mainly due to the significant savings made during the first half of the project through
prudent resource management by all Project partners and extensive cash co-financing mobilized by the PCU
and RCOs. Currently, the ratio for co-financing is 1:8 (GEF funds to cash and in-kind co-finance), which is a
very high figure, and a clear indication of the tremendous ownership of the Project and the issue by all
involved partners.
10 As can be noted from Budget Revision D (see Annex 1), the total Project fund expenditure from 2008
to 2011 is US$2,638,352 (US$2,591,871 + prior year reconciliation US$46,481). As of 1 January 2012, the
remaining Project funds were US$3,049,648. From Annex 1 it can also be deduced that based on the average
yearly expenditure during the first four years, and given that many of the Outcome 2 and Outcome 3 activities
have been completed or are well under way, an average annual expenditure for the years ahead would
realistically be 550k to 650k. During 2012, expenditure is expected to be considerably less than the previous
annual averages, since the Technical Adviser position vas vacant from January to July (seven months).
Similarly, expenditure during the last year of the Project is also expected to be less than other years, since the
Project is expected to end in September, and there will be very few national and regional level activities.
11 Consequently, the PCU concludes that there is sufficient financial room to extend the project by
another two years (until September 2016) without any increase in the overall project budget. The GPTF is
therefore invited to endorse the extension of the work plan by a further two years, subject to the formal
approval by the Executive Committee during 2013, followed by the formalisation of the new Project timeline
in Budget Revision E (to be completed March-April 2013). The extension of the Project would allow a
reasonable timeframe to achieve the national level goals of the project and ensure that the experiences from
the LPCs are shared with the neighbouring countries. It would also be strategic given that the Convention has
not yet entered into force but may be expected to do so in the next 1.5-3 years’ time. During this time and the
years immediately following entry into force, the GloBallast Partnerships Project and partners (RCOs, LPCs
and strategic partners) will have a crucial role to play.
12 The proposal by the PCU to extend the project also takes into consideration the fact that significant
further co-financing can be mobilized during the extended period of the Project, especially considering the co-
financing track record in the first four years.
- 89 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
Revised work plan 2013-2016
13 As demonstrated in the Progress Report (document GPTF/3/3), and as confirmed by the Mid-Term
Evaluation report, significant progress has been achieved in the first four years of the Project. Most of the
targets set for the 2008-2011 period have been met or exceeded, but some key targets remain to be met, not
least under Outcome 2 and Outcome 3. Several tools have been developed to assist with the national level
LPIR process, significant capacity building activities have been implemented at regional level and regional
frameworks and strategies for cooperation and collaboration are being built. However, some hurdles still
remain at the national level when it comes to development of a national BWM strategy, national legislation
and institutional framework to implement the BWM Convention. As noted during the GPTF in 2010 and the
ExCom meeting in 2011, while several LPCs have come a long way in their national level processes, the
indications are that for some countries this process will take considerably more time than was originally
envisaged. One reason is the continued delays at the international level in finalizing the BWM Port State
Control procedures, uncertainties related to the ballast water sampling and monitoring methods, a yet to be
fully matured ballast water treatment technology market and most importantly the global economic crisis that
significantly shifted priorities when it comes to implementation of marine environmental protection regulatory
regimes, not to mention the pressure from regulated industry community on flag states to buy in more
preparatory time for implementation of the Convention.
14 The attached draft work plan, developed by the PCU, takes into consideration the remaining priorities
of the project and the proposal above for an extended timeline. The remaining priorities of the project are
listed below in Annex 1 and are also graphically presented in Figure 1. It is also suggested that some of the
activities originally captured in the ProDoc may need to be revisited and revised, considering the latest
developments in the field. The GPTF meeting will also be invited to discuss if there are other barriers, not
captured in the initial Project Document, that need additional attention to ensure the success of the Project.
15 In summary, in order to sustain the momentum at national level and to continue building the technical
and institutional capacity, the project will focus on the following areas in the years to come:
Global level
Finalisation and distribution of guidelines for Port Biological Baseline Surveys
Development of guidelines for risk assessment
Development of a manual/guideline for sediment reception facilities
Development of a Global Marine Electronic Information System, including an on-line version of the
GloBallast Risk Assessment tool (with TUBITAK, Turkey)
Updating of the Compliance Monitoring and Enforcement training package to include issues of
sampling as per guidance being developed at IMO
Continued partnership with the industry through the GIA
Regional level
Implementation of Regional Strategies, and incorporation into regional seas convention frameworks
Regional training on risk assessment in all regions
National level
Finalisation of national assessments, strategy developments and legislation drafting in remaining
LPCs
Outreach to pilot countries (“twinning”) and transfer of experiences from LPCs to PCs
National training on Compliance Monitoring and Enforcement (including sampling)
16 Annex 2 below provides a more detailed outline of the priority activities during 2013-2016, and the
full draft work plan can be found in Annex 3. For Annex 3 it should be noted that a number of activities would
- 90 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
need to be continued throughout the duration of the Project, whereas some activities have been fully
implemented in the past.
Action Requested of the GPTF
17 The GPTF is requested to review the document and endorse the revised timeline and work plan for
2013-2016, subject to the formal approval by the ExCom and the subsequent Budget Revision E (expected
early 2013).
***
- 91 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
Figure 1: Remaining GBP Priority Activities during 2013-2016 (shaded in red/yellow)
Modif.Risk
Assessm.
guidelines
Risk
Assessm.
training
Develop
guidance
for
sediment
reception
facilities
- 92 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
Annex 1: Budget Revision D (approved 2012)
Award
ID: 00048032
Award
Title: PIMS No 3050 IW FSP: GloBallast Partnerships
Business
Unit: UNDP1
Project
Title:
PIMS No. 3050 IW FSP: Building Partnerships to Assist Developing Countries to reduce the
Transfer of Harmful Aquatic Organisms in Ships’ Ballast Water (GloBallast Partnerships)
Implemen
ting
Partner
International Maritime Organization (IMO)
GEF Outcome /
ATLAS Activity
Responsible
Party
Fund
ID Donor
Name
Atlas Budgetary
Account
Code
ATLAS
Budget Description
Amount
2008
(USD)
Amount
2009
(USD)
Amount
2010
(USD)
Amount
2011
(USD)
Amount
2012
(USD)
Amount
2013
(USD)
Amount
2014
(USD)
Total from
GEF
(USD)
See
Budget
Note:
OUTCOME 1:
LEARNING,
EVALUATION
AND ADAPTIVE
MANAGEMENT
INCREASED
IMO
62000
GEF
71200
International
Consultants / experts
149,859
(149,859)
86,138
(86,138)
60,487
(71,250)
66,888.44
(137,000)
150,000
(120,000)
137,700
(115,000)
152,686
(152,686)
839,997
(650,997)
1, 4
71300 Local Consultants /
experts
34,898
(34,898)
18,468
(18,468)
30,000
(37,500)
70,000
(100,000)
100,000
(32,000)
50,000
(10,000)
70,000
(70,000)
290,388
(304,149)
71600 Travel 9,661
(9,661) 9,810
(9,810) 6,227
(7,784) 14,550.61 (18,000)
100,000 (18,000)
10,000 (10,000)
10,000 (10,000)
81,698 (69,471)
Sub-Total GEF
194,418
(194,418)
114,416
(114,416)
96,714
(116,534)
151,439.05
(255,000)
350,000
(170,000)
197,700
(135,000)
232,686
(232,686)
1,212,083
(1,024,617)
- 93 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
GEF Outcome /
ATLAS Activity
Responsible
Party
Fund ID
Donor
Name
Atlas
Budgetary
Account Code
ATLAS Budget
Description
Amount
2008
(USD)
Amount
2009
(USD)
Amount
2010
(USD)
Amount
2011
(USD)
Amount
2012
(USD)
Amount
2013
(USD)
Amount
2014
(USD)
Total from
GEF
(USD)
See
Budget
Note:
Total Outcome 1 194,418
(194,418)
114,416
(114,416)
96,714
(116,534)
151,439.05
(255,000)
170,000
(403,783)
135,000
(0)
232,686
(0)
1,212,083
(1,024,617)
OUTCOME 2:
BWM
STRATEGIES IN
PLACE, WITH
LEGAL, POLICY
AND
INSTITUTIONAL
REFORMS
DEVELOPED,
IMPLEMENTED
AND SUSTAINED
AT NATIONAL
LEVEL
IMO
62000
GEF
71200
International
Consultants / experts
140,343
(140,343)
78,416
(78,416)
118,488
(143,750)
64,121
(105,000)
150,000
(150,000)
180,000
(180,000)
130,000
(110,000)
878,759
(633,759)
71300 Local Consultants /
experts
-
(-)
47,881
(47,881)
140,821
(176,026)
130,000
(305,000)
77,280.90
(20,000)
90,000
(81,400)
5,000
(5,000)
599,471
(1,098,881)
Sub-Total GEF
140,343
(140,343 )
126,297
(126,297)
259,309
(319,776)
194,121
(410,000)
227,280.90
(170,000)
270,000
(261,400)
135,000
(115,000)
1,478,230
(1,732,640)
Total Outcome 2 140,343
(140,343 )
126,297
(126,297)
259,309
(319,776)
410,000
(410,000)
170,000
(380,000)
261,400
(0)
115,000
(0)
1,478,230
(1,732,640)
OUTCOME 3:
KNOWLEDGE
MANAGEMENT
TOOLS AND
MARINE
MONITORING
SYSTEMS ARE
EFFECTIVELY
UTILISED TO
EXPAND
GLOBAL PUBLIC
AWARENESS
AND
STAKEHOLDER
SUPPORT,
IMPROVE
UNDERSTANDIN
G OF BALLAST
WATER
IMPACTS ON
MARINE
ECOLOGY, AND
IMO
62000
GEF
71200
International
Consultants /
experts
107,825 (107,825)
96,875 (96,875)
118,489 (143,750)
64,121 (127,000)
189,000 (189,000)
150,000 (110,000)
130,000 (110,000)
855,700 (804,700)
71300 Local Consultants /
experts
-
(-)
43,947.17
(43,947.17)
17,683
(22,104)
46,118
(51,000)
70,000
(50,000)
60,000
(35,000)
3,752
(3,752)
190,991
(468,232)
74100 Professional
Services
-
(-)
-
(-)
0
(0)
10,000
(10,000)
35,000
(5,000)
5,000
(5,000)
5,000
(5,000)
25,000
(55,000)
72300 Materials
and Goods
-
(-)
4,348
(4,348)
0
(0)
9,849
(20,000)
15,000
(15,000)
15,000
(15,000)
15,000
(15,000)
68,084
(99,348)
71600 Travel 2,290
(2,290)
4,000
(4,000)
0
(0)
4,000
(4,000)
28,000
(8,000)
8,000
(8,000)
8,000
(8,000)
34,290
(30,290)
Sub-Total GEF 110,115
(110,115)
149,170.17
(149,170.17)
136,172
(165,854)
134,088
(212,000)
337,000
(267,000)
238,000
(173,000)
161,752
(141,752)
1,174,065
(1,457,570)
- 94 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
GEF Outcome /
ATLAS Activity
Responsible
Party
Fund ID
Donor
Name
Atlas
Budgetary
Account Code
ATLAS Budget
Description
Amount
2008
(USD)
Amount
2009
(USD)
Amount
2010
(USD)
Amount
2011
(USD)
Amount
2012
(USD)
Amount
2013
(USD)
Amount
2014
(USD)
Total from
GEF
(USD)
See
Budget
Note:
ENHANCE
MARITIME
SECTOR
COMMUNICATI
ONS.
Total Outcome 3 110,115
(110,115)
149,170.17
(149,170.17)
136,172
(165,854)
212,000
(212,000)
267,000
(413,285)
173,000
(0)
141,752
(0)
1,174,065
(1,457,570)
OUTCOME 4:
PUBLIC-
PRIVATE
PARTNERSHIPS
DEVELOPED TO
SPUR THE
DEVELOPMENT
OF COST-
EFFECTIVE
BALLAST
WATER
TECHNOLOGY
SOLUTIONS
IMO
62000
GEF
71200
International
Consultants / experts
53,189
(53,189)
113,237.36
(113,237.36)
118,488
(143,750)
64,121
(125,000)
140,000
(142,500)
150,000
(130,500)
113,000
(113,000)
790,640
(634,024)
71600 Travel 10,434
(10,434)
580
(580)
24,295
(30,369)
10,000
(20,895)
20,000
(20,500)
20,500
(20,500)
7,210
(5,000)
102,205
(113,514)
Sub-Total GEF 63,623
(63,623)
113,817.36
(113,817.36)
142,783
(174,119)
74,121
(145,895)
163,000
(163,000)
170,500
(151,000)
120,210
(118,000)
892,845
(747,538)
Total Outcome 4 63,623
(63,623)
113,817.36
(113,817.36)
142,783
(174,119)
145,895
(145,895)
163,000
(330,098)
151,000
(0)
118,000
(0)
892,845
(747,538)
OUTCOME 5:
MONOTORING.
LEARNING,
DAPATIVE
FEEDBACK &
EVALUATION
IMO
62000
GEF
71200 International
Consultants
-
(-)
-
(-)
-
(0)
24,528
(40,000)
-
(-)
-
(-)
50,000
(50,000)
90,000
(100,000)
Sub-Total GEF -
(-)
-
(-)
-
(0)
24,528
(40,000)
-
(-)
-
(-)
50,000
(50,000)
90,000
(100,000)
Total Outcome 5 -
(-)
-
(-)
-
(0)
24,528
(40,000)
-
(-)
-
(-)
50,000
(-)
90,000
(100,000)
PROJECT
MANAGEMENT
UNIT
71400
Chief
Technical Advisor -
Level p5
27,000 (27,000)
9,898 (9,898)
27,000 (33,750)
27,000 (27,000)
27,000 (27,000)
27,000 (27,000)
27,000 (27,000)
171,898 (115,474)
2
71400 Technical Advisor -
Level p3
-
(-)
-
(-)
15,000
(18,750)
15,000
(15,000)
15,000
(15,000)
15,000
(15,000)
15,000
(15,000)
75,000
(45,000)
2
71400 Administrative Assistant
(G6)
39,675
(39,675)
56,731
(56,731)
11,211
(14,014)
65,000
(65,000)
75,000
(75,000)
75,000
(75,000)
75,000
(75,000)
403,980
(291,731)
2
72500 Office Supplies
13,571 (13,571)
8,225 (8,225)
13,287 (16,609)
17,306.76 (20,000)
20,000 (20,000)
20,000 (20,000)
20,000 (0)
116,686 (103,222)
71600 Travel 2,948
(2,948)
6,541.68
(6,541.68)
1,002
(1,252)
10,000
(15,000)
15,000
(15,000)
15,000
(15,000)
20,000
(0)
73,213
(70,207)
3
- 95 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
GEF Outcome /
ATLAS Activity
Responsible
Party
Fund ID
Donor
Name
Atlas
Budgetary
Account Code
ATLAS Budget
Description
Amount
2008
(USD)
Amount
2009
(USD)
Amount
2010
(USD)
Amount
2011
(USD)
Amount
2012
(USD)
Amount
2013
(USD)
Amount
2014
(USD)
Total from
GEF
(USD)
See
Budget
Note:
Sub-Total 83,194
(83,194)
81,395.68
(81,395.68)
67,500
(84,375)
92,306.76
(142,000)
152,000
(152,000)
152,000
(152,000)
152,000
(0)
840,777
(625,635)
Total Management 83,194
(83,194)
81,395.68
(81,395.68)
67,500
(84,375)
92,306.76
(142,000)
152,000
(152,045)
152,000
(0)
152,000
(0)
840,777
(625,635)
PROJECT TOTAL
591,693
(591,693)
585,096.21
(585,096.21)
702,478
(860,658)
712,603.80
(1,204,895)
1,226,280.90
(922,000)
1,023,200
(872,400)
846647.84
(809,438)
5,688,000
(5,688,000)
5
1 The Project Management Activities and Monitoring and Evaluation activities are combined with OUTCOME 1 in the log-framework. Costs associated with these items are now separately shown in this
table under Project Management and Outcome 5, respectively. 2 The personnel cost under Project Management Unit component represents only the costs associated with the project administration activities by the Project Coordination Unit. Costs associated with the
technical experts (CTA and TA), who will deliver most of the technical outcomes, are incorporated within the International Consultants components. 3 The travel costs are primarily for PCU staff for the purpose of project management, administration and for outreach activities. Travel costs for technical workshops, training events and travel costs for
international Consultants are incorporated within the local and international consultant components, unless specified otherwise. 4 The PCU time is captured as costs distributed between all Project Outcomes. 5 The cash co-financing that has already been mobilized amounts to USD6,679,000 (as of 30 June 2011, see Mid Term Evaluation)
- 96 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
- 97 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
Annex 2: List of GBP priority activities during 2013-2016
The following table provides a summary of the priority activities for the period 2013-2016.
Tier Remaining Priority Actions
to be started
Remaining Priority
Actions to be sustained
Comments
Activities to be Implemented
Global Terminal Evaluation
Aggregate Economic Impact
Data at Global Level
To result in an updated
publication of GloBallast
Economic Impact
Assessment Study
Update CME Model and
Training Package
Training Package developed
Global Marine Electronic
Information System – Design
Some components already
underway, the main
structure/architecture to be
developed in 2013/14 Global Marine Electronic
Information System – Expert
Workshop
Development of guidelines for
sediment management
To be initiated late
2012/early 2013
To develop a new Risk
assessment activity to
undertake national level risk
assessment – using GloBallast
package, to support CME.
PCU to update the risk
assessment methodology and
pass it on to LPCs
In cooperation with other
efforts such as EU risk
assessment initiative, other
LPCs Risk Assessment
initiatives (e.g. Turkey)
Test Facility
Standardization Manual
Based on inputs from GIA
funded test facility forum
discussions
3rd
GPTF In 2012
4th GPTF In 2014
5th GPTF In 2016
QPR/APRs Continuous
Global Industry
Alliance Activities
Expansion of GIA and
additional activities with
GIA Fund + EBRD
Partnerships
Global R&D Forums
6th IBWMC in November
2012
5th IMO-R&D Forum in
2013
Regional CME Training Regional level training
completed, national trainings
to follow once sampling
procedures are included.
Remaining Regional
Task Force Meetings
Depending on the Progress
achieved in developing the
Strategy
Regional Strategy to be
adopted by Regional
Conventions
CPPS – already adopted by
Lima Convention
Process initiated in
Mediterranean, Wider
Caribbean, GCLME region
- 98 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
and Red Sea & Gulf of
Aden.
LME/RS /Pilot Country
Cooperation / Outreach
More regional/national level
interventions as possible
National Rapid Assessments and
Reports
Submitted by most LPCs
Economic Impact
Assessments and
Reports
Submitted by most LPCs
National BWM
Strategies
Submitted by most LPCs
Develop National
Legislation
Drafts submitted by most
LPCs
Implement CME Based on training at
regional/national level
Review of CME
implementation success
Corrective actions if needed.
Develop National BWM
Websites
PCU to develop a model
and to be distributed to
LPCs (if needed)
Complete Country Profile
Database
Support / Action from LPCs
urgently needed.
National Task Force
Meetings
NTF is expected to be
eventually replaced with a
formal institutional
mechanism to implement the
Convention
- 99 -
- 99 -
Annex 3: Project Implementation and Work Plan for 2013-2016
No Output and activity Description 2013 2014 2015 2016 Responsibility
1.1 Project Management and
coordination structures in place at
global, regional and local level
1.1.1 Hire, equip and maintain project
coordination unit staff and office
at IMO HQ
IMO-PCU
1.1.2 Establish and support Global
Project Task Force (GPTF)
IMO-PCU
1.1.3 Designate and coordinate with
regional coordinating
organizations
IMO-PCU
1.1.4 Establish and maintain regional
task forces
RCOs
1.1.5 Establish project coordination in
each LPC, including identifying
lead organization (LO), national
focal point and national project
coordinator
Completed
1.1.6 Establish and maintain National
Task Forces
LPCs
1.1.7 Represent and promote GloBallast
Partnerships in international and
regional conventions and forums
IMO-PCU/
RCOs/LPCs
2.1 Institutional capacities are
enhanced through a
comprehensive training program
on Ballast water management
2.1.1 Update GloBallast Introductory
Modular Course for Ballast Water
Management
IMO-PCU
2.1.2 Hold regional training courses on
BWM using updated Modular
Training package
Completed
2.2 Risk-based, rapid status
assessment reports are developed
and used to guide country
activities
- 100 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
No Output and activity Description 2013 2014 2015 2016 Responsibility
2.2.1 Develop template and guidelines
for rapid assessments
Completed
2.2.2 Develop rapid status assessments
LPCs
2.3 Economic aspects of marine bio-
invasions factored into national
strategic planning
2.3.1 Develop guidance for economic
assessments
Completed
2.3.2 Develop national economic impact
and response cost assessments,
taking into account the need for
financial sustainability
LPCs
2.3.3 Aggregate economic information
IMO-PCU
2.4
National Ballast Water
Management Strategy (NBWMS)
developed and implemented
2.4.1
Develop guidelines for national
BWMS development, including
options for financial sustainability
Completed
2.4.2
Hold (a) regional harmonisation
(including regional LPI
assessment) and (b) Sustainability
workshops
RCOs
2.4.3 Hold national stakeholder
workshops
LPCs
2.4.4
National Ballast Water
management Strategy (BWMS)
developed
LPCs
2.5 National legal reforms instituted
- 101 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
No Output and activity Description 2013 2014 2015 2016 Responsibility
2.5.1 Develop legal road map, model
legislation and training manuals
Completed
2.5.2
Train regional LPC lawyers on
developing legal frameworks for
BWM
Completed
2.5.3 Develop national legislation
LPCs
2.6 Specialist capacities improved for
BWM
2.6.1 Develop model BWM (specialist)
course
Completed
2.6.2
Capacitate Training Institutes for
delivery of Introductory course
and specialized courses
LPCs
2.7
Compliance monitoring and
enforcement indicators are
developed and national systems
enhanced, with an emphasis on
risk-based priority setting, and the
use of voluntary approaches
2.7.1
Develop and disseminate model
CME framework, including
indicators
Completed
2.7.2 Hold regional training workshops
on CME
Completed
2.7.3 Countries implement modified
CME systems
LPCs
2.7.4
Conduct follow up reviews of
modified CME systems and
develop lessons learned study
LPCs
- 102 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
No Output and activity Description 2013 2014 2015 2016 Responsibility
3.1
Baseline information established
on biodiversity and alien species
presence in major ports
3.1.1 Update Port baseline survey
protocols
Completed
3.1.2
Hold regional training workshops
on port baseline survey design and
implementation
Completed
3.1.3 Develop country, regional and
global rosters of taxonomy experts Replaced by Activity 3.4
3.1.4
Train local taxonomists in generic
tools and methodologies for
marine invasive detection and
analysis
Replaced by Activity 3.4
3.1.5
LPCs carry out baseline surveys
and develop national marine
invasive reports
Replaced by Activity 3.4
3.1.6
Compile country baseline data
and input into GMEIS (see
activity 3.2)
See activity 3.2
3.2
Global Marine Electronic
Information System (GMEIS) for
Ballast Water Management
Established
3.2.1
Identify GMEIS
Design/architecture Options
IMO-PCU
3.2.2 Hold GMEIS expert workshop for
design / architecture selection
IMO-PCU
3.2.3
Develop country profile database
format and disseminate to
participating countries
Completed
3.2.4
Provide training and technical
assistance on knowledge
management and database
development for LPCs
IMO-PCU
- 103 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
No Output and activity Description 2013 2014 2015 2016 Responsibility
3.2.5 Populate the country profile
database
LPCs
3.2.6 Develop and maintain GloBallast
GMEIS web portal
IMO-PCU
3.2.7 Launch and maintain national
BWM websites
LPCs
3.3
Stakeholder and public awareness
of ballast water management and
marine bio-invasion issues is
raised and sustained
3.3.1 Stakeholder outreach to GB pilot
regions, LMEs and Regional Seas
IMO-PCU/RCOs
3.3.2 Publish and post semester
newsletters
IMO-PCU
3.3.3
Develop, update and translate
GloBallast brochures and
publications
IMO-PCU
3.4
Development of a Risk
Assessment framework at the
national level
3.4.1
Modification of the GloBallast
Risk Assessment methodology to
assist CME
IMO-PCU
3.4.2 Training using GloBallast Risk
assessment Tools
IMO-PCU
4.1 Strategic partnership forged with
shipping industry
4.1.1
Set up a Global Industry Task
Force to meet annually and
provide input to GloBallast
Partnerships
Completed
4.1.2
Hold biannual industry dialogues
between GITF and the GloBallast
Steering Committee
IMO-PCU
4.2
Globally agreed standards
developed for ballast water
technology test facilities
4.2.1
Develop framework for ballast
water treatment equipment test
facility standards and inter-
IMO-PCU
- 104 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
No Output and activity Description 2013 2014 2015 2016 Responsibility
calibration procedures
4.2.2
Hold / facilitate experts workshop
to propose test facility standards
and procedures
IMO-PCU
4.2.3
Develop and disseminate
standards and procedures manual
for ballast water treatment
equipment test facility standards
IMO-PCU
4.3
Solutions devised and best
practices publicized on port-based
reception facilities for ballast
water tank sediments
4.3.1
Develop best practices manual for
sediment management (redesigned
activity after GPTF 2)
IMO-PCU
4.4
State of the art in Ballast water
treatment technology solutions
identified and publicized
4.4.1
Establish Ballast Water Innovation
Fund and support innovative
projects
IMO-PCU
4.4.2
Hold biennial global R&D forums
and biennial technology
conferences
IMO-PCU
5.1
Project monitoring, evaluation and
reporting systems established and
implemented
5.1.1 Conduct mid-term evaluation and
initiate mid-course corrections
Completed
5.1.2 Conduct terminal evaluation
IMO-PCU
5.1.3
Develop and submit APR/PIRs
and other required GEF/UNDP
project monitoring reports
IMO-PCU
6.1 Project Management Unit
coordinates the various activities
6.1.1 Project Manager (CTA)
IMO-PCU
- 105 -
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
No Output and activity Description 2013 2014 2015 2016 Responsibility
6.1.2 Assistant Project Manager (TA)
IMO-PCU
6.1.3 Administrative Assistant (AA)
IMO-PCU
6.1.4 Office supplies
IMO-PCU
6.1.5 Travel related to Project
Management
IMO-PCU
____________
106
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
ANNEX 8 List of Priority Activities
2013-2016
During group discussions at the 3rd GPTF the following activities were identified by the LPCs and RCOs as priority actions needed to meet the objectives of the Project, and the implementation of the Convention at regional and national level. Global level
update the introductory training course (activity 2.1.1), in particular to make it more country- and region-specific;
update CME training package, in particular to include a module on sampling;
support to RCOs, PCs and LPCs for biennium R&D Forum (activity 5.1.1);
more emphasis on awareness and outreach and lack of logistics at national level (activity 5.1.2);
harmonization of best practices between regions (e.g. PERSGA twinning); and
new website with better access to global, regional and national level data.
Regional level
Regional strategy plan;
more focus on assisting the implementation of the regional strategy and global information system (activity 1.1.4);
twinning on inter-regional basis, not only regional basis;
regional risk assessments, e.g. an allocation for each RCO to carry out risk assessment in their region. Further support (e.g. from UNEP?) could be mobilized;
stakeholders workshop: support needed for LPCs (activity 2.4.3);
improving the link between regional activities and the national level; and
enforcement of the trans-boundary agreements.
National level
training of PSCOs. Here, twinning between LPCs or LPC to PC on the PSC issue was suggested, even including secondment of PSCOs;
training for sampling (see global level, updating CME package);
support of NTFs;
twinning between the RCOs will be beneficial;
financial resources ;
provide report format and timetable for national reporting;
more focus on PCs in the future years = twinning and national capacity building activities;
replicate on national scale the GIA concept, i.e. national GIA with shipping industry and ship owners, need for more awareness;
engage the ROs : type approval process - flag state implementation;
work with marine environment protection agencies; and
rapid assessment: PCs need additional support (activity 2.2.2).
107
C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx
Reporting The meeting identified that there is a need to improve the reporting both within regions and between the PCU and the RCOs/LPCs. Several suggestions were identified:
more regular meetings between RCOs: Skype, videoconference or MEPC meeting, OPRC-HNS TG;
PCU providing a summary of activities on an annual basis; and
RCOs to request status reports form the LPCs on the implementation of the ratification;
quite possibly a quarterly reporting could be achieved, if a web-based system is implemented. Such a reporting system should be clearly linked to the regional strategies; and
Venezuela offered to take the lead on the development of a web-based form for reporting.
Region-specific comments GCLME:
4 countries were identified as possibly in need of the most assistance: Guinea Bissau, Sao Tome, Equatorial Guinea and Angola. Here, increased efforts on twinning would be useful.
REMPEC:
One issue would be how to engage EU – Med Sea Member States in the implementation of the regional strategy (funds through the UNEP/MAP MTF budget were previously provided for the RTF meetings and capacity building activities). However, GEF funds cannot cover EU countries and a solution for funding may need to be looked into.
SPREP:
The issue of PBBS training at national level would be of interest for the countries in the SPREP region.
REMPEITC:
LPCs are progressing well, moving towards ratification. However, further support to other countries of the region in order to encourage flag states with large tonnage to ratify should be a priority;
There is also a need to harmonize between the 5 LPCs, with mutual support and twinning;
In addition the region has many other stakeholders (non GEF countries) making regional harmonization difficult in the WCAR;
The issue of sediment reception facilities was also raised; and
The dialogue in the region between the ministers of transport.