1.1
1.2
1.3
Scope
The scopepacking, locontrol Syconduits, csections ocommissio Name of c Name of t
Project Sit
Bill of Qu
LOA BBB.II.ABB.II.A
Venplet
Specific te
i) A fully coperatiosystemsThe Buil• Air• Ven• Fire• Sta• Illu
ii) The scopware) fotem, Va
Scope, Q
e of work incoading at wystem (BMSconnector, inf this specificoning& testin
customer:
the project:
te:
antities
BOQ REF. .31.5 .31.4
dor shall proe functionali
echnical r
computerizeon of the mes as detailed ding manage‐conditioninntilation syste fighting ation water sumination sys
pe of work sor synchronizlve hall vent
±800KV, 6
Quantities
ludes designworks, transpS & ACS)inclnterface equication to Agrng of a fully fu
Power Gr
±800KV, 6Interconn
Agra (AG)
ITBuilding MAccess con
ovide detaileity of the spe
requireme
d and automechanical syin section 1 ement Systemg System tem for valve
storage and sstem
shall cover azing/integratilation syste
6000MW, H
Building M
2
SECTI
s & Specif
n, manufactuportation to luding all thipments etc.)ra site. The sunctionalBM
rid Corporati
6000 MW, HVector‐I Proje
TEM DESCRIPanagement strol system (
ed bill of quaecification.
ents
matic Buildinstems servin& 2 of this spm shall cover
e hall & DC H
supply
ll necessary ting the BMSm and Fire D
HVDC MULTIN
ManagemenDoc
ION‐1 fic Technic
ring, assembsite of Buil
he required ) as mentionscope of worMS & ACSat Ag
ion of India
VDC Multi‐Tect
PTION system (BMS(ACS)
ntity (definin
ng Managemng the valvepecification.r the followin
Hall
system provS with the coDetection & F
TI-TERMINNTERCONN
t System& A. No. : TB-3
cal Requir
bly, testing blding Managequipments ed in this secrk also includgra site.
Ltd (POWER
Terminal NER
QUAS) 1 L
1 L
ng 1 LOT) req
ment System hall and se ng services:
visions (incluontrol panelsFire Alarm Sy
NAL NER/ERNECTOR-I
Access Con343-558-03
rements
before supplygement systand access
ction and in vdes complete
RGRID)
R/ER–NR/WR
NTITY LOT LOT
quired meet
(BMS) shallrvice buildin
uding hardwas of Air Condystem.
R – NR/WR PROJECT
trol System34A Rev. 02
y, inspection,tem& accesssories (cable,various othere Installation,
R
ing the com‐
l control theng and other
are and soft‐ditioning sys‐
R T
m2
, s , r ,
‐
e r
‐‐
1.4 The the site
1.5
iii) Monitor
Fire Wat
iv) Control tem.
v) Control
vi) Control
vii) All cableon the la
viii) The equin EHV e
ix) The ConChilled use of p
x) The BMS
Test Requ
vendorshallspecificationrespectively
i) Completii) System
Documen
• Detaileditem
• Technica• Clause‐w• Test cer• Referen
for at le
ring of Fire Fter Tanks etc
(Alarm ackn
and Monitor
& monitorin
es shall be suaying length,
uipments andenvironment
ntrol and MoWater Pumpprogrammab
S & ACS syst
uirement
submit a FAn for Powergy.
te operatingcommissioni
nts to be p
d BOQ to me
al datasheetwise compliatificates as pce list of theeast 2 years.
±800KV, 6
Fighting Systec.
nowledge, re
ring of Utility
ng of illumina
upplied as p, signal loss d
d cables instat which is pro
onitoring of ps, AHU's, vble controller
tem shall be
AT (factory agrid/ BHEL a
and mainteing and acce
provided b
eet the requ
/Catalogues/ance per relevant e Projects wh
6000MW, H
Building M
3
ems includin
eset & test)&
y Services i.e
ation system
er the relevadue to long l
alled in the vone to variou
all Air‐condvalve hall prrs.
expandable
acceptance teapproval tha
nance manueptance tests
by bidder
irement of s
/brochures o
standards here similar
HVDC MULTIN
ManagemenDoc
ng Fire Spray
& monitoring
e. Water Stor
.
ant IEC/IS anength and e
valve hall andus signal inte
ditioning Systressurization
e type.
est) & SAT (sat will be use
uals and trains as specified
with quo
specification
of the item
equipment f
TI-TERMINNTERCONN
t System& A. No. : TB-3
and Hydran
g of fire dete
rage and Sup
nd selection nvironment.
d DC hall shaerference.
tems includin Fans, moto
site acceptaned during in
ning of O&Md in site acce
tation
with make,
for similar a
NAL NER/ERNECTOR-I
Access Con343-558-03
nt systems, w
ection and fir
pply.
of cables sh.
all be suitabl
ing Chillers, orized damp
nce test) plaspection at
personnel. ptance test (
model& qu
application is
R – NR/WR PROJECT
trol System34A Rev. 02
water level in
re alarm sys‐
hall be based
e to operate
Condensers,pers, etc. by
an complyingworks &and
(SAT) plan.
antity of the
s being used
R T
m2
n
‐
d
e
, y
g d
e
d 01
01
01
1.6
1.7
1.7.
1.7.
Drawing/ • Vendor
routing.• Cable sc• All BOQ
to be su• Cables s
shall be • Vendor
tionality• Submiss• Operatio
ENVIRON Design para 1. Indoor w
For nonappabov
Ma
Mi
Ma
Mi 2. Control
Durioutdincr MaxMinMax
/Documen
shall submit chedule for ritems makepplied as peshall be type witnessed bshall submity of all the BOsion of Site aon & mainte
NMENT
meters for i
with control
normal oper‐operation slication durive 60%.
aximum tem
nimum temp
aximum relat
nimum relat
cabinets in
ing the non‐door applicaease above 6
ximum tempimum tempeximum relati
±800KV, 6
nt Require
t a layout dra
espective sye & model, dr Powergrid tested in ac
by Powergridt a detailed FOQ items. Thcceptance tenance manu
ndoor equip
led environm
rating conditstate of the ng shorter ti
perature
perature
tive humidity
tive humidity
control room
operation sttion during s60%.
erature erature ve humidity
6000MW, H
Building M
4
ement in t
awing indica
ystems as peratasheets shapproved vecordance wi/BHEL and rFactory accephe FAT shall best plan for aual meeting c
pment (as pe
ment
tions the relastation, theimes and the
°
°
y %
y %
m
tate of the stshorter time
°°
%
HVDC MULTIN
ManagemenDoc
the event
ating the sco
r section 2.hall be approendor list. th the relevaeport to be aptance test (be approvedapproval. customer spe
er document
ative humidit temperaturen the maxim
Var
C 60
C 5
% 60
% 10
tation, the tees, and then
°C 5°C 5% 6
TI-TERMINNTERCONN
t System& A. No. : TB-3
of order
pe of work a
oved by Pow
ant standardapproved be(FAT) plan tod by Powergr
ecification &
t 1JNL100122
ty is 50% in tres may be mum relative
alve Hall rea 0
0
0
emperaturesthe maximu
55 5 60
NAL NER/ERNECTOR-I
Access Con343-558-03
along with ca
wergrid. Cable
ds (IS/IEC). Thefore supply.o verify the qrid.
& application
2‐145 Rev 04
the valve halas specified e humidity m
Indoor Dhall 50
5
60
10
s may be as m relative h
R – NR/WR PROJECT
trol System34A Rev. 02
able/conduit
e & conduits
he type tests quality, func‐
.
4)
ll. During thefor outdoor
may increase
DC Other Area 40
5
60
‐‐
specified forumidity may
R T
m2
t
s
s
‐
e r e
r y
1.7.
1.7.4
3. Indoor w
MaxMax(dryMin
4. Outdoo
without con
ximum tempximum 24 h ay bulb) imum tempe
r environme
±800KV, 6
trolled envir
erature (dryaverage tem
erature (dry
ent informat
6000MW, H
Building M
5
ronment
y bulb) °mperature
°
bulb) °
tion will be a
HVDC MULTIN
ManagemenDoc
°C 6
°C 6
°C 5
as per Sectio
TI-TERMINNTERCONN
t System& A. No. : TB-3
60 60
5
on 3.
NAL NER/ERNECTOR-I
Access Con343-558-03
R – NR/WR PROJECT
trol System34A Rev. 02
R T
m2
01
2.1
Building m
2.1.1. The Buible an• • •
2.1.2. The in• •
•
•
2.1.3. The Cotercon
a) A Cefacein vopegeneeratdisk•
• • • •
b) BMSThiscontof st
managem
uilding Manand expandab Building LaySystem topoLine diagram
ntegration ofMonitoring Alarm/Malfupeated at BMIn the evenfloors and cDuct DampeIn the eventto help in ev ontractor shnnecting wirientral procee with the coarious areasrator's contreration, histtors control sk) with latest Colored TFTprinter, ExteWindows XPMultimedia Two sets of Following pwith VPS (Vi‐ CPU of B
S outstationss outstation trol paramettand alone o
±800KV, 6
Equ
ment syste
agement Sysble. The BMSyout and Floology, pipingms, bar chart
f the fire Alarof status of eunctioning cMS control pnt of fire alacontrol otheers. t of fire, Secuvacuation an
hall be respoings/cablingsssing unit (Control, monits covered in rol shall provorical data sshall includeconfiguratio
T 22” monitoernal USB 2.0P Prof. or latesoftware anAnti‐ virus Sports/video oideo projectiBMS: 2 Nos.
s at the varioshall provideter dictated operation in
6000MW, H
Building M
6
SECTIO
uipment S
m
stem shall beS software shor plans g and duct wots, pie charts
rm System weach detectoconditions repanel. arm. BMS wer floors to m
ured doors (pd also to avo
nsible for sus of: CPU) locatedtoring and otthe BMS. T
vide for overtorage and r the latest Pon available ir, cordless k0 DVD writerest operatingd hardwareoftware withoutputs alonion System) a DVI‐D port
ous locationse the interfavia the centthe event o
HVDC MULTIN
ManagemenDoc
ON‐2 Specificat
e fully compuhall cover the
ork layout, p of consump
with BMS shaor by super ieported at fi
ould automminimize sm
provided witoid intruder
upply, install
d in the contther informaThe Central prall building retrieval, andentium PC (min the markeeyboard & cr and coloredg system ver
h license ng with suitare required
s: ace betweenral station Cof a BMS com
TI-TERMINNTERCONN
t System& A. No. : TB-3
ion
uterized, usee following:
plant symbolsption trends o
all include at mposing there system co
atically shutmoke hazard
th access conalarms on th
ation and co
trol room shation from thprocessing udata acquisid operator inmin 3.2 GHZet along withcordless opticd A4 Scannerrsion with lic
table cable d:
n the operatPU. Each oummunication
NAL NER/ERNECTOR-I
Access Con343-558-03
er friendly, m
s. of auxiliaries
least the fole same buildiontrol panel
tdown AHU'by closing
ntrol) would hese doors.
ommissionin
hall provide he MCC’s/paunit (CPU) oftion and tranterface. TheZ, 2GB RAM, h: cal mouse, cr cense
required for
ion of the ptstation shans failure. Th
R – NR/WR PROJECT
trol System34A Rev. 02
modular, flex‐
s.
lowing: ing layout. l shall be re‐
s in the firethe relevant
be disarmed
g with all in‐
a user inter‐anels locatedf the centransfer, reporte central op‐120 GB hard
colored Laser
r integration
lant and thell be capablehe Field Con‐
R T
m2
‐
‐
e t
d
‐
‐d l t ‐d
r
n
e e ‐
trollmoubase
2.1.4. Data c
2.1.5. Full do
2.1.6. The Baccura
2.1.7. I/O PO
The mlow. chang
A. I.
lers shall perunted comped controller
communicati
ocumentatio
MS shall proacy not to beTemperaturHumidity Pressure Flow
OINT SUMMA
minimum conThe quantitge/increase a
AIR‐MAI
a) CHIL(1W1)& servi
b) CHIL(2W(1W1) &servi
c) HEACIRC(1 fofor ring (
±800KV, 6
rform remotpletely self‐crs capable of
ions necessa
on for all soft
ovide stable e worse thanre 2 perce
4 perce 2 perce 3 perce
ARY FOR BM
ntrol & monitty/ No. of as per the re
CONDITIONIN SERVICE BLLERS: (2W+2
W+1SBY for op1W+1SBY foice building
LLED WA+2SBY)
W+1SBY for op 1W+1SBY foice building
DER CIRCUCUITS or operator rest of the m(AC‐2))
6000MW, H
Building M
7
e data acquicontained, ff stand alone
ary to affect a
tware provid
control of an: ent of sensorent of sensorent of sensorent of sensor
MS
toring requirequipment
espective doc
ING SYSTEMBUILDING (M2SBY) perator roomor rest of the(AC‐2))
ATER P
perator roomor rest of the(AC‐2))
UIT : 2 H
room (AC‐1main service
HVDC MULTIN
ManagemenDoc
isition and pfield prograe operation.
a BMS data t
ded.
ll connected
r span r span r span r span
red for the Bt mentionedcument/dra
M MSB)
m (AC‐e main
•••••••
•
•
UMPS:
m (AC‐e main
••
••
EADER
1) & 1 build‐
•
•
•
TI-TERMINNTERCONN
t System& A. No. : TB-3
rocess contrmmable, re
transmission
d systems wi
BMS is summd below arwing.
Chiller ‐ EnaChiller Run Chiller RefrFault AlarmCapacity CoChilled WatChiller Comtoring Individual Cture DifferentialIn & out Primary ChiPrimary ChiStart/Stop Primary ChiPump Manu Common ChTemperatuCommon ChTemperatuChilled Wat
NAL NER/ERNECTOR-I
Access Con343-558-03
rol. These sheal‐time mic
n system.
ith a closed
marized in thre indicative
able Status igerant Leak
ms ontrol ter Reset mpressor Curr
Chiller Supply
Pressure Ac
illed Water Pilled Water P
illed Water Pual Operatio
hilled Waterre hilled Waterre ter Flow Met
R – NR/WR PROJECT
trol System34A Rev. 02
all be locallycroprocessor
loop contro
e I/O list be‐e and may
k Alarm
rent Moni‐
y Tempera‐
cross Chiller
Pumps Pump
Pump Statuson Status
r Supply
r Return
ter
R T
m2
y r
l
‐y
01
01
01
02
II.
B.
C.
d) AIR H(1W1) &servi
e) EXPA(2 N
. ADDa) Pack
each
VENHALvalvetotatota
FIRE2 npum2 no2 no
±800KV, 6
HANDLING UW+1SBY for op 1W+1SBY foice building
ANSION TANOS.) DITIONAL SERkage AC unh ASB)
TILATION SYL& DC HALL:e hall/ DC hal 4 Valve hall 4 DC halls
E FIGHTING:nos. electrimps os. jockey pumos. diesel fire
6000MW, H
Building M
8
UNITS: 2W+2perator roomor rest of the(AC‐2))
NK
RVICE BUILDnits (1W+1SB
YSTEM FOR : 1W+1SBY Fall, ls
ical fire fi
mps fighting pum
HVDC MULTIN
ManagemenDoc
•
•2SBY m (AC‐e main
•••••••••
•
DING (ASB3 &BY for •
••
VALVE Fan per
•
•
•
•
••
•
••
ighting
mps
•
•••••
TI-TERMINNTERCONN
t System& A. No. : TB-3
DifferentialIn & out Outside Air AHU Start/sAHU Start/SAHU BloweAHU ManuaAHU Filter SAHU ReturnAHU modulAHU supplyAHU supply Chilled Wating
& ASB4) Start/Stop Trip/ Fault Return air Tty (RH) Fan start/sAir Fan) peFan Manua(1W+1SBY Svalve hall/Fan start/sAir Fan) peFan Manua(1W+1SBY Evalve hall/Heaters ONValve Hall/ Pressure(wTemperaturonment chinterfacing be providedMotorised dFilter dirty aElectrical Fitus Jockey PumDiesel fire fPressure in Sprinkler linFIRE ALARM
NAL NER/ERNECTOR-I
Access Con343-558-03
l Pressure Ac
Temperaturstop Low SpeStop High Spr Status al OperationStatus n Air Temperlate Chilled Wy air temperay air humidity
ter Low Leve
status Temperature
top (1W+1SBer valve hallal Operation Supply Air Fa/ DC hall top (1W+1SBer valve hallal Operation Exhaust Air / DC hall N/OFF DC hall diffe.r.t atmosphre & Humiditheck (free cowith MACH d) damper opealarm re Fighting P
mps status fighting pumHydrant linene flow statuM SYSTEM
R – NR/WR PROJECT
trol System34A Rev. 02
cross Chiller
re and RH eed peed
n Status
rature & RHWater Valveature y
el Monitor‐
e & humidi‐
BY Supply l/ DC hall Status an)per
BY Exhaust l/ DC hall Status Fan) per
erential here) ty: envi‐ntacts for 2 panel shal
n/close
Pumps sta‐
p status e us
R T
m2
l
01
01
01
02
W=WSBY=
D.
E.
I
IIIV
V
F.
G.
WORKING =STANDBY
ILLU
OTHI. 2 no
I. 2 no
I. 2 no
V. 2 nosTran
V. 1 noat mroof1 noat (ASB1 noat (ASBAIR RELA(1W12 N05 BUILGas
±800KV, 6
MINATION S
HER SERVICESos. tube well
os. domestic
os. Fire waters. (1W+1SBY)nsfer pumps
os. treated wmain servicf os. treated wAdditional B 3) roof os. treated wAdditional B 4) roof CONDITION
AY BUILDINGW+1SBY for eaNOS. ARB (ACNOS. FRB
LDING) Genset (CNG
6000MW, H
Building M
9
SYSTEM:
S: pumps
raw water p
r storage tanY) Treated wa
water storagce building
water storagservice bu
water storagservice bu
NING SYSTEG ach ARB/FRBC RELAY BUIL (FILTER
G)
HVDC MULTIN
ManagemenDoc
•
•••
pumps ••
nks •ater •
ge tank g(MSB)
ge tank uilding
ge tank uilding
•
•
•
EM IN
B) LDING) RELAY
••
•
TI-TERMINNTERCONN
t System& A. No. : TB-3
Controls anlumination rated centrbuilding Commandstion buildishould be gof the dayweather cooutside. Thof illuminatyard area sdistribution Tube well PTube well PTube well PStatus Domestic RDomestic RON/OFF Domestic Reration Sta3‐step level
Treated watusAll water stel indicatioIndicate Floof treated wFlow rate, Ttreated wa
TemperatuStart/ Stop
Gas Pressurline
NAL NER/ERNECTOR-I
Access Con343-558-03
nd commandsystem shalrally integratmanagemen for the lighing,outdoor given accordy and also aonditions anhe control &tion system shall be at Mn board level
Pumps statusPump ON/OFPump Manua
Raw water PuRaw water Pu
Raw water Matus l indication
ater Transfer
torage tanksn ow rate, TDSwater TDS & pH vaater High Ala
re in Relay b of aircondit
re indication
R – NR/WR PROJECT
trol System34A Rev. 02
ds for the il‐l be incorpo‐ted with thent systemhting of sta‐yard area
ding to timeaccording tod brightness&monitoringfor outdoor
Main lighting.
s FF al Operation
ump statusump
Manual Op‐
r Pump Sta‐
s 3‐step lev‐
S & pH value
alue of arm
building tioner
n in input
R T
m2
‐‐e . ‐a e o s g r g
n
e
01
01
01
01
01
02
02
01
2.2
Access Co Access Contdoors for thcontrol cardand it shoul(Guard Hut)access contrMain gate shtorisation ofThe ACS systDetails of ga
S. No. Loc1. Sta
2. Maen
3. Ma
4. Ading
5. Ading
ontrol Syst
trol includinhe control rods (50 Nos.),ld be possib). The man grol cards. hall be Doubf main gate ctem softwarates to be co
cation ation main ga
an gate fortry
ain service b
ditional serg‐pole 3
ditional serg‐pole 4
±800KV, 6
tem
g Motorisedoom building card readele to operatgate (for pers
ble leaf slidincomplete wite shall be insntrolled thro
ate
r personnel
uilding
rvice build‐
rvice build‐
6000MW, H
Building M
10
d Gate at thg including rs etc. shall e the gate fsonnel entry
ng type as peth all accessostalled on though Access
Type of doDouble lesliding typNext togate(min. single leafDouble lea
Double lea
Double lea
HVDC MULTIN
ManagemenDoc
he entrance provision ofbe providedfrom the cony) next to the
er gate drawories & functhe BMS contrcontrol syste
oor eaf,7 m wpe o the m
1.25m wf) af, hinged ty
af, hinged ty
af, hinged ty
TI-TERMINNTERCONN
t System& A. No. : TB-3
to the statif electromagd. The main ntrol room ae main gate
wing (gate suptionality is inrol station. em:
Operatide Motori
push bain ide
Accesscard wdoor lo
ype Accesscard wdoor lo
ype Accesscard wdoor lo
ype Accesscard wdoor lo
NAL NER/ERNECTOR-I
Access Con343-558-03
ion and for gnetic door lgate shall band from insshall be acce
pply in BHELn vendor’s sc
tion Qised with button.
1
s control with EM ocks
1
s control with EM ocks
2
s control with EM ocks
1
s control with EM ocks
1
R – NR/WR PROJECT
trol System34A Rev. 02
all entrancelocks, accessbe motorisedside the gateessible using
L scope). Mo‐cope.
Quantity1
1
2
1
1
R T
m2
e s d e g
‐
02
01
02
Plea
ase refer Doccument TB‐3
±800KV, 6
GENERAL
43‐316‐000
6000MW, H
Building M
11
SECTI
TECHNICA
for General
HVDC MULTIN
ManagemenDoc
ION‐3 AL REQUI
Technical Re
TI-TERMINNTERCONN
t System& A. No. : TB-3
REMENTS
equirements
NAL NER/ERNECTOR-I
Access Con343-558-03
S
.
R – NR/WR PROJECT
trol System34A Rev. 02
R T
m2
Recommended