Safety Officier Planning & quantity Survey Quality Assurance Eng. Accounting & Cost control...

Preview:

Citation preview

Safety Officier

Planning & quantity Survey

Quality Assurance Eng.Accounting & Cost control

Building erection

Mechanical equipment

Reheating furnacePiping and aux. Systems

HV / LV power distribution & Automation system

Mechanical

Electrical

Piping

Director, Projects

Sales Manager

Export Finance & L/C Manager

Legal Dept. Manager

Procurement Manager

Quality Manager

Client Project Manager & Project Management Staff

P.M. DMH

P.E. Rolling process

P.E. Mech. Equipment eng.P.E. Hydraulics Lubrication

P.E. Piping Utilities

P.E. Instrumentation

P.M. DCC

P.E. Combustion processP.E. L.V. Distribution

P.E. Automation

P.M. DE

P.C. WTP process

P.E. Civil & structural des.

P.E. Interconnecting pipingP.E. InstrumentationP.E. HVAC

P.E. Firefighting system

P.E. Compressed air system

P.C. Workshop laboratory eq.

P.C. Cranes

P.M. DA

Process CoordinatorP.E. Substation, HV - LV power distrib.P.E. Interconnecting cablingP.C. Automation system level 1

P.C. Automation system level 2

P.M. DCM

P.E. Meltshop process

P.E. Mech. Equipment engin.

P.E. Hydraulics lubrication

P.E. Piping utilitiesP.E. Instrumentation

Site Technical Office Field Engineers

Civil and infrastructure construction Supervisor

Erection Supervisors

Startup and commissioning Team

Material Man

Client Site manager & Staff

P.C. Spare parts

P.C. Packing & Shipping

P.C. Training

P.C. Operation, maintenance & safety manuals

P.C. Expediting / testing (E LE) P.C. Quality Control

P.C. Manufacturing & expediting

P.C. Procurement cc

Danieli Construction & Commissioning (UMAC)P.M. Construct Erection & Commiss.

Site Manager

Deputy Site Manager

Danieli Engineering (DE) Project Manager

Project Planning & Control

Contract Administr.

Automation

Aux. Systems

Turn-key project Key-Personnel Organisation chart

SCHEDULE (LEV. III)

WORK BREAKDOWN

PRICE BREAKDOWN

JOB POSITION (TPC/JET)

INSPECTION TEST SCHEDULE (ITS)

CASH FLOW

(PART 2) (PART 3)

RESPONSIBILITY

CONTRACT & FINANCING TOOLS REQUIREMENTS

MASTER PLANT LIST

TECHNICAL SPECIFICATIONCONTRACT SCHEDULE PAYMENT METHOD/FORMALITIES

PICS (PROJECT INTEGRATED CONTROL SYSTEM)

General Management Flow Chart (part 1)

OUTSIDE (E/LE) INSIDE (I)

(PART 3)

ENGINEERING (DOCUMENT MANAGEMENT SYSTEM - DMS)

TECHN. DOCUMENTS

JOB POSITION (TPC / JET) from part 1

MATERIAL REQUIR.

PROCUREMENT

PURCHASE & ORDERS

MANUFACTURING

General management Flow Chart (part 2)

INSPECTION & TESTING (NOI/IRE/LOC/QCTM)

OUTSIDE (E) INSIDE (I/LE)

INSPECTION TEST SCHEDULE (ITS)

(FROM PART 1)

CERTIFICATIONS (IRE)

SHIPPING & INVOICING

CERTIFICATION (IRP)

PACKING LIST

INSPECTION PLANNING

NOTICE OF SURVEILLANCE (NOS)

PACKING

COMMISSIONING

JOB POSITION (TPC/JET) (FROM PART 1)

RELEASE CERTIFICATE (RC)

PRICE BREAKDOWN (FROM PART 1)

MANUFACTURING (FROM PART 2)

INSPECTION PLANNING

NOTICE OF INSPECTION (NOI)

CONSTRUCTION & ERECTION WORKS SITE PROGRESS MANAGEMENT (SPM)

General management Flow Chart (part 3)

Master Plant List (esempio)

Estratto Livello 3: Plant Unit 31 (Typical)

Programmazione di Livello 3 (Typical)

Programmazione di Livello 4 (Typical)

Cut-off date: Progress (Typical)

planned progress

0

10

20

30

40

50

60

70

80

90

100

2002 2003 20042001

%

N D J MF A M J J A S O N D J MF A M J J A S O N D J MF A

Valide per tutte le discipline e attività

Curve pianificate di avanzamento (typical)

Recommended