Rapid Hydropower Assessment Model Identifying ...Rapid Hydropower Assessment Model 6 • Created to...

Preview:

Citation preview

Rapid Hydropower Assessment ModelIdentifying Hydroelectric Sites Using GISRyan Taylor, GISP Nan Dai, P.Eng

July 25, 2012

2Outline

• About Kerr Wood Leidal and BC Hydro• What is RHAM• Application of RHAM• Model Development• Storage Analysis • RHAM Online

July 25, 2012

3About Kerr Wood Leidal

• Engineering consulting company located in Vancouver, BC• Employee owned (130 full-time employees)• ESRI users since 1998 (ArcView 3.2)• Now run ArcGIS Desktop & ArcGIS Server 10.1• Over 35 staff use ArcMap weekly or daily

July 25, 2012

4About BC Hydro

• A provincial crown corporation and Canada’s third-largest electric utility headquartered in Vancouver, BC

• Reports to the BC Ministry of Energy and Mines, and is regulated by the British Columbia Utilities Commission

July 25, 2012

5About BC Hydro

• Has approximately 1.8 million customers and serves 95 per cent of B.C.’s population by delivering electricity safely and reliably at competitive rates

• Operates 31 hydroelectric facilities and three natural gas-fired thermal generating plants totaling 12,000 megawatts (MW) of installed generating capacity

July 25, 2012

6Rapid Hydropower Assessment Model

• Created to identify new clean energy sources• Determines potential for small hydro projects• Works anywhere in the world (where data is available)• 2008 Consulting Engineers of BC Award of Merit• 2009 GeoTec Conference & Exhibition Map Gallery Competition

Winner

July 25, 2012

7Typical Small Hydro Project

Powerhouse

Penstock

Intake Weir

July 25, 2012

8Application of RHAM

• RHAM projects to date:• British Columbia

• Yukon

• Mexico

• Southeast Asia

• Can be used on large areas (e.g. BC) or small scale (watershed-level)

July 25, 2012

9RHAM Operations

Hydro Assessment•Calculates in‐stream power

Optimization•Identifies “best” locations

Cost Estimate•Determine capital and operating costs

Economic Analysis•Estimate annual production and cost of energy

July 25, 2012

10Stream Power

Power = γw Q H η– γw unit weight of water– Q (flow) from regional hydrologic model

– H (head) from digital elevation model

– η efficiency 

Flow

Head

Power

July 25, 2012

11Optimization

How to find this…

…using this

…for the least $

July 25, 2012

12Cost Estimating

• Site-Based Costs• Intake• Penstock• Powerhouse• Electrical Generating Equipment

• Access Costs• Road• Powerline

July 25, 2012

13Cost-Distance Modelling

• Roads and Powerlines• Terrain Model to Cost Surface (DEMS, etc.)• Generate Pathways for Roads, Powerlines, etc.

$10mil

$0mil

July 25, 2012

14Model Development

2007: Created RHAM using ModelBuilder with Spatial Analyst tools

2008: Added storage analysis

2009: Converted RHAM to Python, 

performance improvements

2010: Web‐enabled output

2011: Additional 

performance enhancements

July 25, 2012

15RHAM Model History (v.1)

July 25, 2012

16RHAM Model History (v.2)

July 25, 2012

17RHAM Model History (v.3)

July 25, 2012

18RHAM Model History (v.4) (Current)

94 lines of Python code

July 25, 2012

19Storage

• Increases Dependable Capacity• Increases Energy Delivered when Needed by Customers• Increases Energy Production• Increases Flow for Aquatic Habitat• Reduces Downstream Flood Risks

July 25, 2012

20Storage Analysis in RHAM

Inputs• Use RHAM Run-of-River

Output as Input• Select Dam Heights (user

defined)

Intake11 m³/s

RHAM Run‐of‐River Output

July 25, 2012

21Storage Analysis in RHAM

Process• Dam Height• Dam Length• Max Water Elevation

40m Height540m Crest Length

Max Water 1070m Elev.

40m Height380m Crest Length

Max Water 950m Elev.

July 25, 2012

22Storage Analysis in RHAM

Output• Lake Surface Area• Lake Volume (m³)• Storage Time

103ha Flooded Area19.7million ³ Volume19.4 Days of Storage

44.1ha Flooded Area7.6million ³ Volume7.5 Days of Storage

July 25, 2012

23Potential Small Hydro in British Columbia

July 25, 2012

24RHAM Online

July 25, 2012

25Contact Information

rtaylor@kwl.ca604-293-3276

Ryan Taylor, GISPNan.Dai@BCHydro.com604-623-3966

Nan Dai, P.Eng

Recommended