THE I-75 DAYTON THE I-75 DAYTON RECONSTRUCTIONRECONSTRUCTION

I-75 RECONSTRUCTIONI-75 RECONSTRUCTION

THREE MAJOR PROJECTS TOTHREE MAJOR PROJECTS TO RECONSTRUCT I-75 BETWEEN SR 4 RECONSTRUCT I-75 BETWEEN SR 4 AND US 35AND US 35 ADD 1 LANE EACH DIRECTION; ADD 1 LANE EACH DIRECTION; REDUCE NB 90 DEGREE CURVE;REDUCE NB 90 DEGREE CURVE; REDUCE NO. OF RAMPSREDUCE NO. OF RAMPS PHASE 1A SPRING 2007 – FALL 2009PHASE 1A SPRING 2007 – FALL 2009 PHASE 1B SPRING 2008 – FALL 2009PHASE 1B SPRING 2008 – FALL 2009 PHASE 2 SPRING 2011 – FALL 2013PHASE 2 SPRING 2011 – FALL 2013

I-75 IN DOWNTOWNI-75 IN DOWNTOWNDAYTONDAYTON

PHASES 1A, 1B, 2PHASES 1A, 1B, 2

US 35US 35

SR 4SR 4

1B

2

1A

SYSTEM CONFIGURATIONSYSTEM CONFIGURATION

2 DYNAMIC MESSAGE SIGNS2 DYNAMIC MESSAGE SIGNS 7 CCTV CAMERAS / VEHICLE7 CCTV CAMERAS / VEHICLE DETECTION STATIONSDETECTION STATIONS 4 HIGHWAY ADVISORY RADIOS4 HIGHWAY ADVISORY RADIOS 2 CCTV INSTALLED ON ROOF OF2 CCTV INSTALLED ON ROOF OF MONTGOMERY COUNTY BUILDINGMONTGOMERY COUNTY BUILDING

FEATURESFEATURES

MOST DEVICES INSTALLED ON MOST DEVICES INSTALLED ON TEMPORARY BASISTEMPORARY BASIS WIRELESS COMMUNICATIONS FORWIRELESS COMMUNICATIONS FOR ALL DEVICESALL DEVICES ONLY DMS WILL BE PERMANENTONLY DMS WILL BE PERMANENT WEEKDAY/DAYTIME CONTROL FROMWEEKDAY/DAYTIME CONTROL FROM D7 OFFICE IN VANDALIAD7 OFFICE IN VANDALIA NIGHTTIME/WEEKEND CONTROLNIGHTTIME/WEEKEND CONTROL FROM ARTIMISFROM ARTIMIS

TRAFFICTRAFFICMANAGEMENTMANAGEMENTCENTERCENTER

CCTV LOCATIONSCCTV LOCATIONS

CAMERAS ONCAMERAS ONROOF OF THEROOF OF THEMONTGOMERYMONTGOMERYCOUNTYCOUNTYBUILDINGBUILDING

DYNAMICDYNAMICMESSAGEMESSAGESIGNSSIGNS

HAR LOCATIONSHAR LOCATIONS

TRAVEL TIME WILL BE ACQUIREDTRAVEL TIME WILL BE ACQUIREDFOR AN 8-MILE SECTIONFOR AN 8-MILE SECTIONENCOMPASSING THE WORK ENCOMPASSING THE WORK ZONES OF ALL 3 CONSTRUCTION ZONES OF ALL 3 CONSTRUCTION PHASESPHASES

CALCULATION BASED UPON CALCULATION BASED UPON EITHER LICENSE PLATE READERS EITHER LICENSE PLATE READERS OR CELLULAR PHONE TRACKINGOR CELLULAR PHONE TRACKING

OPPORTUNITIES TO LEVERAGEOPPORTUNITIES TO LEVERAGEINFRASTRUCTUREINFRASTRUCTURE

IN SUMMARY:IN SUMMARY:

EARLY DEPLOYMENT OF PORTIONEARLY DEPLOYMENT OF PORTION OF REGIONAL FMSOF REGIONAL FMS

MAINTENANCE OF TRAFFICMAINTENANCE OF TRAFFIC

LEVERAGE INFRASTRUCTURELEVERAGE INFRASTRUCTURE FROM PLANNED ROADWAY PROJECTSFROM PLANNED ROADWAY PROJECTS