Stone or Specialty Sidewalk - Excavation Limited REV: OCT

Preview:

Citation preview

NOTES:

1. Meter posts to be 2" Schedule 40 Galvanized Pipe (Per BTD Spec A104).

2. All meter posts to be 24" O.C. from the face of curb, except when

instructed by the Transportation Department.

3. Meter posts to be reamed inside and deburred outside on the top end.

4. Precaution should be taken so not to drill through any subterranean

obstacle such as a basement, areaway, or heated sidewalk.

DA

TE

: A

UG

. 2

3, 1

97

1

RE

V: N

OV

. 1

7, 1

98

2R

EV

: JU

L. 8

, 1

98

5R

EV

: A

PR

. 1

6, 1

98

6R

EV

: M

AR

. 2

8, 1

99

6R

EV

: O

CT

. 2

8, 2

01

4

An

ch

or ro

d

5

8

" d

ia

., 7

5

8

" lo

ng

, w

ith

ru

t a

nd

wa

sh

er (H

ilti [H

AS

-R

5

8

" x 8

"] o

r e

qu

al).

Drill 4

h

ole

s -

11

16

" x 5

" d

ee

p (m

in

.), fill w

ith

ep

oxy re

sin

(H

ilti [H

VU

5

8

" x 5

"] o

r e

qu

al).

Stone or Specialty Sidewalk - Excavation Limited

Recommended