View
3
Download
0
Category
Preview:
Citation preview
bsc ScrumBoardSAP® Focused Build Edition
Sprint Name
The sprint information is from PPM. Changing
sprint status has to be done in PPM
Icons showing the sprint status
Backlog
The backlog show the Work Items of a sprint
without a sprint assignment
Sprint Planning View
Sprint Planning View
Work Item Ranking is reflected by the display sequence (highest rank on top). Ranking can
be changed by drag and drop to different position.
Development Team selector
Sprint Planning View
Only Work Items are shown in the Planning View.
Sprint assignment can be changed by drag and drop to a different sprint section.
The blue circles show the story points of the
Work Item
The grey circles show the initials of the
assigned developer
Board View
Development Team selectorSprint selector
Icon indicates sprint statusSet filter to display only My Issues
Work Package the Work Item belongs to
Work Items
Colored corner indicates if it is a general change (without transport) or a normal
change (with transport)
Story Point aggregated on Work Package Level
Board View
Work Item status columns
Status change can be done by drag and drop to status column
Story Point BarShowing story points aggregated on
sprint level
Board View
When dragging a Work Item color indicators show on which status it is allow to drop it
Board View
Link opens Work Package details
Link opens Work Item details
Work Item Details
Link opens Work Item UI5 App
Create Work Item comments which are also shown in the Work Item
UI5 App
Create simple checklists for the work items
Monitor View
bsc solutions GmbH & Co. KGIndustriestr. 50 b69190 WalldorfGermany
Tel: +49 (0) 6227 384 85 0Fax: +49 (0) 6227 384 85 101
info@bsc-solutions.comwww.bsc-solutions.com
Special Offer 2018for SAP® Focused Build Customers
Enterprise License
6 month free of charge
Please contact:scrum@bsc-solutions.com
www.scrum-in-sap.com
Recommended