  • REVISED PERT-CPM DIAGRAM

    BAR CHART

    S-CURVE

    1

    1

    N

    LFES

    L E G E N D:

    CRITICAL PATH

    ACTIVITY

    DUMMY

    EVENT NO. - N

    EARLY START - ES

    LATE FINISH - LF

    REVISED PERT/CPM TIME-SCALED NETWORK DIAGRAM

    REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - MARCOS BRIDGE (BO1752LZ) ALONG MARCOS HIGHWAY, MARIKINA CITY

    (DUE TO VARIATION ORDER NO. 2)

    REPUBLIC OF THE PHILIPPINES

    NATIONAL CAPITAL REGION

    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

    2ND STREET, PORT AREA MANILA

    CONSTRUCTION DIVISION

    PROJECT AND LOCATION:

    REHABILITATION/MAJOR REPAIR OF PERMANENT

    BRIDGES - MARCOS BRIDGE (BO1752LZ) ALONG

    MARCOS HIGHWAY, MARIKINA CITY

    SHEET CONTENTS:PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED:

    SHEET No.:

    CEFERINO A. LONDINA

    AUTHORIZED MANAGING OFFICER

    EDGARDO S. RAMOS

    ENGINEER III

    PROJECT ENGINEER III

    EDWIN M. LUZON

    CHIEF, CONSTRUCTION DIVISION

    ADOR G. CANLAS, CESO IV

    REGIONAL DIRECTOR

    SUBMITTED BY:

    JUBY B. CORDON

    ASSISTANT REGIONAL DIRECTOR

    1

    1 1

    S

    0 0

    2

    33 33

    1

    1 1

    3

    48 48

    5

    94 94

    4

    64 94

    6

    199199

    7

    215215

    8

    230230

    9

    245245

    10

    276276

    13

    337337

    11

    306337

    12

    306337

    14

    368368

    15

    390390