STRUCTURAL ENGINEERS ASSOCIATION OF WASHINGTON€¦ · Image courtesy of One Reel. 6. 7 WATERFRONT...

Preview:

Citation preview

STRUCTURAL ENGINEERS ASSOCIATION OF WASHINGTONSeptember 26, 2017

1

Image courtesy of One Reel

6

7

WATERFRONT SEATTLE A NEW DESTINATION PARK

8

WATERFRONT SEATTLE PROGRAM

9

CONSTRUCTION SCHEDULE

7

SEAWALL

7

7

13

15

PROMENADE

16

17

PROMENADE

TIDELAND TERRACES

18

• The new Alaskan Way/Elliott Way surface street is a hard-working street that provides critical mobility for people and goods not provided by the SR99 tunnel

• Unlike the Viaduct, the SR99 Tunnel does not provide access to Downtown Seattle or to northwest Seattle via Elliott and Western Avenues. The new surface Alaskan Way is critical to the SR99 Tunnel – it serves those missing functions. The new street is particularly important for freight, transit and ferry traffic, as well as providing local access to waterfront businesses and properties.

WHY IS THE NEW ALASKAN WAY/ELLIOTT WAY IMPORTANT?

Existing SR 99 Traffic

Patterns

3 times current traffic volume

2 times current traffic volume

STREET DESIGN TRAFFIC CONSIDERATIONS2030 AVERAGE DAILY TRAFFIC

TRANSIT: SW TRANSIT PATHWAY

VEHICLES, PARKING AND LOADING

NORTH/SOUTH BICYCLE AND PEDESTRIAN MOVEMENT

FERRIES: LOADING AND UNLOADING

STREET DESIGNFUNCTIONS OF THE STREET

23

ALASKAN WAYS KING ST – YESLER ST

ALASKAN WAY INTERSECTION

24

ALASKAN WAY INTERSECTION AND PERGOLA RESTORATION

25

PIONEER SQUARE

COLMAN DOCK / TRANSIT HUB & MARION ST PROJECT AREA

27

INTERSECTIONS

28

29

TERRACES

30

MARION STREET BRIDGE CONCEPT

31

ALASKAN WAY PIKE – PINE ST

MARKETFRONT

Source: Barbie Hull, courtesy of Pike Place Market PDA32

33

OVERLOOK WALK UPDATE

34

OVERLOOK WALK

35

OVERLOOK WALK

36

PINE ST CONNECTION

37

ELLIOTT WAY BRIDGE

ELLIOTT WAY AND WESTERN AVE

38

39

PIER 62/63 REBUILDPRESENT

40

PIER 62/63 REBUILD

41

PIER 62/63 REBUILDFUTURE

42

PIER 62/63 REBUILDFUTURE

Public

• City Departments

– Office of the Waterfront

– SDOT

– Parks

– SPU/City Light

• WSDOT

• Port of Seattle

• King County Metro

• Tribes

Private/Non-Profit

• Central Waterfront Committee• Friends of Waterfront Seattle• Seattle Aquarium• Pike Place Market• Historic Pier Owners • Downtown Seattle Association• Building Owners and Managers

Association (BOMA)• Chamber of Commerce• Seattle Parks Foundation• Development Community• Alliance for Pioneer Square• Neighborhood Orgs

43

KEY PLAYERS

44

BUDGET

45

FUNDING

• Bertha emerges (April)

• Concept design for Pike and Pine Streets (May)

• ‘MarketFront’ opens (June)

• Council action on funding and LID (September)

• Council action to advance management partnership with Friends of Waterfront Seattle (September)

• 90% design complete for Main Corridor – Alaskan and Elliott Ways, Columbia and Seneca Streets, Lenora Street Bridge (October)

• Pier 62 rebuild starts (November)

• Washington St Boat Landing reinstall complete (December)

46

2017 MILESTONES

47

QUESTIONS?

48

VISIT WATERFRONTSEATTLE.ORG OR CONTACT US WITH QUESTIONS!

Recommended