View
219
Download
3
Category
Preview:
Citation preview
Questions? Contact us:24/7 phone: 403-212-0565 info@SWCRRproject.com SWCRRproject.com
Southwest Calgary Ring Road Segment 2: Glenmore Trail from 69th Street to 37th Street SW
2017 Construction Highlights • Construction of new eastbound lanes along
Highway 8 and Glenmore Trail
• Earthworks for the interchange south of Sarcee Trail
• Work at the Grey Eagle Resort & Casino to establish a new entrance/exit to Glenmore Trail
• Preparations for realignment of the Elbow River, including excavation of the new section of river channel, erosion control and planting of native vegetation
• Utility work along the length of the road segment
What to Expect in 2017• Periodic closures of access to Glenmore Trail from
45th Street SW
• Periodic lane closures and speed reductions: » 37th Street SW » Sarcee Trail SW » Highway 8 / Glenmore Trail SW
• Increased truck and equipment activity
69th S
t SW
Tsuut’ina Nation
Elbow River
Elbow RiverRealignment
Signal Hill
Wes
thill
s W
ay S
W
Westhills Shoppng
Centre
Sarc
ee T
rail
SW
Glamorgan
45th
St S
W
37th
St S
W
Glenmore Trail SW
Mount Royal University
Lincoln Park
Ric
hard
Rd
SW
North Glenmore
Lakeview
37th
St S
W
Wea
selh
ead R
d
Tsuut’ina Parkway
Grey Eagle Resort & Casino
Weaselhead/ Glenmore Park
Glenmore Trail SW
N
Grey Eagle
Dr
Richmond Rd SW
Storm Water Pond
Storm Water Pond
SWCRR & Ramps
SWCRR Bridges Existing Roads
Neighbourhoods
Public Centres
Waterways
Landscaping
Connection Upgrades Construction by Others
Traffic Lights
Transportation Utility CorridorGated Emergency Access
Road Closure
SWCRR Pedestrian Bridges SWCRR Roundabout
Recommended