    Jamalpur

    Mymensingh

    Tangail

    Fulbaria

    Cantonment(Dhalapara)

    Muktagacha

    Nandina

    Muktagacha/Fulbaria

    Modhup

    ur

    Muktagacha

    Nandina FulbariaNandina

    Fulbaria

    AchimPatuli

    Bakta

    Balian

    Bhabanipur

    Deokhola

    Enayetpur

    Fulbaria

    Kaladaha

    Kushmail

    Naogaon

    Putijana

    Radhakanai

    Rangamatia

    Pourasabha

    Akua

    Ashtadhar

    Bhabkhali

    Dapunia

    Ghagra

    Khagdahar

    Kushtia

    Pourasabha

    Baragram

    Basati

    Daogaon

    Dulla

    GhogaKashimpur

    Kheruajani

    KumarghataMankon

    Tarati

    Arjuna

    Birhati

    Falda

    Gabsara

    Gobindasi

    Nikrail

    Birtara

    Dhanbari

    Dhopakhali

    Paiska

    Musuddi

    Anehola

    Deulabari

    DeoparaDhalaPara

    DigalkandiDigar

    GhatailJamuriaLakherPara

    RasulpurSandhanpur

    PourasabhaAlamnagar

    Dhopakandi

    Hadira

    Hemnagar

    Jhaoail

    Mirzapur

    NagdaSimla

    Alokdia

    Arankhola

    Ausnara

    Golabari

    Madhupur

    Fulbaria

    Muktagachha

    Bhuapur

    Dhanbari

    Ghatail

    Gopalpur

    Madhupur

    JamalpurPBS

    SherpurPBS

    MymensinghPBS-3

    MymensinghPBS-2

    TangailPBS

    SirajganjPBS-2

    BograPBS-2

    20 MVA

    20 MVA

    20 MVA

    20 MVA

    20 MVA10 MVA

    10 MVA10 MVA10 MVA

    10 MVA10 MVA

    10 MVA

    20 MVA15 MVA

    10 MVA

    10 MVA 20 MVA

    15 MVA 10 MVA10 MVA 20 MVA

    Ghatail-6

    Fulbaria-4

    Mymensingh-3

    Ghatail-5(Hamidpur)

    Ghatail-4(Deopara)

    Ghatail-2(Dhalapara)

    Ghatail-3(Sagardigi)BhuapurGhatail-1

    Fulbari-2Gopalpur

    Madhupur

    Fulbaria-3(Soaitpur)Fulbaria-1

    Dhanbari(Hazrabari)

    RamchandrapurMymensingh-1

    (Dapunia)

    Muktagacha-1Muktagacha-2Muktagacha-4

    (Chandimondop)

    Mymensingh-2(Khamarbazar)

    90°20'0"E

    90°20'0"E

    90°10'0"E

    90°10'0"E

    90°0'0"E

    90°0'0"E

    89°50'0"E

    89°50'0"E

    25°0'0"

    N 25°0'0"

    N

    24°50'0

    "N 24°50'0

    "N

    24°40'0

    "N 24°40'0

    "N

    24°30'0

    "N 24°30'0

    "N

    24°20'0

    "N 24°20'0

    "N

    ®1:300,000Scale

    Mymens

    ing PB

    S-1

    INDEX MAP

    B A Y O F B E N G L E

    5 0 5 10 152.5KM KM

    Authorized Signature

    Asst. GIS SpecialistGIS DirectorateBangladesh Rural Electrification BoardDhaka, Bangladesh.

    DirectorGIS DirectorateBangladesh Rural Electrification BoardDhaka, Bangladesh.

    Projection SystemProjection SystemDatumUTM ZoneLinear Unit

    ::::

    Universal Transverse Mercator (UTM)WGS 198446Meter

    INDEXå PBS HQ°000 PBS Grid°0 Existing 33/11 KV S/S°.0 Under Construction 33/11 KV S/S°. Proposed 33/11 KV S/S

    " River Crossing Tower [UREDS]Proposed 33/11 KV S/S [UREDS])°.

    ®C Proposed Switching Station [UREDS]

    International BoundaryPBS BoundaryNational HighwayRegional HighwayUpazila BoundaryUnion Boundary

    33 KV Line

    River/CanalPrepared by:GIS DirectorateBangladesh Rural Electrification Board (BREB)Dhaka, Bangladesh.

    Under UREDS ProjectsMAP OF 33 KV SOURCE LINE OF MYMENSINGH PBS-1

    Existing 33/11 KV S/S 09 (Nos.)Proposed 33/11 KV S/S 10 (Nos.)Proposed 33/11 KV S/S [UREDS] 02 (Nos.)Proposed Switching Station [UREDS] 01 (Nos.)Total Length of 33 KV L ine 153.4 Km.

    33 KV Network In formation of Mymensing PBS-1

Recommended