A L L P U R P O S E V I N Y L S T O R A G E S H E D S
A Product of USPUS POLYMERS INCUSP
Instructions for AssemblySize 10 Ft x 8 Ft / 3.2 Mtr. x 2.4 Mtr. (Approx.)
Foundation KitTM
TOOLS YOU WILL NEED• Cordless Drill - Philips Head
PART 1 10 Ft x 8 Ft FoundationAssembly Instruction
PART 2 10 Ft x 8 Ft Foundation With One Extension Assembly Instruction
Ver: 2.0
Note : Follow Part 1 only for 10 Ft x 8 Ft Foundation Assembly
Note : Follow Part 2 only for 10 Ft x 8 Ft Foundation with Additional Extensions Assembly
1
PART 1 : 10 Ft x 8 Ft Foundation Assembly
Make sure while assembling, the channel position should be as shown.
Note
Channel Position
Parts List
CODE QTYF01A 2F02A 2F03 4F04A 6F05A 6F06A 12S1 112
Note: Check all parts prior to installation.
F01A
1
Over lapping
3
F02A
F04A
F05A
S1
FRONT SIDE
S1
F01A
F02A
F01A
F02A
F04A
F04A
F05A
F05A
S1
Make 2 Sets
2
Make 6 Sets
2
Make sure while assembling, the channel position should be as shown.
Note
4
5
6
F03
F03
F03
F03
F04A
F05A
F04A
F05A
F04A
F05A
F04A
F05A
FRONT SIDE
FRONT SIDE
FRONT SIDE
F06A
F06A
F06A
F06A
F06A
F06A
F06A
F06A
F06A
F06A
F06A
F06A
S1
S1
S1
3
8a. After completing the assembly of shed place exterior grade CDX 3/4 Inch (19mm) plywood inside the foundation. See fig.
The Plywood should be placed after completing the Wall Assembly.
Note The Base ‘U’ Channels are only in the Shed Box 2 of 2, not along with the Foundation.
7
8
Note
OR 8b. After completing the assembly of the base U-channel fill the concrete upto the foundation top surface.
2333mm
1220mm
1220mm683mm
F01A
F02A
F02A
F04A
F04A
F05A
F05A
S1
B1RA
B1LAB21
B22
B21
B22
B3RA
B3LA
FRONT SIDE
FRONT SIDE
FRONT SIDE
F01A
4
PART 2 : 10 Ft x 8 Ft Foundation With One Extension Assembly
Parts List
CODE QTY
F06A 3F07 6F03H 2F08 4S1 32
Note: Check all parts prior to installation.
1
F01A
F02A
S1
F04A
F05A
F07
S1
Over lapping
For each extension add one channel (F07).
Note
Make sure while assembling, the channel position should be as shown.
Note
Channel Position
3
F07
F07
F04A
F04A
F05A
F05A F02A
F01A
F02A
F01A
S1
2
Make 2 Sets
Make 6 Sets
FRONT SIDE
5
4
5
6
Make sure while assembling, the channel position should be as shown.
Note
F03
F03
F03
F03
S1
F07
F04A
F05A
F07
F04A
F05A
F07
F04A
F05A
F07
F04A
F05A
F06A
F06A
S1
S1
F06A
F06A
F06A
F06A
F06A
F06A
F06A
F06A
F06A
F06A
F06A
F06A
F06A
FRONT SIDE
FRONT SIDE
FRONT SIDE
6
S1
F08
F03H
S1
F03HF08
Note The Base ‘U’ Channels are only in the Shed Box 2 of 2, not along with the Foundation.
7
8
For each extension add two (F03H) channel.
Note
FRONT SIDE
F07
F07
F04A
F04A
F05A
F05AF02A
F01A
F02A
F01A
S1
B1RA
B1LAB21
B22
B21
B22
B3RA
B3LA
EXTR
EXTL
FRONT SIDE
F03H
F03H
F08
F08
F08
F08
7
9a. After completing the assembly of shed place exterior grade CDX 3/4 Inch (19mm) plywood inside the foundation. See fig.
OR 9b. After completing the assembly of the base U-channel fill the concrete upto the foundation top surface.
2204mm
1220mm
1220mm
683mm
FRONT SIDE
Note The Plywood should be placed after completing the Wall Assembly.
9
FRONT SIDE
919mm
1903mm
8
Plywood Sizes For Each ExtensionMake sure while assembling, the channel position should be as shown.
Note
10 x 8 with 3 Extension - 10 x 15
1865mm
Channel Position
2238mm
602mm
2440mm
683mm1220mm
1220mm
Channel Position
2055mm1220mm
1865mm
1220mm
683mm
FRONT SIDE
FRONT SIDE
1 10 x 8 with 2 Extension - 10 x 13
2
9
10 x 8 with 4 Extension - 10 x 18
10 x 8 with 5 Extension - 10 x 21
Channel Position
Channel Position
2238mm
1220mm
1865mm
1392mm
1865mm
2238mm
2182mm1220mm
1220mm
683mm
627mm765mm
1220mm
683mm
FRONT SIDE
FRONT SIDE
3
4
10 x 8 with 6 Extension - 10 x 23
10 x 8 with 7 Extension - 10 x 26
Channel Position
2238mm
2440mm
1865mm
2345mm
627mm
683mm
FRONT SIDE
Channel Position
1865mm
2238mm
2345mm
1220mm1417mm
1220mm
683mm
815mm
602mm
FRONT SIDE
10
5
6
11
10 x 8 with 8 Extension - 10 x 28
10 x 8 with 9 Extension - 10 x 31
Channel Position
2345mm
1220mm
1865mm
2238mm
2207mm
1220mm
683mm
FRONT SIDE
Channel Position
1865mm
2238mm
2345mm
2440mm 2395mm
683mm
602mm
FRONT SIDE
7
8
Recommended