View
237
Download
4
Category
Tags:
Preview:
DESCRIPTION
Museum Design
Citation preview
No matter how glorious a culture used to be, it will be replaced by a new culture, without any exception. Human beings are creating new cultures continually, while the culture itself cannot be immortal. However, we can still seek the traces of these cultures through some vehicle, which is the museum.
This book takes the architecture and display features of museums as its content, displaying various thematic museums’ features in modeling and space design. From the use of materials to their cultural and regional embodiment, the book analyses the cultural and historical connotations of museum design systematically.
DESIGN MEDIA PUBLISHING LIMITED
Thematic M
useums
DESIGN MEDIA PUBLISHING LIMITED
ThematicMuseums
CONTENTS
The New Museum Aan de Stroom
Los Angeles Museum of the Holocaust
Voyager New Zealand Maritime Museum
Shimane Museum of Ancient Izumo
Museum of Liverpool
New Mexico History Museum
Madinat al Zahra Museum
Carabineros Museum of Chile
Extension of the National Maritime Museum
Waterloo Region Museum
6
12
20
24
28
34
44
52
60
68
74
80
86
97
102
110
122
128
134
140
146
152
158
172
178
186
194
202
208
214
220
226
234
240
248
256
262
268
274
282
288
296
302
Yokosuka Museum of Art
Museum Villa Vauban
Grand Rapids Art Museum
ARoS Arrthus Museum of Art
Crpatoa Museum of Contemporary Art
Extension of the Denver Art Museum
Musee Herge
Mecenat Art Museum
Museum of Culture, Fine Arts and Science, Changchun
Crocker Art Museum
Jiangsu Provincial Art Museum
Bechtler Museum
Tel Aviv Museum of Art
The Bronx Museum of the Arts Expansion, North Wing
Erie Art Museum
Lam - Lille Museum of Modern, Contermproary and Outsider Art
Museo Soumaya
Museum ABC Illustration and Design Centre
Labyrinth of Sciences and The Arts Museum
Riverside Museum
National Automobile Museum Renovation and Extension
Welios Science Museum
National Glass Museum
Polish Aviation Museum
Nestlé Chocolate Museum
Fort Worth Museum of Science and History
Museum of Energy
National Automobile Museum
Canadian Museum of Nature
Lyon House Museum
Mimesis Museum
ECO MUSEUM in Rennes
INDEX
HISTORY MUSEUM ART MUSEUM
SCIENCE MUSEUM COMPREHENSIVE MUSEUM
The New Museum Aan de StroomLocation : Antwerp, Belgium Designer : Neutelings Riedijk Architects Completion Date : 2010
Construction Area: 19,557m2 Photographer: Neutelings Riedijk Architects and City of Antwerp
6 - 7
East Façade North Façade West Façade South Façade
Left: SituationFacing: Overview east side
8 - 9
Left: Night view hallRight: Evening view eastFacing Above: Inside viewFacing Below: Internal space
10 - 11
Facing Above and Below: Interior with window
Ground Floor Plan: 1. Entrance hall 2. Information desk 3. Cafetaria 4. Logistic centre 5. Garage 6. Workshops
Level 9 Plan: 13. Restaurant 14. Conference room 15. Kitchen 16. Roof terrace
Level 1 Plan: 7. Gallery 8. Offices 9. Meeting rooms 10. Staff canteen
Level 2 Plan: 11. Gallery 12. Exhibition room
Level 3 Plan: 11. Gallery 12. Exhibition room
Level 4 Plan: 11. Gallery 12. Exhibition room
2
3
4
5
6 8
10
9 9
66
7
11
12
11
12 11
12
16
13
14
15
1
Los Angeles Museum of the HolocaustLocation: Los Angeles, CA,USA Designer: Belzberg Architects Completion Date: 2010 Photographer:
Belzberg Architects, Benny Chan-Fotoworks, Iwan Baan
12 - 13
Below: Museum Roof Plan
14 - 15
Exhibit Plan: 1. Taper atrium 2. Gallery 3. Audio room
Left Above and Right Above: Ramp wall
12
3
2 2 2
2
2
22
2
16 - 17
3
21
3
2
1
Section: 1. Planter continous 2. Beam 3. 6” Gravel
Cross Section:1. Parking 2. Gallery 3. Lobby
1
18 - 19
Section
Mezzanine Floor Plan: 1. Open to below 2. Ramp to garage below, ramp slope 20% 3. Storage 4. Conference room 5. Library stacks 6. Admin office
North Ramp Elevation
2
1
3
4
5
6
Location: Auckland, New Zealand Designer: Pete Bossley Architects Total Floor Area: 1,456m2
Completion Date: 2009 Photographer: Simon Devitt Awards: 2011 Property Council NZ, Excellence
Award in Special Purpose Category; 2010 NZ Institute of Architects, Auckland Public Architecture Award
Voyager New Zealand Maritime Museum
20 - 21
Facing Above: North elevationFacing Below: East elevation at night
22 - 23
Above Left: Black Magic NZL32Above Right: Hall of yachtingFacing Above: Exhibition space
1. Existing gallery 2. Hobson Wharf 3. Entrance4. Introduction 5. Local segment 6. Technology segment 7. NZL32 hanging above 8. Store 9. Gallery of yachts 10. NZL32 segment 11. Sir Peter Blake segment 12. Ramp up over 13. Blake Theatre 14. Void 15. NZL32 16. Blue water segment 17. Theatre
Ground Floor Plan
First Floor Plan
1
2
3
5
67
8
4
9
11
12
14
15
13
16
14
101
17
Shimane Museum of Ancient IzumoLocation: Izumo City, Japan Designer: Fumihiko Maki + Maki and Associates Completion Date: 2006
Construction Area: 11,855m2 Photographer: Toshiharu Kitajima, Makoto Yoshida
24 - 25
South Elevation and Section: 1. Entrance hall 2. Lobby 3. Permanent exhibition 4. Storage 5. Shop 6. Café 7. Observation deck
West Elevation and Section: 1. Lobby 2. Permanent exhibition 3. Lecture room 4. Library 5. Office
Facing Above: Southwest elevationFaicng Below: Night view
1 2 3 456
71
2 3 4 52
26 - 27
5
Above: Building and landscapeBelow: South garden
Ground Floor Plan: 1. Entrance Hall 2. Gallery 3. Lobby 4. Permanent exhibition 5. Temporary exhibition 6. Lecture room 7. Library 8. Office 9. Storage 10. Mechanical 11. Café 12. Observation deck
1
2
3
4
6
5
7
8
12
11
4
9
10
4
5
8
Museum of LiverpoolLocation: Liverpool, UK Designer: 3XN Completion Date: 2011 Site Area: 13,000m2 Photographer:
Pete Carr, Philip Handforth, Richard White
28 - 29
Left: Liverpool sketch
New Mexico History MuseumLocation: Santa Fe, New Mexico State, USA Designer: SaylorGregg Architects Completion Date: 2009
Construction Area: 8.919m2 Photographer: Kirk Gittings, Gallagher & Associates Award Name: 2010 N. M. Heritage Preservation Award for Urban Design with an Historic Context
34 - 35
Facing: Museum at dusk
Site Plan (Left):1.The Palace of the Governors2. New Mexico History Museum3. Fray Angelico Chaves History Library and Photo Archive4. Meem Community Room 5. The Plaza
2
1
5
3
4
36 - 37
Facing Left Top: The Palace courtyard portalFacing Right Top: The Palace courtFacing Below: Lobby view to The palaceAbove: Entrance lobbyBelow Right: Entrance detail
Two Above: West-east Section/North-south Section: A. The Palace of the Governors B. Meem Community Room 1. Tickets 2. Exhibit lobby 3. Exhibit 4. Learning centre 5. Theatre 6. Board room 7. Catering/café 8. Collections 9. Storage 10. Palace / History Museum portal
12
3
4
5
B
7
9
3
3
A
2
2 2
33
6
889
10
38 - 39
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
3
9
A
C
7
B
8
8 8
6
6
52
2
2
C
B
A
9
First Floor Plan: A. The Palace of the Governors B. Fray Angelico Chavez History Library and Photo Archive C. Meem Community Room 1. Board room 2. Admin/curatorial offices 3. Exhibit lobby 4. Exhibit 5. Volunteers6. Conservation lab 7. Mechanical 8. Catering/café 9. Terrace
Ground Floor Plan: A. The Palace of the Governors B. Fray Angelico Chavez History Library and Photo Archive C. Meem Community Room 1. Tickets 2. Museum shop 3. Exhibit lobby 4. Exhibit 5. Learning centre 6. Administration/security 7. Receiving 8. Mechanical 9. Palace / History Museum portal
Above: Entrance to The PalaceFacing Above: The second floorFacing Below Right: Entrance
42 - 43
Facing Above and Below: Interior view of theatre
1
23
4
5
6
7
1
5
7 7
7 67 7
7
1
6
1
1
Lower Level and Mezzanine Plan (Left Above and Above):1. Exhibit 2. Exhibit staging 3. Collections storage vault 4. Collections processing 5. Theatre/lecture Hall 6. Storage 7. Mechanical
Madinat al-Zahra MuseumLocation: Cordoba, Spain Designer: Nieto Sobejano Arquitectos S.L.P Completion Date: 2008 Site
Area: 9,125m2 Photographer: Preparar Y Enviar Award Name: 2010 Shortlist of Aga Khan Award for Architecture
44 - 45
Below: Landscape around the museumFacing Above: Aerial viewFacing Below: Archaeological site of al-Zahra
48 - 49
Above: Access ramp to the museumBelow Left: Access rampFacing Above: View of Mashrabiyya-type openings and reflecting pool
50 - 51
11
Above Left: Patio nearby the working areasAbove Right: Corridor in the working areasFacing: View of the two levels of exhibitions
Carabineros Museum of ChileLocation: Santiago, Chile Designer: Gonzalo Mardones Viviani Completion Date: 2008 Construction
Area: 4,550m2 Photographer: Gonzalo Mardones Viviani
52 - 53
Facing Above: Museum frontFacing Below: Cultural centre at dusk
Left: Detail 1. Concrete slab (SC) for rain water runoff2. BUDNIK Pastel on 50 X 50 (OPTION 2)3. PLOT (pivot adjustable FPM) (OPTION 2)4. Asphalt membrane system of double elastomeric SBS protect themselves according to paragraph 2.9.2 of EETT5. Navy thermal insulation over read protections6. Concrete slab (SC) for rain water runoff7. BUDNIK Pastel on 50 X 50 (OPTION 2)8. PLOT (pivot adjustable FPM) (OPTION 2)9. Asphalt membrane system of double elastomeric SBS protect themselves according to paragraph 2.9.2 of EETT10. Navy thermal insulation over read protections11. Thermal insulation Bayma polyurethane 3 CMS 5518 AD, BAYER12. Volcanic13. Metal structure14. Exposed concrete15. Aluminum window16. Dust in cedar plywood17. Porcelain 30 X 90 cm18. Concrete over read19. Dust guard20. Volcanic21. Metal structure22. Gypsum plaster23. Aluminum window24. Aluminum window25. Porcelain 30 X 90 cm26. Concrete over read27. Dust guard28. Glass thermo panel29. Gypsum plaster30. Porcelain 30 X 90 cm31. Concrete over read32. Dust guard33. Glass thermo panel34. Volcanic plaster to receive water glaze35. Thermal insulation36. Volcanic plaster to receive water glaze37. Dust in cedar plywood38. Dust guard39. Volcanic plaster to receive water glaze40. Thermal insulation41. Volcanic plaster to receive water glaze42. Dust in cedar plywood43. Dust guard44. Porcelain 30 X 90 cm45. Concrete over read46. Dust guard47. Dust guard48. Gypsum plaster
12345
6789
1011
1213
1415
16171819202122
23
24252627
28
29
3031
32
33
34
3635
3837
4039
41
4342
4544
46
47
48
Extension of the National Maritime Museum
Location: London, UK Designer: C. F. Møller Architects Completion Date: 2011 Construction Area:
7,300m2 Photographer: Julian Weyer
60 - 61
1 2 3 4
5 6 7
8 12
10
14
9
13
15
11
16
17
17
18
19
20
1. Greenwich Park 2. Lower cross avenue 3. Herbaceous border 4. Water rill 5. King William statue6. Reflection pools 7. Restaurant
8. Entrance plaza 9. Extension part 10. Special exhibition gallery11. Exhibition lobby/shop 12. Entrance 13. Lobby 14. Terrace
15. Lantern16. Interactive gallery17. Archives 18. Reading room 19. Treasures zone 20. South-west wing
62 - 63
Section E-E:1. Café terrace 2. Self-service café 3. Brasserie terrace 4. Brasserie 5. Toilets/cloakroom
Section B-B:1. Loading bay 2. Brasserie 3. Brasserie terrace 4. Skylight 5. Terrace 6. Toilets/cloakroom
Section D-D:1. Entrance plaza 2. Entrance 3. Lobby 4. Terrace 5. Skylight 6. Reception
7. Reception 8. Lobby 9. Exhibition lobby 10. Plant room/electrical 11. Plant room/AHU 12. Toilets 13. Exhibition transit storage
7. Interactive gallery 8. Archives 9. Archives 10. Reading room 11. Treasures zone 12. Special exhibition gallery 13. Exhibition lobby/shop
6. Interactive gallery 7. Archives 8. Reading room 9. Treasures zone 10. Special exhibition gallery 11. Plant room/AHU
1 2
3 4
5 6
7
8
12 3 4 5
6 7 8
13
4
11
11 12
10
1 2 3
4 5
6 7
8
9
10
11
1312
7
9
1011
11
9
64 - 65
Level 1 Terrace Plan: 1. Terrace 2. Brasserie terrace 3. Brasserie 4. Servery 5. Void to museum foyer below6. Green roof 7. Skylight 8. Reading room
1
23 54
6
7
8
5
66 - 67
Level -1 Exhibition Plan: 1. Void to special exhibition gallery 2. Void to exhibition transit room 3. Exhibition workshop 4. Plant room/AHU 5. Plant room/electrical intake and distribution 6. Void to exhibition lobby
Level 2 Archives Plan: 1. Bridge connection 2. Archive storage 3. Plant for archive 4. South wing 5. West wing
1
23 4 5 6
1
5
2
3
4
68 - 69
Waterloo Region MuseumLocation: Kitchener, Canada Designer: Moriyama & Teshima Architects in association with The Walter Fedy
Partnership Construction Area: 4,360m2 Completion Date: 2011 Photographer: Tom Arban
Below: Quilt Wall viewed from Homer Watson BoulevardFacing Above: Night view from streetFacing Below: Event terrace
West Elevation
North Elevation
Railway Section
South Elevation
Colour Scheme
Final Homer Watson “Quilt Wall” façade
Conceptual Diagramme:1. Past2. Future3. Elmira to Galt rail line4. Flood plain5. Axial view6. Main entrance7. Image quilt wall8. 7 divisions of Waterloo Region9. Recycled wood wall10. Classroom wing11. View to living history village12. Stone wall13. Gallery wing
Section Detail:1. White roof2. High-level air supply3. Sun shade4. Recycled wood5. High performance Low-E glazing6. Sun shade7. Timber column in background8. Recycled wood on front desk9. Hated floor10. Pool (Grey water cistern)11. Entrance info desk
Left: Front Entrance with image quilt wall
70 - 71
8
7
6
4
3
2
1
5
5
11
10
9
1213
1
2
3
4
5
6
7
8
11
9
10
Left: Main lobby view to historic village Facing: Crossroads
Site Plan:1. Main entrance2. Classroom wing3. Lobby4. Gallery wing5. Terrace 6. Outdoor classroom7. Pool8. Waterfall9. Storm pond10. Bioswale11. Existing animal pastures12. Entrance to village 13. Historic train station14. Existing barns15. Martin house16. Return from historic village17. Existing swale
72 - 73
1
23
4
5 6
7
9
8
10
16
11
15
14
13
12
17
Yokosuka Museum of ArtLocation: Yokosuka City, Japan Designer: Riken Yamamoto & Field Shop Completion Date: 2006
Photographer: Sergio Pirrone Award Name: 49th BCS (Building Contractors Society) Prize in 2008
74 - 75
Section1:1. Exhibition hall 2. Gallery 3. Storage 4. Storage anterior chamber 5. Restaurant 6. Curator’s office 7. Light well 8. Information lounge 9. Volunteer staff room 10. Library
Section 2:1. Exhibition hall 2. Gallery 3. Storage 4. Electric room 5. Parking 6. Entrance hall 7. Light well 8. Taniuchi Rokuro pavillion 9. Information lounge
1
2 345
6781
2
3 4
56 7
810 9
1
8
5
9
1
76 - 77
Above: Balcony
Sectional Detail:1. Windbreak 2. Gallery 3. Bridge 4. Exhibition hall 8 5. Information lounge 6. Penthouse 7. Exhibition hall 3 8. Storage
8
7
6
5
4
2
3
1
6
3
78 - 79
Plan-B1F(Left) & B2F(Right): 1. Exhibition hall 2. Gallery 3. Storage 4. Storage anterior chamber 5. Receiving and unwrapping 6. Service yard 7. Exhibit preparation room 8. Machine room 9. Electric room 10. Dynamo room11. Parking
Plan-1F(Above) & 2F(Below): 1. Exhibition hall 2. Entrance hall 3. Restaurant 4. Museum shop 5. Workshop 6. Workshop anteroom 7. Administration office 8. Meeting room 9. Reception room
1
2
3
4
56
7
8
1 1
1
1
2
2
3
3
10
9
8
1
2
3
4
5
7
8
1 1
1
1
2
2
3
3
10
9
8
11 11
1
2
3 4 5 6
7
8
1
1
910
11 12 13
14 1515
16
17
18 1913
10. Director’s office 11. Curator’s office 12. Curator’s data room 13. Closed stack room 14. Light well 15. Taniuchi Rokuro pavilion 16. Information lounge 17. Volunteer staff room 18. Library 19. Heat source equipment
Museum Villa VaubanLocation: Luxembourg City, Luxembourg Designer: Philippe Schmit Architects Construction Area:
2,045m2 Completion Date: 2010 Photographer: Lukas Roth Award: 1st Prize TECU Architecture Award
2010
80 - 81
Below Left: Frontal side view, renovated villa plus entrance annexBelow Right: Annex, entrance area, connection of old-newFacing Above: Back general view from parkFacing Below: Annex, night, back view from park
East View
South View
North View
Above: Frontal general viewBelow: Annex, night, viewed form the entrance sideFacing Above and Below: Annex corner, backside viewed from park
82 - 83
84 - 85
Facing Above Left: Annex, entrance reception, ground floorFacing Above Right: Renovated villa, exhibition room, ground floorAbove: Annex, inner staircase, level -1Right: Annex, exhibition room, level -2
1. Hall2. Elevator3. Entrance4. Exhibition space5. Staircase6. Passage
4
3
2
1
5
4
4
4
5
5
Location: Grand Rapids, USA Designer: WHY Architecture Completion Date: 2007 Construction Area:
11,613m2 Photographer: Kulapat Yantrasast
Grand Rapids Art Museum
86 - 87
Below: Entrance & Exit
GRAM Section:1. Lantern-skylight2. Permanent collection European art3. Permanent collection American art4. Permanent collection early modern art5. Permanent collection modern art6. Print-study room7. Print galleries8. Temporary exhibition galleries9. Auditorium10. Main lobby11. Permanent collection of design & modern craft
Art and the Environment: Design Solutions (Left):1. Energy-saving Skylights Tailored to Light Levels for Art: Natural light enters through triple-layered glass with ultraviolet protection and adjustable louvers to provide suitable light 2. Safe and Energy-efficient Indoor Air Quality Control: Carbon dioxide monitoring, low-emitting materials and strict chemical/pollutant control3. Certified Wood Flooring: White oak planks used in the gallery come from sustainably harvested forests in the Northwest, certified by Forest Stewardship Council4. Local Materials: Much of the building’s materials are sourced locally - the concrete is made from cement, sand and stone from sources near Lake Michigan5. Use of Recycled and Recyclable Materials: Building’s insulation materials made from recycled paper and fiber. Recyclable carpeting made from digestible corn-based plastic6. Public Transportation Friendly: Bicycle racks and staff showers in the facility7. Water-efficient Landscape Design8. Educate and Inform the Public about Green Building and the Environment: Regeneration of underdeveloped urban site9. Innovative Air-conditioning System: Energy-saving air conditioning uses 3 of 3.6-metre-diameter energy wheels to bring in fresh air. Indirect evaporative cooling method for air-conditioning. Ozone depletion policy10. Small Building Footprint: Leaving parts of the land for park, courtyards and water features11. Natural Water Recycling: Rain and snow water is stored and recycled for toilets, plant irrigation, pool and water wall12. Energy-saving Construction: Efficient insulation for solid concrete walls and glass walls13. Green Housekeeping and Strict Recycling Programme14. Eco-friendly Entrance: Large front portico gives protection in the harsh winter and shade in the summer for activities 15. Natural Light + Energy Saving Features: Resourceful use of natural light through large windows and skylights without harming the art. 3 layers of filters: exterior louvers, energy-saving insulated glass with argon gas and fabric scrim for light filtering in public area
1
23
4 5
6 7 8
3
9
1
11
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
88 - 89
Facing: EntranceTop Right: CanopyAbove: Pocket Park
Lantern Section (Above):1. 1-9/16” laminated glass wall butt-glazed joints between structural glass panels2. Pre-finished alum-framing system with double light glass panel. Integral motor operated blind slat unit.3. 5-1/2” concrete slab on 2” metal deck. To maintain 2 HR. Rating4. In floor grille flush with fin. Floor5. 5/8” GYP. Board over 5/8” fire retardant plywood6. Line of wall in background and foreground
1
2
3
4 5
6
90 - 91
Ground Floor Plan:1. Gallery2. Auditorium3. Museum shop4. Sculpture court5. Reflecting pool6. Museum offices7. Lobby8. Dining court9. Pocket park10. Café
Facing Above: EntranceFacing Below: LobbyAbove: Pool
1
2
3
4
5
6
7
8
1
9
10
92 - 93
Facing: GalleryAbove: Permanent collection gallery
First Floor Plan:1. Gallery2. Library3. Museum offices
1
2
3
1
1
1. dfadf aasd2. adfadfd3. sdfasdf4. asdfasfdgg 555 dag5. df dgag sfd6. dfasfggs asdfes7. dfasdfgasg
8. dfad sdfag fad9. adfadf10. sdfasdf sdfae11. asdfasfdgg 55512. df dgag adg13. dfasfgg14. dfasdfgasg
94 - 95
Facing: East courtAbove: Auditorium
Third Floor Plan:1. Gallery2. Lantern gallery
2
1
1 1
2 2
ARoS Aarhus Museum of ArtLocation: Aarhus, Denmark Designer: Schmidt Hammer Lassen Architects Completion Date: 2004 Site
Area: 17,700m2 Photographer: Schmidt hammer lassen architects Awards: 2004 Aarhus Municipality’s
Architecture Prize, 2004 FX Awards Best Museum and 2004 InSitu Prize
96 - 97
Site Plan:1. ARoS2. Scandinavian Congress Centre3. Industry & Trade Archives4. Aarhus City Hall5. Aarhus Concert Hall6. Aarhus Public Library
North Elevation:1. Entrance
1 231
1
East Elevation:1. Entrance2. Lift tower3. Café
2
3
4
5
6
1
98 - 99
Section A-A:1. Interior street2. Foyer3. Exhibition4. Changing exhibition5. Galleries/the 9 rooms6. Auditorium7. Paint store8. Gallery corridor9. Plant room
Section B-B: 1. Entrance2. Interior street3. Stairs/lift tower4. Gallery corridor5. Exhibition
1
2
3
4
5
6
78
9
1 2
34
5
3
3
3
8
8
9
9
4
4
41
100 - 101
Ground Floor Plan: 1. Entrance2. Interior street3. Foyer4. Book shop5. Café
Level -1 Plan:1. Open2. Footbridge3. Gallery corridor4. Auditorium5. Children’s space
Level 3 Plan: 1. Open2. Footbridge3. Gallery corridor4. Exhibition5. Library
6. Offices7. Meeting room8. Stairway to level 19. Study room10. Fire stairs
6. Workshop7. Exhibition8. Classroom9. Conservation Studio10. Fire stairs
6. Ticket sales7. Cloakroom8. Main stairway9. Staff canteen10. Fire stairs
12
34
5
6
7
8
9
10
12
12
3
4
56 7 8
9
10
10
10
10
87
6 6 6 9 9
4
5
1
2
3
3
Croatia Museum of Contemporary ArtLocation: Zagreb, Croatia Designer: Igor Franić, Studio za arhitekturu d.o.o. Completion Date: 2009
Construction Area: 18,000m2 Photographer: Filip Beusan, Damir Fabijanic, Sandro Lendler
ć
ć
102 - 103
Above: Site planRight: Aerial viewBelow: West elevationBottom: South elevationFacing Above: Front viewFacing Below: General view
Extension to the Denver Art MuseumLocation: Denver, USA Designer: SDL WITH Davis Partnership Completion Date: 2006 Construction
Area: 16,723m2 Photographer: SDL, BitterBredt, Michele Nastasi, DAM
From Top to Bottom: Panoramanic of DAM from East; East elevation; North-South section from east; Aerial view of museum and museum residencesFacing Above: DAM’s enormous cantilever hovers over the street
110 - 111
Section Looking East:1. Permanent exhibition2. Restroom3. Atrium4. Mechanical5. Meeting room6. Lobby7. Passage8. Auditorium lobby9. Art storage
1
2
3
4
5
6
7 8
1
1 1
1
1 1
1
4
2
3
3
3
8
5
5
92
112 - 113
Facing: Titanium clad entrywayBelow: Sculpture deck
Section Looking North:1. Mechanical2. Restroom3. Permanent exhibition4. Lift lobby5. Office6. Atrium7. Auditorium lobby
1
2
3
4
5
6
7 8
8. Projection booth9. Lobby10. Kitchen11. Coats12. Auditorium13. Storage14. Sculpture deck
1
3
2
2
1
4
3
3
3
1213
11
10
3
14
9
116 - 117
Left: Atrium stair showingdigital Engi installationFacing: View of atriumstair from ground floor
118 - 119
Above, Facing Above and Below: Contemporary Art GalleryLeft: Antony Gormley’s Quantum Could
120 - 121
Ground Floor Plan:1. Entrance2. Lobby3. Café entrance4. Café 5. Dining6. Coats7. Kitchen
12
3
4
5
6
7
8
12
11
13
1415
10
9
8
8
3
8. Office9. Reception10. Visitor’s services11. Retail12. Special exhibition13. Passage14. Dock staging15. Loading dock
Facing: Rock formation digital video porojectionAbove: Auditorium
Location: Louvain-la-Neuve, Belgium Designer: Atelier Christian de Portzamparc Completion Date: 2009
Site Area: 3,600m2 Photographer: Nicolas Borel
Musee Hergé
122 - 123
Left: Site planBelow: The volume of the museum, simple lens, seems to float in the forest and on the road, make a pass like a shipFacing: From the dock, a large eye can be seen which would vary depending on the exhibitions and events at the museum. The bridge leads to the museum along the window of the library, bright and alive
124 - 125
Above: The volume of the museum is divided between voids and solids. The vacuum is the reception area in which are housed four forms, four volumes that contain the showroomsThe Following Pages:Left: The tour starts at 3 and runs from one volume to another, alternant cozy atmosphere of dimly lit rooms due to the original and walkways and stairs to the concourseFacing Left Above: The narrative space, a kind of mental maze, in agreement with the world of Hergé. That everything resonates, as in an orchestral scoreFacing Left Below: This is the main reason why the museum is Hergé and decomposed with its rhythms, its scansions, its failures, its divisions, its crossings, its bridges
126 - 127
1
2
3
4
5
6
13
7
8
13
12
11
10
8
9
Ground Floor Plan
1. Entrance stairs2. Gallery3. Shop4. Café 5. Temporary exhibitions6. Technical facilities7. The laboratory8. The World of Tintin9. Tintin books10. The Museum of Ethnography11. Bridge12. Studio 13. A twentieth-century classic
First Floor Plan
Mecenat Art MuseumLocation: Hiroshima, Japan Designer: Tetsuya Nakazono (naf architect & design) Completion Date: 2010
Construction Area: 100m2 Photographer: Noriyuki Yano
128 - 129
Section:1. Gallery 12. Gallery 2
Top Left: South elevationMilddle Left: West elevationLeft: East elevationFacing: North elevation
1
2
Museum of Culture, Fine Arts and Science, Changchun
Location: Changchun, China Designer: gmp Architekten Completion Date: 2010 Construction Area:
107,500m2 Photographer: Marcus Bredt
134 - 135
Above Left: Site planLeft: Overview
East elevation
South elevation
West elevation
North elevation
138 - 139
Ground Floor Plan:1. Main entrance2. Lobby3. Museum forum4. Lecture hall5. Exhibition6. Museum for science7. Control room/office/security8. Security9. Public education
1
2
3
4
5
6
7
8
5
5
5
5
5
5
4
2
9
4
Location: Sacramento, California, USA Designer: Gwathmey Siegel & Associates Architects (GSAA)
Completion Date: 2010 Site Area: 1,188m2 Photographer: Bruce Damonte
Crocker Art Museum
140 - 141
Above: Exterior rendering
Recommended