THE ITALIAN ERTMS EXPERIENCE
UIC ERTMS Conference – Bern
Sep 2007
2UIC ERTMS Conference – Bern September 2007
RFI
RETE FERROVIARIA ITALIANA
ITALIAN INFRASTRUCTURE MANAGER
Main tasks:
1) To manage the railway network in accordance with national and Europeanrules
2) To ensure and assess railway safety at system level
3) To assess characteristics of the railwayundertakings
4) To propose and issue rules and regulationsfor railway operations
3 UIC ERTMS Conference – Bern September 2007
1. ETCS implementation: interoperability choices (GSM-R coverage of the HS and CR network, ETCS Level 2 on high-speed lines, SCMT as prefitted ETCS Level 1 on conventional main lines and nodes, rolling stock equipped accordingly)
2. First experience with ETCS Level 2 on the Rome-Naples high-speed line and Novara-Torino in commercial operation (solved and unsolved problems on both infrastructure and rolling stock) – Main lesson learnt – Certification and Assessment
3. Extension of SCMT towards ETCS Level 1 on corridors linking up with Europe (adding standard ETCS features to track-side SCMT: consequences for balise configuration, how to resolve the infill issue – the proposed radio infill solution)
Italian strategy for ERTMS/ETCS implementationItalian strategy for ERTMS/ETCS implementation
Main pMain phaseshases and and relatedrelated basic basic elementselements
4UIC ERTMS Conference – Bern September 2007
NAPOLI
ROMA
Padova
VENEZIA
GENOVA
TORINO
Novara
BOLOGNA
FIRENZE
MILANO
Verona Corridor B
Corridor D
Corridor A – 1st phase
Corridor A – 2nd phase (The belt line south of Milan)
Parigi Parigi -- LioneLione
SempioneSempioneGottardoGottardo
BrenneroBrennero
LubianaLubiana
Domodossola LuinoChiasso
Bolzano
TRIESTE
HS network in progress 2008: Milano - Bologna (182 km)2009: Bologna - Firenze (78 km) 2009: Novara - Milano (34 km)2011: Firenze - Roma (260 Km)2013: Milano - Verona (112 km) 2013: Padova - Mestre (25 km) 2013: Verona - Padova (77 km) 2013: Terzo Valico (52 Km)
HS network - 20072005: Roma - Napoli (204 Km) 2006: Torino - Novara (91 Km)
Interoperable corridors in ItalyCorridor A Rotterdam - Genova (1st phase) 230 kmCorridor A Rotterdam - Genova (2nd phase) 290 kmCorridor B Stockholm - Napoli 978 kmCorridor D Valencia - Budapest 674 km
About 3 285 km of interoperable network (20% of total RFI network = 16 850 km)
(100% HS/HC net (1 115 km)) + 14% (2 170 km / 15 750 km) (100% HS/HC net (1 115 km)) + 14% (2 170 km / 15 750 km) CR network: corridors A,B,D)CR network: corridors A,B,D)
Scenario 2015Scenario 2015
The RFI Interoperable NetworkHS/HC Lines + interoperable corridors A,B,D
5 UIC ERTMS Conference – Bern September 2007
Main technological innovations adopted by RFI
1.1. ERTMS/ETCSERTMS/ETCS
2.2. GSMGSM--RR
3.3. COMPUTER CONTROLLED COMPUTER CONTROLLED INTERLOCKINGSINTERLOCKINGS (ACC)(ACC)
4.4. INTEGRATED MULTIFUNCTION INTEGRATED MULTIFUNCTION DIAGNOSTICS TRAINDIAGNOSTICS TRAIN
5.5. PHYSICALPHYSICAL AND FUNCTIONAL TECHNOLOGY INTEGRATIONAND FUNCTIONAL TECHNOLOGY INTEGRATION
6.6. ITALIAN HSLITALIAN HSL PERFORMANCESPERFORMANCES
7.7. OVERALL OVERALL RFIRFI INVESTMENTS IN TECHNOLOGY INVESTMENTS IN TECHNOLOGY
6 UIC ERTMS Conference – Bern September 2007
System System life cyclelife cycleSystem Definition andApplication Conditions
Risk Analysis
System Requirements
Apportionment ofSystem Requirements
Design andImplementation
Manufacture
Installation
System Validation(Including Safety Acceptance
and Commissioning)
System Acceptance
Operation andMaintenance
PerformanceMonitoring
Modificationand Retrofit
De-commissioningand Disposal
Re-apply Lifecycle(See Note 1)
14
131112
10
9
8
7
6
5
4
3
2
Concept 1
( See Note 2)Re-apply Risk Analysis
RFI
RFI
Manufacturer and/orThird Party
7 UIC ERTMS Conference – Bern September 2007
EERTMS/ETCS on RTMS/ETCS on HS / HC: the BenefitsHS / HC: the Benefits
Less environmental impact than road, equivalent to the discharge of a city with 220 thousand inhabitants (e.g. Perugia+Treviso) and consumption and emissions of a 102 MW power station (1.3% of Italy’s domestic power consumption).
TransportatiTransportationon
EnvironmentEnvironment
Doubles available capacity on the routeEstimated traffic in 2015 on the vertical axis – 35 million passengers and10 million tonnes of freightExisting lines dedicated to freight transport and local and urban transportRegional rail services redesigned and completion of large rail hubs
8 UIC ERTMS Conference – Bern September 2007
(DMI SCMT Separato in prima fase)
The OnThe On--Board SubBoard Sub--SystemSystem
9 UIC ERTMS Conference – Bern September 2007
The OnThe On--Board SubBoard Sub--System ERTMS/ETCS+STM System ERTMS/ETCS+STM (integrated architecture)(integrated architecture)
Sistema di protezione
e controllo
Sistema di Misurae visualizzazione di
velocità
Sistema di controllopresenza
e vigilanza del personaledi condotta
Sistema di Registrazione
Sotto - Sistema diInterfacciameto alMateriale Rotabile
Sotto - Sistema diInterfacciamento
al SST
Sotto - Sistema di Elaborazione
Sotto - Sistema diInterfacciamento al
Personale di Condotta
GT GT
Antenna X CdB
Antenna X
AntennaX CdB
Antenna
JRU
DMI
ERTMS
Sistema di ausilio
alla condotta
Organi
di
rilevamentoMobile
MMI
Radio
Supporto di registrazione
ORGANI TRENO ORGANI TRENO
AntennaPer PI
AntennaPer PI
VisualizzazioniNazionali
Radar
Modulo Euroradio
STMX
STM Y STM
SCMTEVC
SISTEMII TRENO
SISTEMITRENO
10 UIC ERTMS Conference – Bern September 2007
DISTRIBUTED ARCHITECTURE OF THEDISTRIBUTED ARCHITECTURE OF THECOMPUTERCOMPUTER--CONTROLLED INTERLOCKINGCONTROLLED INTERLOCKING
Architecture adopted for the newArchitecture adopted for the new ItalianItalian highhigh--speedspeed lineslinesMilanoMilano--BolognaBologna--FirenzeFirenze
LL
PJ
LAV
PTPM
RBC
TLC-LD per SCC + Fibra Ottica
LLPC
BTS
TrainPosition Movement
Authority
Eurobalise
GSM-R
SCC NVC
nPP nPP nPP nPP
CENTRALISED SUPERVISION ROOMCOMMAND AND CONTROL - RADIO BLOCK CENTRE - CENTRAL INTERLOCKING COMPUTER
SDH FIBRE OPTIC BACKBONE
SINGLE IXL PERIPHERAL UNITS
11 UIC ERTMS Conference – Bern September 2007
SCC
QL RBCTD
GSM-R
ERTMS/ETCS HIGH SPEED LINE CONTROL ROOM – ROMA-NAPOLI
12 UIC ERTMS Conference – Bern September 2007
ERTMS/ETCS HIGH SPEED LINE CONTROL ROOM – TORINO-NOVARA
13 UIC ERTMS Conference – Bern September 2007
RBC OPERATOR INTERFACE
GE
A
Unità ventole
Unità diagnostica
QLv2 (1)QLv1(1)Vnv
KDI DVC
IPA
Cestello VMMI-HSL(armadio elaborazione)
RBC1RBC2RBC3 RBC1RBC2RBC3
Arresti di EmMenù Principale
Arresti di EmMessaggi di TTacitaz Suon
RBC EducatioTabelle
Rallentam Pun Rallentam Pre
OpzioniLogout
Modo operativo
FS21 53 4
01 5Numero Treno
Testa del Treno
Coda del Treno
Velocità
ID RBC ID Treno Stato Data Operatore
1 RBC1 12345 CONFERMATO 13/02/2004 08:05:52 3267
2 RBC2 56789 ATTESA 13/02/2004 08:55:24 3267
3 RBC2 08765 CONFERMATO 13/02/2004 09:28:32 3267
4 RBC1 25625 REVOCATO 13/02/2004 10:56:12 3267
5 RBC3 14881 CONFERMATO 15/02/2004 08:35:06 1294
6 RBC3 06654 CONFERMATO 15/02/2004 08:52:58 1294
7 RBC1 01888 CANCELLATO 15/02/2004 10:55:05 1294
8 RBC1 63999 ATTESA REV 15/02/2004 13:55:58 1294
9 RBC1 22233 CONFERMATO 15/02/2004 14:26:01 1294
Rallentamenti o emergenzeai treni via radio dal centro
TastieraIcona treno
MovementAuthority
Fine sezione
FineSezione
prima PdS
14 UIC ERTMS Conference – Bern September 2007
E404 PLT R1 R2 R3 R4 R5 R6 R7 R8 E404 PL
On-board sub-system diagnostics:
SIGNALLING: ERTMS – GSMR –SCMT & BACC
INFRASTRUCTURE: gaugemeasurement
Dynamic measurements: bogieaccelerations, measurement of Q and Y forces
Pantograph-catenary interaction
Integrated Multifunction Diagnostics TrainIntegrated Multifunction Diagnostics Train
15 UIC ERTMS Conference – Bern September 2007
Technology Technology -- IntegrationIntegration
Integration of National Regulations with
ERTMS Rules
SST - SSB
SST SSB GSM-R
Safety Case forSupplier Integration
at System Level
ASF
AF
AF
ALS
ETCS ETCS –– SCMTSCMTIXL IXL –– RBCRBCRBC RBC –– CTCCTCIXL IXL –– Track circuitTrack circuit
ETCS ETCS –– SCMTSCMT
EVC EVC -- STMSTM
EVC EVC -- TRAINTRAIN
NORTELNORTEL
SIEMENSSIEMENS
16 UIC ERTMS Conference – Bern September 2007
SubSub--System Release CertificationSystem Release Certificationfor Commercial Operationfor Commercial Operation
Radio Block Centre
7 software releases
N
BC
a
10 software releases
17 UIC ERTMS Conference – Bern September 2007
SubSub--System Release CertificationSystem Release Certificationfor Commercial Operationfor Commercial Operation
ERTMS/ETCS On-Board Sub-System
ERTMS/ETCS stand-alone
ETR 485
ERTMS/ETCS + STM (integrated)
ETR 500 ETR 600 ETR 610
ERTMS/ETCS + STM (external)
ETR 500
ERTMS/ETCS + STM (external)ERTMS/ETCS + STM (integrated)
ETR 402 ETR 403
ETR 500 Brand AV
ETR 600 “New Pendolino “
ETR 485
ETR 470
ETR 470
60 trains
30trains
15trains
15trains
=120 trains
18 UIC ERTMS Conference – Bern September 2007
System Integration: aSystem Integration: achievingchieving compatibility between compatibility between Nortel and Siemens GSMNortel and Siemens GSM--R constituentsR constituents
Salone
GricignanoRoma
Working withBTS SIEMENS
NapoliWorking with
BTS SIEMENSBTS SIEMENSAV/AC Roma-Napoli Working with
BTS NORTELBTS NORTEL
MSC
SR11.0
NSS CoreNSS Core
Linea Storica
Siemens
BSSBSS
VMS
SMSCHLRi
IN
Billing
SGSN
GGSNInterception
OTA
TRAU
BTS
GPRS
Tratta AC/AV Roma Napoli
NortelNetworks
IN
SMSC
Interfaccia A
BTS
BSC
BTS
TRAU
BTSBSS
BR7.0
/SR11.0
V15R.1BSC
BTSBTSBSS
TRAU
MSC
V12R.0
4
Roma Tuscolana
MSCHLR
NUOVO
BSS Nortel
AbisBSC
BTSBTS
BTSBTS
RBC
Test Plant – PCS Roma T.ni
SIEMENS – NortelNetworks
BSS Nortel
RBC
Radio Block Centre
MSC Siemens LS
Pre-ese
rcizio
BTS di migrazione
MSC Siemens
19 UIC ERTMS Conference – Bern September 2007
GRASS (GRASS (GGSMSM--R R RRisk isk ASSASSessmentessment))
OUT OF
SERVICE
NOMINAL
SERVICE
10-5
10-4
10-3
10-2
10-1
100
Aver
age
BER
40353025201510Es/N0
A research project has beenA research project has beencarried out into the possible causes of carried out into the possible causes of GSMGSM--R system degradation, theR system degradation, therelated risks and possible means of related risks and possible means of mitigationmitigation.
20 UIC ERTMS Conference – Bern September 2007
ITALIAN HIGH SPEED LINES IN OPERATION SINCE DEC 2005ITALIAN HIGH SPEED LINES IN OPERATION SINCE DEC 2005
ROMAROMA--NAPOLINAPOLI
30 30 trains per daytrains per day
96% on time 96% on time (within 5')(within 5')
98%98% ERTMS/ETCS ERTMS/ETCS onlyonly
TORINOTORINO--NOVARANOVARA
16 16 trains per daytrains per day
96% on time 96% on time (within 5')(within 5')
98%98% ERTMS/ETCS ERTMS/ETCS onlyonly
PERFORMANCE RECORDPERFORMANCE RECORD
OverallOverall distancedistance runrun2 2 millionmillion kmkm
ERTMS (ETCS+GSM-R) DIRECT CAUSE OF DELAY
IN LESS THAN 2% IN LESS THAN 2% OF CASESOF CASES
21 UIC ERTMS Conference – Bern September 2007
PunctualityPunctualityReliability targets: • All HS rolling stock to be in class traction A+• Critical breakdown / Mkm = 7 (tgt ‘06: 8) • Repairable breakdown / Mkm = 93 (tgt ’06: 110)
Punctuality targets: • 95% of trains on time (tol.: 5’)
Punctuality HS Rome - Naples - Year 2006
86,25%
97,32%98,65%
97,49%
94,35%95,36%
96,37%
93,48% 94,03%
96,17% 96,38%95,58%
97,57%
80,00%
85,00%
90,00%
95,00%
100,00%
Gen
naio
Febb
raio
Mar
zo
Apr
ile
Mag
gio
Giu
gno
Lugl
io
Ago
sto
Sette
mbr
e
Otto
bre
Nov
embr
e
Dic
embr
e
Gen
naio
2007
% Result Target
22 UIC ERTMS Conference – Bern September 2007
Market Share on RMMarket Share on RM--NA routeNA route
Local; 1.000; 5%
IC; 2.100; 11%
ES; 4.000; 21%
Air: 150; 1%
Others: 1.200; 6%
Car:10.900; 56%
NAPLES NAPLES –– ROME (2005)ROME (2005) NAPLES NAPLES –– ROME (2006)ROME (2006)
ES; 3.400; 17%
IC; 2.700; 14%
Local: 1.100; 6%Car: 9.300;
46%
Air: 150; 1%
HS; 2000; 10%
Others: 1.200; 6%
The launch of our first 4 pairs of trains togetherwith the oil price shift in mid-2006, increased ourtotal modal market share by 10 pp.
The market share of High Speed trains is about10%, of which 4 pp are taken from ES standard trains.
The total market increased altogether by 2%
Analysis date: July ‘06. Update in progress
Total Total TrainTrain Market Share Market Share (after(after 7 7 months)months)
47% (+10 47% (+10 pppp))
23 UIC ERTMS Conference – Bern September 2007
A
C
B
D E
F
G
H
D
Inserzione del SSB
Ingresso in ERTMS/ETCS L2
Gestione itinerari
POC
POC
Uscita da ERTMS/ETCS L2
Hand Over RBC
Cambio Fase attivo
Legenda
Marcia in FS con EoA su segnale virtuale chiuso di PdS(TSR a 90km/h)
Grafico dei Dati da Log di RBC1,2,3
=
RBC 1 RBC 2 RBC 3RBC 2
Velo
cità
Gra
dien
te(°
/ °°)
Posti di servizio e tempo di passaggio
Performance Performance MonitoringMonitoring
24 UIC ERTMS Conference – Bern September 2007
Overall trackside signalling sys maintenanceevents/operation year 2006 (excluding ETCS)
Power supply 3Base Transmission Stations 4Track Circuit 14Hot Box Detectors 14Switches 5GSM-R 2Centralised Traffic Control 1
Maintenance Data from ItalianMaintenance Data from Italian High High SpeedSpeed / High / High CapacityCapacity LinesLines
Maximum Permitted Unavailability at System Levelless than 8’ (RFI Requirements):
C O N F I R M E Dby the data collected from the overall ERTMS/ETCS signalling system
Results fromexperience withERTMS operation
System availability stabilised by the proper ‘tuning’ of GSM-R and ETCS configuration parameters
Improved knowledge of the management of downgraded modesfor both drivers and trackside RBC and IXL managers
Technical and functional integrationamong several ERTMS suppliersachieved
Recommended