RESOURCES WATER 2017 Business Plan...WATER RESOURCES 2017 Business Plan Tuesday, August 30, 2016 ......

Preview:

Citation preview

WATER RESOURCES 2017 Business Plan

Tuesday, August 30, 2016

Mission and Vision

To Provide Superior Water Service at an Excellent Value

To be widely recognized as a leader in the water industry

Value of Water

Public Health

Quality of Life

Economic Development

Protect the Environment

Public Health

Moving Toward Sustainability: Water Utility Roadmap

Providing Fundamental

Services

Optimizing Operations

and Services

Transforming Operations and Services for the

Future

Utility of the Future

Continuous improvement through personal commitment, innovation, efficiency, and education

DWR Services

Staff of

550

Serving over

918,132 residents

with a

Agenda

Financials

Core Services and Service Levels

Workforce Development

Financials: Revenues

W&S Revenue $ 328.9 Million

Stormwater Revenue $ 31.67 Million

97%

3%

W&S Service FeesOther

99%

<1%

Stormwater FeesOther

Transfer to R&E

$22.6M

Operations Expense

$8.1M

Debt Service $361K

Transfer toR&E (Capital)OperationsExpenseDebt Service

Financials: Stormwater

Stormwater Budget

Total Stormwater 2017 Budget: $31 Million

Operations Expense $129M

Transfer to R&E

$128M

Debt Service $94M

OperationsExpenseTransfer to R&E(Capital)Debt Service

Water and Sewer Budget

Financials: Water and Sewer

Total Water and Sewer 2017 Budget: $351 Million

Financials: Operations Expenses

$43.3M

$14.4M $21M $15.7M

$9.6M

$24.9M

2017 Water and Sewer Operations Expenses

Personnel ServicesUtilitiesProfessional ServicesRepair and Maint.ChemicalsOther

Financials: Water and Sewer Debt Service

$-

$20

$40

$60

$80

$100

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Mill

ions

$16M

$40M

Financials: Water and Sewer Capital Program

$115 $120 $125 $130 $135 $140 $145 $150

2017 2018 2019 2020 2021 2022

Mill

ions

Services: Water Production and Reclamation

Water Production

Produce safe drinking water

At the right pressure and quantity

In 2015, water production plants produced 25 billion gallons of safe drinking water

Water Reclamation

Reclaim wastewater (and other products)

Return high-quality water back to Lake Lanier; Chattahoochee and Yellow Rivers

In 2015 19.6 billion gallons of wastewater was reclaimed

G AL Keep Equipment Operational

Permits require maintained

facilities

Water Production and Reclamation

Prevent Equipment Failure • Number of reported failures per year

Quickly Repair Equipment • Number of backlog work orders

Keep Equipment Operational

Water Production and Reclamation

G AL

Prevent Equipment Failure

• Improved preventive and predictive maintenance programs

• Staff trained on predictive maintenance • Failures reduced by 30% since 2013

Keep Equipment Operational

Water Production and Reclamation

G AL

Water Production and Reclamation

Quickly Repair Equipment • 1,317 backlog work orders identified at

F. Wayne Hill • Backlog due to procurement

difficulties • 60 Annual contracts • Backlog reduced from 1,317 to 115 • Consultant annual cost of $2.58 million

Keep Equipment Operational G AL

New Contract Management Group • 1 Contract Section Manager • 1 Construction Manager II • 2 Contract Inspector Associate II • 1 Warehouse Tech III

Decision Package

Water Production and Reclamation

Services: Water Distribution and Collection

Water Distribution

Deliver safe water to our customers Keep the

water in the 3,770 miles

of pipes

Ensure 43,000 fire hydrants

work

Ensure 255,000 water

meters are accurate

Water Distribution

Keep the water in the 3,770

miles of pipes

Ensure 255,000 water

meters are accurate

Number of Pipe Leaks per

100 miles a year

Number of meters tested or replaced

0

50

100

150

200

250

12:0

0:00

PM

5:00

:00

PM

10:0

0:00

PM

3:00

:00

AM

8:00

:00

AM

1:00

:00

PM

6:00

:00

PM

11:0

0:00

PM

4:00

:00

AM

9:00

:00

AM

2:00

:00

PM

7:00

:00

PM

12:0

0:00

AM

5:00

:00

AM

10:0

0:00

AM

3:00

:00

PM

8:00

:00

PM

1:00

:00

AM

6:00

:00

AM

11:0

0:00

AM

4:00

:00

PM

9:00

:00

PM

2:00

:00

AM

7:00

:00

AM

12:0

0:00

PM

5:00

:00

PM

10:0

0:00

PM

3:00

:00

AM

8:00

:00

AM

1:00

:00

PM

6:00

:00

PM

11:0

0:00

PM

4:00

:00

AM

9:00

:00

AM

2:00

:00

PM

7:00

:00

PM

12:0

0:00

AM

5:00

:00

AM

10:0

0:00

AM

3:00

:00

PM

8:00

:00

PM

1:00

:00

AM

6:00

:00

AM

11:0

0:00

AM

4:00

:00

PM

9:00

:00

PM

2:00

:00

AM

7:00

:00

AM

12:0

0:00

PM

South Pressure Zone Isolation

Previous Pressure Current Pressure with Working PRV's

Before After

Water Distribution

Began a Pressure Management Program in 2012

Keep water in our pipes G AL

Water Distribution

Partnership between Water Production, Water Distribution, and our Technical Support Group

Water pipe leaks have decreased by 44%

• From 11.7/yr to 6.5/yr per 100 miles in 3 years

Keep water in our pipes G AL

Water Distribution

Ensure Accurate Meters

Size % of System Revenue Replaced ¾ Inch 96.7% 63% 15yr or 1M Gallons 3+ Inch 0.3% 22% When they fail 1-2 Inch 3.0% 15% No Program

Meter Distribution and Revenue

G AL

Water Distribution

Additional meter testing and replacement crew • 2 Trades Associate III

Decision Package

For testing and replacement of 1- to 2-inch meters

Wastewater Collection

Deliver wastewater to the treatment facilities

Keep the wastewater in the 3,000 miles of pipe and 220 pump stations

Wastewater Collection

Number of sanitary sewer overflows (SSOs) per 100 miles of pipe

Keep wastewater in our pipes

3000 Miles of Pipe

220 Pump Stations

Decreased from 2008–2014

From 1.4 to 0.87 per 100 miles

G AL

Wastewater Collection

Number of sanitary sewer overflows (SSOs) per 100 miles of pipe

Keep wastewater in our pipes

Increased from 2015 to 2016 due to:

Fats Oils

Grease Flushables

1.30

0.87

G AL

Wastewater Collection

• Educate residents about keeping flushables and FOG out of sewer

Corrective Measure #1

Education

Keep wastewater in our pipes G AL

Wastewater Collection

To Reduce SSOs: Educate residents about keeping flushables and FOG out of the sewer system • 1 Resource and Marketing Specialist

Decision Package

Wastewater Collection

• Flush the sewer lines before they become blocked

Corrective Measure #2

Spill Prevention

Keep wastewater in our pipes G AL

Wastewater Collection

Keep wastewater in our pipes

Now: 4 hydrojet crews flushing 230 miles of sewer yearly • (less than 8% of system, 12.5 years to flush system)

Industry Goal: flush every 5 years • (20% of entire system or 540 miles sewer each year)

Solution: SL-RAT (sewer line rapid assessment technology)

G AL

Wastewater Collection

Keep wastewater in our pipes

Targeting using a SL-RAT for reconnaissance

G AL

Wastewater Collection

To Reduce SSOs through proactive inspections and line flushing

• 4 Trades Associate III • 2 Trades Associate III to add fifth hydrojet crew

to flush lines • 2 Trades Associate III to add a second SL-RAT

crew

Decision Package

Services: Stormwater

Stormwater

Provide adequate drainage Prevent flooding

Improve water quality of streams

and lakes

Stormwater

1,427 miles of stormwater pipe

Feet of Stormwater Pipe Replaced or Lined Per Year

Provide adequate drainage

50% is galvanized corrugated metal pipe with a estimated

life of 25 years

G AL

Services: Stormwater

Improved CIP delivery processes

Improved communications with Land Acquisition Division

Increased funding from other sources

Proactive pipe inspection increases chance to line pipes

Provide adequate drainage

Feet of Stormwater Pipe Replaced or Lined

G AL

Stormwater

53,000 90,673 140,000

143-year replacement rate

Provide adequate drainage

Feet of Stormwater Pipe Replaced or Lined

53-year replacement rate

83-year replacement rate

2010 to 2014 2015 2016 Est.

G AL

Stormwater

Over 8,000 Stormwater Management ponds

50% of maintenance inspections require re-inspection

1.5 staff doing pond inspections (>once every 10 years)

Goal is once every 5 years

Improve water quality of lakes and streams and prevent flooding

Number of Stormwater Ponds Inspected

G AL

Stormwater

Increase the Number of Stormwater Management Ponds Inspected

• 1 Construction Manager II

Decision Package

Distribution, Collection, and Stormwater

2015 – over 1,800 W&S, and stormwater line repairs

515 repairs required landscape work to complete

Currently have one 3-person crew

Combined concrete, asphalt, and sod contracts

Currently at 20 days, goal is to be below 14 days

Time to complete a repair Excellent Customer Service G AL

Reduce the amount of time to complete landscaping • 1 Trades Associate III

Decision Package

Distribution, Collection, and Stormwater

Customer Care

Customer Care

245,600 water meter accounts 165,000 sewer

accounts

50,000 customer contacts monthly

236,000 bills sent out monthly

Customer Care

Increased training and customer skills development • An average of 2,300 calls per year monitored and used

to coach agents Implemented fairer, easier to understand policies

Improved the lock-off process

Option of online one-time payment added

Excellent Customer Service G AL

Customer Care

Call abandonment rate reduced from 18% to 10%

Customer wait time decreased from 5.5 min to 3.5 min

Call quality increased from 73% to 93%

1,000 customers used the one-time-pay the first month

Excellent Customer Service G AL

Field Customer Care

Field staff turn on meters and re-read meters if needed

Meter turn-ons have priority

Half of the needed re-reads are not done (500 a month)

Customer service agents must estimate bills

Customers may have water leak that will continue

Customer Satisfaction G AL

Customer Care

Increase customer satisfaction by improving bill accuracy

• 1 Trades Associate III

Decision Package

Workforce Safety

Need to Expand Safety Program

High-Voltage Electric Shock

Explosive and Toxic

Gases Hazardous

Waste

Corrosive Chemicals

Confined Space

Hazards

High-Speed Rotating

Equipment

Potential Hazards

Workforce Safety

Number of recordable incidents of injury or illness to DWR employees

• Increase safety assessments • Analyses and reporting of findings • Development of annual risk assessment • Safety training and awareness • Emergency response training

Workforce Safety

Goal: Reduce the number of recordable safety incidents • 1 Safety Officer

Decision Package

Decision Package Recap

1 Contract Section Manager 1 Construction Manager II 2 Contract Inspector Associate III 1 Warehouse Technician III 1 Safety Officer 1 Resource and Marketing Specialist

16 Total Positions

Decision Package Recap

1 Trades Associate III – meter re-read position

4 Trades Associate III – sewer inspection and cleaning

1 Trades Associate III – landscape job improvement

1 Construction Manager II – stormwater pond inspection

2 Trades Associate III – meter testing group

16 Total Positions

Decision Package Recap

16 Total Positions

Decision packages funding total: $1.3 Million

0.37% Increase in total budget if all packages are approved

Workforce Development

Workforce Development

A look at our workforce • 550 employees (7.9% vacancy rate)

• Professional, Skilled Trades, Analysts, Administrative

24/7 requirement to meet service level

Continuous improvement through personal commitment, innovation, efficiency, and

education

Need for Large Diversity of Skillsets

62

Field Trade Associates

Customer Service Reps Pump

Station Mechanics

Construction Inspectors

63

Engineers

Admin Assistants

Electricians

Meter Repair Technicians

Need for Large Diversity of Skillsets

64

Maintenance Techs

Leak Detectors

Lab Techs

GIS Techs

Need for Large Diversity of Skillsets

Warehouse Technicians

Operators Trades Technicians

Financial Analysts

Need for Large Diversity of Skillsets

Workforce Challenges

Water Resources

Needs

45% of current workforce can retire in next 5

years

Strong Competition for highly skilled

workers

Technology constantly advancing

Goals for our Workforce

Highly Performing Staff Highly qualified and skilled

Adaptable

Collaborative

Committed

Safety Focused

G AL

Our Workforce

Managers engage with staff more through regular staff meetings and field visits Staff is exposed to best practices and new technology through visits to high-performing utilities and conferences

Hired Training Manager

Hired Safety Manager

Highly Performing Staff G AL

Our Workforce

Improved communication with staff – manager engagement

Increased training hours (22 hours to 40 hours per staff)

Promotions have increased from 37 to 101 (2011 to 2015)

Over 40 DWR subject matter experts identified

Quarterly safety audits of facilities and field crews

Highly Performing Staff G AL

Future Workforce

The Future Of Water Resources Workforce

Where is our Workforce Now?

Utility of the Future

Continuous improvement through personal commitment, innovation, efficiency, and education

Providing Fundamental

Services

Optimizing Operations and

Services

Transforming Operations and Services for the

Future

D W R

Currently here Progressing to be here

Is our Workforce Ready to Advance?

Employee online survey performed this year • 90% employee response rate • 98% are looking to gain more knowledge to increase

skills • 92% know how their job contributes to accomplishing

the mission of DWR • 81% are interested in taking on greater leadership role

and duties

Path to the Future

Hired an expert in the training field • Creating a job specific training program • Creating qualification cards for employees • Partnering with local education institutions • Expanding the co-op and intern program

Paving the way forward

Workforce Development Program

Create career paths for

employees

Advancement tied to established skills and performance

All staff receive job-specific

training

Trades Associate I

Trades Associate II

Trades Associate III

Our Future Workforce

Providing Fundamental

Services

Optimizing Operations and

Services

Transforming Operations and Services for the

Future

Workforce of the Future

This is DWR’s major focus for 2016 and 2017

Questions?

Recommended