The Azores Archipelago, Portugal is composed of nine volcanic islands situated in the middle of the North Atlantic Ocean, and is located about 1,500 km (930 mi) west from Lisbon and about 3,900 km (2,400 mi) east from the east coast of North America.
GRUPO EDA
Population: 246,746 inhabitants (2011 census)
Area: 2,346 km2 (906 sq mi)
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Azores Energy production - 2011
GRUPO EDA
Fuel - 61,5%
Diesel - 8,59%
Hydro -3,9%
Wind -3,9%
Geothermal – 22,1%
Others renewables - 0,01%
Year 2011
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Problem
Isolated electricity with "strong" wind power penetration
Power oscillations between the groups diesel / water and wind
Difficulty in controlling the grid frequency High/Sub loads for diesel generators
• Load shedding / power cuts
• Wear of mechanical equipment
• Further specific consumption (l / kWh)
• Large amounts of energy "rejected" Wind Park (kWh)
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
GRUPO EDA
Goal and Challenges – Renewable Energy
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
For stable power grid based on renewables Necessary: • Storage technologies • New control strategies
GRUPO EDA
ISLANDS CHALLENGE
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
In the European main land power grid instability related to the contribution of renewable energies is a challenge of TOMORROW.
Islands live this future challenge TODAY So Islands are the ideal platform to develop energy concepts of TODAY and TOMORROW
Project Background
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
First contact in Islenet conference
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Azores Island first visit
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Azores Island first visit
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Learning local reality– Graciosa Island, Azores
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Simulation, economic modulation and basic ideas for “Small Graciosa”
Cost of Electricity - Comparison
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1 3 5 7 9 11 13 15 17 19
€/kWh
hybrid total diesel indirect diesel direct
hybrid average diesel average
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
2008-2009
“Small Graciosa” Construction and commission
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Construction -Site test Berlim, Germany
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Battery Installation – Site test Berlim, Germany
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Equipment Installation – Site test Berlim, Germany
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Final view– Site test Berlim, Germany
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
2010-2012
Comercial and technical project development
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Network control and management Energy Management and SCADA SystemEnergy Management and SCADA System
Communication LayerCommunication Layer
ForecastForecast DispatchDispatch
Data LoggingData Logging HMIHMI
Consumers
AlarmingAlarming
OptimizationOptimization
InterfaceInterfaceInterfaceInterfaceInterfaceInterface
Battery
Power Plant
Battery
Power Plant
μs/Seconds • Compensation fluctuations of renewable energy • Control of the voltage and frequency • Power supply short-circuit
Minutes /Hours • Standard features of SCADA • Demand optimization production and
storage units • Control integration and
communication between producers of renewable energy systems and conventional power
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Wind measures– Graciosa Island, Azores
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Technical Demonstration– Site test Berlim, Germany
Project Layout
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Preliminary project
2.5 MW
5.4 MW
0.5 MW
4.6 MW
2.2 MW System adapted to cover 70% of electricity consumption in 2014
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Wind Farm preliminary localization
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Wind Farm preliminary localization
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
PV preliminary localization(s)
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
PV layout example
Source: Solon SE
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Battery (schematic) En
erg
y b
alan
ce
Short time max. charging
Long time max. discharging
Continue discharge
Network stability Production > Demand :Charging Production < Demand :Discharge
Mean Wind Power
Mean Consumption
Actual Wind Power
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Batteries type evaluation being held in Berlin and negotiation with suppliers
Sodium sulfide (NaS) High energy capacity
Lithium High capacity power delivery
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Batteries type evaluation
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Batteries type evaluation
The battery station on Graciosa will have to serve both tasks: • Shift energy from one point in time to another • Compensate short term fluctuations. Therefore Younicos is currently evaluating: Based on the price and performance parameters submitted by both suppliers – if either high power or high energy or a combination of both is the most suitable.
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Batteries type evaluation
The choice of battery has a feedback effect on the required size of renewable energy plants to achieve the same energy yield, the overall system layout will have to be decided as a whole
• High Energy 17.2 MWh Nas
• High Power 4 MWh Li + strongly increased renewable capacity (~25%)
• Hybrid Battery 8.6 MWh NaS + 1.4 MWh Li + slightly increased renewable capacity
• (10-15%)
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Battery location study
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
15kV Power Line
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Linking the new hybrid system and infrastructure
Meter
(kWh)
Island Demand
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Actual contractual relationship
Production
Distribution and Sales
regulatory authority
Demand
15% Clean Energy
85% Diesel
100
%
En
erg
y
Agreement tariff € / kWh
Regulated fare €/kWh
EEG
Windfarm 2 x 300 kW 2 x 100 kW
Refund
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
New contractual relationship
Production
Distribution and Sales
regulatory authority
Demand
70% Clean Energy
35% Diesel
100
%
En
erg
y
Agreement tariff € / kWh
Regulated Tarif
€/kWh
New company (Graciolica)
• Windfarm • PV • Battery • System
Management
Refund
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Stakeholders & Contractors
Graciolica (Investiment ~25 M€) Company responsible for the project
/ Energy Supply
Promoter
Subsidies for ivestment
Windfarm
TBD Solar Company
PV
Battery
Battery
Power Manegement
Suppliers
Maintenance
contrats
Turnkey contract
Investors Bank and private
investors
Regulatory Authority
Demand
Refund
100
%
En
erg
y
Regulated Tarif €/kWh
70% Clean Energy
Ad. Contract
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Project Objective and Impacts in the Azores
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Hybrid renewable energy system at real scale
• Construction of a full-scale photovoltaic park, wind farm and battery center in order to provide maximum penetration of electricity from renewable sources
Objectives Possible impacts
• Visual impact
• Road noise and disturbances during construction
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Model for the world
• Creating a unique model worldwide in terms of solutions for energy sustainability
Objectives Possible impacts
• Increased visits to Graciosa with a scientific character
• Platform for future research activities (eg mobility, smart grid, energy use surplus ...)
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Savings in terms of fossil fuels
• Savings> 2,000,000 l of diesel per year
Objectives Possible impacts
• Diesel Power Station emissions reducing
• Stabilization and reduction of electricity costs in the long term
• Increased energy autonomy of Graciosa Island
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Local valuing
• Increase the value and potential of the Azores
Objectives Possible impacts
• Paying taxes by the company (60,000 € -250,000 annually)
• Jobs
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Schedule
ERSE approval final layout Financing Detail planning Construction Commission
2012
2013
2014
GRUPO EDA
SUSTAINABLE ENERGY IN AZORES ISLANDS, GRACIOSA ISLAND - WIND-SOLAR-DIESEL SYSTEM
Recommended